    Future Technical Training Centre

    at TGBtoward Construction at Kariangau

    Proposal for Establishment of Training Facility

  • 8/13/2019 PTP Tech-TC TGB Towards Kariangau DRAFT=v20140114

    2/32

    BACKGROUND

  • 8/13/2019 PTP Tech-TC TGB Towards Kariangau DRAFT=v20140114

    3/32

    Why TGB (Tanjung Batu)?

    Anticipation of existing-inevitable constraints.

    o Implementation of non-existing on-the-job training (e.g. precision

    work, repair to cylinder heads & rebuild of major components).

    o Delivery of training in line with PTP development/improvement plan

    prioritized for Asset maintenance crews (e.g. service crew,

    mechanics, auto-electricians & welders).

    Alternative use of the existing facility for technical training purposes.

    o Optimizing PTP rebuild shop at TGB for practical training facility prior

    to construction of the new facility.

    o Provision of On-the-Job training for related tasks above.

    o Provision of maintenance/storage for precision tools, measuring

    device & special hand/power tools.

  • 8/13/2019 PTP Tech-TC TGB Towards Kariangau DRAFT=v20140114

    4/32

    Why TGB (Tanjung Batu)?

    Anticipation of existing-inevitable constraints.

    o Implementation of non-existing on-the-job training (e.g. precision

    work, repair to cylinder heads & rebuild of major components).

    o Delivery of training in line with PTP development/improvement plan

    prioritized for Asset maintenance crews (e.g. service crew,

    mechanics, auto-electricians & welders).

    Alternative use of the existing facility for technical training purposes.

    o Optimizing PTP rebuild shop at TGB for practical training facility prior

    to construction of the new facility,

    o Provision of On-the-Job training for related tasks above.

    o Provision of maintenance/storage for precision tools, measuring

    device & special hand/power tools.

  • 8/13/2019 PTP Tech-TC TGB Towards Kariangau DRAFT=v20140114

    5/32

    Objectives of Proposal

    Identification of immediate actions for full delivery of overall technicaltraining programmed for Asset Mgmt.

    Provision of main workshop drawings with as-build dimensions at TGB.

    Draft of possible-generated expenses for provision of facilitybased onpricing from the big picture only.

    Draft of building models for review from Management prior to

    preparation of detail technical drawing for construction.

  • 8/13/2019 PTP Tech-TC TGB Towards Kariangau DRAFT=v20140114

    6/32

    Objectives of Proposal

    Identification of immediate actions for full delivery of overall technicaltraining programmed for Asset Mgmt.

    Provision of main workshop drawings with as-build dimensions at TGB,

    Draft of building models for review from Management prior topreparation of detail technical drawing for construction,

    Draft of possible-generated expenses for provision of facilitybased on

    the big picture pricing only.

  • 8/13/2019 PTP Tech-TC TGB Towards Kariangau DRAFT=v20140114

    7/32

    EXISTING FACILITY

  • 8/13/2019 PTP Tech-TC TGB Towards Kariangau DRAFT=v20140114

    8/32

    Technical TrainingTemporary Facility

  • 8/13/2019 PTP Tech-TC TGB Towards Kariangau DRAFT=v20140114

    9/32

    Main Workshopwith Training Ground

    Training temporary

    facility

  • 8/13/2019 PTP Tech-TC TGB Towards Kariangau DRAFT=v20140114

    10/32

    Main Workshopwith Training Ground

    1200 x 1000cm

    ground area

  • 8/13/2019 PTP Tech-TC TGB Towards Kariangau DRAFT=v20140114

    11/32

    Main Workshop as-build Layout

    Training ground;

    1200 x 1000cm

  • 8/13/2019 PTP Tech-TC TGB Towards Kariangau DRAFT=v20140114

    12/32

    Technical TrainingTemporary Facility

    1200 x 1000cm

    ground area

    Rebuild Shop

  • 8/13/2019 PTP Tech-TC TGB Towards Kariangau DRAFT=v20140114

    13/32

    IMPLEMENTATION

  • 8/13/2019 PTP Tech-TC TGB Towards Kariangau DRAFT=v20140114

    14/32

    Project MilestoneRefurbishment

    PIC

    2013 2014

    Attendee week51 week52 week 1 week 2 week 3 week 4

    1 Brainstorming --quick study on feasibility of

    training/rebuild centre establishment at TGB.

    Asri, Greg, Salim,

    Donny, Fahry

    y y

    2 Provision of draft of drawing, project plan/proposal &

    technical training curricullum

    Heru/Syamsul,

    Fahry

    o

    3 Review/revision & approval processes of project plans. Adrian, Bobby &

    E&C

    p p

    4 Construction of training centre & refurbishment of TGBrebuild shop

    Asset Mgmt. &HCOD

    p p

    5 Purchase of training supporting equipment^ Asset Trg. &

    Procure.

    6 Finishing of comp't rebuild shop refurbishment &

    commissioning of training facility.

    E&C, Asset Trg.

    7 One-day visit & official opening of Technical training facility

    at TGB.

    Asset Mgmt. &

    HCOD

    8 Start of use^^ for 2014 --e.g. recommencing 100 hours of

    cluster/RPL type of refresher program.

    Asset Trg.

    Note:

    ^ Wish-list for purchase is only to suit training program 2014

    ^^ Program calendar 2014 --to be customized, is provided separately to take place at TGB.

    PeriodTasks

  • 8/13/2019 PTP Tech-TC TGB Towards Kariangau DRAFT=v20140114

    15/32

    Project MilestoneRefurbishment (contd)

    week 5 week 6 week 7 week 8 week 9 week 10 week 11 week 12 week 13 week 14 week 15 week 16 week 17

    1

    2

    3

    4 p p p p p p p p p

    5 p p p p p p p p p

    6 p p

    7 p

    8 p p p

    UPDATE: 24-DEC-2013Legend:

    y yes --done

    o ongoing now

    f project forecasted

    p expected programs

  • 8/13/2019 PTP Tech-TC TGB Towards Kariangau DRAFT=v20140114

    16/32

    Project MilestoneCurriculum H#1 2014

    Legend:

    y yes --done

    o ongoing now

    f project forecasted

    p expected programs

    2014

    week 17 week 18 week 19 week 20 week 21 week 22 week 23 week 24

    7 (Cont'd)

    8 Start of use^^ for 2014 --e.g. recommencing 100 hours of

    cluster/RPL type of refresher program.

    p

    9 Precision & Rebuild Work -- Cluster Training

    5-week Batch #1

    f f f f f

    10 Precision & Rebuild Work -- Cluster Training5-week Batch #2

    f f

    Note:

    ^ Wish-list for purchase is only to suit training program 2014

    ^^ Program calendar 2014 --to be customized, is provided separately to take place at TGB.

    PeriodTasks

  • 8/13/2019 PTP Tech-TC TGB Towards Kariangau DRAFT=v20140114

    17/32

    Wish ListTraining Aid

    Click to view Total unbudgeted costs

    # Description Qty. USD x100

    1 Lathe Machines; good condition 2ndhand 1 ea. 176.50

    2 Bench Drill, electric; good condition 2ndhand 1 ea. 11.87

    3 Line-boring Set; including equipment for MIG weld 1 ea. 294.15

    4 Measuring Tools (e.g. Electronic monitoring/testing measuring device,

    Inside/outside/depth micrometers, Vernier calipers, Dial gauge set, etc.)

    1 lot 58.83

    5 Precision Toolsfor reconditioning Cylinder heads & Valves mechanism 1 lot 235.30

    6 Special/common hand tools & standard fasteners (e.g. Multi-torque,

    dial/manual torque wrench, heavy-duty sockets, soft-hammer, etc.)

    1 lot 94.12

    7 Used machines, powertrain & major components; ex-rebuild 1 lot 188.25

    8 Engine/transmission, Final drive & Steering brakes Stands; fabricated 1 lot 20.00

    9 Electrical .Air-con& Hydraulic/pneumatic Simulators; new or fabricated 1 lot 105.90

    10 Mounting/dismantling device (e.g. bench vice, puller, hydraulic ramps, etc.) 1 lot 94.12

    11 Steel cabinets & Work benches; new or fabricated 1 lot 20.64

    12 Emergency (OHSE) device, Document cameras & electric whiteboard;

    new & ex-TGB

    1 lot 35.30

    Items need in place before end of H#1 2014

  • 8/13/2019 PTP Tech-TC TGB Towards Kariangau DRAFT=v20140114

    18/32

    CURRICULUM

  • 8/13/2019 PTP Tech-TC TGB Towards Kariangau DRAFT=v20140114

    19/32

    Program Outline5 weeks Cluster Training

    # Unit of Competency

    Main Point of

    Performance Criteria

    Critical Aspects

    in Assessment/Training

    1 Mounting/dismantling,

    inspection & repair; (1 of 2)*

    MEM18003C Use tools for

    precision work

    MEM18006C Repair and fit

    engineering components.

    Required Reference/Evidence;

    Engineering references --

    specifications, plans,

    drawings

    Codes and Standards

    Standard Operating

    Procedures

    Workplace documentation

    Work safety practices

    Waste minimisation

    Effective communication

    Manufacturers instructions

    for materials and equipment.

    1.1 Maintenance and

    precision fitting you

    have carried out.

    Use of tools for repair; e.g.

    a) reaming,

    b) broaching,

    c) scrapping,

    d) re-threading, or

    e) any other form of precision

    fitting tasks.

    1.2 Component-based

    repairs have you

    performed & how to

    complete the task

    Demonstration of MEM18055B

    with advancement;

    a) stripping and assessing of

    damage,

    b) repairs, re/manufacturing ofparts, material selection,

    c) calculations performed and

    tools used, safety aspects.

  • 8/13/2019 PTP Tech-TC TGB Towards Kariangau DRAFT=v20140114

    20/32

    Program Outline5 weeks Cluster (contd)

    # Unit of Competency Main Point of

    Performance Criteria

    Critical Aspects

    in Assessment/Training

    2 Contd (2 of 2)

    MEM18033B Perform engine

    bottom-end overhaul,

    MEM18034B Perform top-

    end engine overhaul*

    * Note: units clustered to coverprecision work/repair in

    the engine top-end

    overhaul.

    Required Reference/Evidence;

    Specifications/job instructions

    Manufacturers manuals/

    data/catalogues

    Standard operating

    procedures

    OH&S procedures

    Calculations and numerical

    operations

    2.1 Dismantling stage of

    performing a

    bottom-end

    overhaul and how

    you have cleaned

    and assessed parts.

    Draining oil from engine

    Removing cowling and

    disconnects hoses, pipes, etc.

    Removing engine from plant

    Removes top-end

    components*

    Dismantling block/headassembly

    Assessment of parts for

    abnormal wear and defects

    Assessment of parts for reuse

    or replacement

    Selection and use of cleaning

    solution

    Setting out or racking parts

    per original location in the

    engine.

  • 8/13/2019 PTP Tech-TC TGB Towards Kariangau DRAFT=v20140114

    21/32

    Program Outline5 weeks Cluster (contd)

    # Unit of Competency Main Point of

    Performance Criteria

    Critical Aspects

    in Assessment/Training

    2.2 Measurements as

    part of an engine

    top & bottom-end

    overhaul and what

    were the

    measurements used

    for.

    Ovality of pistons and

    journals

    Straightness of block and

    crankshaft

    Flatness of block

    Taper of bores and journals

    Squareness of block Alignment of crankshaft and

    crankshaft bores

    Use of measurement to

    determine appropriate

    under/ oversize of parts and

    bearing clearance in

    reconditioning

    Identification of ridges, gaps,

    tapers, ovality and

    protrusions.

  • 8/13/2019 PTP Tech-TC TGB Towards Kariangau DRAFT=v20140114

    22/32

    Program Outline5 weeks Cluster (contd)

    # Unit of Competency Main Point of

    Performance Criteria

    Critical Aspects

    in Assessment/Training

    (contd).

    *)Assessment of abnormality

    on cylinder head

    components; e.g.

    a) Major parts for abnormal

    wear and defects; e.g.

    b) Cylinder head for cracks &warpage.

    c) Valve guides, springs &

    seats for excessive wear &

    fatigue.

    d) Injectors --if non-electrical

    controlled-- for improper

    function.

    Major parts repair, reuse or

    replacementin accordance

    with critical aspects of

    MEM18006B;

  • 8/13/2019 PTP Tech-TC TGB Towards Kariangau DRAFT=v20140114

    23/32

    Program Outline5 weeks Cluster (contd)

    # Unit of Competency Main Point of

    Performance Criteria

    Critical Aspects

    in Assessment/Training

    (contd) in accordance with

    MEM18006B;

    a) Valve springs, seats &

    inserts/ guides

    testing/measurement.

    b) Refacing valve seats; e.g.

    with cutters & reamers.

    2.3 How to recondition

    components

    Disassembling engine

    Cleaning components

    thoroughly

    Checks for wear

    Replacement of worn

    components

    Appropriate corrective action.

  • 8/13/2019 PTP Tech-TC TGB Towards Kariangau DRAFT=v20140114

    24/32

    Program Outline5 weeks Cluster (contd)

    # Unit of Competency Main Point of

    Performance Criteria

    Critical Aspects

    in Assessment/Training

    Use of tools & equipment

    correctly --tension wrench,

    dial gauge & feeler gauge

    Reconditioning components

    to factory specifications

    Determination of bearing

    clearance Re-assembling components to

    factory specification.

  • 8/13/2019 PTP Tech-TC TGB Towards Kariangau DRAFT=v20140114

    25/32

    FUTURE TRAINING FACILITY

  • 8/13/2019 PTP Tech-TC TGB Towards Kariangau DRAFT=v20140114

    26/32

    Training CentreNew Facility outside TGB

    10000 x 12000cm

    --Main Shop & TC

  • 8/13/2019 PTP Tech-TC TGB Towards Kariangau DRAFT=v20140114

    27/32

    Training CentreNew Facility outside TGB

  • 8/13/2019 PTP Tech-TC TGB Towards Kariangau DRAFT=v20140114

    28/32

    Training CentreNew Facility outside TGB

  • 8/13/2019 PTP Tech-TC TGB Towards Kariangau DRAFT=v20140114

    29/32

    Training CentreNew Facility outside TGB

  • 8/13/2019 PTP Tech-TC TGB Towards Kariangau DRAFT=v20140114

    30/32

    GENERATED COSTS

  • 8/13/2019 PTP Tech-TC TGB Towards Kariangau DRAFT=v20140114

    31/32

    Unbudgeted CostsTemporary Facility Only

    Facility Refurbishment

    USD 5,930.00

    Items from Wish-list

    USD 133,500.00

    Total unbudgetedUSD 139,430.00

    Simply click the box above to go to Training Ground Model

    Click the above to view Wish List

  • 8/13/2019 PTP Tech-TC TGB Towards Kariangau DRAFT=v20140114

    32/32

    Prepared by

    Technical Training Asset Mgmt.

    End of Presentation


Recommended