Date post: | 31-Dec-2015 |
Category: |
Documents |
Upload: | acton-gates |
View: | 25 times |
Download: | 0 times |
Pulaski CountyGeographic Information System
• State requirement to provide Phase II E-911 wireless capabilities at the Dispatch Center.
• State E-911 Wireless Board provides additional funding to localities to assist with IT and GIS services.