PTO Pumps / Pre-installation check Tractor equipped with PTO shaft Cardan shaft Rovatti Pump Suction pipe Delivery pipe (and gate valve) Foot Valve (and strainer) Trolley Three-point mounting 1" 3/8 Z6 Kindly cross your availability of any single component PAM Self priming unit (optional) www.rovatti.it
Transcript
  • PTO Pumps / Pre-installation check

    Tractor equipped with PTO shaft

    Cardanshaft

    Rovatti Pump Suction pipe Delivery pipe(and gate valve)

    Foot Valve(and

    strainer)Trolley Three-point mounting

    1" 3/8Z6

    Kindly cross your availability of any single component

    PAM Self priming unit(optional)

    www.rovatti.it