nSRT range Polyester pumping stationsManufactured by filament winding
Mechanical and corrosion resistance
1 • Orthogonal filament winding consists in puttingroving yarns on a mandrel along circumferential andlongitudinal axes.
2 • This gives a material that offers maximumresistance on the load axes (60 to 70 % glass).
3 • We assemble the base on the shell, then addpolyester lamination in order to obtain a perfectseal.The shell is made by filament winding.
3Mechanical resistanceof the three techniques for the use of polyester
2
1
The No-corrosionchoice
SRT range Polyester pumping stationsDesigned for communities
2
Wa
te
r
ma
na
ge
me
nt
Po
lyes
ter
pu
mp
ing
sta
tio
n
The SRT station is perfectly suited for waterpumping for any community such as:• Industry,• Town,• Subdivision,• Camp site,• Supermarket, etc...
Volume pumped: 5 to 300 m3/h.
The Range consists of 8 tank cross-sections:1 • 1,2 • 1,4 • 1,6 • 1,8 • 2 • 2,4 et 2,9 m.
For a height of 1 to 8 m.
SRT pumping station adjustment is precise tothe centimetre to facilitate installation.
Sewer
Discharge
Electric Control Panel
Water Outlet
Rain water and waste water
All our stations comply with the regulatory requirements of NF EN 12050 and are coveredby a compliance certificate of the basic type (Test Report) granted by an authorized agency(CSTB). They can thus carry the mark.
Hoist arm support
Inlet sleevewith gasket, performed to
adapt to the nature anddiameter
of the pipe
Hoisting lug
2 meters of ductingfor cable guidance
Tank bottomSelf-cleaning,
integrated slope andreinforcement bars
Base with polyester cover(in series execution)
Glazed internal walls to avoid grease
accumulation
Aluminium ladderwith detachable bracket(optional)
Screen basket (option)
Guiding bars
Non return valve and shutterfor each pump
3
Wa
te
r
ma
na
ge
me
nt
Po
lyes
ter
pu
mp
ing
sta
tio
nSRT rangePolyester pumping stations3 possible configurations
General description
Anchoring feetOn concrete slab for models ø 1,400 mm and over
on the ø 1,000 and 1,200 mm models the anchoring feet are integrated
We also offer 3 configurations for NRV and shutter installation:
NRVs and shuttersinside the station
NRVs and shutters in anexternal valve chamber
NRVs and shutters + technical floor
12
3
Stainless steel
hardware
4
Wa
te
r
ma
na
ge
me
nt
Po
lyes
ter
pu
mp
ing
sta
tio
n
Optional (see page 6)
Valve chamberseparate (optional)
Flange valveEPOXY-coated cast iron
Non-return valveEPOXY-coated cast iron
Aluminium ladder with detachable bracket(optional)
Screen basket(optional)
Lifting pumps
Guiding bars
Floats
10-year TankWarranty
Valve chamber (optional)
Base with polyester cover
Inside viewwith flange valves and
non-return valves
Configuration with valve chamber S
RT
5
Wa
te
r
ma
na
ge
me
nt
Po
lyes
ter
pu
mp
ing
sta
tio
nSRT rangePolyester pumping stationsProducts that meet your needs no matter what the site constraints are
Photos of our material on site
1 • Screen basket with guiding bar
3 • Water hammer prevention tank mounted in the valve chamber
2 • Hoist arm4 • Technical floor 3
2
4
1
Equipment and options for tanks
6
Wa
te
r
ma
na
ge
me
nt
Po
lyes
ter
pu
mp
ing
sta
tio
nS
RT
Descriptions and references
A
B
C
D
OS106
OS105
OS366
OS241
E’
E
Galvanized steel screen basketOS366 Mesh size 50 mm. + galvanized steel guiding bar for 2 to 3 metre-high stations.
OS368 Mesh size 50 mm. + galvanized steel guiding bar for 3.5 to 6 metre-high stations.
Stainless steel screen basket OS365 Mesh size 50 mm. + stainless steel guiding bar for 2 to 3 metre-high stations.
OS367 Mesh size 50 mm. + stainless steel guiding bar for 3.5 to 6 metre-high stations.
Galvanised steel hoist armOS105 100 kg with winch
OS106 300 kg with pulley
Valve chamberA With non-return valves and shutters
Galvanised steel baseB + Galvanised steel cover
C Without cover for installation under roads (cast iron covers suitable for road application must be provided)
Galvanised steel technical floor- For access to NRVs and shutters
Mixing pump OS356 Jetly SEMISOM 450T + control
OS349 Jetly SEMISOM 265T + control
Aluminium ladder + bracketOS240 For 1.5 to 3 metre-high stations.
OS241 For 3.5 to 5 metre-high stations.
OS242 For 5.5 to 7 metre-high stations.
Other options on the tankOS120 Overflow, ø 200mm, PVC
OS115 Cleaning valve 15/21 + hose
D Galvanised steel fall prevention grid
- Stainless steel fall prevention grid
- Discharge drain + valve
- Galvanised steel internal piping
E Stainless steel internal piping (station and/or valve chamber E’)
- Stainless steel guiding bars
- Stainless steel chains and shackles
OS125 24-Volt tank lighting port
7
Wa
te
r
ma
na
ge
me
nt
Po
lyes
ter
pu
mp
ing
sta
tio
nSRT rangePolyester pumping stationsControl panels defined according to power
Descriptions and references
Control panels for two 400-Volt three-phase pumps (according to desired options)
Panel Outer casing dimensions Height of base Maximum powerreference l x h (mm.) mm. Kw
CS202P_ 535 x 525 600 5,5
CS204P_ 435 x 645 500 5,5
CS206P_ 535 x 745 500 5,5
CS207P_ 535 x 745 500 11
CS208P_ 635 x 845 500 5,5
CS209P_ 635 x 845 500 11
CS210P_ 850 x 1055 500 5,5
CS208PV
CS209PV
CS206PV
CS207PV CS204PV CS202P
The all-in-one panel is self-extinguishingand IP66 watertight. It is made offiberglass-reinforced polyester, hotpressed, with smooth finish.
All panels are fitted with 2 doors:
1 • One inside door (A)housing all the control devices
2 • One outer door with 2 1242E-type locks with key- either transparent (B)
in tempered glass, ref.: CS20xPV- or solid (C), ref.: CS20xPP
Our control panels are installed on a polyesterbase (D) with a lockable inspection cover (E).
A
C
D
B E
Air Injection SystemSIA05 For anti-H2S treatment (Please ask for our SIA05 documentation)
Options on control panelsOS305 Time meter
OS325 Ammeter 0 to 30 A
OS332 Voltmeter with measurements on 3 phases
OS313 Inversion and missing phase protection relay
OS321 24-Volt inlet
OS343 24-Volt hand lamp + 10 m wire
OS335 Heating resistor
OS371 Differential switch, 30 mA max 25 A
OS372 Differential switch, 300 mA max 25 A
OS373 Differential switch, 30 mA max 40 A
OS374 Differential switch, 300 mA max 40 A
OS375 Differential switch, 30 mA max 63 A
OS376 Differential switch, 300 mA max 63 A
OS323 230-Volt inlet + differential 30 mA
OS324 400-Volt inlet + differential 30 mA
OS319 Pushbutton for lamp testing
OS339 Fuse set
OS312 Lightning arrester
OS309 Current relay
OS342 Cabinet light
OS304 Pulse counter
OS315 Front panel buzzer
Remote management and remote alarmOS141 Remote management unit, Sofrel S 50 A 6 Etor
OS144 Remote management unit, Sofrel S 50 A 12 Etor / 2 Stor
OS146 Remote management unit, WIT CLIP 6 Etor / 2 Stor
OS147 Remote management unit, WIT CLIP 12 Etor / 4 Stor
OS145 Location + terminal for future remote management unit
OS358 Remote alarm, VOCALYS Lite
RegulationOS314 Ultrasound regulation
Other option(s) upon request:
Equipment and options for control panels
8
Wa
te
r
ma
na
ge
me
nt
Po
lyes
ter
pu
mp
ing
sta
tio
nS
RT
Descriptions and references
OS
305
OS
332
OS
304
OS
343
OS
321
OS
141
OS
314
OS
146
SIA
05
9
Wa
te
r
ma
na
ge
me
nt
Po
lyes
ter
pu
mp
ing
sta
tio
nSRT rangePolyester pumping stationsVery rapid installation: the station is delivered ready to install
Installation under grass Installation under a road
control panel inpolyester cabinet
Hoisting arm
Concrete slab
Road cover
Steel base
10-15 mm gravel
Earth cable
Concrete reinforcement iron
Concrete slab
Earth rod
Road coating material
Concrete slab
10-15mm
gravel
The station must be buried 20 cm belowthe surrounding land.
Pass the cable duct through to the control panel.
Fill with 10-15 mm gravel up to the upper side of the station.
Make a 20 cm thick concrete slab; sealthe 250 or 400 kN cover frame.
MaintenanceGenerally speaking, all pumping stations require regular maintenance.The frequency depends on the nature of the water theydeal with (at least 3 to 4 inspections per year). Regular maintenance consists in cleaning the floats and rinsing thoroughly thetank walls and all lines and accessories in contact with the waste water. Twice a year, the pumps must be taken out andinspected.
CommissioningIn France, commissioning is always done by Techneau or its contacts. It consists in connecting the equipment up to the powersupply, putting the pumps into position, checking that everything is in good working order, and testing with water.The customer is responsible for the following: installing the station andconnecting it to the various pipes, installing the control panel and powersupply and inspecting the electrical installation.
CAUTION, for the station to work correctly, lower float n°1 must be set tostop the pump half way up the motor.Float n°2 must be set to start the pump at 20 cm from the inlet level.IMPORTANT, the floats must be cleaned regularly to make sure that thestation works correctly.
Dig a hole according to the size of the tank.Place the earth rod.
Make a 20-cm thick concrete slab at the bottom of the pit.
Place the station on the slab.Anchor the fastening feet of
the station to the slab.Connect up the pipes and fill
with 10-15 mm gravel.
Inlet and outlet sleevesmade to the dimensions
requested by thecustomer.
ø SRT Opening(mm) (mm)1000 520 x 8401200 560 x 10101400 750 x 12101600 770 x 13541800 920 x 1510
Minimum size of openingrequired to pass the
pumps:
Questionnaire for design of a pumping station
10
Wa
te
r
ma
na
ge
me
nt
Po
lyes
ter
pu
mp
ing
sta
tio
nS
RT
Please consult us
Your contact informationCompany:
First name: Last name:
Address:
Post Code: Town:
Tel: Fax :
Mobile phone: E-mail :
Date: Site Ref:Nature of the Water: Domestic Waste water Rain water Industrial Waste water
Volume: or Number of users:
Number of pumps:
Power Supply: Three-phase 400 V Single-phase 230 V.
Land measurements (see diagram below):A Land level:
B Highest point:
C Inlet level:
D Discharge length:
E Discharge cross-section:
Designing a polyester pumping station requires careful analysis. We have developed acomputer programme with which the characteristics of a station can be defined very quickly.To enable us to meet your needs precisely, please photocopy this page, fill it in and fax itto us at +33 (0)2 33 56 61 93.
CL
D+
33 (
0)2
96 3
5 33
20
- w
ww
.cld
.fr-
Impr
imer
ie C
OR
BR
ION
Your distributor
Z . A . L a C h e v a l e r i e50570 MARIGNY - FranceTél.: +33 (0)2 33 56 67 78Fax: +33 (0)2 33 56 61 93E-mail : [email protected] w w . t e c h n e a u . c o m
WATER MANAGEMENT
•• Water PRE-TREATMENT - Oil interceptors
- Grease / starch separators
•• Water TREATMENT - Settle solids interceptors
•• HYDRAULIC ACCESSORIES- Flow controllers
- Penstocks
•• PUMPING STATIONS- Small communities - Large communities
FLOOR EQUIPMENT
•• FLOOR ACCESS COVERS •• STAINLESS STEEL FLOOR DRAINS & CHANNELS