WH1
WH1
PTAC2
PTAC3PTAC3
PTAC3PTAC3PTAC3
PTAC3PTAC3
PTAC3PTAC3PTAC3PTAC3
T
AHU1
BB1
PTAC3
PTAC4 (4TH FLR)
PTAC3
PTAC4 (3RD FLR)
PTAC3
PTAC4 (3RD FLR)
PTAC3
PTAC4 (3RD FLR)
PTAC3
PTAC4 (3RD FLR)
PTAC3
PTAC4 (3RD FLR)
PTAC3
PTAC4 (3RD FLR)
PTAC3
PTAC4 (4TH FLR)
PTAC3
PTAC4 (4TH FLR)
PTAC3
PTAC4 (4TH FLR)
PTAC3
PTAC4 (4TH FLR)
PTAC3
PTAC4 (4TH FLR)
PTAC3
PTAC4 (4TH FLR)
T
DATE:
ALLIANCE ARCHITECTS
ALL RIGHTS RESERVED
SHEET NO.
© 2016
c:\users\bradley\dropbox\design\alliance\indianapolis\draw
ings\dw
g\m
echanical.dw
g, 11/29/2016 12:14:42 P
M N
one
.\A
lliance_A
rchitecture.tiff
BR
AD
LE
Y A
. W
HIT
E, P
.E
.
ELE
CT
RIC
AL, M
EC
HA
NIC
AL,
AN
D P
LU
MB
IN
G C
ON
SU
LT
IN
G
PO
B
OX
1514, S
OU
TH
B
EN
D, IN
46634
574-234-7767 bradw
@repairs-inc.com
11/28/2016
11
IN
SIG
HT
D
EV
EL
OP
ME
NT
C
OR
P.
IN
DIA
NA
A
VE
NU
E A
PA
RT
ME
NT
R
EN
OV
AT
IO
NS
825 IN
DIA
NA
A
VE
NU
E
IN
DIA
NA
PO
LIS
, IN
DIA
NA
SCALE:
NO
RT
H
BUILDING A 1ST FLOOR MECHANICAL PLAN
1/8"=1'
SCALE:
NO
RT
H
BUILDING A 2ND/3RD FLOOR MECHANICAL PLAN
1/8"=1'
MECHANICAL NOTES:
1. WORK SHALL BE IN ACCORDANCE WITH THE APPLICABLE NATIONAL,
STATE, AND LOCAL CODES AT THE TIME OF BIDDING, INCLUDING BUT
NOT LIMITED TO: THE INDIANA MECHANICAL CODE, 2014 EDITION AND
INDIANA ENERGY CONSERVATION CODE, 2014 EDITION.
2. DRAWINGS ARE DIAGRAMMATIC. FIELD VERIFY ALL EXISTING
CONDITIONS AND COORDINATE LOCATIONS WITH OTHER TRADES.
3. INSTALL ALL EQUIPMENT, DEVICES, AND MATERIALS IN ACCORDANCE
WITH THE MANUFACTURES INSTRUCTIONS.
4. SUBSTITUTIONS FOR BRAND OR MODEL OF DEVICES ARE NOT
PERMITTED IN THE BASE BID UNLESS OTHERWISE STATED OR
APPROVED IN WRITING BY THE ARCHITECT/ENGINEER. SUBSTITUTIONS
MAY BE SUBMITTED WITH WRITTEN EXPLANATION AS VOLUNTARY
ALTERNATES.
5. SEE THE ALTERNATES SECTION OF SPECIFICATIONS FOR DETAILS ON
WORK INCLUDED IN EACH ALTERNATE
6. SEE ALTERATIONS SECTION OF SPECIFICATIONS
7. ALL DUCTWORK ABOVE CEILINGS SHALL BE INSULATED.
8. PROVIDE PROPER FIRE STOPPING AT ANY PENETRATIONS OF FIRE
RATED ASSEMBLIES
9. REPLACE WOODEN RUNNERS UNDER OUTDOOR HEATPUMP UNITS,
INCLUDE NEW SLIP SHEETS UNDER RUNNERS
10. OPEN EXISTING PITCH POCKETS ON ROOF TO ROUTE NEW LINESET AND
POWER CONNECT, ROOFER TO SEAL PITCH POCKET AND MAINTAIN
ROOF WARRANTY
11. PROVIDE NEW DISCONNECT SWITCHES AND WHIPS FOR ALL OUTDOOR
EQUIPMENT
12. PROVIDE NEW PROGRAMABLE ROOM THERMOSTAT WITH ALL PTAC
UNITS, SEE APARTMENT DETAILS ON ARCHITECTURAL SHEETS FOR
THERMOSTAT LOCATIONS
13. ALL THERMOSTAT CONNECTIONS TO BE WIRED THERMOSTATS, INSTALL
NEW 18-6 THERMOSTAT CABLE FOR HEAT PUMP CONTROL
14. THERMOSTAT CABLE IN BUILDING A TO BE FISHED THROUGH WALL AND
ABOVE CEILING, COORDINATE DRYWALL PATCHING AND FINISHING WITH
OTHER TRADES.
15. THERMOSTAT CABLE IN BUILDING C TO BE PULLED THROUGH EXISTING
CHASE USING OLD CABLE, WHERE OLD CABLE IS UNABLE TO SERVE AS
A PULL STRING, ROUTE TO PARTITION WALL BELOW BEDROOM DUCT
AND FISH THROUGH WALL, COORDINATE DRYWALL PATCHING AND
FINISHING WITH OTHER TRADES
16. PROVIDE NEW WHIP FOR ALL INDOOR AIR HANDLING EQUIPMENT
17. PROVIDE NEW LINESETS FOR ALL ALL HEAT PUMP SYSTEMS, ROUTE TO
MATCH EXISTING LINESETS AS CLOSELY AS POSSIBLE.
EXTEND MANUFACTURER'S DUCT
TRANSITION KIT TO ROUTE ALONG
WALL THROUGH PARTITION TO
BEDROOM, LIKE EXISTING DETAIL.
(TYPICAL)
TERMINATE SUPPLY GRILLE THROUGH
PARTITION WALL TO BEDROOM (TYPICAL)
AIR HANDLER LOCATED IN ATTIC ABOVE
3RD FLOOR.PROVIDE CEILING
PENETRATION BETWEEN ROOF JOISTS
FOR REMOVAL OF OLD UNIT AND
INSTALLATION OF NEW. COORDINATE
CEILING PATCHING AND FINISHING WITH
OTHER TRADES.
ADAPT SUPPLY AND RETURN
AIR PLENUMS TO NEW AIR
HANDLING UNIT CONNECTIONS.
RE-INSULATE PLENUMS.
AHU2
AHU3
HP2
HP3
HP1
WH1
WH1
BB4
BB4
BB1
BB5
BB5
BB1
BB5
BB1
WH1
HP2
HP3
HP1
RTU1
DATE:
ALLIANCE ARCHITECTS
ALL RIGHTS RESERVED
SHEET NO.
© 2016
c:\users\bradley\dropbox\design\alliance\indianapolis\draw
ings\dw
g\m
echanical.dw
g, 11/29/2016 12:14:43 P
M N
one
.\A
lliance_A
rchitecture.tiff
BR
AD
LE
Y A
. W
HIT
E, P
.E
.
ELE
CT
RIC
AL, M
EC
HA
NIC
AL,
AN
D P
LU
MB
IN
G C
ON
SU
LT
IN
G
PO
B
OX
1514, S
OU
TH
B
EN
D, IN
46634
574-234-7767 bradw
@repairs-inc.com
11/28/2016
12
IN
SIG
HT
D
EV
EL
OP
ME
NT
C
OR
P.
IN
DIA
NA
A
VE
NU
E A
PA
RT
ME
NT
R
EN
OV
AT
IO
NS
825 IN
DIA
NA
A
VE
NU
E
IN
DIA
NA
PO
LIS
, IN
DIA
NA
SCALE:
N
O
R
T
H
BUILDING B 1ST FLOOR MECHANICAL PLAN
1/8"=1'
PTAC SCHEDULE
MARK MAKE MODEL
COOLING
CAPACITY
EER
HEAT PUMP
CAPACITY
COP
ELECTRIC HEATING
CAPACITY
POWER NOTES
PTAC1 FREDRICH PDH07K3SG 7.0MBH 13.0 5.8MBH 3.6 2.5KW 208V/1ɸ PROVIDE FAN POWERED EXHAUST, NEW THERMOSTAT,
FACTORY DUCT EXTENSION KIT, AND NEW CORD WHIP.
PTAC2 FREDRICH PDH09K3SG 9.2MBH 12.1 8.1MBH 3.5 2.5KW 208V/1ɸ
PTAC3 FREDRICH PDH12K3SG 11.6MBH 11.6 10.4MBH 3.4 4KW 208V/1ɸ
PTAC4 FREDRICH PDH15K5SG 14.2MBH 10.4 13MBH 3.1 4KW 208V/1ɸ
AIR HANDLING UNIT SCHEDULE
MARK MAKE MODEL AIRFLOW
COOLING
CAPACITY
SEER
HEATING
CAPACITY
COP
AUXILIARY HEATING
CAPACITY
POWER
AHU1 CARRIER 40RUQ07 1570CFM 5TON 11.0 66MBH 3.3 25KW 208V/3ɸ
AHU2 CARRIER 40RUQ08 3250CFM 7.5TON 11.0 87MBH 3.3 37KW 208V/3ɸ
AHU3 CARRIER 40RUQ07 2115CFM 6TON 11.0 66MBH 3.3 30KW 208V/3ɸ
CONDENSING UNIT SCHEDULE
MARK MAKE MODEL
COOLING
CAPACITY
EER
HEATING
CAPACITY
COP POWER
HP1 CARRIER 38AUQ07 6TON 11.0 66MBH 3.3 208V/3ɸ
HP2 CARRIER 38AUQ08 7.5TON 11.0 87MBH 3.3 208V/3ɸ
HP3 CARRIER 38AUQ07 6TON 11.0 66MBH 3.3 208V/3ɸ
ROOFTOP PACKAGE UNIT SCHEDULE
MARK MAKE MODEL AIRFLOW
COOLING
CAPACITY
SEER
HEATING
CAPACITY
COP
AUXILIARY HEATING
CAPACITY
POWER
RTU1 CARRIER 50TCQ 4800CFM 12.5TON 10.6 142MBH 3.2 59.8KW 208V/3ɸ
SCALE:
BUILDING C RTU DUCT DETAIL
N.T.S.
SCALE:
BUILDING B AHU DUCT DETAIL
N.T.S.
SCALE:
N
O
R
T
H
WHOLE BUILDING ROOF PLAN
1/16"=1'
ELECTRIC BASEBOARD SCHEDULE
MARK MAKE MODEL
HEATING
CAPACITY
LENGTH POWER
BB1 BERKO BKOC2504W 1KW 4' 208V/1ɸ
BB2 BERKO BKOC2506W 1.5KW 5' 208V/1ɸ
BB3 BERKO BKOC2504W 1KW 4' 208V/1ɸ
BB4 BERKO BKOC2506W 1.5KW 5' 208V/1ɸ
BB5 BERKO BKOC2508W 2KW 8' 208V/1ɸ
WALL HEATER SCHEDULE
MARK MAKE MODEL
HEATING
CAPACITY
LENGTH POWER
WH1 BERKO 38AUQ07 1.8-4KW 11.0 208V/1ɸ
ADAPT ECONOMIZER BOXES TO EXISTING
RETURN AND FRESH AIR DUCTWORK.
REMOVE EXISTING MOTORIZED DAMPERS.
SEE DETAIL THIS SHEET
HEAT PUMP OUTDOOR UNITS
ON ROOF ABOVE, ROUTE
LINESET TO ASSOCIATED AHU
HEAT PUMP OUTDOOR UNITS
ON ROOF ABOVE, ROUTE
LINESET TO ASSOCIATED AHU
REPLACE ROOF TOP PACAGE UNIT, SET
UNIT ON STRUCTURAL CURB AND
ADAPT SUPPLY AND RETURN AIR
DUCTWORK TO UNIT SIDE DISCHARGE,
SEE DETAIL ON THIS SHEET.
(TO BE INCLUDED BY ADDENDUM)
(TO BE INCLUDED BY ADDENDUM)
WH1
WH1
BB1
WH1
WH1
PTAC3 PTAC3 PTAC3
PTAC4PTAC3PTAC3PTAC3PTAC3PTAC3PTAC3PTAC3PTAC3
PTAC1
PTAC1 PTAC3 PTAC3 PTAC3 PTAC3 PTAC4
RTU1
BB1
BB1
WH1
PTAC3
PTAC4 (4TH FLR)
PTAC3
PTAC4 (4TH FLR)
PTAC3
PTAC4 (4TH FLR)
PTAC3
PTAC4 (4TH FLR)
PTAC3
PTAC4 (4TH FLR)
PTAC3
PTAC4 (4TH FLR)
PTAC3
PTAC4 (4TH FLR)
PTAC4
PTAC4PTAC3
PTAC4 (4TH FLR)
PTAC3
PTAC4 (4TH FLR)
PTAC3
PTAC4 (4TH FLR)
PTAC3
PTAC4 (4TH FLR)
PTAC3
PTAC4 (4TH FLR)
PTAC3
PTAC4 (4TH FLR)
PTAC3
PTAC4 (4TH FLR)
PTAC3
PTAC4 (4TH FLR)
DATE:
ALLIANCE ARCHITECTS
ALL RIGHTS RESERVED
SHEET NO.
© 2016
c:\users\bradley\dropbox\design\alliance\indianapolis\draw
ings\dw
g\m
echanical.dw
g, 11/29/2016 12:14:44 P
M N
one
.\A
lliance_A
rchitecture.tiff
BR
AD
LE
Y A
. W
HIT
E, P
.E
.
ELE
CT
RIC
AL, M
EC
HA
NIC
AL,
AN
D P
LU
MB
IN
G C
ON
SU
LT
IN
G
PO
B
OX
1514, S
OU
TH
B
EN
D, IN
46634
574-234-7767 bradw
@repairs-inc.com
11/28/2016
13
IN
SIG
HT
D
EV
EL
OP
ME
NT
C
OR
P.
IN
DIA
NA
A
VE
NU
E A
PA
RT
ME
NT
R
EN
OV
AT
IO
NS
825 IN
DIA
NA
A
VE
NU
E
IN
DIA
NA
PO
LIS
, IN
DIA
NA
SCALE:
N
O
R
T
H
BUILDING C 1ST FLOOR MECHANICAL PLAN
1/8"=1'
SCALE:
N
O
R
T
H
BUILDING C 2ND/3RD/4th FLOOR MECHANICAL PLAN
1/8"=1'
EXTEND MANUFACTURER'S DUCT
TRANSITION KIT TO ROUTE ALONG
WALL THROUGH PARTITION TO
BEDROOM, LIKE EXISTING DETAIL.
(TYPICAL)
TERMINATE SUPPLY GRILLE THROUGH
PARTITION WALL TO BEDROOM (TYPICAL)
ROOFTOP UNIT LOCATED ON
ROOF ABOVE 4TH FLOOR