Date post: | 02-Jan-2016 |
Category: |
Documents |
Upload: | kristopher-robertson |
View: | 216 times |
Download: | 3 times |
Public safety (vehicular & pedestrian)
Worker safety
Maintenance of traffic flow
Business access
Maintenance of utility services
Traffic Control Goals
Southbound lanes of Mt. Rushmore Road from Highland Park Drive to Flormann Street
Construction Sequence – Phase 2A
Southbound lanes of Mt. Rushmore Road from Tower Road Bridge to Highland Park Drive
Construction Sequence – 2B
Northbound Lanes of Mt. Rushmore Road from Tower Road Bridge to Highland Park Drive
Construction Sequence – Phase 3A
Northbound Lanes of Mt. Rushmore Road from Highland Park Drive to Flormann Street
Construction Sequence – Phase 3B
Center Lanes & Median of Mt. Rushmore Road from Tower Road Bridge to Flormann Street
Construction Sequence – Phase 5