PV213 Enterprise Information Systems in Practice 0 4 – Quality assurance. Content of this presentation. Role of quality management and quality assurance ISO, CMMI, EFQM QA plan Document management Reviews Tools Lean Next lesson. Quality. What is quality?. Quality – definitions. - PowerPoint PPT Presentation
40
PV213 EIS in Practice: 04 – Quality assurance 1 PV213 Enterprise Information Systems in Practice 04 – Quality assurance
Transcript
Page 1: PV213 Enterprise Information Systems in Practice 0 4  –  Quality assurance

PV213 EIS in Practice: 04 – Quality assurance 1

PV213 Enterprise Information Systems in Practice

04 – Quality assurance

Page 2: PV213 Enterprise Information Systems in Practice 0 4  –  Quality assurance

PV213 EIS in Practice: 04 – Quality assurance 2

Page 3: PV213 Enterprise Information Systems in Practice 0 4  –  Quality assurance

PV213 EIS in Practice: 04 – Quality assurance 3

Page 4: PV213 Enterprise Information Systems in Practice 0 4  –  Quality assurance

PV213 EIS in Practice: 04 – Quality assurance 4

Content of this presentation

Role of quality management and quality assuranceISO, CMMI, EFQMQA planDocument managementReviewsToolsLeanNext lesson

Page 5: PV213 Enterprise Information Systems in Practice 0 4  –  Quality assurance

PV213 EIS in Practice: 04 – Quality assurance 5

Quality

What is quality?

Page 6: PV213 Enterprise Information Systems in Practice 0 4  –  Quality assurance

PV213 EIS in Practice: 04 – Quality assurance 6

Quality – definitions

Reducing the variation around the targetQuality is meeting customer expectations.Quality is conformance to specified requirement & is never an accident

Page 7: PV213 Enterprise Information Systems in Practice 0 4  –  Quality assurance

PV213 EIS in Practice: 04 – Quality assurance 7

Quality – ISO 9000

Degree to which a set of inherent characteristics fulfils requirements

Characteristic – distinguishing featureRequirement – need or expectation

statedgenerally impliedobligatory

Page 8: PV213 Enterprise Information Systems in Practice 0 4  –  Quality assurance

PV213 EIS in Practice: 04 – Quality assurance 8

Kano model

Quality attributes

BasicExpectedExcitingIndifferentReverse

Page 9: PV213 Enterprise Information Systems in Practice 0 4  –  Quality assurance

Project management areas

Integration ManagementScope ManagementTime ManagementCost Management and ControllingQuality ManagementHuman Resource ManagementCommunications ManagementRisk and Opportunity ManagementProcurement Management

PV213 EIS in Practice: 04– Project management 9

Page 10: PV213 Enterprise Information Systems in Practice 0 4  –  Quality assurance

PV213 EIS in Practice: 04 – Quality assurance 10

Quality management

ISO 9000 definitionCoordinated activities to direct and control an organization with regarding to quality

ActivitiesPlanningControlImprovementAssurance

Page 11: PV213 Enterprise Information Systems in Practice 0 4  –  Quality assurance

PV213 EIS in Practice: 04 – Quality assurance 11

Quality management levels

Process/project metrics projects

processes

business

continuou

s co

ntr

ol

checks at d

efined

intervals

Quality metrics

BalancedScorecard

EFQMassessments

CMMIassessments

ISO9001 audit

Project/risk audit

Page 12: PV213 Enterprise Information Systems in Practice 0 4  –  Quality assurance

PV213 EIS in Practice: 04 – Quality assurance 12

ISO

International Organization for StandardizationISO 9001:2008 Quality management systems

Regular internal ISO9001 process audits for the purpose of improvement

ISO 14001:2004 Environmental management systemsOHSAS 18001:2007 Occupational Health and Safety Assessment SeriesISO 27001:2005 Information technology – Security techniques – Information security management systemsISO 20000-1:2005 Information technology – Service managementISO/IEC 15504 Information technology — Process assessment (Software Process Improvement and Capability Determination – SPICE)

Page 13: PV213 Enterprise Information Systems in Practice 0 4  –  Quality assurance

PV213 EIS in Practice: 04 – Quality assurance 13

CMMI

Capability Maturity Model IntegrationBased on CMM (Capability Maturity Model)Appraisal – SCAMPI (Standard CMMI Appraisal Method for Process Improvement)Published appraisal results

http://sas.sei.cmu.edu/pars/

Page 14: PV213 Enterprise Information Systems in Practice 0 4  –  Quality assurance

PV213 EIS in Practice: 04 – Quality assurance 14

Page 15: PV213 Enterprise Information Systems in Practice 0 4  –  Quality assurance

PV213 EIS in Practice: 04 – Quality assurance 15

EFQM model

PeoplePeople

Policy andStrategy

Policy andStrategy

Partnershipand Resources

Partnershipand Resources

Leader-ship

Leader-ship ProcessesProcesses

ResultsResults

PeopleResults

PeopleResults

CustomerResults

CustomerResults

SocietyResults

SocietyResults

KeyPerformance

Results

KeyPerformance

Results

90

80

90

90

200

60100 140 150

Innovation and LearningInnovation and Learning

EnablersEnablers

Page 16: PV213 Enterprise Information Systems in Practice 0 4  –  Quality assurance

PV213 EIS in Practice: 04 – Quality assurance 16

Balanced scorecards

Balanced scorecards perspectives:The customer perspective (Customers / Market)To achieve our vision, how should we appear to our customers? The financial perspective (Finances)To succeed financially, how should we appear to our shareholders? The learning and growth perspective (Human resources / Innovation)To achieve our vision, how will we sustain our ability to change and improve? The internal process perspective (Internal processes)To satisfy our shareholders and customers, what business processes must we excel at?

Page 17: PV213 Enterprise Information Systems in Practice 0 4  –  Quality assurance

PV213 EIS in Practice: 04 – Quality assurance 17

EFQM, BSC, CMMI and metrics

Process/project metrics projects

processes

business

continuou

s co

ntr

ol

checks at d

efined

intervals

Quality metrics

BalancedScorecard

EFQMassessments

CMMIassessments

ISO9001 audit

Project/risk audit

Page 18: PV213 Enterprise Information Systems in Practice 0 4  –  Quality assurance

PV213 EIS in Practice: 04 – Quality assurance 18

Quality assurance

ISO 9000 definitionA part of quality management focused on providing confidence that quality requirements will be fulfilled

Different understanding in different companies

Page 19: PV213 Enterprise Information Systems in Practice 0 4  –  Quality assurance

PV213 EIS in Practice: 04 – Quality assurance 19

Quality assurance manager in project

Incorporates quality aspects into a project with respect to

Strategic targets and goals of quality organizationBasic processesCustomer interestsThird parties

Four eye principle

Page 20: PV213 Enterprise Information Systems in Practice 0 4  –  Quality assurance

PV213 EIS in Practice: 04 – Quality assurance 20

Quality assurance plan

Central planning instrument for all quality activities in projectContent

QA requirements, environmental requirementsDevelopment method and tailoringQA measures, environmental measuresQuality reporting procedure and quality recordsCorrective and preventive measures

Page 21: PV213 Enterprise Information Systems in Practice 0 4  –  Quality assurance

PV213 EIS in Practice: 04 – Quality assurance 21

What went wrong?

This is a story about four people named Everybody, Somebody, Anybody and Nobody.There was an important job to be done and Everybody was sure Somebody would do it.Anybody could have done it, but Nobody did it.Somebody got angry about that because it was Everybody's job. Everybody thought Somebody could do it but Nobody realized that Everybody wouldn't do it.In the end Everybody blamed Somebody when Nobody did what Anybody could have done.

Page 22: PV213 Enterprise Information Systems in Practice 0 4  –  Quality assurance

PV213 EIS in Practice: 04 – Quality assurance 22

Checks

Nobody/Nothing is perfect Errors, Faults, DeficienciesChecks to identify them as early and as efficiently as possible

Different types of checksAutomatic code analysisTestChecking compliance with processesAudits (ISO)Assessments (CMM/CMMI, EFQM model)Reviews

Page 23: PV213 Enterprise Information Systems in Practice 0 4  –  Quality assurance

Costs of fault identification

PV213 EIS in Practice: 04 – Quality assurance 23

Phase in which a fault is detectedRela

tive c

ost

s fo

r dete

ctin

g a

nd c

leari

ng

a f

ault

Requirements Design Code Developmenttest

Acceptancetest

Operation

1000

500

200

100

50

20

10

5

2

1

Page 24: PV213 Enterprise Information Systems in Practice 0 4  –  Quality assurance

PV213 EIS in Practice: 04 – Quality assurance 24

Reviews

Formalized, systematic and critical documented check of development results at the end of defined work stages with purpose of finding errorsMost efficient method to reduce “error costs”

Why?

Objects under reviewProject documentationProduct documentationSource codeCompany documentation

Page 25: PV213 Enterprise Information Systems in Practice 0 4  –  Quality assurance

PV213 EIS in Practice: 04 – Quality assurance 25

Review phases

PlanningAt project startWhat, who, how, when

InvitationUsually initiated by author

PreparationParticipants according to their role

ExecutionDo not blame author, criticize object

ConclusionAnalysis, correction, verification of found errorsRelease of an object

Page 26: PV213 Enterprise Information Systems in Practice 0 4  –  Quality assurance

PV213 EIS in Practice: 04 – Quality assurance 26

Comment review technique

Review object is distributed to reviewers (usually author)Reviewers work through the code segments on their ownReviewers pass their findings to the organizerAuthor evaluates the comments and incorporates changes

RolesAuthorReviewers

Page 27: PV213 Enterprise Information Systems in Practice 0 4  –  Quality assurance

PV213 EIS in Practice: 04 – Quality assurance 27

Session review technique

Review object is distributed to reviewersComments are worked through and assessed in one sessionAuthor corrects errors and faults identified as agreed

RolesFacilitatorAuthorMinutes keeperReviewers

Page 28: PV213 Enterprise Information Systems in Practice 0 4  –  Quality assurance

PV213 EIS in Practice: 04 – Quality assurance 28

Intensive inspection

Session technique based on Michael Fagan inspectionUp to 6 reviewersMaximum 2 hours per one sessionAdditional step

Introductory sessionRoles

AuthorFacilitator, minutes keeperReaderInspectors with different roles (e.g. designer, architect, user)

Page 29: PV213 Enterprise Information Systems in Practice 0 4  –  Quality assurance

Code review - example

class Hello { public String text; public Hello() { text = null; }

// method to set text public void set(String t) { text = t; }

public String get() { return text; }}

PV213 EIS in Practice: 04 – Quality assurance 29

Page 30: PV213 Enterprise Information Systems in Practice 0 4  –  Quality assurance

PV213 EIS in Practice: 04 – Quality assurance 30

Microsoft

MS Project + Enterprise Project ManagementMS Team Foundation Server + SharePoint

Reporting and trackingSource control

MS ExcelEasy to enhanceStandard SW setLimited functionality

Page 31: PV213 Enterprise Information Systems in Practice 0 4  –  Quality assurance

PV213 EIS in Practice: 04 – Quality assurance 31

Trac

http://trac.edgewall.org/ OSSWikiTickets, milestonesSCM interface

Page 32: PV213 Enterprise Information Systems in Practice 0 4  –  Quality assurance

PV213 EIS in Practice: 04 – Quality assurance 32

Redmine

http://www.redmine.org/OSSWikiTicketsSCM interface

Page 33: PV213 Enterprise Information Systems in Practice 0 4  –  Quality assurance

Atos standard tools

IBM Rational Team Concert

IBM Rational ClearQuestIBM Rational ClearCaseHP Application Life Management

PV213 EIS in Practice: 04 – Quality assurance 33

Page 34: PV213 Enterprise Information Systems in Practice 0 4  –  Quality assurance

Development toolsexample

PV213 EIS in Practice: 04 – Quality assurance 34

Page 35: PV213 Enterprise Information Systems in Practice 0 4  –  Quality assurance

PV213 EIS in Practice: 04 – Quality assurance 35

Document management

Update, release and distribution of documentsEnsures that most recently released version of the document is usedStatus (validity) of a particular document is identifiableAudit trail of a document must be traceable

Who created or changed documentWhat was the last changeWho made a review and where are the resultsWho approved itWhen these actions took place

Document management systemsLivelinkMicrosoft SharePoint

Page 36: PV213 Enterprise Information Systems in Practice 0 4  –  Quality assurance

PV213 EIS in Practice: 04 – Quality assurance 36

Company tools unification

Costs vs. benefitsBuy vs. buildTraining costs

Page 37: PV213 Enterprise Information Systems in Practice 0 4  –  Quality assurance

Lean

Value addedWaste

ReworkOver-processingOverproductionMotionInventoryWaitingTransportIntellect

Necessary but Non-Value-Added

PV213 EIS in Practice: 04 – Quality assurance 37

NNVA

Value Added Activity

Waste

Elements of work

ELIMINATE WASTE

Never stop trying to eliminate waste MINIMISE Necessary

Non Value Add (NNVA)Necessary for the value added to happen, under

the current circumstances

MAXIMISE Value Add (VA) activities;

Changes form, fit or function towards

customer requirements

Page 38: PV213 Enterprise Information Systems in Practice 0 4  –  Quality assurance

Lean in SW development

Eliminate wasteAmplify learningDecide as late as possibleDeliver as fast as possibleEmpower the teamBuild integrity inSee the whole(source: wikipedia.org)

PV213 EIS in Practice: 04 – Quality assurance 38

Page 39: PV213 Enterprise Information Systems in Practice 0 4  –  Quality assurance

PV213 EIS in Practice: 04 – Quality assurance 39

Next lesson

Development processDevelopment process in generalProcess tailoringWaterfallIterative and incrementalAgile developmentScrumExtreme Programming

[email protected]

Page 40: PV213 Enterprise Information Systems in Practice 0 4  –  Quality assurance

PV213 EIS in Practice: 04 – Quality assurance 40

Děkuji za pozornost.