El 064 VOL. 3 Ir .1~~~~~~~~~~~~~~~~~~~~~~I WBLoan Application Project IL Environmental Management Plan OF CUIJIAYING SHIPPING AND HYDROPOWER PIVOTAL PROJECT AT THE HAN RIVER (Final Report) THE 2ND HARBOUR ENGINEERING INVESTIGATION & DESIGN INSTITUTE OF THE MINISTRY OF COMMUNICATIONS JANUARY 2005 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized
Transcript
Page 1: Public Disclosure Authorized El 064 - World Bankdocuments.worldbank.org/curated/en/720671468743763531/...Projects on International Waterways (OP/BP/GP7.50). Among these safeguards

El 064VOL. 3

Ir .1~~~~~~~~~~~~~~~~~~~~~~IWB Loan Application Project IL

Environmental Management Plan

OF

CUIJIAYING SHIPPING AND HYDROPOWER PIVOTAL PROJECTAT THE HAN RIVER

(Final Report)

THE 2ND HARBOUR ENGINEERING INVESTIGATION & DESIGNINSTITUTE OF THE MINISTRY OF COMMUNICATIONS

JANUARY 2005

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Page 2: Public Disclosure Authorized El 064 - World Bankdocuments.worldbank.org/curated/en/720671468743763531/...Projects on International Waterways (OP/BP/GP7.50). Among these safeguards
Page 3: Public Disclosure Authorized El 064 - World Bankdocuments.worldbank.org/curated/en/720671468743763531/...Projects on International Waterways (OP/BP/GP7.50). Among these safeguards

TABLE OF CONTENTS

1.0 GENERAL ........................... 1

1.1 Project Overview ........................... 11.2 EIA Basis ........................... 31.3 EIA Standards 5..........................51.4 Environment Protection Objects ........................... 7

2.0 MEASURES FOR ENVIRONMENTAL PROTECTION ANDINVESTMENT ESTIMATE .. 10

2.1 Measures for Environmental Protection during Construction . 102.2 Measures for environmental protection in the stage of operation .212.3 Environmental Protection Measures for the Environmental Sensitive Zone.. 242.4 Environment Protection Investment Estimate .24

3.0 MONITORING AND MANAGEMENT PLAN OF ENVIRONMENTALPROTECTION .29

3.1 Environment Monitoring Plan .293.2 Environmental Administration .413.3 The Legal Forces for Environmental Protection Action Plan .47

4.0 ANALYSIS OF ECONOMIC LOSS AND BENEFIT OFENVIRONMENTAL IMPACTS . . 51

4.1 Analysis in Environmental Economic Benefit .514.2 Analysis of Loss of Environmental Impacts .54

Page 4: Public Disclosure Authorized El 064 - World Bankdocuments.worldbank.org/curated/en/720671468743763531/...Projects on International Waterways (OP/BP/GP7.50). Among these safeguards
Page 5: Public Disclosure Authorized El 064 - World Bankdocuments.worldbank.org/curated/en/720671468743763531/...Projects on International Waterways (OP/BP/GP7.50). Among these safeguards

1.0 GENERAL

1.1 Project Overview

1.1.1 Project Class and Standard

1. Project Class

The Cuijiaying Shipping and Hydropower Pivotal Project is a comprehensiveapplication project mainly featured as shipping one and compromises to generatehydropower with the hydropower generated to promote shipping, its normal impoundedlevel is 63.23m and its corresponding reservoir volume is 285 million m3 , and its

installed capacity is 96MW. The total capacity of the reservoir is 10'1. 08m3, thisproject is decided as Class II with Large (2) type scale. The installed capacity of the

hydropower station is 50-300MW, the project class is Class III, its scale is middlescale; As for the integrated application water conservancy and hydropower pivot project,the standard specifies that the highest class will govern for the whole pivot project whenclassification figures belong to several different classes, therefore, this project isclassified as Class II.

The pivot building is composed of shiplock, hydropower station, sluice gate and earthdam. According to the pivot classification standard, permanent buildings belong toClass II, secondary buildings Class III, and temporary buildings Class IV.

2. Flood standard

The main buildings of this project are designed as per one flood every 50A100 years and

checked as per one flood every 300-1000. Considering the downstream flood will belessened and the anti-flood standard of the area downstream of the Danjiangkou Damwill be upgraded after the execution of the Danjiangkou final project. At the same time,from the viewpoint of consequences of building wreckage, no serious losses will becaused. Therefore the main buildings will be designed as per one flood every 50 yearswith its corresponding flood flow of 19600 m3/s and will be checked as per one floodevery 300 years with its flood peak flow of 25380 m3/s.

1.1.2 Engineering scheme and techno-economic figures

The pivot is situated at 17km at the downstream of Xiangfan City with control drainagearea of 3.06x 104 kM2, normal impounded level of 63.23m (except indicated in thisoutlines, all the levels are of the Yellow Sea Elevation System), backwater length ofabout 39.8km up to Xinji, and it is composed of water release gate, dam, shiplock andpowerhouse. The general layout of the dam is shown in Fig. 1.

1. Water release gate

It is of RC lock-and-dam structure, designed as per Class II hydraulic structure, with

I

Page 6: Public Disclosure Authorized El 064 - World Bankdocuments.worldbank.org/curated/en/720671468743763531/...Projects on International Waterways (OP/BP/GP7.50). Among these safeguards
Page 7: Public Disclosure Authorized El 064 - World Bankdocuments.worldbank.org/curated/en/720671468743763531/...Projects on International Waterways (OP/BP/GP7.50). Among these safeguards

e ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~~~~_ t I gt t U,6 &

_________hK2 130624 MW 96

$$F $@ i0e ~10 487 nm 5.st Z$$f£i m'/6 1470 6

_________ mI/ s 25380 p=O. 33% 33g0 42 ia| _ id6;t13 8CiI Im/S 19600 p 2X T V l/ 2 330 42

IV 'm 64.22 p0.333% %iUEL MW 36.3it_____C/ __ mn 63.23 p--2% 4 tt _ _ 1 _V/h 4.39

_E__i____t m 63.23 $%'J'fl h 45697*Clt E*fcI m 62.73 M t- ____

81 10M5 35 86 * m 167 X21. 6 -X

IS 8 l9TI' 10ionm' 2.65 it4 r-Ai t.' lot/ 675pvxv 10%M 0 43 m itfl4l I 9.0

m T9.7 mkfy In 66.00 _ _ j Cj 2 t i#C lbTfaa m 48.53 0131;M Rt m 180X 23X3.

9 7 #CFd2, *k2.+Lt t9 28 icy, M1:RIYA4 I 63.23I il 2K1nhl ctlt m 1 6 i# ffiLki_t_ i * 4 m 62.73WM 1m s 61 9 T_____ah_ m 62 469m4t ID -; R.ttthi m-S 02.7 ______ m 64.5 _

In 13460 ___

Figurel~~~~~~~~ Th genra layout; of6 th a (hrcomnedcee

X f i t 1 . x t L T 3 g ; . r Iti ! ,- t | t s X , ^ T s {j .- , ,'--1 t , : -,,~~~3 . 1 '

= == = 1 2.rPFt21RittZJLORf

cP Ylg | 1~~~4 == 9i i 1 r9tF#.;K &t

_n I~~~~~I

Figure 1 The general layout of the dam (the recommended scheme )

Page 8: Public Disclosure Authorized El 064 - World Bankdocuments.worldbank.org/curated/en/720671468743763531/...Projects on International Waterways (OP/BP/GP7.50). Among these safeguards

gate top elevation of 66m, design flood discharge capacity of 19600m3 /s and total gatelength of 543.2m.

2. Dam

It is of clay inclined wall grit shell structure, with the dam top elevation just the same asthat of water release gate, top width of 6.5m (communication requirements have beenconsidered) and total dam length of 1324m.

3. Shiplock

Its hydraulic structure is of dock structure with lock chamber's effective dimension of180X23 X3.5m and the design annual maximum trafficability of 1425.6x104 t.

4. Powerhouse

Its installed capacity is 96MW (5 power generating units) and two circuits of 11 OkV HVlines are connected with the Xiangfan city power network.

The main characteristics of the pivot project are shown in Table 1. 1-1.

Table 1. 1-1 The main characteristics of the pivot project

No. and description Unit Quantity Remarks

I. Hydrological data

1. Drainage area

Total drainage area km2 159000

Area over the project site km2 130624

The one in the bracket2. Average runoff over years 10 9 m3 449 (341) means the late scope after

water diversionII. Reservoir

1. Water level of reservoir Late scope of Danjiangkou

Maximum flood level m 64.22

Design flood level m 63.23

Normal water level m 63.23

Dead water level m 62.73

2. Reservoir area in normal water level km2 80.64

3. Backwater length Km 39.8

4. Capacity of reservoir

Total reservoir capacity (reservoir 9 3

capacity under maximum flood level) 10m 3.86Reservoir capacity under normal water 109m3 2.85level _ _ _ _ _ _ _

Balancing storage (from normal water lO9m3 0.45level to the dead water level)

2

Page 9: Public Disclosure Authorized El 064 - World Bankdocuments.worldbank.org/curated/en/720671468743763531/...Projects on International Waterways (OP/BP/GP7.50). Among these safeguards

5. Height of dam m 13

III. Indexes of benefits

1. Benefit of power generation

Installed capacity MW 96

Guaranteed capacity MW 36.3

Annual average power output over years 109kW * h 4.39

2. Irrigation benefit

Area l OOOOmu 177

3. Shipping benefit

Shorten the mileage of the channel Km 34.7

Tonnage t 1000

Annual freight amount planned lOOOOt/year 598.8 Year 2030

4. Main electromechanical devices

Quantity of hydraulic turbine Set 6

Unit capacity MW 16

Max. operating head m 8.08

Min. operating head m 1.5

Rated operating head m 5.5

Rated flow m3/s 330

1.2 EIA Basis

1.2.1 World Bank Requirements

The World Bank requirements include primarily the Bank's ten safeguard policies,including Operational Policies (OP), Best Procedure (BP), Good Practice (GP) andOperational Directives (OD). These safeguard policies are:

Environmental Assessment (OP/BP/GP4.0 1);Forestry (OP/GP4.36);Natural Habitats (OP/BP4.04);Safety of Dams (OP/BP4.37);Pest Management (OP4.09);Involuntary Resettlement (OP4.12);Indigenous People (OD4.20);Cultural Property (OP4. 11);Projects in Disputed Areas (OP/BP/GP7.60); andProjects on International Waterways (OP/BP/GP7.50).

Among these safeguards policies, Environmental Assessment (OP4.01) is the primary

Page 10: Public Disclosure Authorized El 064 - World Bankdocuments.worldbank.org/curated/en/720671468743763531/...Projects on International Waterways (OP/BP/GP7.50). Among these safeguards

requirements and thus will be fully applied in this report and other EA documentation.In addition, other safeguard policies will first be screened during the EA and fullyapplied if triggered by the screening. Safety of Dams (OP/BP4.37), Natural Habitats(OP/BP4.04), Pest Management (OP4.09) and Forestry (OP/GP4.36) will be applied inthis Report too. Involuntary Resettlement and Cultural Property will be applied in bytwo separate teams, but the major findings and subsequent assessment will be includedin the EA process and the EA reports.

Since there are no project components that involve international waterways, indigenouspeople (OD4.20) or disputed areas as defined under OP7.60, policies related to thesesubjects will not be applied in the EA.

1.2.2 National laws and regulations

1). Environmental Protection Law of PRC;2). Environment Impact Assessment Law of PRC;3). Land Management Law of PRC;4). Noise Pollution Prevention Law of PRC;5). Air Pollution Prevention Law of PRC;6). Water Pollution Prevention Law of PRC;7). Solid Waste Pollution Prevention Law of PRC;8). Water and Soil Conservation Law of PRC;9). Anti-flood Law of PRC;10). Rules of Environmental Protection Management for Construction Projects, issuedby the State Council of PRC, November 29, 1998;11). Notice on Enhancing Environment Impact Assessment Management Work ofConstruction Projects Financed by International Financial Organizations issued by theSEPA, the State Planning Commission, the Ministry of Finance, the People's Bank ofChina;12). Basic Farmland Protection Rules issued by the State Council of PRC;13). Measures Concerning Environmental Protection and Management forTransportation Construction Projects, issued by MOC;14). Notice on Enhancing Ecological Protection of Everglade issued by the SEPA,March 31, 1994;15). Pollution Prevention and Treatment Management Rules of Drinking Water SourceProtection Zone issued by the SEPA, the Ministry of Health, the Ministry ofConstruction, the Ministry of Water Conservancy and the Ministry of Geology andMinerals;16). Notice to Strengthen the Environmental Impact Assessment and Management ofConstruction Projects Financed by Loan from International Financial Organizations, jointlyissued by SEPA, the State Planning Commission, the Ministry of Finance and the People's Bankof China;1 7).Electromagnetic Radiation Environment Protection Management Methods issued by SEPA;18).Hubei Provincial Environment Protection Rules;19). Hubei Provincial Government General Office's Transmitting the Notice on HubeiSurface Water Environment Function Classification;20). Han River Water Pollution Prevention and Treatment Ordinances

4

Page 11: Public Disclosure Authorized El 064 - World Bankdocuments.worldbank.org/curated/en/720671468743763531/...Projects on International Waterways (OP/BP/GP7.50). Among these safeguards

1.2.3 EIA technical documents

(1). Environment Impact Assessment Technical Guide Rules (HJ/T2.1 -2.3-93);(2). Environment Impact Assessment Technical Guide Rules for Water Conservancy andHydropower Project (HJ/T88-2003) ;(3). Environment Impact Assessment Technical Guide Rules for Acoustic Environrnent(HJ/T2.4- 1995);

(4). Environment Impact Assessment Technical Guide Rules for Non-pollutionEcological Impacts (HJ/T 19-1997);(5). Environment Impact Assessment Code for Inland River Shipping ConstructionProject (JTJ227-2001);(6). Integrated Treatment Code for Water and Soil Conservation (GB/T16543.1l16543.6-1996);(7). Technical Specification for Water and Soil Conservation Plan of Construction

Project (SL204-98).

1.2.4 Project Study Document & Special Reports

(1) Feasibility Study Report of the Cuijiaying Shipping and Hydropower Pivotal Projectat the Han River;(2) Special Report of Water and Soil Conservation,

(3) Water Resource Demonstration Report;

(4) Special Report of Flood Control and River Regime Impacts;

(5) Special Report of Cultural Relics Plan.

1.2.5 Engagement Document

Engagement Letter for EA work for the Cuijiaying Shipping and Hydropower PivotalProject at the Han River by the Preparation Team of the Project Department of theCuijiaying Shipping and Hydropower Pivotal Project at the Han River

1.3 EIA Standards

As per the environment categories of the project area, the following standards will be applied inthe EIA.

1.3.1 Water environment

(1) The main functions of the Han River are drinking, shipping and irrigation. Class IIof Surface Water Quality Standard (GB3838-2002) will be based for water environmentbaseline and impact assessment for the section upstream of the Xiangfan Railway Bridge. ClassIII of Surface Water Quality Standard (GB3838-2002) will be based for water environment

5

Page 12: Public Disclosure Authorized El 064 - World Bankdocuments.worldbank.org/curated/en/720671468743763531/...Projects on International Waterways (OP/BP/GP7.50). Among these safeguards

baseline and impact assessment for the section downstream of the Xiangfan Railway Bridge.Class IV of Surface Water Quality Standard (GB3838-2002) will be based for waterenvironment baseline and impact assessment for the Tangbai River. (See Table 1.3-1).(2) Wastewater discharge will be evaluated by Class I in Integrated Wastewater discharge

Standard (GB8978-1996) (Table 1.3-2).

Table 1.3-1 Surface Water Quality Standard (GB3838-2002) Unit:

mg/L(except pH)

No Item Class II Class III Class IV

I pH 6_9 6_9 6_92 SS

3 COD 15 20 30

4 BOD 5 3 4 6

5 Dissolved 02 6 5 3

6 COD 5 3 4 57 Potassium 4 6 10

permanganate index8 Total P 0.1 0.2 0.3

9 Total N 0.5 1.0 1.5

1 0 Oils 0.05 0.05 0.5

11 Ammonian 0.5 1.0 1.5

Total coliform 2000 10000 20000

Remarks Surface Water Quality Standard (GB3838-2002)

Table 1.3-2 Integrated Wastewater discharge Standard (GB8978-96) Unit:mg/L

Item SS CODcr BOD5 I Oils | Total P AmmonianClass I 70 100 20 5 0.5 15

1.3.2 Acoustic environment

(1) With reference to the Standard of Environmental Noise of Urban Area (GB3096-93),Class III will be applied for the residential areas within the EA scope of the project: 65dB(A) atday and 55dB(A) at night.

(2) Noise Limits for Construction Site (GB12523-90) will be applied in the assessment forconstruction phase noise impacts (Table 1.3-3).

Page 13: Public Disclosure Authorized El 064 - World Bankdocuments.worldbank.org/curated/en/720671468743763531/...Projects on International Waterways (OP/BP/GP7.50). Among these safeguards

I --- -M~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

I~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

Page 14: Public Disclosure Authorized El 064 - World Bankdocuments.worldbank.org/curated/en/720671468743763531/...Projects on International Waterways (OP/BP/GP7.50). Among these safeguards

Table 1.4-1 Environment protection objects in the aspects of ambient air and

noise

Total Household Nearest distance with Relative locationpopulation quantity the dam site (m) with the dam site

Qianying Team No.5 170 42 600 NWQianying Team No.6 206 50 400 W

Shangzhou Team No.4 372 93 1600 NEZhongzhou Team 505 126 1400 E

No.3Zhongzhou Team 290 72 1400 E

N o .4 I__ _ _ I__ _ _ _ _ _I__ _ _ _ _ _ _ _ _

1.4.2 Protection objects of water environment

The Xiangfan city water intakes and industrial water intakes are protection objects ofwater environment. Details are shown in Table 1.4-2

8

Page 15: Public Disclosure Authorized El 064 - World Bankdocuments.worldbank.org/curated/en/720671468743763531/...Projects on International Waterways (OP/BP/GP7.50). Among these safeguards

Table 1.4-2 Summary of the Xiangfan city water intakes and industrial waterintakes

No. Item Capacity (1 04 t/d) Distance to the damsite (kmi)

1 Xiangfan No. 2 3.5 (domestic water) 16 (upstream)Water Plant

2 Xiangfan No. 4 7 (domestic water) 15 (upstream)Water Plant

3 Xiangfan No. 1 4.5 (domestic water) 17.5 (upstream)Water Plant

4 Xiangfan No. 3 15 (domestic water) 16.5 (upstream)Water Plant

5 Xiangfan No. 5 20.5 (domestic water) 28 (upstream)Water Plant

6 Dongfeng 7.5Industrial water 28.5 (upstream)Automobile

Company WaterPlant

7 Water intake of 4.01ndustrial water 18.5 (upstream)Xiangfan Thermal

Power Plant8 Water intake of 2.5Industrial water 18 (upstream)

Xiangfan CottonSpinning Plant

9 Water intake of 3.2Industrial water 1.5 (upstream)Zhongtian Co.

10 Water intake of 92.7Industrial water 5(downstream)Xiangfan Power

Plant

1.4.3 Natural fishes spawning bedsThe Niushou-Xiangfan 22. 5km natural fishes spawning beds need to be protected

in the inundate area.

1.4.4 Cultural relicsThe Ferry relics and Chengpo relics need to be protected in the inundate area.

The environment protection objects are shown in Fig. 2.

9

Page 16: Public Disclosure Authorized El 064 - World Bankdocuments.worldbank.org/curated/en/720671468743763531/...Projects on International Waterways (OP/BP/GP7.50). Among these safeguards

as 4* .

7

4

j - ' C 4., f as.; "'A

, :- \Cuijia'yin~Sh~pinb and~ ydi power Pi~otaIP4oJec

Figure 2 Thegeneral layot of environent protectin objects o Cuijiaying hipping and ydropower Piotal Projec

*~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~C relics :A- ,,,. Grvy r Ati_1 e

2#~~~~~~~~~~~~h Nd- uXiangfino4atePat7hoetsae)1 uKet)1.* t -- t<

r~~~~~^'t tal ')1,f,. shes pawni3# XiangfanNo IWatsPlant 4.5 (dome 22i5wat ) 17 usra , | a i

/ < s G a r i § ;g S ! eS|'r"-T' '

6# Dongeng AuomobileCompan WaterPlant 75 ( Inustrialwater) 28.5 (pstream) { ff 1. * ..ffi r-; t1 8 i9 tT-, 3 'ttj,

8# Wat~~e r intk fXaga otnSinn ln nutilwtr)1 ptem)& :.-10#~~~1 WaeitkoXagaPwrln B.PIdsrawtr (ontem) Ai; ta-- }4

4 iur 2 h eea aoto niomn rtcinojcs fCiiyn hpigadHdooe ioa rjc

Page 17: Public Disclosure Authorized El 064 - World Bankdocuments.worldbank.org/curated/en/720671468743763531/...Projects on International Waterways (OP/BP/GP7.50). Among these safeguards

2.0 MEASURES FOR ENVIRONMENTAL

PROTECTION AND INVESTMENT ESTIMATE

2.1 Measures for Environmental Protection during Construction2.1 .1 Measures for water quality protection

2.1. 1.1 Treatment measures for drainage of foundation pitIn order to reduce the influences on the water quality of Hanjiang River from the suspended matters

in the drainage of foundation pit, the discharging opening shall be arranged near the place in

Hanjiang River as much as possible where the middle thread flow speed is relatively larger, and the

standing time of the waste water in the foundation pit shall be prolonged before discharging.

According to the field data of drainage of the foundation pit in Qingjiang River Geheyan Water

Conservation Pivot, the density of the suspended matters in the waste water in the foundation pit can

meet the corresponding discharging standard after standing for 2 hours, therefore, it is suggested that

the waste water in the foundation pits of the buildings in Stage I and II be discharged after standing

for 2 hours. Furthermore, the standing time shall be prolonged properly in low flow season or when

the strength of excavating the foundation pit and pouring concrete is relatively larger, and the

neutralization agent shall be poured into it properly depending on the pH value of the waste water so

as to ensure SS reaches up to the discharge standard of 70mg/I to reduce the pollution

influences on the water quality of Han River from the drainage of the foundation pit.

2.1.1.2 Treatment measures for waste water in sandy and rock materials processingsystem

One sandy and rock materials processing system will be respectively arranged for thisproject at each bank of the site. In order to protect the water quality of Hanjiang River,the waste water discharged from the systems shall be treated before being discharged(SS shall reach up to the discharge standard of 70mg/1). In the light of the treatmentmeasures of the waste water in sandy and rock materials processing system in ThreeGorges Project, the waste water in the sandy and rock materials processing system ateach bank of the site will be mainly pre-treated in sand basin and then enter the reactionbasin and sedimentation tank for treatment. The process flow of waste water treatmentis just as following diagram:

Sand basinFactory sewage Sedimentation tank Hajiang

0 ~~~~~~~~~~~~~~~River

IF s r |Sludge drying bed Sludge

lA I

Page 18: Public Disclosure Authorized El 064 - World Bankdocuments.worldbank.org/curated/en/720671468743763531/...Projects on International Waterways (OP/BP/GP7.50). Among these safeguards

2.1.1.3 Treatment measures for domestic sewage

Since the discharge amount of domestic sewage from the construction sites inconstruction period is little and the construction sites and the management station in thelate period are at the same place, the treatment of the domestic sewage shall be takeninto account together with the treatment of the sewage in the management station inoperation period. Septic tank will be arranged in construction sites and the secondaryembedded sewage treatment station shall be arranged in the management station, in thisway, the domestic sewage from the construction sites will be discharged to thesecondary treatment station after pre-treatment in septic tank, and then it will bedischarged after meeting Grade I standard in Comprehensive Discharging Standard ofSewage through secondary treatment.

2.1.1.4 Improvement measure for oily sewage

The ship for construction and the ship coming and going shall not directly discharge theoily sewage in the construction river section of this project and it is necessary for themto install and use oil-water separator according to related specification so as to ensurethe soil density in the oily sewage from the ship is less than lOmg/L after treatment bythe separator before it is allowed to discharge.

2.1.1.5 Protection of domestic water sources

Since the domestic water for the construction area will be introduced directly fromHanjiang River, in order to protect the domestic water quality well, the discharging ofthe pollutants shall be strictly controlled. The water taken from the river shall beproperly treated and sterilized to reach up to the sanitary standard specified by the statebefore it is used as domestic water. The constructors shall be educated to form a goodsanitary habit and not drink unboiled water so as to avoid infection of diseases.

In order to protect the water quality of Hanjiang River from being influenced by theconstruction activities, any activity related to the harmful water quality shall be strictlyprohibited in construction period, for example, the activity of directly dischargingindustrial solid waste, domestic garbage, ordure, production waste drainage anddomestic sewage into the water body.

2.1.2 Prevention and improvement measures for atmospheric pollution

According to engineering analysis, the maximum influence distance of lime-soil mixingand concrete mixing and job is about 200m, the protective objective of this project is atleast 600m away from the construction sites and its influences mainly focus on thehealthy damage to the constructors.

(1) In order to reduce the healthy influences on the workers and constructors inconstruction sites from the dust, the transportation of the materials for construction shalladopt airtight mode as much as possible; the air-tightness of the machinery fortransportation shall be checked and maintained.

11

Page 19: Public Disclosure Authorized El 064 - World Bankdocuments.worldbank.org/curated/en/720671468743763531/...Projects on International Waterways (OP/BP/GP7.50). Among these safeguards

(2) The construction sites and the roads for transporting the materials for constructionshall be watered to restrain the dust; as to the watering frequency and the amount, theywill be determined depending on the weather and the road condition; the air quality ofthe surrounding environment of construction site and the roads for construction shall beprotected.

(3) In order to avoid the influences on the constructors and workers from the dust in theconstruction sit, the mixing plant shall be provided with dust collection facilities;furthermore, the management and maintenance of the devices shall be strengthened.

2.1.3 Prevention and improvement measures for noise pollution

(1) In order to reduce the damage on constructors from the noise of the devices forconstruction, the devices with high noise shall be far away from the construction sites.As to the selection of the devices for construction, it's better to select the devices andprocess with low noise; at the same time, the maintenance of the devices shall bestrengthened; as to the devices with large vibration, the vibration reduction engine baseshall be adopted.

(2) The acoustical damper shall be provided at the air intake and outtake of the fixedequipment and the machinery such as excavator and transport truck; as to the machinerywith high noise, the vibration reduction and noise reduction facilities shall be installed,if necessary, the temporary simple acoustical barrier shall be arranged around themachinery with high noise.

(3) The construction time shall be strictly organized and controlled and it is prohibitedto carry out construction at night with the machinery with high noise. The constructiontime of the project shall be strictly controlled in 8: 00-12: 00 in the morning and14:00-20:00 in the afternoon.

(4) The labor protection for the workers near the machinery and devices with high noiseshall be strengthened and they shall wear noise-proof tools, such as earplug and so on.

(5) The transport cars may produce the noise beyond the standard, which will influencethe residents at both sides of the transportation routes, as a result, the speed of thevehicle and vehicle flowrate in unit time shall be strictly limited in transportationprocess; the speed shall be reduced properly when the vehicle passes through the townsso as to reduce the disturbance to the residents in the town; the signal alarm shall beprohibited.

2.1.4 Protection measures for ecological environment

On June 29, 2004, the affairs about the remission of the fish in the assessment areaof the project were discussed. The ones attending the meeting included You Lixin, XuHaiyang, Liu Shujun and the governmental officers (Xiangfan Environment ScienceAcademy). The contents are to: control the fishing amount, specify the fishing

12

Page 20: Public Disclosure Authorized El 064 - World Bankdocuments.worldbank.org/curated/en/720671468743763531/...Projects on International Waterways (OP/BP/GP7.50). Among these safeguards

prohibition period, limit the masking web, limit the unreasonable fishing laws and so onso as to seek for the reasonable measures to utilize the fish resources.

2.1.4.1 Protection measures for aquatic organism

(1) In order to reduce the influences on the aquatic organism from the floating workssuch as cofferdam, rock cut and removal of cofferdam and so on, the above-mentionedworks shall not be carried out in the spawning season of aquatic organism. According toinvestigation, the spawning season of the main fishes in Hanjiang River is May andJune, therefore, the underwater excavation works shall not be carried out in May andJune as much as possible.

(2) The constructors are forbidden to directly throw the various wastes into the waterbody, especially the poisonous and harmful matters.

(3) In order to reduce or avoid the influences on the aquatic environment and theaquatic organism from the waste slag of the project, the excavation waste dump shall beselected above the flood inundation line; the slag retaining wall, intercepting ditch andtrench drain shall be provided around the excavation waste dump to avoid the pollutionof the water quality and the influences on the inhabitation environment of the aquaticorganism.

(4) The education on the constructors for environmental protection shall bestrengthened and it is forbidden to fish in Hanjiang River.

2.1.4.2 Protection measures for terrestrial organism

(1) In order to protect the lasting stability and durable peace of shipping pivotal project,it is not enough to just consider the peripheral areas, it is necessary to make overallplans for the whole Hanjiang River valley especially he ecological protection forestsystem construction at the middle and upper reaches of Hanjiang River andcomprehensively improve it to ensure the ecological safety of this shipping andhydropower pivotal project.

(2) Patrol and protection for the animals in the reservoir area shall be strengthened inconstruction period; it is forbidden to poach for the wild animals; the related laws andpolicies such as Wild Animals Protection Law, Environmental Protection Law and soon shall be seriously publicized to raise the environmental consciousness of the localcommunities and educate the constructors not to poach for the wild animals in thereservoir area.

(3) The earth material yard shall be horizontally excavated and the surface soil shall bestored in form of centralization, if rain comes, the cut surface shall be covered withwaterproof cloth; after borrowing, the soil shall be covered to recover the ecologicalsystem.

(4) As to the cleaning of the woodland, all plants in the reservoir area shall be cleaned

13

Page 21: Public Disclosure Authorized El 064 - World Bankdocuments.worldbank.org/curated/en/720671468743763531/...Projects on International Waterways (OP/BP/GP7.50). Among these safeguards

up before water storage; the fruit trees that can be transplanted shall be transplanted asmuch as possible; otherwise, all of them will be cut down; the trees that is cut downshall be use as much as possible; otherwise, they shall be burned on the site and thewoody ashes shall be used as fertilizer.

2.1.5 Measures for public health

2.1.5.1 Health protection measures

It is very important to protect public health in construction period and the owner shalldo well in the health protection for the constructors.

(1) do well in the sanitary quarantine inspection work for the constructors; makemedical examination to understand the healthy conditions and germ carrying situationof the constructors before them enter the construction sites; if it is found that someperson carrying germ is not suitable to enter the construction site, he shall be cured intime and be assigned work again after he gets well. Carry out regular physicalexamination for the constructors in construction process, master the healthy conditionsof the constructors at any time, prevent and control the occurrence and extension of thediseases.

(2) Do well in sterilization and disinfection work in construction area, especially, carryout the sterilization and disinfection for the public facilities regularly. At the same time,the temporary resident areas of the constructors shall be sprayed with the medicines forkilling the mosquitos, fly and rat and so on and for controlling the extension of variouscommunicable diseases effectively.

(3) Perform sanitary monitoring and control system, supervise and manage the foodentering the construction sites to ensure good food sources and food processing.

(4) Establish medical and health care departments, store necessary medicines forpreventing and control the diseases, such as the medicines for stopping bleeding,preventing bloody flux and cold and so on so that the emergency measures can be takenwhen the constructors meet with accidents and epidemic diseases.

(5) Do well in sanitary publication and education work in the construction site to makethe constructors form a good sanitary habit.

(6) Monitor and control the drinking water for the constructors, and carry outsedimentation and sterilization before use.

(7) The domestic garbage in construction site shall be collected and treated in form ofcentralization, if necessary, the special refuse wagon shall be provided to transport thedomestic garbage to the urban garbage treatment site for treatment.

2.1.5.2 The environment of the bottom of the reservoir

14

Page 22: Public Disclosure Authorized El 064 - World Bankdocuments.worldbank.org/curated/en/720671468743763531/...Projects on International Waterways (OP/BP/GP7.50). Among these safeguards

a. Normal toilets, manure piles, garbage and sewage ditches must be carried to the wastefields for unified treatment if they cannot be used as organic fertilizers for orchards.b. Tomb clearing. The graves in the reservoir must be moved to other places by owners.Graves of unidentified owners must be sterilized, of which, the clear-out skeleton mustbe buried outside the sanitary protection belt.c. Demolition and clearing of structures: The cleared garbage must be carried to thewaste fields for backfilling. The remained parts are not allowed 0.3m higher than thesurface.d. Forest land clearing: All vegetation in the reservoir area before impounding must becleared up. Those fruit or precious trees that are transplantable must be transplanted tothe places out of the reservoir. Those trees that cannot be transplanted must be cut mustbe burned out, and the ashes shall be used as the fertilizers.

2.1.6 Treatment measures of solid waste

Since the construction period of this project is long, various solid wastes produced at theconstruction sites and pivotal projects in the construction and production process shallbe properly treated and it is forbidden to throw them randomly. The domestic wastessuch as the wasted concrete block and parts of the devices shall be piled in the form ofcentralization and finally they shall be buried at the place near the construction site thatwill not influence the sight. As to the domestic garbage in construction period, thegarbage can and garbage bag shall be arranged to collect it, then it shall be transportedto the urban garbage treatment site for treatment through the cooperation between theowner and the local sanitary and environmental departments.

2.1.7 Measures for conservation of soil and water

(1) Prevention and improvement area of main works

In designing the main works, the excavated slope surface shall be designed according tothe structure of the pivotal buildings and the corresponding engineering protection andplant protection measures shall be taken. Engineering protection measures will be takenfor the inlet channel and outlet channel of the shiplock and the water release gate; as tothe upstream slope of the earth dam at the left bank, dry paving will be adopted; as tothe downstream slope grass protection will be adopted. Besides protecting the safety ofthe project, these engineering measures and plant measures can effectively protect theexposed area of the soil texture of the buildings and prevent the occurrence of new soilerosion.

(2) Prevention and improvement area of excavation waste dump

This project is located in Jianghan Plain; as to the excavation of the foundation of theproject, after balanced utilization of the earthwork, 937.25 X 104m3 waste earthwork willbe produced at last; the excavation waste dump will be selected in the bank at the leftbank of Hanjiang River; through measurement, it will have an area of 184.5 1ha.

The excavation waste dump will be arranged in the bank and it is use for the slag. Theexcavation waste dump occupies the dry land in the ban. In order to improve the slag

15

Page 23: Public Disclosure Authorized El 064 - World Bankdocuments.worldbank.org/curated/en/720671468743763531/...Projects on International Waterways (OP/BP/GP7.50). Among these safeguards

surface of the excavation waste dump, the 30m thick cultivated horizon of the surfacelayer shall be peeled off in pieces before abandoning the slag and be piled in theexcavation waste dump in the form of centralization; furthermore, the temporaryprotection measures shall be taken to prevent the nutrient from loss.

When the slag is abandoned, firstly it shall be utilized along the expropriation boundary;slag retaining bank shall be built at the slope toe; the section of the slag retaining bankis trapeziform, the top width is 1 .Om, the average height is 1 .Om and the side slope is 1:1.The slag shall be rolled by the tractor for 3-4 times. After the slag is completed, theanghropic soil will be returned for second plowing. The seeds of bermuda grass shall beseeded on the slope surface of the slag.

Through calculation, it will fill 5450m3 slag retaining wall, the grass will be temporarilyplanted for 27.68ha and the second plowing area is 178.01ha.

(3) Prevention and improvement area of material yard

According to the project design, it can be known that 22.35 X 104m3 clay materials and76.89 X 104m3 grit stone materials are needed for the construction of the project (note:here the earth materials are compacted earth and the grit stone materials are netamount).

® Zhuangjiachong clay material yard

The materials yard is located at the foot of the hill. In order to prevent the badinfluences on the materials yard from the rain from the slope surface, before excavation,the materials yard shall provided with intercepting pitch and drainage ditch along theexpropriation boundary. The drainage ditch adopts trapeziform section, its bottom is30cm wide and it is 30cm high; the side slope ratio is 1:1. The drainage ditch will beconnected with the existing ditches. The upper side slope is intercepting ditch with thelining of cement-laid stone masonry and the lining thickness is 30cm. Thesedimentation tank will be arranged at the exit of the drainage ditch, with the length of4.3m, the width of 3.3m and the depth of 1.5m. The side wall is trapeziform section andis laid by the cement-laid stone masonry. Its top is 40cm, its bottom is 80cm and theinternal slope is 1: 0.5. The water will be drained into the existing ditches aftersedimentation of sedimentation tank. In construction period, it shall be managed by thespecial personnel and the slush shall be cleaned up in time.

At the same time, in order to protect the agricultural soil on the surface layer with highfertility, the measures of second plowing for the earth materials yard shall be taken. Theplowing soil on the surface layer of the earth materials year shall be separated with theseparation thickness of 15cm or so. And then it shall be piled in the temporary surfacesoil storage yard in the materials yard; the storage side slope shall be controlled about1:2 and the height of soil storage shall be controlled about 2.0m. The surface shall betamped and planted with the seeds of clover for protection. After the borrowing isfinished, the excavation surface of the excavation yard shall be improved with thesurface soil. The exploitation depth initially set is 4.Om and the excavation side slope isless than 1:4.

16

Page 24: Public Disclosure Authorized El 064 - World Bankdocuments.worldbank.org/curated/en/720671468743763531/...Projects on International Waterways (OP/BP/GP7.50). Among these safeguards

Through calculation, the floor space of Zhuangjiachong Clay Material Yard is 7.12ha,the earth to be borrowed is 26.29 X 104m3, the overburden to be separated is 2.19X104m3, the drainage pitch to be built is 1190m, the lining is 404.68m3 and the secondplowing is 7.12ha.

( Fenghuangtan grit stone material yard

The natural grit stone materials are on the diara of Hanjiang River, its upside will becovered with 0-3m thick pulverulent fine sand and the landform is gentle. After theupside overburden layer is cleaned up with bulldozer and face shovel, 1 set of type 150diesel engine will be selected for exploitation and then it will be transported to the rawmaterials yard with tug sand barge ship. The cleaned overburden layer shall be piled inthe temporary surface soil storage yard in the materials yard; the storage side slope shallbe controlled about 1:2 and the height of soil storage shall be controlled about 2.0m.The surface shall be tamped and planted with the seeds of clover for protection. Afterthe exploitation is completed, the overburden layer shall be returned to the excavationsurface. The sandy and rock materials yard will be inundated so it is not necessary totake vegetation measure.

The project plans to exploit 73.78 X 104m3, the overburden layer to be separated is 18.45X 104m3, the flood land to be occupied by the material yard is 12.30ha. 9.22 ha will beused to plant clover temporarily.

®) Longmentan grit stone material yard

The natural grit stone materials is located at the marginal bank at the left bank ofHanjiang River, its upside will be covered with 0-3m thick pulverulent fine sand andthe landform is gentle. After the upside overburden layer is cleaned up with bulldozerand face shovel, 1 set of type 150 diesel engine will be selected for exploitation andthen it will be transported to the raw materials yard with tug sand barge ship. Thecleaned overburden layer shall be piled in the temporary surface soil storage yard in thematerials yard; the storage side slope shall be controlled about 1:2 and the height of soilstorage shall be controlled about 2.0m. The surface shall be tamped and planted with theseeds of clover for protection. After the exploitation is completed, the overburden layershall be returned to the excavation surface. The exploited surface will form a deep ditchand become a natural water surface, so it is not necessary to take vegetation measure.

The project plans to exploit 80.00 X 104m3, the overburden layer to be separated is 20.00X 104m3, the flood land to be occupied by the material yard is 3.33ha. 10.00ha will be

used to plant clover temporarily.

(4) Prevention and improvement area of construction access road

According to the construction engineering, it can be seen that based on utilizing theexisting traffic roads, combining the permanent traffic, one 0.60km long permanent roadshall be arranged at the right bank and two temporary backbone roads totaling 4.40km

17

Page 25: Public Disclosure Authorized El 064 - World Bankdocuments.worldbank.org/curated/en/720671468743763531/...Projects on International Waterways (OP/BP/GP7.50). Among these safeguards

long shall be arranged at the left bank to connect with each construction site. The totallength of construction road is 5.00Km.

According to the characteristics that the landform at both banks is flat, when theconstruction access road is built, the drainage ditch will be excavated at both sides;besides draining the surface runoff from both sides of the construction access road andthe rain on the road surface, it can be used as the boundary ditch for the farmland andthe road to prevent the vehicles for construction from damaging the farmland at the sideof the road. The drainage ditch shall connect with the existing channels. The drainageditch will adopt trapezoid section, the bottom is 30cm wide, it is 30cm depth and theside slope is 1: 1; the internal wall shall be tamped (the quantity of bill of drainage pitchhas been included in the main works, it will not be calculated and listed out in thisreports).

Considering the use period of the construction access road is four years at most and it islocated in the plain area, the trees shall be planted at both sides of the constructionaccess road; since the conservation of soil and water by trees has a certain posteriority,at the same time, it is bad for leveling up and plowing the land again in the late stage,therefore, as to the vegetation measures for the construction access road, it mainlymeans planting grass. The specific measures is to plant the seeds of bermuda grass at theinternal sides of the drainage ditches at both sides of the access road according to 0.5mwidth to protect the side slope of the subgrade.The hardening layer on the surface layer of the construction access road at the left bankshall be cleaned up and be leveled up with the construction site for second plowing; thethickness to be cleaned is 20cm; as the permanent management area, the constructionaccess road at the right bank shall be reserved for use.

(5) Prevention and improvement area of auxiliary enterprises of construction

According to the arrangement characteristics of the pivot, the auxiliary facilities forconstruction will take the right bank as the main, including two construction area at theright and left bank. The corresponding construction enterprises, warehouses and livingfacilities such as concrete mixing systems, grit stone materials processing system, repair,processing and maintenance factory and comprehensive processing factory and so onare arranged at both banks of the site.

According to pivot design planning, the construction site at both banks of the site shallbe in the range of the pivot management area. The left bank occupies 1 0.OOha land andthe right bank occupies 34.12ha land, totaling 44.12ha purchased land. The left bankmainly occupies the farmland within the bank and the right bank mainly occupies theupland of the bank. In order to protect the plowing soil on the surface layer, the 30cmthick plowing soil on the surface layer shall be separated and temporarily stored at oneside of the construction site; then the storage side slope shall be tamped and the seeds ofclover will be planted on the surface to prevent the loss of the nutrient. At the same time,the drainage ditch shall be excavated around the construction sites and it will connectwith the channels nearly; the designed section of the drainage ditch is similar with theone of construction access road.

18

Page 26: Public Disclosure Authorized El 064 - World Bankdocuments.worldbank.org/curated/en/720671468743763531/...Projects on International Waterways (OP/BP/GP7.50). Among these safeguards

Durilnu constl-uctioni period, as to the sanidy anid rock mlaterials processing factory andconcrete mnixinlg systemi., the sanidy anid rock imlaterials in bags wZill be used arouLnd thematerials yard for tempoar-y retaininlg, the retainingc section is trapezoid, the top is I rwide and it is I m high too; the storage slope ratio is 1: I

As to the land temporarily occupied by the auxiliary enterpr-ises for COnlStlUCtiOn1, thefree grouLnd sllall be planted with seeds of the solver for protection, with the area of 40%,',of the floor space in this stage.

When the constructioln is completed, the lhardening layer of the site slhall be cleaned upand the thickniess of cleaning is 20cm. The cleaned slag slhall be transported to theexcavation waste dump at the left bank to pile up in the fonr of centralizationi. Thecleaning area in this stage slhall be taken into account as 30% of the floor space. Theseparated plowing soil at the left bank shall be recovered for second plowing; thevegetation shall be recovered at the right bank, combining with the planning of the pivotmanagement area.

(6) Migrants resettlement area

The direct influenice area of this project is mainly the migrationi resettlement area. Fromthe clhapters and the sections about reservoir inundation and land purchase in dam areain the Feasibility Study Report, it can be seen that the removal and resettlement of theresidents will adopt the measures of building new resident areas in foim ofcentralization; furthermore, the enterprises government-sponsored institutions shalladopt the migration measure with one-off compensation; it will be operated by the localmigration department; the liability of preventing and controlling the loss of soil andwater and the legal liability have been transferred as a whole; the local migrationdepartment shall prepare special water and soil conservation scheme according to thelaws.

2.1.8 MeasuL-es to slow down the bad influenices on social envir-onlmielnt

2.1 .8.1 Measures for preser-v ation of cultural relics

According to the regulationi of cultul-al relics protection of tlle related departmenits.before constructioll. the negotiationi w\ith the local cultural relics protectioni departmiienitsshall be can-ied out firstlv. Marki the place in advance where the cultural relics mav beburied to protect themii. Once the cultural relics are fouLnd1 in constructioni. theconstLuctionI shall be stopped immllediately to protect the site and thel infoe r thecultural relics protectioni departmiienits and the construction slhall not be car-ied out attainbeforc the cultural relics protection departmiienits take con-esponding, m1easuL-es.

Furthermlore, as to the existing 2 cultural relics in the reservoir area that mnay beinunldated, necessar-v excavation- and treatmenit measuL-es slhall be takeni beforeconstr-uctioni according to the opinionis of the cultLural relics protection departmenits.Dulkou shall be exca% ated iii 2005.4, the other- Chcnipo shall be excavated M '200S.

2. 1.8. Protectioni of intake andc drainiage facilities

Page 27: Public Disclosure Authorized El 064 - World Bankdocuments.worldbank.org/curated/en/720671468743763531/...Projects on International Waterways (OP/BP/GP7.50). Among these safeguards

The water catchment facilities in the reservoir area take bailing in Hanjiang River as themain and the construction of the hydropower project will not influence it; contrarily, itwill play a role of stabilize the water catchment point. As to the existing drainagefacilities, since the purification condition of water quality will become weak after theproject is completed, therefore, it is necessary to intercept various blow-off lines toprotect the water quality of Hanjiang River and send the sewage to Xiangfan SewageTreatment Plant uniformly. At the same time, the construction of the planed sewagetreatment factory shall be carried out in ahead of the construction of the main works inthe reservoir area as much as possible so as to be good to collect the pollutants inreservoir area and protect the water quality in Hanjiang River.

2.1.8.3 Environmental hydrogeology

(1) as to the possible seepage of the reservoir, the necessary engineering measures shallbe taken, such as grouting, overspreading, blocking, building intercepting wall, waterretaining wall and discharging water as well as lowering the pressure, shall be taken toprotect it.

(2) as to the bank slope that may meet with possible serious destroy (bank slump andlandslip), the measures such as slope protection, load discharge, improvement,reconstruction and necessary plant protection and so on shall be taken to protect it.

(3) as to the farmland and buildings that may be inundated, the measures, such asbuilding drainage system, change the vegetation structure and reinforcing thefoundation of the foundation, shall be taken to solve it.

2.1.8.4 Power transmission and transformation work

a. It is to make scientific planning of electric power line. Tower base and buildings mustavoid as much as possible farmland and forestry land.b. It is required to utmost use existing earth for foundation construction. Large-scaleearth cutting and back-filling must be avoided. After completion of tower base,vegetation recovery is required.c. Materials required by electric power line shall be completed manually, thus to avoidpossible damage to the natural environment..d. Wire lashing shall use tension and hauling machines so to reduce tree cutting andavoid damage to the vegetation.e. No pesticides would be used.

2.1.9 Material sites and transportation

( 1 ) Protection of water qualitya. Intercepting and draining ditches must be built in the stone-chip fields; settling tanksmust be built under the stone-chip fields where runoff is produced.b. It is required to enhance the management of sand mining so to avoid the negativeimpacts of SS on water quality.

20

Page 28: Public Disclosure Authorized El 064 - World Bankdocuments.worldbank.org/curated/en/720671468743763531/...Projects on International Waterways (OP/BP/GP7.50). Among these safeguards

(2) Air environmenta. Trucks carrying bulk dust-producing materials must be covered to avoid dusting.Overloading must be prohibited. The showering materials must be cleaned promptly.b. The roads for carrying materials must be frequently water-sprayed.c. It is to build stone crushing shelter to prevent dust spreading.

(3) Acoustic environmenta. The blasting in quarries shall be done in two times respectively at 11:50 and 17:50.b. It is to control the working time for transport. Trucks are not allowed to pass theresidential areas at the rest time sections, respectively of 12:30-2:30 and 22:00-7:00.

(4) Ecological environment and conservation of soil and watera. All mining of materials must apply for the mining rights and approved mining area.

No additional area shall be allowed.b. Earth excavating in borrow pits must be done horizontally. The surface earth must

be stacked in a place. When it rains, the excavating surface must be covered bywater-proof fabric. When earth excavating completes, ecological recovery via earthcovering is required.

c. Around the material stacking yards where easily cause surface runoff, preventivemeasures, such constructing waste retaining wall, must be taken to prevent watererosion.

2.2 Measures for environmental protection in the stage of

operation

2.2.1 Protection measures for aquatic environment

(1) Measures of preventing oil seepage of the pivotThe unit selected shall not seep the oil; at the same time, the seeped oil collecting pitand accident treatment basin shall be arranged in the workshops; meanwhile, theoil-water separator shall be provided to treat various seepages and the oily sewage.

(2) Treatment of the domestic sewage in management stationSecondary sewage treatment system shall be provided in the management station. Thesewage in management station will be discharged into the domestic sewage treatmentstation after pretreatment in septic tank; as to the secondary treatment of the sewage, itwill adopt the embedded domestic sewage treatment unit. The main process flow ofsewage treatment is as follows:

Domestic sewage s t isterilizatio Discharge

(3) Treatment of waste water from the shipStrengthen the control over the domestic sewage and oily sewage; the ship shall beprovided with necessary domestic sewage treatment facilities and oil-water separatoraccording to the requirements of the related authorities; it is forbidden to discharge

21

Page 29: Public Disclosure Authorized El 064 - World Bankdocuments.worldbank.org/curated/en/720671468743763531/...Projects on International Waterways (OP/BP/GP7.50). Among these safeguards

sewage fi-om the ship in the reservoir area.

As to the domestic garbage from various ships. the storage cabinet shall be provided onthe ships; the domestic garbage shall be collected in the form of centralization and thenwill be sent to the garbage treatment site on the bank for treatment.

2.2.2 Treatment measures of solid waste

The domestic waste in the management station will be collected in the garbage can andthen will be transported to the urban garbage site for treatment.

2.9.3 Ecological environment

(1) Terrestrial ecological protection( strengtlheni the construction of ecological protection forest system around the

reservoir, effectively manage the various plants in the reservoir bank and the green area;if the dead tree is found, another tree shall be replanted in time.( as to the production migration area, control well the development scale of the land,prevent the excessive development of the farmland in the reservoir area and prohibitdestroying the existing woodland.Q) Recover the vegetation in the wash land and put an end to opening up wasteland onthe wash land so as to prevent the landslip and collapse of the river bank.(2) Protection of animals(O Strengthen the protection of the wild animals in the reservoir area and arrangepersoinel to protect them to prevent wide animals from being porches for.(2, Since the bottomland at the river valley is inundated, the kinds and the amount ofthe birds in the reservoir area will inevitably reduce. If the measures of buildingartificial watersplash zone are adopted and the sites for the birds for activities andseeking for food are increased, the influence degree will be reduced.(After water- retaining of the dam, most of the animals that previously resided aroundthe river banks will migrate to other places quickly, while there will be some animalsstaying behilnd looking during the primary period of water impounding to see whetherthey can adapt to the new environmenit. In this period, it is necessary to organize peopleto patrol for protection so as to avoid any animllal hunting in the chaos of the animals orexcessive distuLrbing. This will help to ietain more animals to live in the reservoir area.

(3) Protection of fishesIn order to thoroughly make clear the influences on the ecological and fishery resourcesin the water area from this project, the environmllent administrations of the project shallassist with the aqulatic product departmenits in further monitoring so as to obtain thecomprehensive data and provide basis for making reasonable measures. Fishway andFish protection station shall be constructed and completed together with the main-bodyprojects and put into operation at the same time.

If the fishes are not proliferated manually in the reservoir, there will no fishes forfishing gradually. According to related information, the process of nutrient enrichmentin some areas is very quick after the reservoir is built. mainly because the phytoplankton

22)

Page 30: Public Disclosure Authorized El 064 - World Bankdocuments.worldbank.org/curated/en/720671468743763531/...Projects on International Waterways (OP/BP/GP7.50). Among these safeguards

incr-eases rapidly vhile the silver carp and bighead carp directly USing/ the phvtoplaniktoniare in sei-ious lack. the ph,ytoplaniktoni as the second link in the aquatic or-gallisrn foodchaini can be bred. Since the phytoplankton is largely bred and t can provide a lot offeedstuff for the fishes; if they are not used, the fished will die, in this way, it willinfluence the water quality. Therefore, it is suggested by the experts that a large number-of Fishes that eat the phytoplaniktoin shall be put into the reservoir, especially the localfishes. The local kinds mainly include Yichang dolphinfislhes, Makou fish, bream.crucian and so on; in light of the kinds weifed in the present stage, thev are the mainkiinds in this area.

They can purify the water quality to keep the amount of the fishes in a stable level;otherwise, the fishes in the reservoir will reduce rapidly and it will influence theecological water environment.

Artificial aquiculture is one of the effective methods to proliferate the fish resources,mainly used for proliferating the resources of the freshwater- fish and the migrating fish,with good effect. Taking Taihu Lake as an example, since the water conservancy wasbuilt and the dam was built on the riverway, the passage for the migration of the fishwas interrupted, the four domesticated fishes cannot reproduce by themselves ; theoutput of the fish abruptly has falled down from 1 950s; however, since the kinds and thequantities of the small rough fish increase, the composition of the fish meets withchanges. According to the infomnation about the feedstuff in tlle water area,ichthyofaunia composition, economic benefit and the probibality of the fish fry breeding,the four domesticated fishes are selected and are put into the water area with the size ofI 3-16cm, good effects are achieved. Fish protection station shall be proliferate the foul-domesticated fishes.

Fish,x'ay will reduce the influence to migratin(g fish.

2.2.4 Conservation of water and soil(1) The repairs of the facilities of the maini works and conservation of water and soil, aswell the nursing of plants shiall be caiied out;

(2) It is to enhlanice the afforestation of the office and residenitial areas.

I.5 Environmnental sanitatio(1) Workers and nearbv residenits of the reservoir shall receive periodical randommedical checks.

(2) It is to unldertake periodical activities of w\iping OLit mosquiitoes. mice and flies.

2.'.6 Environmirriental geology

It is required to unldertake periodical m-ionitoring and mainiteniance of the stability ofreservoir banlks in the protectioni area. Any danigel-ous conditioni must be treated onemergency basis.

2.2.7 Material stackinlg vards

(I ) It is requil-ed to make good mainitenance of thc vegetation on the waste fields so thatgood ve-etation covering rate can be ensured-

Page 31: Public Disclosure Authorized El 064 - World Bankdocuments.worldbank.org/curated/en/720671468743763531/...Projects on International Waterways (OP/BP/GP7.50). Among these safeguards

(2) It is required to enhance the mneasures for conservation of water and soil in the wastestone fields until the ecological environment turns stable.(3) It is needed to strengthen the repairs on1 the waste blocking darn in the waste fieldsso to avoid collapse.

2.2.8 Electric power line

(1) It is reqLuil-ed to provide frequent repairs on1 the works of water and soil conservationand nursinu of the v\egetation.(2) It is requiled to strengthen the monitoring of electromagnetic radiation. In caseelectromagnaetic radiation caused by power supply line is found, necessary measuresmust be taken.(3) Sound isolation devices shall be installed for powerhouse and kept maintainedregularly.

2.3 Environmental Protection Measures for the EnvironmentalSensitive ZoneThe nearest distance between the sensitive points of atmosphere and acousticenvironment involved in this project and the site is about 600m, and the pollutioninfluences will not be brought about after operation of the project; the protection shallnot be carried out in operation period.

The nearest distance between the water catchment of the domestic water at the upperreaches of the site and the site is 1 5Kim the influence on water catchment is positiveafter the operation of the project and bad influences will not be brought out. Therefore,it is not niecessarv to carry oLut protectioni in operation period. As to the water catchmnenitof the water for industrv near to the site, it is not necessary to carry out protection aswell

In view of the importance of the above-mentioned domestic water and industrial waterto the residenits and the industries at the upper reaches of the site, it is necessary tostrengthen the cont-ol over the ship coming and going in operation period to prevent theoccurr-enice of the pollution accidents.

2.4 Environment Protection Investment EstimateEnvironmenit protection investment estimate of the project is shown in Table 2.4-1.

Table 2.4-1 List of environmental measures and investment estimate

I_ L _ _ _ _ _ _ _ I _ _ _ _ _ _ _ _ _ __ _ _ _ ___2

24

Page 32: Public Disclosure Authorized El 064 - World Bankdocuments.worldbank.org/curated/en/720671468743763531/...Projects on International Waterways (OP/BP/GP7.50). Among these safeguards

I1. Water lfom tihe foundation pit shall be discharged afier it5reaches Lip to the standard in the sedimentation basin.2. Thle water lor processing the sand and stone shall bedisCharged Ifter it reachles up to the standard after sedimenitationin the sedimentaitioni basini.

_ - 3. The teniporar\ livin g sewage In the constiuctioni area shall betreatecl in thC scwagc pullrifier.

cPe lzrotectionl of 4. The manaemient station shall be established ii the Contractor 170f. v "ate Cualitx constructioll area and the living sewage shall be discharged after0

a treatiienit in the embedded integral sewage treatment equipmenitand reachinl LIp to the standaid5. T-ihe \\aste water with oil fIolm ConstuCtioll and the ship shallbe dischaL-ccd alter tivatment bv the oil-water separator6. [he domileslic \Natcr shalil be usecl alter treatimienit anddisinflction: it is lorbidden to directl\ discharge theconstructioll waste residue andl gar aige andc so oti inito i-anlRivet.1. I-be transportation of constiuctioni materials will adopt tlheform n'fenclosuLre andc enclosinig cover anid so on.2. As to thc \Worlkillg sectoon or construction road that cati 2.0

Air environimiienit produce tihe flting dust easily. the water shall be spraved Owner 0frequently to fall the dust: tile times shall be deterimiineddepending Onl the liVin2 dust.3. Install dust collectioni equlDlimelnt tn the miXing pallt.I 1hc e(uipmenit with lihigi noise shiall be placed in the place faraway fiom ltile camrp buildinig and resident area: at the sametime, a certaini numiuber of anti-nioise articles shall be provided todeliverl to the worlkers at the construCtioll point with higil noise.2. Use the equipillelIt wvithl low noise as mucih as possible atid

Acousti'c install sounL HisLIlatioll for tie ower generator. 15.0Aenvion nt 3. In.<tai3 noise isoLlatikonl andliib-atioun reductioni equipIllellt for Owner 0

ma1LchineI \\ Itl1 11iLTI1 11(oiS(.4. Reiisoitl li arrange a tic hetime anid do(1 1not LsSC thlC IlnaChille withihigbi nloisc neial tlhe sensitive place in rest period.5. Rcasoniahlv arri cLc the workmin section. carry out theCI||onstlruCtioll of the wvorking section without iniitlenice at thesensitivc place in rest period or schooltimiie.

Ecologic I. The constiuctioni ol dam shall not be carried out in the season 1 61environimienit of leril-odCItioll ofIldI-OPh1tic ori 01aisiii. 1 6.04

protection anid 2. Strentgttlien the pioteetioti of the aniinial in thie reseivoil areaiithe conservatio0l thli no-eli patiol and prolli bit poach iiig l'or the \wile aniniials.ol soil atid water 3 Do \vell in cielinieii thc bottoni ol thc reservoir: the plant that

citil be tiisit>pltantd saill be trailsplaltiitettS ImLchi as possible:the one thait cannot he trantisplanted sliall be uLtilized aftel cLittilig|.4. Build cettiint-laidi stotie masonr\ retaitimnt wall. i oterceptiollditcih anii dJrairiie dcitchi and so oii in the place where the soilerosion exists.b||5 t Adopt tŽi- slope protection I'lm the side slope: all teniporar|j j j| lanid lr CIStlLCtiOIl shall be planted \\ith trees and grass alter|

i | 6 I'e.l ollI the CI.ltiV1t1o1 laV- Oil the suLrface layer before thleslag IS thlo-\Mi. phile OIi tli eiii andci adopt temp torary protectioiiIlldestiiCs.7. Wheni the slao is thrown. the slag rctaiining baTik shall be builtat telhislopc toe and plarit grass breecd oi tile slope surface.8. Adopt pioteetioti slope at the Lipper cacilhes of the earth damr| and adopt i.assolr protecti ng the slope.9 A\fer the. SlatL, iS thromit inl tlie siaL \\iastc vard. tlhc veoctaltionshiall le I°cCi\ ered1(0. bulil(l drainlue ditch iill the resettielilci t itret. soil retailliiinI\\all aind protectloll slope andc so oti.I1. liuild initcC-eptiLig ditch aiid drainage diteci in

ZLiZhuangiaichi(ig Cti Naard aicl set tip temporary sedimenitatiointanlk. Carr\ oult secoid plowingii of the materials yard aflter-borrow iiins ald dlie area is 7.12ha_

25

Page 33: Public Disclosure Authorized El 064 - World Bankdocuments.worldbank.org/curated/en/720671468743763531/...Projects on International Waterways (OP/BP/GP7.50). Among these safeguards

_12. he o\erburden Iaver of the sand and the stone yard atFenghuilangtan11 anLI Longmentan shall be piled out: the side slopeshall be controlle(d within 1:2 and the height shall be controlledwitiniil 2911: the surlace layer shall be protected with temporaryvegetation measures.Fished protectioni station shall be constr-ucted and completed Ownertogether with the main-body prqjects and puLt ito operationi at Fisherv 650

Aquatic ecology the same timie. departmentFisiim a\ sIha11 be Lonstructed and completed together with the Owner 600main-bodl pirojects mlc piut into operation at the same time_.I The \h aste SiteS SUch as the toilets. cesspits and pens ibrlivestock shall be sun itized in an all-rouLid way and the gnat. flyatid rat shall be perished.2. ConIStrulCt puiblic toiiet ill the ConlStrLIClioin at-a anid saniitizefircqucnltl\3. Carry out heallth c\amination for the pet-sonniiel enter-inig theCOnStrciCtOil areCi: CdlITN out regular physical check for theC cnstRu ci is an cd ca ir\ oult prevention anud immunity \Vorkaccordiln a to the discalses. ocn er- ~~~~~ ~~~~~~~~~~Local 60.0Crowd healthi 4. Cal-r oult saletv and sariitationi managemnent for thie food for medical 0constructor: scIpc-vise atid check the purchase and piocessiilg unitprocess of tlhe food.5. Protect thc water qLialit) for driikiitig. educate theconstructors to have the good sanizationl habit: the water fromthe local shall be saniitized bebore uisig.6. the domestic oarhbae shall not be piled out randomilv and itshall be pilcd in centilalization and treated ulliforlliv: it can betreated with the soil u\ase anid tihe special garbage truck shall be

___________________ pUrchased.

Owner andCUltural relies ProelCt thlC CultirIal i-clies according to the principle of impol-talnt culturalp Cutuetioci protection and importanit excavationi: the excavation area is i-elics 81protection 1000m(n2 protection

nit1 As co the place wheiec tihe ieakitge ol'the reser-voir may happen Jshall he pirotect \\ itli the measuies such as LrlOutiog. covering|.blockina and drainagec 1Or redclcing the pressure atid so on.2. As to lhe river section where thC serious banik slump may

Environmental htppclI. tile mcasuLrcs suchi as acioptitig protection slope. Owner 150.neology unloading. ilipciovelilciit alcd necessary plant protection shall be 00

takcni.3. build drainaue 5vstcnm for tile fartiing lanid and the buildingestliai m1( be inuLIdIlied: chanige the load of' tIle structure ailCiStlCIUtIlICI: tilC oULcllaIiclln ofltic hluiiclitle and So, 011.1 As 1o the satlitizatioll cleanillg oF tilc toilets. Cluilehill. cuorril||iiuck ditcild and so iOn. ilf it ctl be uisccd as lertilizer. usc it as theFertilizer. oilce it cilillot be cIsci as tile ert iIizel. transport it tothe slay waste treatilmleilt vard for clli torill treatillenlt.2. 2is to tlhe cleatitlL of grave, tie graves in tie reservoir areashall be imloved to tie wastelanld bl- resettenleent; tIle onlewitiltlit anil owilcI shall be sanitized: tile skeletoil shlall be bul-iedl

Envi-otlilnlent at octsidlc thlc sttl1itiZctioll protectionl belt. 20.0the bottom of, 3. Reilo; l anid clchiiil ' clithe bl.lildilgs. The gtrbaige cicanedc Owiler 0

lthe reservoir sblall - Irinspoirtcd tlo tile lancdfill for cicanilig: tlhe wcllii`iloundl:tioll aiid tll toc shall lot he hieher tlcail (0.3m of' the|

l I I I ~~~~~~~~~~~~~rIgol. ti d

4. Clcatting oi' tilc vegetatioln. The plallts ill tIle i-eservoilr areashiall be transplaintecd as niuichi as possible. As to tie onle thatcannot he tratisplanitccl. it shall be CUl for Lise: as to the onic thatcannot Lisecl. it shall be birneed at tIle place and the ash silial beciseCi 'iS ertitI izet.

Water quality 1. Bun ild interccptilng atli clraiiltiae ditchl at tIlc Crcisliled stoileplotectiol I silte lcUild scdiiilcottitioii talilk at the place i here the IuIuoi'f O\\ iler 7.00

______ __________r.__-__p_ - OLLCeS-titicie tie crislleied stOlje yard.

2 6

Page 34: Public Disclosure Authorized El 064 - World Bankdocuments.worldbank.org/curated/en/720671468743763531/...Projects on International Waterways (OP/BP/GP7.50). Among these safeguards

2. The maniageiment ot' the exploitationi process of the sand pitshall be strenigthieiiecn to avoid the influences on the waterqualit\ r1o0111 thc SS.

ihe vcliclics lor transporting the materials with dust shall becovered with tarpilulill to prevent the flyiig of the materials: thetransportation of' the sand, stone and the wastes shall i notoverloaded to avoid the showering along the road: once the

Ai.- e.ivii-oiiiei sho\erinL l appenls. clean it in timie.2. Spra\ the \vater on the materials transportation road to extract

the dust: tIe tLies shall be detei-iniiled depending on the actualflying d ust3. 13uil1I stone 'LushinL shelci to prevent tihe ditlisinio of' theCItLSI.1 'I'Thc blistine- ol' the stone pit shall eb carried out in two tmiesat 11:50( in tihL moriniig and 5 7:5t in the alteroon: furthierlmore

Acoustic the special person shall be assiened to take charge. Ownerenvi-onitenit 2. Contiol tile tranispor-tationi time and stop the passing of' the

transportation vehicles thioughi the residenit area in the restperio(l.1 l'he e\ploitation stir-ace ol' all materials yards shall get thelegal cxploitation right atid atea andl the exploitationi area shall

Ecologic iiot be en liarcd randomilv.environment 2. 'I'hc soil materials vtard shall be excavated horizontally: the

protectionm ancl surfacc soil shall be piled in cenitializationi: when the raini Owner 25.5the conser-vationi happeis. the excavated surlace shall be covered withof soil and vater \vaterproofing cloth: alte- the borrowing is completed. recover

the ecolhgo throughl backfilling.3. Build( slag retaininig wall at the piace arouln1d the materialsyard u IhCrC the runofl happerns.

Ecokgicrnxsirsetnlm 1. P lan the puIe transmission circctit scientifically: the towerCOiavseatiol"il jdin d`.(latioti and lltlC hulildiln shall not oCcctpanc\ the farmllingimdlhilacidlttxic land atnd the forest laud as muchi as possible.

crvilwonniclit 2 Usc the foIrmc soil excavation Ibundationl as much aspossible to avoid the large excavation and backfilling: after thetorelr foutndation is finislhed. recover the vecetationl.3 After completioni of the constrtictioll. recover the special 25.0constructioto pavement. Owlner 04. The construction ol. th euipimenit \vith high noise shall notbe cai-ricd Otl lillar thc r esident place,5. T'lhC materials ILoI \\ im ite shall be transported by manpover toavoid desiroyinlg tdl natural environmiiien;t from thetraitsportation roila6. Lay OLut the CItrCLlit \vith tension and haulilig enginle to reducethe CUttillLn ol'thc trees and destroying the vegetation.I . Bfil(l scptic tank III the callmp buildinigs to treat the liviign

\ I .. I Water quality se\wace.protection 2 Thc li\ m aurbagc and Se\age in tlhe camp buildincg shall be Owner 5.00L | ticitate(d and it is prht ih ited to pOuIIt anid clischarge the water bocd.

1 p OMt \i atce oll tilC COtistlrLctioll p1lac Whiere tile Ii vilig duLIstAir- environrmetnt eNist[ CaNtN. Onr 30

2. The asphalt mixting plait shall be placed in the clear place. O 3()0tii awilv l'roni thc weind directioti of'the sensitive points.I , The lllrc cOnsrticLtiOll machliine aticl equLipllelnt workting field

A i |c shall be lra a\oay litoiii the ad jacent sensiti\ve poiit, the distanice|eoutivc.?jjt~iit shall not lbe less t1ati 20(01mw the COIlStr'uCtiO l sliall be stopped Owniier

fil0m 221)0 at night to 7:00 in the morninic, at tile sensitivesectioll. i|. 1 cson1allIN arlrallee tlie cli rectioll of, the roatds. I IVLci Lse thleI

cooi former'jl parClilClIt. oCLIpalicY tIle fttrtiiiIg laiucl atid redLcC the 15.ecolocic destroN duie io the excavation of tlie road. Owner | 0

jen\irotimetit 2.7 carr\ out greeiiiilig recovery anid second plowing oii the|______ ______ tem)iparililN oCCeIpiecl forest land or farming land in time.

Water IArranuc oil leakimac collectioni tank anid accidenit trcatiheoities 80.0g r E E | -C: Wae | tanklinh the wvorkeshop: at the salle Lilme. provicle oil-wvater |ALutIlorities 0 -. v I7- eiivirvoniiiient I scpar itiOll ti oni eri trlat VaritsseeXvac \sitli oil. I

27

Page 35: Public Disclosure Authorized El 064 - World Bankdocuments.worldbank.org/curated/en/720671468743763531/...Projects on International Waterways (OP/BP/GP7.50). Among these safeguards

2. Establish secondarx sewage treatmiienit system in themaniacement station, namlel) equip embedded living sewagetreatment Uilit.3. Stren.gthen the managemilenit of' ship pollutiom the necessarylivinag s.vwaye treatmlienlt facilities and oil-vater separationi uniton tile ship to avoid discharge the waste water withlini thercscr \Oil'4 ('ollect the d onlicstic garhage Jhoit lhe ship and trcat it on thebi_iil_: (li o noL thi-o itrt arndonil\1. Sll'C il ecolotic prolectioll lorest svstem constructiollnear the reservoir, ef'fectivel) manage the various plaiits in thebank and the greening area: once the dead plant is found. plant aneON One in timilc ior supplemiienltatioin.2 ,As to the proOductionI resettlement area, contiol the landdex.elopmenit scope. prevent the expansion of' the landc andsc shl-ini of thc forest land.3. RecoVer the \eCtetaliol at first alnd put aLn end to cultivatingthe \\NIsCelaild to p'eC\ clt the s creepwvash and collapse of thebaiik. 38]14. Streingteilci the protection of'the wvild animals in the reservoir Authorities 00area, arrange personinlel for patrol to prevent poachinlg for thewild animiials.

o 5. Strenigtiheti the moniitorin1g of the fishery resources ii thereservoir area: ill necessary. put ill a certain nuiilber- of localtishes to maintain the balance of' the I islies of the reservoir area.6. Strenigt2ieii the nieai nteiiance of' various water and soilcoliservatioln lacilities in the special wvorks area of the maiI ploeci as \\ell is tlhe planit lacilities.7. Strengihetiieii the greeni ng aiid beautifvilng work in the of'ficeand livinE area

Environiiiental 1. Carr- OLlt health sampling checkl for the staff'and the residelnts I10.0sa.itatioii . ea-l reserir -ea. Authol-ities I2. Destrmo the ailatis. Irits andcl hies and so oii.

n viroimiital tvloniiito r atnd Iamwin ti in the stabilitv ol the reservoir banlk orI tli 30()pi-otectioin arei oif the projcct rego.larlk: as tothe section with Autlho-ities 30.e geolog\ danilotis coiid itiol yive eiiel-reeicx treatiiieat tiI, I Ma itiai the vectatioii in the waste soil varcl every vear. I

|~ |( |c °R |2. Strenitlieni the iainteiiance aid repair for the cotiservatio of 1 5.0j d E t -'9 Csoil aiid (water of'various measures in the stone waste yarcl liitil Authorities 0

( IC tihe ecologic enx irotimienit is stable.3 Maiiitaiii the slau retaininiio dai iiin the waste materials vard.

Coiiservatioii of MIaintain \xater and soil conservation works ltrequeiitlx and 2 0(tsoil aid \\ater aiaiii tiii thC veeetalimii.

SireClith en the Iorltoii rili oh' tle clectroll-iaeietic radiatio n: oiiceI Electroniaoletic the tranismissionli hie is iiillueiicecd by the electromagnetic

protection | riadiation. tOle eleciFoIIignetic protection1 measures shall be 5takeii.

PJo\NC I nistalll IIOISC iisulatioll Facilities in the powerlliUse and niaiiltaiithe facilities 20.0

J ¢ { gd~~~ilt 0 I I I at io nl I _ _ _ _ _ _ _ I I___ _ _I_

Watei- ClIcClk tind iiainilalill thle road d1aila&ge sStelni ficqUentlt o | 5.ievironietit C1slite the U1)hloCeikeSs 01'the dCaiiiage S)stem.

Aii eniviroti iielit Sprp\ \ntel tie on lt IerOad stirTaCe aCCOr-dilI to Ilie Wvater. 8.00

| | Acoustic [t'Iie ploteetioli nicansutes slialll be takiei at the sensitive poiiitswhere the noise exceeds the standard accorditig to the 5.00viroiini_iit iiolitorilia results.Ecoloic | 1. Check the ariLss anid the tree at both sides of the roacd

eniironimienit fre(queCitl1\: onCe thel dead treies anid grass are fouliid. plant lor| 6.001~ ~ ~ ~ ~ ~ ~~______________ . StiphiQlleiiiititioiOI.

I t |laffijc Sallctl Set Upi \ irOUS trUlluih sattety sign plates in the sectiois \hele the

I I I I ________________________________________________ aecCideClt. Iii:\ Ii il)e11 I 2.00Total of, iiixestltiieti estimate li oili\ iroits e tit.lh protectio n Iiiaso res [N. 4033.54

28

Page 36: Public Disclosure Authorized El 064 - World Bankdocuments.worldbank.org/curated/en/720671468743763531/...Projects on International Waterways (OP/BP/GP7.50). Among these safeguards

3.0 MONITORING AND MANAGEMENT PLAN OFENVIRONMENTAL PROTECTION

3.1 Environment Monitoring Plan

3.1.1 Objective of environmental monitoring

Environmental monitoring includes the one in construction period and the one inoperation period, the objective of monitoring is to investigate and understand the rangeand degree of influence on the environmental quality from the construction of theproject in construction period so as to provide authoritative information in time andscientific basis for environmental management.

3.1.2 Environment Monitoring during the Period of Construction

In order to monitoring the performance of various measures for environmentalprotection in construction period and understand the environmental influences from theproject in operation period as well as to better understand the environmental quality inconstruction area and the discharging of the pollutants in different construction stages, itis necessary to carry out environmental monitoring in construction period.

The monitoring period shall include the whole construction period and the contentsinclude water quality, air, noise, solid waste and public health and so on.

(1) Water quality monitoring

(o Monitoring of sewage port

Monitoring item: pH value, suspended matters, oily matters, COD, BOD5 , ammonia andnitrogen.

Monitoring point: including the discharging port of domestic sewage, discharging portof sewage of foundation pit, discharging port of the sewage from sandy and rockmaterials processing system.

Monitoring frequency: twice per year, once respectively in level period and dry season.The monitoring time shall be increased in the peak period of construction.

(2) Monitoring of water quality of Hanjiang River at this section

Monitoring project: pH value, water temperature, suspended solids, oils, indexes ofhypermanganate, BOD5 , ammonian and total phosphorus.

Monitoring section: one section shall be arranged respectively at the upper and lowerreaches of Hanjiang River at construction area to collect the water sample of the surfacelayer.

29

Page 37: Public Disclosure Authorized El 064 - World Bankdocuments.worldbank.org/curated/en/720671468743763531/...Projects on International Waterways (OP/BP/GP7.50). Among these safeguards

Monitoring frequency: twice per year, once respectively in level period and dry season.The monitoring methods of water quality shall be carried out according to Monitoringand Analysis Method of Water and Waste Water (the second edition) issued by StateBureau of Environmental Protection.

(2) Air monitoring

Monitoring item: TSP, SO2 and NO2 .

Monitoring frequency: twice per year, once respectively in summer and winter, 5 dayscontinuously for each time.

Monitoring point: each monitoring point will be set respectively at the foundation pit,concrete mixing plant and living and office area.

The monitoring and analysis methods will be carried out according to the specificationsin Monitoring and Analysis Method of Air and Waste Air (1990) issued by State Bureauof Environmental Protection.

(3) Noise monitoring

Monitoring item: continuous effective sound level A.

Monitoring frequency: once per half a year for the noise source and once per year forthe environmental noise in construction boundary and living area.

Monitoring point: each monitoring point will be set respectively at the foundation pit,concrete mixing plant and office area.

(4) Monitoring of Public Health (Epidemic Situation)

Regular statistics and analysis must be done for various infectious diseases and diseasescaused by natural pestilential sources. Timely treatment must be followed once a newdisease is found. Generally speaking, the statistics is done once every three months. Thesystem of report of epidemic situation must be set up and timely report must be madeand relevant measures must be adopted when a statutory infectious disease is found soas to get the development of the disease under control. For the highly dangerous publicdue to touching toxic waste water or detrimental substance, or those whose quarantineresult is suspicious, health monitoring must be followed according to the different cases.

(5) Monitoring of Water and Soil Erosion

Contents of monitoring: to make sure the stacks of waste are piled as per the relevantregulations; to avoid destroying scenes; to prevent soil erosion caused by improperstacking of waste residues; to secure the safe stacking in the waste yard. It is strictlyprohibited to dump the waste into the Han River.

30

Page 38: Public Disclosure Authorized El 064 - World Bankdocuments.worldbank.org/curated/en/720671468743763531/...Projects on International Waterways (OP/BP/GP7.50). Among these safeguards

Regular examining must be done to keep the height of the stacks of the waste underthe designed height for piling up the wastes as well as to make sure the slopeprotection construction is done according to the designation.

Checking the protection measures for critter on top of the wastes yard must also be doneand tree planting and afforestation must be followed to prevent soil erosion.

(6) Monitoring of other construction sitesAs for the construction situation of the reservoir, lower reaches, bridges and roads,material stacking sites and waste fields, aquatic eco-system and Terrestrial eco-system,the supervising and the managerial staff of the environmental protection department ofthe project must make daily inspection of the sites, so to have direct views of thegeneral environmental quality, promptly discover environmental problems and analyzetheir developing tendency.The environmental monitoring plan of pivot and other works in construction period isshown in Table 3. 1-1.

The layout plan of environmental monitoring of the project in construction period isshown in Fig. 3. 1-1.

31

Page 39: Public Disclosure Authorized El 064 - World Bankdocuments.worldbank.org/curated/en/720671468743763531/...Projects on International Waterways (OP/BP/GP7.50). Among these safeguards

Legend

Environmental monitoring sites during consbuction period:

waterqualitymonitoringsitesA WWI air quality monitoring sitesN M 03 noise quafity monitoring sitesD 01 excavation waste dump monitoring sites

Environmental monitoring sites during operation period: 14

W(Mg water quality monitoring sitesN 01 (9)9 noise quahty monitoring sites

so

7--Q zo

- - - - - - - - - -- -

&V1� 60

P-W

4 r

SZ2

L6U

IM A A

OB

6c.

19 4

W.

PleA

W,J)

-in

\N 2.,

j

4A

N IJ I

�hipping an Hy ropow r vota Proj--I-��,S ia : Ul

It

W"

.ri %\

Wf'.3-

J�

%

r 44WL

qnl�

Figure 3 The layout plan of environmental monitodng of Cuijiaying Shipping and Hydropower Pivotal Project

Page 40: Public Disclosure Authorized El 064 - World Bankdocuments.worldbank.org/curated/en/720671468743763531/...Projects on International Waterways (OP/BP/GP7.50). Among these safeguards

Table 3. 1-1 Environmental monitoring plan of pivot and other project in construction periodMonitoring Monitoring point (section) Monitoring item Monitoring Monitoring unit

facor ~~~~~~~~~~~~~~~~~~~frequencyOSample the mixing water at the left, PH, water temperature, SS, Twice/year,middle and right 2km away from the CODMn, BOD 5 , oils, NH3-N twice/monthupper reaches of the dam site and total P for SSb(OSample the mixing water at the left,middle and right 2km away from the Ditto I Dittolower reaches of the dam site

Water (®)Sample mixing water at the drainage PH, SS, CODm,, BOD5 , oils Ditto envLronmentalquality hole of the foundation pit and NH3-N monitoring unit

(A)Sample mixing water at the drainage PH, SS, COD,, BOD 5 , oilshole where the waste water is used for and NH31N S Dittowashing the sand and stone materials(E)Sample mixing water at the drainagehole where the domestic sewage is PH, SS, CODN3 , BOD, oils Dittodrained to the river and NH3-NOConcrete mixing plant system

Air (:)Foundation pit of main dam TSP, S02 and N02 Twice/year, envLronmental(ArPivot management and living area at every time monitoring unitthe right bankOFoundation pit of main dam Twice/year,.)Concrete mixing plant system Equivalent and continuous A once for Local

Noise (l)Pivot management and living area at sound level every day monitoring unitthe right bank respectively

Check the excavation wasteLoss of position, height, protection Once/month, Localwater and Excavation waste dump slope and biological 12times/year environmentalsoil purification measures at the top monitoring unit

of the excavation yard

Heavy Localmetals Dumped soil Heavy metals in dumped soil Once environmental

monitoring unitLocal healthy

Crowd . Bloody flux, virus hepatitis and Once/season epidemichealth Construction camp typhoid fever prevention

departmentReservoir and upper reaches EnvironmentalBridge and road protection

Construction observation department ofOthers Materials stock yard and waste bank environmental quality Everyday the project and

constructionAquatic ecosystem land ecosystem supervision

3.1.3 Environment Monitoring Plan during the Operating Period

(1) Monitoring of the Water Quality

The change of the water quality at the inlet of the reservoir, in the reservoir and at theoutlet of the reservoir after the reservoir is built must be monitored. If the result showsthat pollution is aggravated or over the limit, timely report to the environment protectionadministration must be made in order to adopt the relevant measures for controlling thepollution sources and to guarantee the water quality to reach the function standard asregulated.

Layout of the Sections for Monitoring: the principle of the layout is to control thequality of the water source from the upper reach of the river, and that of the water in thereservoir and that at the outlet of the reservoir. Five sections are to be laid out in the

32

Page 41: Public Disclosure Authorized El 064 - World Bankdocuments.worldbank.org/curated/en/720671468743763531/...Projects on International Waterways (OP/BP/GP7.50). Among these safeguards

following places: No.4 Water Plant section (17 km upstream of the dam site); QianyingSection (6km upstream of the dam site and Yujiahu section (1km downstrearn of thedam site).

Monitoring Frequency: one monitoring each during low flow period, level period andhigh-water period; three days running each time for sampling at sections of the right,middle and the left.

Monitoring items: totally 7 items, including water temperature, pH, SS, DO, CODmn,BOD5, ammonian.

(2) Monitoring of Water Temperature

After the Project is completed, the water temperature will show its firm layeredstructure. At that time monitoring of the vertical layered structure of the watertemperature must be performed and the temperature of the flow or drain must bevalidated in order to adopt measures to reduce the influence on water for industrial andagricultural uses at the lower reaches of the river.

Monitoring of the water temperature structure is to be done within the five verticalobservation lines distributing in the left, middle, right zones of the dam and in thereservoir and at the tail of the reservoir.

Monitoring frequency: the observation period is 5 years and the time for the same termobservation is the fifth day, 15• day and 2 5th day of each month at 8:00.

Monitoring items: the water temperature and the runoff at the outlet of the power station,the vertical water temperature of the reservoir, the water temperature and runoff at theinlet, the air temperature in front of the dam, water level, etc.

(3) Monitoring of noise

Two monitoring points are to be set in the Junction Administration and Living Area atthe right bank.

Monitoring Frequency: two times of monitoring each year;

Time and Method for Monitoring: as per the relevant requirements in Methods forMeasuring of Environmental Noises in Urban Area (GB/T14623-93).

(4) Monitoring of public health (epidemic situation)

The change of the environmental conditions after the reservoir is built may place apremium on the prevalence of a certain infectious disease, therefore it is necessary tocarry out the monitoring among the inhabitants so as to discover the epidemic situationin time and to prevent the prevalence and to reduce its effect on them.

Monitoring items: diseases of historically high incidence, such as dysentery, malaria,

33

Page 42: Public Disclosure Authorized El 064 - World Bankdocuments.worldbank.org/curated/en/720671468743763531/...Projects on International Waterways (OP/BP/GP7.50). Among these safeguards

viral hepatitis, etc. and the breeding of flies and mosquitoes around the reservoir and thedensity of rats.

Monitoring alternative: general examination to be done regularly for public health in thereservoir area combined by positioned monitoring based on tracing.

Qianying Team No.5 and No.6 are the monitoring points for tracing.

Requirement for monitoring: one evaluation to be performed for epidemic situation andthe popular examination of the public health of the reservoir area after functioning ofthe reservoir and hereafter once every three years. The monitoring period will last for 10years. The investigation of epidemic situation must be well done for the traced publicand file management must be set up for the epidemic situation. Investigation andanalysis of the varieties, density and multiplying of the mass media of the diseases inthe regions to be traced for monitoring must also be done.

(5) Monitoring of stability of reservoir bank

Monitoring will be done in successive four years since the functioning of the reservoir.

(6) Monitoring of water and soil erosion

Monitoring period will last for 10 years. The first monitoring will be performed at thefirst year of operation period and hereafter once every three years.

(7) Monitoring of Terrestrial Ecologic System and Land Resources

This monitoring is to be done for investigation of the influence on the regionalterrestrial ecosystem and the use of the land resources due to the reservoir flowage andimmigration cultivation after the operation of the reservoir.

Irregular investigation must be done for the percentage of coverage by vegetation andthe change of the community of the terrestrial plants and animals and their diversitychanges, with the emphatic observation of the backwater region of the reservoir.Another irregular observation and investigation of the modes of land use and the changeof the utility benefit, conditions of soil erosion and soil fertility in the reservoir area andin the host area. For the soil gleying and the secondary salinization in the regions aroundthe reservoir and the region near the backward position, the irregular observation mustalso be performed.

(8) Monitoring of aquatic ecological system

The investigation will be undertaken on fishery output, fish varieties and quantities. Theinvestigation period will last for 5 years.

(9) Monitoring of other construction sites

As for the construction situation of the reservoir, lower reaches, material stacking sites

34

Page 43: Public Disclosure Authorized El 064 - World Bankdocuments.worldbank.org/curated/en/720671468743763531/...Projects on International Waterways (OP/BP/GP7.50). Among these safeguards

and waste fields, aquatic eco-svsteml and Terrestrial eco-svstem. the supervising aLncd themanagerial staff of the environmental protection departmiienit of the project must miakesdaily inspectioni of the sites, so to have direct views of the gener-al envir-onmiiienital quality.promptly discover environmental problems and analvze theil- developing tendency.

The plans for environmental Imlonitorinlg during, operation period are shown in TableE.I -i.Environmenital Moniitoi-incg Plani During Operationi Period is shlo"vin in Flu. 3..

Page 44: Public Disclosure Authorized El 064 - World Bankdocuments.worldbank.org/curated/en/720671468743763531/...Projects on International Waterways (OP/BP/GP7.50). Among these safeguards

Environmental Monitoring Plan During Operation Period

Table 3.1-2

Items Monitoring Points (sections) Monitoring items Monitoring frequency MonitoringInstitutions

Water quality (O)No.4 Water Plant section at Water temperature, pH, SS, DO, One time respectively in Local environmentalupstream CODMn, BOD5, ammonia dry period, level period monitoring units(®) Qianying section at nitrogen and high-water periodupstream each year. Each time will0) Yujiahu section at last for 3 days. Mixeddownstream sampling shall be done on

left, middle and right.Water Left vertical viewing line of Water temperature, flow, air Monitoring period is 5 Local environmental

temperature dam site temperature, water level years. Monitoring time is monitoring unitsMiddle vertical viewing line of at 8:00 am of 5t, 15t,dam site and 25th of each month.Right vertical viewing line ofdam siteMid-reservoir viewing lineEnd-reservoir viewing line

Noise G The administration and Sequential equivalent sound lday/season, 4 days/a. Local environmentalliving areas level A once respectively in monitoring units®Qianying Team No.5 daytime and nighttime(®)Qianying Team No.6

Epidemic Qianying Team No.5 Dysentery, malaria, viral One general survey to be Local sanitary andSituation Qianying Team No.6 hepatitis, typhoid fever etc performed after epidemic prevention

functioning of the dept.reservoir and hereafteronce every three years.

36

Page 45: Public Disclosure Authorized El 064 - World Bankdocuments.worldbank.org/curated/en/720671468743763531/...Projects on International Waterways (OP/BP/GP7.50). Among these safeguards

Items Monitoring Points (sections) Monitoring items Monitoring frequency MonitoringInstitutions

Stability of All protection areas Successive 4 years' Geological dept.reservoir monitoring , once per

bank year.Water & soil Reservoir area Intensity and volume of water & Monitoring period is 10 Local environmental

erosion Immigrant settlement area soil erosion; years(once in first year; monitoring unitsonce every three yearshereafter.)

Terrestrial Reservoir area Irregular investigation must be One to three years' Local forestry dept.ecological done for the percentage of irregular investigation.

system Immigrant settlement area coverage by vegetation and thechange of the community of theterrestrial plants and animals andtheir diversity changes, with theemphatic observation of thebackwater region of thereservoir. Another irregularinvestigation of the modes ofland use and the change of theutility benefit.

Aquatic Reservoir area Fishery output, fish varieties and Once per year. Local aquatic productecological quantity. dept.

systemOthers Reservoir & lower reaches Observing changes of 1 time/week Environmental

Recovery of material environmental quality protection dept. ofstackyards and waste fields the projectAquatic and Terrestrial systems

37

Page 46: Public Disclosure Authorized El 064 - World Bankdocuments.worldbank.org/curated/en/720671468743763531/...Projects on International Waterways (OP/BP/GP7.50). Among these safeguards

3.1.4 Environmental monitoring institutions

Environmental monitoring during the construction period is to be done by the joint monitoringgroup consisting of local qualified local environmental protection department entrusted by theproject, local quarantine service and local environmental geological department.

After the completion of the reservoir, it is suggested that the environmental monitoring duringthe operation period is to be performed by the local environmental protection departmententrusted. The local quarantine service can be entrusted for the monitoring of public health andsanitary within the reservoir area. The monitoring of stability of reservoir bank is to beundertaken by local environmental geological department entrusted. Monitoring of Terrestrialecological system shall be done by local forestry department, while the monitoring of aquaticecological system shall be done by local aquatic products department.

All methods for monitoring and analyzing will adopt the existing concerned standards andspecification of the state or trade

3.1.5 Submission of Environmental Monitoring Report

After completion of each phase of monitoring during construction period, the monitoringinstitution is required to submit in duplicate Environmental Monitoring Report duringConstruction Period of the Project to the Environmental Protection Department of the ProjectConstruction Office of Hanjiang Cuijiaying Shipping and Hydropower Development Co. Ltd.(hereafter referred as to the Project Office).

Hubei Communications Bureau will submit the English version to the World Bank. From thefirst year of construction, the Project Office is required to submit half yearly report respectivelyto Hubei Communications Bureau, Hubei Environment Protection Bureau and XiangfanEnvironmental Protection Bureau. Meanwhile, Hubei Communications Bureau shall submit thehalf yearly report English version to the World Bank. Such shall end till completion of theproject.

Project monitoring report submission procedure is shown in Drawing No.3.1-3.

38

Page 47: Public Disclosure Authorized El 064 - World Bankdocuments.worldbank.org/curated/en/720671468743763531/...Projects on International Waterways (OP/BP/GP7.50). Among these safeguards

t -| ~~~Xiangfan Environment Protection Bureau|l

Hubei Environment Protection Bureau

< j ~~~Hubei Communication Bureau |m 3

o- Xiangfan Environment Protection Bureau |0~ ~ ~~~~~~~~~~~~~~~~~0

0~~~~~~~~~~~~~~~~~Hubei Environment Protection0 PI ~~~~~~~~~~~~~~~~~~~~0

0~~~~~~~~~~~~~~~0 O'~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~-

Hubei Communication Bureau

Xiangfan Environment Protection Bureau0~~~~~~~~~~~~~~~00

H-ubei Comumunication Bureau

Page 48: Public Disclosure Authorized El 064 - World Bankdocuments.worldbank.org/curated/en/720671468743763531/...Projects on International Waterways (OP/BP/GP7.50). Among these safeguards

3.1.6 Estimated Costs of Environmental Monitoring

(1) Cost of Environmental Monitoring during the Construction Period

Construction period: 5 years; monitoring of water quality: RMB160000/yr.; monitoring of air:RMB120000/yr.; monitoring of noise: RMB 8000/yr.; monitoring of waster erosion:RMB 12000/yr.; investigation of public health (epidemic situation): RMB 10000/yr.

(2) Cost of Environmental Monitoring during the Operation Period:

Monitoring of water quality: RMB 30,000/Year, monitoring period 20 years;

Monitoring of Quality and Temperature of Water : RMB 20,000 /Year, monitoring period 5years;

Monitoring of Noise: RMB6,000/Year, monitoring period 5 years;

Investigation of Public Health: RMB 20,000 /Year, monitoring period 10 years (once in firstyear, hereafter once every three years);

Monitoring of stability of reservoir bank: RMB 10,000/Year, monitoring period 4 years;

Monitoring of Terrestrial Eco-system and Use of Land Resources: RMB250,000 totally,monitoring period 10 years (From the first to third year, irregular monitoring);

Monitoring of aquatic ecological system: RMB 30,000/Year, monitoring period 5 years.Total: RMB 1,330,000.

The estimation of environmental monitoring charges is shown in Table 3.1-3.

40

Page 49: Public Disclosure Authorized El 064 - World Bankdocuments.worldbank.org/curated/en/720671468743763531/...Projects on International Waterways (OP/BP/GP7.50). Among these safeguards

persons. The responsibilities of the Department include the following aspects:

( 1 ) The department is administerially under the leadership of the Project Office andprofessionally under the guidance of the provincial and prefectural (city) environmentalprotection bureaus, being responsible for submitting the monthly report on environmentalmanagement and compiling the statements of environmental monitoring during constructionperiod.

(2) It will supervise the contractors to carry out the pollution preventive measures, participatein the works of project supervisor. It can issue warning notice and report to the Project Office ifthe contractors are found to violate environmental protection regulations or fail to effectivelyimplement the pollution preventive measures. The department shall help to deal with theproblems in case pollution accidents occur.

(3) It will assist local governmental environmental protection department to establish newmonitoring sections and bank monitoring points, as well help to undertake training for themanagerial and monitoring staff.

(4) According to the environmental problems found during the construction period, it willput forward suggestions for environmental protection measures during operational period tolocal environmental protection and navigation departments.

The Project management organization and work procedure are shown in Diagram 3.2-1.

42

Page 50: Public Disclosure Authorized El 064 - World Bankdocuments.worldbank.org/curated/en/720671468743763531/...Projects on International Waterways (OP/BP/GP7.50). Among these safeguards

Drawing No.3.2-1 Project management organi ation and work procedure

Hubei communicationis bureau F ubei v . ent Pro ectuon reaL

(D 00 f

odms,hnipsptragtiOn 0 _ o0ALW a0: LU LUL--; -sU-;0

CD CDa -')

< ~~~~~~- 1 -, I I 0'

L~ I LI` i ,]

Hubei WB Financd Shipping Project Office Xiangfan Environment Protection Bureau

!nvironment Financial Administrative Pollutionadministrative bureau office control4, ~~~~~~~~~~~~~~~~~~~~~office ofc

Xiangfan Hubei Hanjiang Cuijiaying Shipping & Hydropower Development Co. Ltd.shipping *-

idministration > -

(D~~~~~~~~~~~~~~~~~- CD O

-. .- s(D 0 ~~~~~~~~~~~~~~~~~~~D0

~ ~~~~~C .... .... .. ... . ......... .......1 . ............ .....

contractor ||orkconracororkt t coseranc t P-Jt C-nsurvcor1 S-- sufi|

CD ;Dam safety L --------- JCD

Xiangfan Shiipping Construction Project Office

Land administration Environment Project Machinery bureau

Protection bureaui management dept.

contractor work contractor work construction hyrpwr.stpervisor

43

Page 51: Public Disclosure Authorized El 064 - World Bankdocuments.worldbank.org/curated/en/720671468743763531/...Projects on International Waterways (OP/BP/GP7.50). Among these safeguards

3.2.2 Environmental Supervisor

During the process of project construction, there will emerge various environmental problems.Prompt settlement of these problems will ensure the smooth progress of the project and alsomaximally mitigate the impacts of construction on the environment. Therefore, it isrecommended that, after the Project Office has established the department of environmentalprotection, project supervisor shall also set up correspondent department of environmentalprotection or assign special personnel to be responsible for the issue.

The environmental protection supervisor can be assumed by construction engineer who canlearn to supervise environmental works after being trained.

The responsibilities of the environmental supervisor are, based on routine site observation, tocoordinate the environmental protection department of the Project Office to deal with theidentified environmental problems.

The construction supervision organization chart of the project is shown in Diagram No.3.2-2.

44

Page 52: Public Disclosure Authorized El 064 - World Bankdocuments.worldbank.org/curated/en/720671468743763531/...Projects on International Waterways (OP/BP/GP7.50). Among these safeguards

Drawing No. 3.2-2 Project Construction Supervision Organization Chart

| eneral project supervisor

I - -- I~~~~~IP-

Vice general project supervis0ri Vice general project supervisor2

Deign office tuptiri deparetmen

-v_ __ __ _______ - ______.___ _-- -

hiplock supervise deprtment Earth da supervise department o plant supenise department Water release gate supervise depariwen Reservoir protection supervise department Flnage building supervise departmetAn envirlament engint engineerrn e en nt engineer An enviranent engineer An envirennent engineer _ An envircnment engineer

451 I q W;;3 I; c9 i;91

45

Page 53: Public Disclosure Authorized El 064 - World Bankdocuments.worldbank.org/curated/en/720671468743763531/...Projects on International Waterways (OP/BP/GP7.50). Among these safeguards

3.2.3 Environmental Protection Training

All personnel including the administrative staff of the project office and construction workershave to receive environmental protection training at least one time. Key environmentaladministrative and monitoring personnel must go through the pre-post technical training for aperiod of 1-3 months.

3.2.3.1 Environmental technology and technique training

( 1 ) On-duty training for environmental monitoring managerial personnelThe targets to provide with on-duty training for the environmental monitoring personnel are toenhance the works of environmental monitoring and management during construction andoperational periods, thus to ensure the quality of environmental monitoring and effectiveenvironmental management and to wholly improve the quality of the project. During thetraining, the trainees will know how to distinguish the key environmental problems duringconstruction period and acquire more about the existing problems and deficiencies so that theycan make prompt reports to the environmental protection department to take necessarypreventive measures. During the process of construction, the Project Office will invite expertsof environmental protection or experienced administrative staff to lecture on the possibleenvironmental problems and correspondent solutions.

(2) Training for persons in-charge and construction workersBefore commencement of the project, the persons in-charge and construction workers of thecontractor must receive systematic training of environmental protection knowledge, so thatthey can avoid the damages to the environment due to mal-operation during the process ofconstruction. The target of training person in-charge of contractor is to clarify theresponsibilities of environmental protection for the contractor. The aim of training constructionworkers is to emphasize the correct operating methods for construction works duringconstruction and operational period, so that mal-operation can be avoided. The training ofperson in-charge and construction workers shall be charged by the assigned persons of theenvironmental protection department of the Project Office, of which, the main tasks are tomake clear the possible damages to the environment by project construction, necessaryenvironmental protection measures and the handling methods for any problems. Throughtraining, the person in-charge may know the obligations that he should shoulder and thepossible consequences if the environment is damaged. At the same time, construction workersmay be more directly knowing about the degrees and methods of environmental protection forthe sensitive points. According to the actuality of the project, the training period for the personin-charge and construction workers shall last for one week.

(3)) During operation period, Project Owner shall regularly provide environmental protectiontraining for the staff, hence to make them clear about possible environmental problems andtake necessary measures. Each personnel shall have the awareness to protect the environment.

3.2.3.2 Training method and training charges

46

Page 54: Public Disclosure Authorized El 064 - World Bankdocuments.worldbank.org/curated/en/720671468743763531/...Projects on International Waterways (OP/BP/GP7.50). Among these safeguards

Training method includes:(1) Experts give lectures, or experts from environmental protection competent department.Training budget is RMB 30000.

(2) Visit of site project environmental protection. This is to organize visit to the environmentaladministrative departments where have started or completed representative inner waterwaydevelopment projects to learn experienced environmental administrative method through sitedemonstration. Training budget: RMB60000.

(3) Non-scheduled long-term (1 to 2 years) or short-term (1 to 3 months) training sponsored bydomestic universities and scientific research units. Estimated cost for training is RMB 100,000.

(4) Abroad study and training. Twelve persons divided into two groups will be sent abroad tothe places where have similar experiences (especially World Bank aided projects) to learnforeign advanced management. It is to formulate provisions for environmental administrationaccording to the actuality of the project. The training period shall be one month. Trainingbudget: RMB600000.

The total budget of the above training will be RMB790000.

3.2.4 The Implementation of Mitigating Measures for Environmental Protection

The Implementation of mitigating measures for project environmental protection is shown inTable 3.2-1.

3.3 The Legal Forces for Environmental Protection Action PlanEnvironmental protection action plan is regarded as the guide for construction units to carry outthe environmental protection measures. It is also the basis for environmental competentdepartments to inspect and approve the works of environmental protection. Therefore, theenvironrmental protection action plan must have the same legal forces with the contract andbidding documents.

When the project employer intends to invite public bidding of the project construction, theenvironmental protection action plan shall be treated as one of the basic bidding documentssold to the bidders. It must be included in the bidding documents, of which, necessary chargesrequired by various environmental protection measures can be listed in the construction budget.When the project employer examines the bidding documents, it must consider the commitmentspecified in the EAP as one of the basis for document examination. When signing constructioncontract, it must include EAP as one of the works included in the contract. It should clarify thatEAP is one of the basis for approval of the project quality, any environmental losses due to thefailure in fulfilling EAP shall be borne by the contractor. The personnel in charge of the ProjectOffice must acquire to well know the significance of EAP before project commencement andshall be responsible for making explanation to contractors.

47

Page 55: Public Disclosure Authorized El 064 - World Bankdocuments.worldbank.org/curated/en/720671468743763531/...Projects on International Waterways (OP/BP/GP7.50). Among these safeguards

The project supervisor must treat EAP as one of the basis for the supervisory works. Any worksthat have not fulfilled the environmental protection measures cannot be approved.

The contractors must assign special personnel to be responsible for the implementation of theEAP, formulate the alternatives of EAP implementation. All measures specified in the EAPmust be carried out thoroughly according the schedule.

48

Page 56: Public Disclosure Authorized El 064 - World Bankdocuments.worldbank.org/curated/en/720671468743763531/...Projects on International Waterways (OP/BP/GP7.50). Among these safeguards

Mitigating Measures for Project Environmental Protection

Table 3.2-1

Essential ienvironmental Mitigating measures institution

problemsI. Design period

1 . Anti-flood and Dam site, dam pattern, flood discharge mode, normal Hubeireservoir inundation storage level should be rational, hence to reduce the Communicationsarea loss caused by inundation and avoid adverse impacts Planning &

on anti-flood in reservoir area. Design InstituteHubei

2. the safety of reservoir Adopt measures to prevent the risk of eroding bank Communicationsbank and dam. and dam breaking. Dsanningsu

Design Institute,local government

3. The impacts of Promote anti-flood standard, repair and maintainincreasing water level flood release gate, flood release channel and poweron flood dam and drainage and irrigation facilities as well as implement Dittoinundation of irrigation compensation for water conservancy and electricityand drainage facilities. and the planning of removal.4. Protection of cultural Check if there are underground cultural relics hence SHEIDI-EArelics. to protect culture relics from being damaged. TEAMII. Construction period

Waste water are mainly from the waste dischargesfrom sand and stone materials, foundation pits. Thepollutants can be settled for discharge after reaching

1. waste water pollution the standard through treatment in sedimentation tanks Contractorsand depositing tanks. It is to adopt underearthintegrative sewage treatment equipment forpermanent sanitary waste and employ septic tank for_temporary residences.Water sprayer will be used to regularly spray water to

2. dust pollution reduce dust. The earth falling down from running Contractorsvehicles in construction sites must be cleaned uppromptly.Choose low-noise construction machine.

3. noise pollution Strong-noise machine shall be arranged to work in Contractorsdaytime. Construction time limit shall beimplemented in sensitive spots.Adopt water and soil erosion prevention measures inconstruction period. Build stone retaining wall,protection slope and water drainage in where water

4. water and soil erosion and soil erosion easily occur. Prompt refilling, Contractorstamping is necessary if there is some cutting.Vegetation must be promptly recovered in borrowpits and excavated materials disposal area.

Local. enviroment In construction period, regular monitoring must be environmental

5. environmental implemented on water, atmosphere, acoustic and protectionmonitoring ecological environment. monitoring

station6. protection of cultural Digging protection Hubei Culturalrelics Dign rtcinRelics BureauIII. Operation period1. industrial waste No waste water shall be discharged by the Pivot Xiangfanpollution proper. Enterprises within reservoir area can Municipal

49

Page 57: Public Disclosure Authorized El 064 - World Bankdocuments.worldbank.org/curated/en/720671468743763531/...Projects on International Waterways (OP/BP/GP7.50). Among these safeguards

Essential Implementationenvironmental Mitigating measures institution

problemsdischarge waste water into the Han River after Governmentreaching the standard through treated through the citywastewater treatment plant, hence to reduce thepollution to water body. Ships and vessels shall notdischarge waste oil, manure and garbage into waterbody but into acceptance facilities in the port.

According to the rules, all ships and vessels must be Navigation

2. the treatment of waste equipped with oil water separator. Ships and vessels adupervaisndischarged by vessels shall not discharge waste oil, manure and garbage and wharf

into water body but into acceptance facilities in the ,m.r.port. ~~~~~~~~~~~administrativeport. department

3. the control of noise of Strengthen the management of passing ships and Navigationpassing vessels vessels. Those which noise is beyond the limited supervisingstandard are not allowed to run. administration

Strengthen safety protection awareness; strictly Transportation4. pollution of leaking 't administrativeaccident of poisonous implement the regulations of the State on the department,products transportation of dangerous products. Any leaking of navigationpoisonous and dangerous products must be promptly supervising

reported and timely settled. administration

Local5. environmental Environmental monitoring must be implemented environmentalmonitoring according to monitoring plan. protection

bureau

6. protection of fishery Establish fishery protection station Local aquaticproducts bureau

1 ~~~~~~~~~~~~~~~~~50

Page 58: Public Disclosure Authorized El 064 - World Bankdocuments.worldbank.org/curated/en/720671468743763531/...Projects on International Waterways (OP/BP/GP7.50). Among these safeguards

4.0 ANALYSIS OF ECONOMIC LOSS AND BENEFIT

OF ENVIRONMENTAL IMPACTS

4.1 Analysis in Environmental Economic Benefit

4.1.1 Social Benefit

Cuijiaying pivot is a water conservancy project, which mainly serves for navigationand meanwhile gives attention to comprehensive benefits such as irrigation, tourismand aquaculture. Therefore, benefits of this project include navigation, powergeneration, farmland irrigation, aquaculture, tourism, etc.

Cuijiaying pivot possesses comprehensive benefits such as navigation, powergeneration, irrigation, aquaculture and tourism. Implementation of this project willnotably improve the navigation condition in the middle and lower reach of HanjiangRiver. 39.8Km of reservoir backwater will inundate 4 clusters of beaches in thereservoir area and increase the navigation level of this reach up to 1 000t, which savesmaintenance cost of the waterway. Besides, raising of water level in the reservoir willsave dredging cost for Xiangfan Port on one hand, and on the other hand will boostthe economy there, so it has obvious social benefit.

The annual energy output of this project is 4.15 X 1 08kw * h; according to the presentsituation, the quantity of electric charge per 109 kwh in Hubei is equivalent to RMB1,016,000,000.00 industrial output, in this way, this project provides the necessarycondition for creating the industrial output of RMB 4,210,000,000.00.

As for the notable benefit of power generation, this project generates annual poweroutput of 4.15X 108 kw * h, which creates essential conditions for 4.21 billion ofindustrial output value according to the fact that electric quantity of every 0.1 billionkw * h equals to 1.016 billion of industrial output value at present in Hubei province.Apart from that, using the direct financial income created in power generation fordynamic development of the waterway will ultimately solve the problem of financialstrain for the waterway construction.

Implementation of this project will improve the farmland irrigation condition inTangdong irrigation area with effective irrigation area of about 177 X 104mu, andreplace the irrigation compensation project for the implementation of midline projectof the south-north water transfer strategy.

In addition to the above social benefit, this project will also create considerablebenefit for tourism, aquaculture, etc, which is mainly reflected by the fact that

51

Page 59: Public Disclosure Authorized El 064 - World Bankdocuments.worldbank.org/curated/en/720671468743763531/...Projects on International Waterways (OP/BP/GP7.50). Among these safeguards

upgrade of waterway level and establishment of Yuliangzhou scenic spot attract moretourists, and the completion of Cuijiaying pivot will provide favorable water space tothe development of aquaculture in the reservoir area.

This project will provide necessary transportation conditions to the lineal economicdevelopment, especially to the construction of Xiangfan city because the raise ofwater level in Cuijiaying pivot will improve conditions in Zhangjiagang water areaand Tangbaihe river mouth, which will promote significant economic development inXiangfan as well as in the base of China's Second Automobile in Xiangfan.

As the absolutely necessary compensation project in the midline of south-north watertransfer strategy, the flier canalization project in the middle and lower reach ofHanjiang River, if completed early, will provide a solid base for realization of thismagnificent blueprint with great comprehensive benefits.

On completion of the navigation hydropower pivot, the increased amount ofimpounded sand and low water flow rate will improve water quality in the lowerreaches of the dam site. In addition, expansion of the water surface will regulate theclimate, promote growth of various plants, and increase the plant coverage in thereservoir area.

In general, after the flow off of Cuijiaying pivot flows across Danjiang Reservoir inthe upper reaches being regulated and stored, the riverbed and flow off becomerelatively stable, which will provide convenient transportation on land and water andpossess the advantages of adjoining power utilization load center, having wideriverbed in the construction area as well as short construction period. This project is infavor of the implementation of the midline south-north water transfer strategy.

4.1.2 Economic Benefit

Direct economic benefit brought by this project mainly lies in decreasedtransportation cost, power generation, etc. Other benefits such as irrigation, floodcontrol, tourism, aquaculture and poultry, and improvement in local investmentenvironment are difficult to quantify, so following below is just some qualitativedescription.

(1) Navigation BenefitImplementation of this project will notably improve the navigation condition in themiddle and lower reaches of Hanjiang River. 39.8Km of reservoir backwater willinundate 4 clusters of beaches in the reservoir area and increase the navigation levelof this reach up to 1 000t; improve the condition of Xiangfan Port, realize the opennavigation between Xiangfan and the north effluent of Tangbaihe River all the yearround, which saves maintenance cost of the waterway as well as dredging cost forXiangfan Port. Therefore, the navigation benefit of this project is mainly represented

52

Page 60: Public Disclosure Authorized El 064 - World Bankdocuments.worldbank.org/curated/en/720671468743763531/...Projects on International Waterways (OP/BP/GP7.50). Among these safeguards

by the increased freight volume and decreased transportation cost, as well as themaintenance cost, which will be saved by the replaceable waterway regulation projectafter completion of construction project.

(2) Power BenefitThe shadow electricity price of this project shall be set down on the basis of long-termmarginal cost of the power supply system i.e., the increased system capacity cost andelectric quantity cost caused by the increase of unit loading.

(3) Irrigation BenefitAfter completion of midline south-north water project, there will be no transition ofmedian water period in the lower reaches of Hanjiang River because of the quickenedhydraulic drop from high water to low water and shortened time in median water,which will cause adverse impact on the farmland irrigation in the middle and lowerreaches of Hanjiang River (esp. Tangdong irrigation area of Xiangfan). Relevantsurvey data show that if Cuijiaying reservoir pivot is not built, it will cost RMB0.3billion to build a channel linking Danjiang river mouth and Tangdong irrigation areato solve farmland irrigation in that area. However, after the completion of Cuijiayingreservoir, due to the raised water level, irrigation conditions in Tangdong irrigationarea will be improved with effective irrigation area of 177 X 104mu, which will saveinvestment in construction of the irrigation channel. Substitution effect made byirrigation in this project equals to the investment in the irrigation channelconstruction.

(4) Aquaculture BenefitOn completion of Cuijiaying pivot, backwater length of the reservoir area will be39.8Km, and the water area can reach up to 7.4 X 104mu if the average river surfacewidth is 1.5Km, in which, 1 X 104mu can be provided as area for manual aquacultureand poultry in the reservoir area, and 6.3 X 104mu for fishery for fulltime fishers. Tocalculate in term of 100mu as cage culture area in the reservoir area and 4 X104Kg/mu as per unit area yield, the annual production of adult fish will be 400 X104Kg; in term of 1 X 104mu as enclosure culture area in the river port and 1 00Kg/muas per unit area yield, the annual production of adult fish will be 100 X 104Kg; in termof 6.3 X 104mu as natural fishery water surface and 14Kg/mu as per unit area yield,the annual production of adult fish will be 882,000Kg. The above three items total588.2 X 10 4Kg of annual production of adult fish, which, if calculated in term ofRMB10/Kg, will create an annual production value of RMB58,820,000. If deductedthe investment cost of aquaculture, the aquaculture benefit of Cuijiaying pivot innormal years can reach RMB 10 million/year.

(4) Tourism BenefitApart from aquaculture benefit, the natural and geographic conditions in HanjiangRiver will bring notable economic benefit to tourism in Xiangfan with not onlycultural relics such as the ancient Longzhong and ancient city wall, but also newly

53

Page 61: Public Disclosure Authorized El 064 - World Bankdocuments.worldbank.org/curated/en/720671468743763531/...Projects on International Waterways (OP/BP/GP7.50). Among these safeguards

opened Yuliangzhou scenic spot, which has become a fresh attraction to urban people.CuijiayingJ pivot is situated in the lowver reaches of Yuliangzhou and the constructedreservoir will be integrated witlh this scenic spot, creating a large-scale recreation siteproviding reservoir scenery as well as water amusement. Beside considerable tourismbenefit. this reservoir will also add new tourism routes for tourists.On completion of the navigation hydropower pivot, the increased amount ofimpounded sand and low water flow rate will improve water quality in the lowerreaches of the dam site. In addition. expansion of the water surface will regulate theclimate, promote growth of various plants. and increase the plant coverage in thereservoir area.

4.2 Analysis of Loss of Environmental Impacts

The constructioln of dam without adopting relevant protection measures may causeenvironmental loss, which includes mainly the discharge of pollutants during theconstruction period, the upraise of incidence of diseases among the constructionworkers, the interference of the growing environment of animals and abusive killingof them. the obstruct of the dam, the serious damage to the growing environment offishes and flooding historical cultural sites due to the water flow from the dam and thepossible blowup of the growing environment for flies and mosquito that spreadmalaria.

Other disadvantageous impacts on environment can be avoided or dulled throughadopting measures. The environmental loss is about equal to the total sum of the costof protection measures for disadvantageous influence and the relevant monitoring costof environlmental protection and control.

The total investment on environmental protection will be RMB 40.3354 million andthe ann1ual environimental control and monitoring charges will be RMB 2.88 millionIand training charges of RMB 0.79 million duLing the operation period.

4.2.1 Analysis of' Envir-onmllenital Econiomic Loss

Environmental economic loss includes the necessary investment for avoiding orreducing the loss, totaling RMB 32.712 million. The average annual value of loss isRMBI.636 million during 20 years' operationl.

4.2.2 Analysis of Environlmenital Economic Benefit

(1) Water power is to be used as the clean energy sources, which can greatly reducethe discharges of the three wastes, and its environmental benefits can be calculatedbased on the equivalent environmental investment for using- thermal electricitygeneratin g planit on1 the coequal scale. which can be saved if water power is used. Thecalculation is as l'ollows: the annu,al standard consumptioll of coal is 112 thousandtonls based on the standard consumption of 0.35kg per kw *h, and the annual discharge

54

Page 62: Public Disclosure Authorized El 064 - World Bankdocuments.worldbank.org/curated/en/720671468743763531/...Projects on International Waterways (OP/BP/GP7.50). Among these safeguards

of sulphur dioxide will 2.707 thousand tons based on the percentage of the sulphurcontent of the local coal, 1.51%, upon which RMB 0.2/kg is levied as the dischargefee for sulphur dioxide, so making a sum of RMB 542 thousand to be paid for the

discharge fees for sulphur dioxide every single year. A rough estimation of the cost ofa set of electrical dedusting equipment is RMB 2.97 million for treatment of soot,which must be added by another sum of RMB 0.66 million for two tippers of 8 tonsfor moving the fly ash collected to the fly ash yard because of the use of dry dustingwithout ash sluicing water. As for the construction of an ash yard, the investment ofRMB 25 million is needed. Therefore, the annual investment for E.P. will be

RMB1.909 million if the E.P. establishments can be used for 15 years. The operatingcost of environmental protection facilities is RMB 250 thousand each year.

So it can be calculated that RMB 2.159 million can be saved each year after operationof the project.

4.2.3 Analysis of Loss and Benefit of Environmental Economy

Ratio of Loss and Benefit = value of annual environmental loss / value of annualenvironmental benefit

The annual average environmental loss is RMB 1.636 million and the annual average

environmental benefit is RMB 2.159 million, so the ratio being 1:1.32. Therefore, theeconomic benefits brought by the environmental investment is larger than theenvironmental loss and remarkable social benefits and environmental benefits areshown as well.

55