1
construction area of 1.32 Lakhs Sq.ft comprising Laboratory Animal House, Community center, Shopping Complex, Primary School, Auditorium, Veterinary Hospital, Farmers Hostel, Research Scholars Hostel, Transformers Yard etc.
Laying of Under ground water supply, Sewerage system, Sumps and 8 Lakhs capacity of Over head water storage tank, Fire fighting sumps etc.
Construction of 7.5Kms Compound wall around the site.
Laying of 10Kms internal roads, cross drainage works etc.,
External Electrification, Street light poles, HVAC etc., 2
PROJECT DETAILSPHASE – II
Tendered Value : 98.36 Crores Revised Value : 98.40 Crores Completed Value : 93.51 Crores Certified Value : 90.63 Crores Commencement Date : 02.08.2008 Schdl. completion date : 01.11.2009
BUILDING WISE AREA IN PHASE - II
Sl. No. Name of Building Building Type
Built-up Area Completed
(SFT)Physical Progress / Stage of work
1 Animal Laboratory G+2 18300 On hold as instructed by user dept.
2 Auditorium 650 Nos. of seating capacity 36600 Structure work completed
3 Community Centre G+1 8800 Completed
4 Farmers Hostel Ground Floor 15000 Completed
5 Primary School Ground Floor 10300 Completed
6 Research Scholars Hostel G+2 21700 Completed
7 Shopping Complex G+1 8800 Completed
8 Veterinary Hospital Ground Floor 12500 Completed
9BSL – 3 Facility
Ground Floor
Services like HVAC / Clean room works are in progress
10ABSL – 3 Facility
Ground Floor
Services like HVAC / Clean room works are in progress
11 Internal roads Completed
12 Compound wall Completed
Total 132000
LABORATORY ANIMAL HOUSE
Built up Area – 18,300 SqftFloors - G+2Details :•External Surface covered with Aluminum Composite Panel Cladding.• UPVC Doors & Windows• Vitrified Flooring• 1Nos of passengers lift• American Standard make Sanitary fixtures and Jaquar make CP fixtures
5
SHOPPING COMPLEX
Built up Area – 8,800 SqftFloors - G+1Details :•External Surface covered with Aluminum Composite Panel Cladding.• UPVC Doors & Windows• Internal false ceiling with Gypsum board• American Standard make Sanitary fixtures and Jaquar make CP fixtures
6
COMMUNITY CENTER
Built up Area – 8,800 SqftFloors - G+1Details :•External Surface covered with Aluminum Composite Panel Cladding.• UPVC Doors & Windows• Internal false ceiling with Gypsum board• American Standard make Sanitary fixtures and Jaquar make CP fixtures
7
AUDITORIUM
Built up Area – 36,600 SqftDetails :• 650 Nos seating capacity• unsupported slabs at +13.80mtr, +15.30mtrs, +16.8mtrs of 43mtrs span • 2nos Seminar hall, Gazebo and Green room facilities etc.
8
PRIMARY SCHOOL
Built up Area – 10,300 SqftFloors - Ground FloorDetails :• 100 Nos students seating capacity• Vitrified Flooring• UPVC Doors & Windows
9
FARMERS HOSTEL
Built up Area – 15,000 SqftFloors - Ground FloorDetails :• 40nos Rooms• Cone Canopies covering with Imported Roof tiles.• External Surface covered with Aluminum Composite Panel Cladding.• UPVC Doors & Windows
10
RESEARCH SCHOLARS HOSTEL
Built up Area – 21,700 Sqft eachFloors - G+2Details :• Each building contains 12nos Single bed room flats, each flat area is 485Sqft • UPVC Doors & Windows• Vitrified tiles flooring• External Surface covered with Aluminum Composite Panel Cladding.• American Standard make Sanitary fixtures and Jaquar make CP fixtures
11
VETERNARY HOSPITAL
Built up Area Poultry Unit – 12,500 Sqft Floors - Ground FloorDetails :• External Surface covered with Aluminum Composite Panel Cladding.• UPVC Doors & Windows• Vitrified tiles flooring•American Standard make Sanitary fixtures and Jaquar make CP fixtures
POULTRY UNIT
12