Kelley Square
Improvement Project
Worcester | Project File No. 609226
PUBLIC WORKSHOP #2White Room - Crompton Collective
Oct 24, 2018 | 6:00 pm
Mass DOT
Kelley Square Improvement ProjectWorcester | Project File No.609226
Presenters & Facilitators
• Barry Lorion• Muazzez Reardon• Steve Risotti• Tom Emerick• James Robida
• Erin Kinahan• Lori Shattuck• Arthur Frost• Robin Giando• Pam Marquis
• Joe Frawley• Ann Sullivan• Adam Nabulsi
VHB – Design Consultant• Don Cooke• Tracie Lenhardt
• Erin Thompson• Scott Brunner
• Greg Russell• Amanda Bazinet
RVA – Public Outreach Consultant • Kate Barrett• Amanda Poggenburg
• Emily Christin
Project Area
Kelley Square Improvement ProjectWorcester | Project File No.609226
Other Projects
Kelley Square Improvement ProjectWorcester | Project File No.609226
• Improve safety for all users
• Improve mobility for all users
• Enhance neighborhood connectivity
• Create a walkable & bike-able Kelley Square
• Support existing businesses and economic growth
Project Need & Goals
Kelley Square Improvement ProjectWorcester | Project File No.609226
Crash Summary (2013 – 2016)
Kelley Square Improvement ProjectWorcester | Project File No.609226
Collision Type Madison St. Washington to
Green
Kelley Square
I-290 Interchange
Other Total
Angle 49 80 61 0 190
Head-On 0 0 0 1 1
Rear-End 13 49 32 0 94
Sideswipe(Opp. Direct.)
3 1 4 0 8
Sideswipe(Same Direct.)
6 27 34 0 67
Single Vehicle 6 25 12 0 43
Non Motorist (Bike/Pedestrian)
4 13 5 0 22*Total 81 195 148 1 403
* The non-motorist crashes are also accounted for in the crash totals.
Crash Summary (2013 – 2016)
Kelley Square Improvement ProjectWorcester | Project File No.609226
81 Crashes
195 Crashes
148 Crashes
• Crash rate MEV (crashes per million entering vehicles)
– State average 0.57 MEV for un-signalized location– Kelley Square: 2.89 MEV
Nearly 300 comments so far– Do what's necessary but do as little as possible– Vernon St bridge width & I-290 Ramps– Maintain neighborhood connectivity– Bicycle and pedestrian accommodation/routes– Maintain business access – Be sensitive to parking – Place making/Gateway
Public Outreach Feedback
Kelley Square Improvement ProjectWorcester | Project File No.609226
• Roundabout(s)
• Signalization
• Unsignalized with Geometric improvements
• Potential changes in directionality of streets
Potential Improvement Alternatives
Kelley Square Improvement ProjectWorcester | Project File No.609226
Alternative 1: Signalization
Kelley Square Improvement ProjectWorcester | Project File No.609226
• Clearly delineates traffic lanes and movements
• Complex signal phasing and long cycle lengths.
• Increased queueing
• Well understood ped phases with shorter crossings. However, long ped waiting times.
• Proposed street directionality modifications.
• Provides bike accommodation
• Requires property impacts
• I-290 WB ramps remains unsignalized
Alternative 2: Roundabout
Kelley Square Improvement ProjectWorcester | Project File No.609226
• Traditional Roundabout that clearly delineates traffic lanes with fewer conflict points
• Traffic calming
• Shorter crossings with fewer opportunities to cross Vernon St.
• Millbury St is one-way NB (Right-out only)
• Water St remains one-way NB (Access restricted)
• Provides bike accommodation on and off roadway
• Requires property impacts
• I-290 WB ramps signalized
Alternative 3: Hybrid – Option 1
Kelley Square Improvement ProjectWorcester | Project File No.609226
• Hybrid design that clearly delineates traffic lanes with fewer conflict points
• Traffic calming
• Shorter crossings with opportunities to cross Vernon St.
• Millbury St is one-way NB (Right-out only)
• Harding St south of the intersection is two-way.
• Water St remains one-way NB
• Provides bike accommodation on and off roadway
• Requires property impacts
• I-290 WB ramps signalized.
Alternative 4: Hybrid – Option 2
Kelley Square Improvement ProjectWorcester | Project File No.609226
• Hybrid design that clearly delineates traffic lanes with fewer conflict points
Traffic calming
Shorter crossings with opportunities to cross Vernon St.
Millbury St is one-way SB
Water St remains one-way NB
Provides bike accommodation on and off roadway
Requires property impacts
I-290 WB ramps signalized and left turn at off ramp prohibited.
•
•
•
•
•
•
•
Potential Improvement Alternatives
Kelley Square Improvement ProjectWorcester | Project File No.609226
Pedestrian & Bike Accommodation
Pedestrian
Bike
Potential Improvement Alternatives
Kelley Square Improvement ProjectWorcester | Project File No.609226
Alt 1Signalization
Alt 2Roundabout
Alt 3Hybrid –Option 1
Alt 4Hybrid –Option 2
Safety
Pedestrian Accommodation
Bicycle Accommodation
Business Access/Egress
Traffic Operations(congestion, delay & queuing)
Property and Building Impacts
Place Making
Neighborhood Connectivity
Transit Options
Community Health
- Mail-in comment sheets
- Project Email Address: [email protected]
– Project website: https://www.mass.gov/worcester-kelley-square-improvement-project
Kelley Square Improvement ProjectWorcester | Project File No.609226
We Want To Hear From You…
Project Schedule
25% Design Submittal Jan 2019
Design Public HearingFebruary/March 2019
100% Design SubmittalMay 2019
Construction Starts Oct 2019
Kelley Square Improvement ProjectWorcester | Project File No.609226
.
Outreach• Previous Outreach
– Numerous meetings with community and local groups– MassDOT 1st Public Workshop – Oct 10, 2018
• Additional community/business/Stakeholder meetings to come
• MassDOT Public Information Meeting – Nov 15, 2018– Formal presentation and public comment period
• Additional public meetings during design phase
Kelley Square Improvement ProjectWorcester | Project File No.609226
We Want To Hear From You…
- Mail-in comment sheets
- Project Email Address: [email protected]
– Project website: https://www.mass.gov/worcester-kelley-square-improvement-project
Kelley Square Improvement ProjectWorcester | Project File No.609226
Thank You
Next Meeting:November 15, 2018Worcester Academy
Examples of Hybrids
Kelley Square Improvement ProjectWorcester | Project File No.609226
Carmel, IN
Examples of Hybrids
Kelley Square Improvement ProjectWorcester | Project File No.609226
Gainsville, FL
Examples of Hybrids
Kelley Square Improvement ProjectWorcester | Project File No.609226
Omaha, NE
Existing Conditions
Kelley Square Improvement ProjectWorcester | Project File No.609226
• Lack of signage and pavement markings• Wide pavement width with little to no delineation
for traffic movements• Lack of bicycle accommodation• Long crosswalks• High number of crashes• Physical constraints
– Vernon St Bridge– Vernon Hotel and Kelley Sq Pizza
Crash types and locations
Kelley Square Improvement ProjectWorcester | Project File No.609226
7 crashes with parked cars
8 crashes involving pedestrians
27 angle collisions
51 crashes with left-turns to/from ramps
14 side-swipe collisions
4 pedestrian crashes
Pedestrian fatality
10 crashes exiting gas station
18 crashes with vehicles turning to/from Washington St.
13 rear end collisions
53 angle collisions
Daily Volumes
Kelley Square Improvement ProjectWorcester | Project File No.609226
Kelley Square Improvement ProjectWorcester | Project File No.609226
Public Outreach Feedback
Public Outreach Feedback
Nearly 300 comments so far– Do what's necessary but do as little as possible– Vernon St bridge width & I-290 Ramps– Maintain neighborhood connectivity– Bicycle and pedestrian accommodation/routes– Maintain business access – Be sensitive to parking – Place making/Gateway
Kelley Square Improvement ProjectWorcester | Project File No.609226