PV-HYBRID SYSTEM FIELD-TEST MONITORING AT
STAR
Bob HammondPrincipal Investigator
Arizona State University
FY2002 ENERGY STORAGE SYSTEMS PEER REVIEW NOVEMBER 19-20, 2002
Home
Agenda
FY2002 11-19-02 2
ACKNOWLEDGEMENTS
• DOE Energy Storage Program -Funding source
• SNL: Garth Corey, Technical Liaison• Arizona Public Service: Herb
Hayden• EECI: Dr. Phil Symons• Spencer Everingham, Co-author
FY2002 11-19-02 3
OVERALL GOALS
• Enhance a Partnership With a Progressive Electric Utility [APS] with Mutual Interests
• Support the Development of the “Alternative Configuration” to Equalize Individual Strings of a Battery Bank
• Monitor Batteries in Large Remote Hybrid PV Systems• Evaluate Battery Test Equipment• Support IEEE SCC21 Energy Storage Subsystem
Working Group
FY2002 11-19-02 4
WHY
• Reduce the Life-Cycle Cost of Remote Hybrid Systems
• Increase the reliability, durability and confidence in Remote Hybrid Systems
• Make above information available to users (e.g., via IEEE Standards)
• Determine which battery test equipment can best predict battery failure
FY2002 11-19-02 5
PROJECT HISTORY• Dec. 1996: APS Hybrid Test Facility Completed• Q1 1997: SNL-APS “Partnership” Formed• Jun. 1997 - Jun. 2000: First Hybrid System • May 1998 - SNL-ASU Contract • Jul. 1999: San Juanico, Mexico; Fishing Village
– 17 kW PV, 10 10-kW Wind, 80 kW Diesel, 70 kW Trace, L16 Bat.
• Jan. 2000: YPG, 105 kW, ABS IIP • Jan. - Aug. 2001: Dangling Rope Sys. at STAR• Aug. 2001 -Present: AES Inverter Evaluation• Jan. 2001 - Support Alternative Configuration
FY2002 11-19-02 6
THE SITE - STAR
DedicatedJan. 1988
FY2002 11-19-02 7
THE SITE - STAR
Ocotillo Power Plant
FY2002 11-19-02 8
HYBRID “EXPERIENCE” - CSM
InstalledOct. 1995
AbacusInverter, S/N #1
FY2002 11-19-02 9
New Battery: GNB ABS IIP, 05/13/02
05/16/02
FY2002 11-19-02 10
CSM Cell Voltage ReadsCarol Springs Mountain Battery
String 3 Jar Voltage Comparison Midtronic vs Cell Corder Reads
2.05
2.06
2.07
2.08
2.09
2.10
2.11
1 11 21 31 41 51 61 71 81 91Jar Number
Vdc
Midtronic Jar Voltage (May 16, 2002)Sandia Cell Corder Jar Voltage (May 16, 2002)
FY2002 11-19-02 11
CSM Cell Resistance ReadsCarol Springs Mountain Battery
String 3 Jar Resistance Comparison Midtronic vs Cell Corder Reads
280
290
300
310
320
330
340
350
360
370
1 11 21 31 41 51 61 71 81 91
Jar Number
Cel
l Res
ista
nce,
m
icro
-ohm
s
Sandia Cell Corder Jar Resistance (May 16, 2002)Cell Corder #2 Jar Resistance (May 13, 2002)Midtronic Jar Resistance (May 16, 2002)
FY2002 11-19-02 12
CELLTRON VS. CELLCORDER
FY2002 11-19-02 13
CELLTRON VS CELLCORDERSPECIFICATION COMPARISON
PARAMETER MIDTRONICS CELLTRONCTM-300
ALBER CELLCORDER
Application 2, 4, 6, 8, 10, 12 V Jars 2V, 6V, and 12V BatteriesVoltage Accuracy 2% 0.1% of reading +/- 1 LSDVoltage Resolution 10 mV [20 mV actual] 1 mvMemory 252 Test Results 1792 Test Results
7 Strings of 256 CellsWeight (tester) 1 pound (500 grams) 8.5 pounds, not including leads or
carry caseSize 9” x 4” x 2.5” w/case 11” x 10” x4”
Ease of use (10 = easiest) 8 5Data collection & storage time 55 seconds 40 seconds
Battery Life 1 hour 6 hoursCost (including software) $4935 $5400Software sold separate Yes, $620 NoAbility to predict battery failure UNKNOWN UNKNOWN
FY2002 11-19-02 14
THE HYBRID TEST FACILITYEstablishedDec. 1996
FY2002 11-19-02 15
YUASA EVALUATION: JUNE 1997 - JUNE 2000
TRACE 30kWBI-DIRECTIONAL
INVERTER
with
PEAK POWER TRACKER
BATTERY CHARGER
30 KWKOHLER
GENERATOR
HYBRID TESTFACILITY
LOAD BANK
0 - 100 kW
STAR CENTER
APS GRID
PV SUB-ARRAY1
10 kW
PV SUB-ARRAY2
10 kW
BANK AYUASA DT85-11120 2V-CELLS
425AH BATTERY
BANK BYUASA DT85-11120 2V-CELLS
425AH BATTERY
80A
80A
80A
80A
CR9000DATALOGGER
COMPUTERand
MODEM
FY2002 11-19-02 16
CR9000 DAS, SIGNAL CONDITIONER
FY2002 11-19-02 17
D.R. TEST BATTERIES AT STAR
FY2002 11-19-02 18
ALTERNATIVE CONFIGURATION
• Support the Development of a New Proprietary Technique to Equalize Individual Strings of a Battery Bank– Test site located at the APS STAR Center
– Support via data collection, data quality control, data processing and on-site system management/repair as required by:
• Dr. Phil Symons (EECI) and
• Mr. Garth Corey (SNL Program Manager)
FY2002 11-19-02 19
ALTERNATIVE CONFIGURATIONEquipment Building
FY2002 11-19-02 20
ALTERNATIVE CONFIGURATION
FY2002 11-19-02 21
GENSET STARTING BATTERY
FY2002 11-19-02 22
A.C., LOAD SHACK - EXTERIOR
FY2002 11-19-02 23
A.C., LOAD SHACK - INTERIOR
FY2002 11-19-02 24
A.C., CHECKLISTAlternate Configuration Project Checklist. 11-Oct
12:00Are the lights ON (Timer: 6-9 PM)? NIs the refrigerator running? YIs the swamp cooler running? NIs the load shed door latched? NIs the battery shed door closed? YWhat is the generator state? [ON or OFF] OffWhat is the fuel level in percent of full? 78%Does the monitor turn on? YAre the fans running? YWhat is the start time of the current battery cycle? 10/10/01 17:40What is the state of the battery? DischargeIf in FINISH CHARGE, are charger lights active? N/A
FY2002 11-19-02 25
IEEE STANDARDS
1. IEEE P1361/D15. Draft Guide ForSelection, Charging, Test and Evaluationof Lead-acid Batteries Used in Stand-AlonePhotovoltaic (PV) Systems
2. IEEE P1561/D5. Recommended GuideFor Optimizing the Performance and Lifeof Lead-Acid Batteries In Hybrid RemoteSystems
FY2002 11-19-02 26
IEEE 1561: USER QUESTIONSCAROL SPRINGS MOUNTAIN
REMOTE HYBRID SYSTEM
: How do the battery characteristics change with age.
1. For a nominal load, what is the relationship between State ofCharge (SOC) and Vbb?
2. What methodology should be used to measure SOC? AmpHourcounting? Vbb? Both?
3. What is the recommended charging technique? Equalizationfrequency?
4. For the Remote Solar Electric System (RSES), how should thosebatteries be managed?
5. Temperature compensation – charge set points only? Discharge set points?
6. VRLA/CSM7. CSM: Equalization frequency? Finish charge every two weeks?
5% Overcharge (Ah)?8. Why is there not a smart controller that can anticipate daytime
PV availability and decide when to start the genset?
FY2002 11-19-02 27
IEEE 1561: USER QUESTIONS
GRAY WOLF HYBRID REMOTE SYSTEM1. How does load affect genset start/stop and Low Battery cutoff
(LBCO) set points? How do we compensate for the effects of load?2. What is an authoritative reference for temperature compensation of
Charge and Discharge set points?3. Equalization: How often? Procedure?4. Where do you measure Temperature, Voltage, Current? How do
you measure these parameters?5. How are above answers affected by battery age?6. How is battery resistance measured?7. How effective is Amp-hour counting? Pros and cons? Procedure?
When is counter reset?
FY2002 11-19-02 28
IEEE STANDARDS: P1561CHARGE ACCEPTANCE AT 40C (FLOODED LA BATTERY)
0
10
20
30
40
50
60
70
80
90
100
0.00 0.50 1.00 1.50 2.00 2.50 3.00Charge Time, Hours
Cha
rge
Acc
epta
nce,
%
2.00
2.10
2.20
2.30
2.40
2.50
2.60
2.70
2.80
2.90
3.00
Volta
ge, V
dcPos. PlateNeg. PlateCell Voltage
Source:Figure 5.7, pg 147: Rand, D., R. Woods and R.M. Dell, Batteries for Electric
Vehicles, John Wiley & Sons, Inc., New York, 1998
FY2002 11-19-02 29
CONCLUSIONS - 1
• Lead-acid Battery Technology is Mature. Battery Management in PV Systems is still in the early stages of development.– Need charge controllers that include amp-hour counting– The Alt. Config. management system is a major step
forward
• Proper Battery Management Information is not readily available to the System Integrator/User.– System Integrators still have more questions than answers
FY2002 11-19-02 30
CONCLUSIONS -2
• The Alber Cellcorder has 20 times greater voltage resolution than the Midtronics Celltron. Time will tell which instrument is better at predicting battery failure.
• The partnership between APS and DOE/SNL is an excellent means of leveraging the resources of both organizations in order to improve function and reliability of hybrid systems, and to reduce the costs of hybrid systems
FY2002 11-19-02 31
PLANS FOR THE FUTURE
• CONTINUE TO SUPPORT:– Alternative Configuration Development– STAR, Hybrid Test Facility– STAR, CSM Battery
Management/Optimization– Battery Standards– On site Liaison between APS and DOE/SNL
FY2002 11-19-02 32
THANK YOU
QUESTIONS
FY2002 11-19-02 33
BIBLIOGRAPHY1. Hammond, R., et. al., Photovoltaic Hybrid Test Facility: System Evaluation of Yuasa VRLA/GEL Batteries, EESAT 2000 Conference: September 18-20, 2000, Orlando, FL
2. Bryan Hill, Pinnacle West &Y Dangling Rope Solar Hybrid System, Pinnacle West, October 2001
3. Rosenthal, A., Dangling Rope Marina: A Photovoltaic-Hybrid Power System, SNL Quarterly, Volume 1, 1998
4. Rosenthal, A., Dangling Rope Marina: Preliminary Results, Photovoltaic Performance and Reliability Workshop, Las Cruces, NM, 1997
5. Thomas, M. and Post, H., Photovoltaic Systems Performance and Reliability: Myths, Facts, and Concerns - A 1996 Perspective, PV Performance and Reliability Workshop, 1998
6. Post, H. and Thomas, M., Photovoltaic Systems Costs for Stand-Alone Systems with Battery Storage, PV Performance and Reliability Workshop, 1998
7. Newmiller, J. and Farmer, B., PVUSA Operations Experience With Trace Technologies PV Inverters, 26th IEEE PVSC, Anaheim, CA, Sep. 29- Oct. 3, 1997
Top