PT SURYA UTAMA PUTRA, Established 2009, located in Rancaekek industrial area, Bandung, west java. Total area 8.200 m2, building area is 3.240 m2 and marketing area 300 m2.Consists of resources that are competent, expert, young, creative, innovative and always following technology developments.
About PT.Surya Utama Putra
I S O
S N I
T K D N
RAW MATERIAL
Certification
W W W. S U R Y A U T A M A P U T R A . C O M
PT SURYA UTAMA PUTRA - PRODUCT( Indonesia PV Manufacture & Applications )
• Design manufacture • Solar Panel• LED DC/AC lamp• Lithium Battery• Aplication of Solar panel, LED and
Battery • Training center• Service center
SUPPLIERFACTORY SELECTION
QUALITY CONTROL RAW MATERIAL WHEN PURCHASETRANSPORTASION METHODE
QUALITY CONTROL RAW MATERIAL AT SUP FACTORYIMPLEMENTASI ON ISOPRODUCTION PROCESS
PACKAGING AND SHIPMENTINSTALLATION
OPERASIONAL AND MAINTENANCE
EFFISIENCY IN ONE CYCLE
QUALITY = EFFISIENCY
PRODUCTION ROOM
SOLAR PVDC/ACLAMP
SOLAR PVBATTERY
PT SURYA UTAMA PUTRA - PRODUCT( Indonesia PV Manufacture & Applications )
• Training center• Service center
PT SURYA UTAMA PUTRA – OUR PRODUCT( Indonesia PV Manufacture & Applications )
Customers
PT. Perlinas Energi Utama
PT. Daya Hasil Bersama
PT. Mahakam Lembu Mulawarman
PT. Pri Yaka Karya
PT. Karya Satria Putra
PT. Maharani Citra Nusa
PT. Indo Sultra Perkasa
PT. Uniteknindo Inti Sarana
CV. Wilis Fhylosopia
PT. Global Pratama
PT. Prass
PT. Quds Rabbani
CV. Adonara Putra TEknik
CV. Surya Timor Perdana
PT. Dua Sekawan
PT. INTI
PT.SEI
PT. TML
PT. GMN
PT. Wijaya Karya Energi
KALIMANTAN
Site Tana Tidung ( SHS )Site Berau ( PATS )
( SHS )( PJU )
Site Kaltim ( SHS )( PLTS )
Site Nunukan ( PLTS )( PJU )
Site Balikpapan ( PLTS)
JAKARTA
Jakarta ( PLTS CCTV )Jakarta ( PLTS )Jakarta ( SHS )Tangerang ( PLTS )Cilandak ( PLTS )
PORTOFOLIOSURYA UTAMA PUTRA
Cianjur ( SHS )Bandung ( PJU )
Ciamis ( SHS )Cimahi ( PJU )
Tasikmalaya ( SHS )
JAWA BARAT
SUMATERA
Kepahiang, Ogan Ilir, Landak ( SHS )
Batam ( SHS – 80 Wp )( SHS – 80 Wp )
BATAM
MALUKU BARAT DAYA
Maluku Barat Daya( PLTS 200 Wp )
SULAWESI
Majene, Mamuju, Parigi Moutong, Buol dan Pahuwato
( PLTS )
PORTOFOLIO
W W W. S U R Y A U T A M A P U T R A . C O M
PORTOFOLIO
W W W. S U R Y A U T A M A P U T R A . C O M
MARKET OPPORTUNITY
Preface : INDONESIAN ARCHIPELAGO
Indonesia have 17.504 Island
TARGET OF ENERGI MIX UP TO 2025
NEW RENEWABLE ENERGY TARGET
SOLAR ENERGYCAPACITY TARGET
2025 : 6.379 MW2050 : 45.000 MW
NEW RENEWABLE ENERGY TARGET
SOLAR ENERGYCAPACITY TARGET
2025 : 6.379 MW2050 : 45.000 MW
To reach 6.5 GWpin the next 5 years, it takes 1 GWp per year
Then capital is neededAround USD 1.2 Billion on Grid / hybrid application
*Assumption 1 USD/Wp and average within 5 years
PT SURYA UTAMA PUTRA TARGET IS 10% or Around 120 Million per year*
• CENTRALIZED SOLAR POWER PLANT (Hybrid)• ESS ( ENERGY STORAGE SYSTEM )• ROOFTOP ON GRID or Hybrid• Other PV Applications including E-Motor and E-
Car supporting facility.
EXCELLENT PROGRAMS
( to achieved the target )
Warranty 5 years and extended another 5 years( including maintenance & Monitoring )
SAMPLE SIZE PROJECT
• HYBRID APPLICATION• Main ( PV + ESS ), 24 x 7
• Optional Genset• CAPACITY PV 5 MWp and ESS 15 MWh• MULTI LOCATION OUTSIDE JAVA ISLAND ( Remote Area )• WARRANTY & PERFORMANCE SYSTEM FOR 5 + 5 YEARS
( including maintenance & monitoring )• PROJECT VALUE AROUND USS 30 Million
( include design, supply, insurance, shipment, installation, commissioning, training, maintenance, spare part & engineer )
WELCOMEStrategic partner For
Technology & Investment
TOGETHER WE MAKE IT EXCELENCE
Thank you