  • 8/22/2019 Qc Manual Edited for Audit

    1/25

    ABLINDUSTRIES,LLC

    Rev#0Date:6/19/13

    TITLEPAGE

    SectionA Date:June19,2013

    ABLINDUSTRIES,LLC1024HWY343

    ChurchPoint,LA.

    QUALITYCONTROLMANUAL

    For

    ShopFabricationandFieldAssemblyofPressureVesselsandParts

    Inaccordancewith:ASMESectionVIIIDivision1

    CertificationMarkwithUDesignator

    Shop/FieldRepairsand/orAlteration(Metallic)toPartsandPressureRetainingItemsin

    accordancewiththeNationalBoardInspectionCode(NBIC)RSymboland

    JurisdictionalRequirements

    ControlCopy#QMC

    EDITION4June19,2013

    Revision0June19,2013

    This is a ControlledManualControlled defined as: the holder of such amanual shall be

    furnishedwithallrevisionsandaddendums

  • 8/22/2019 Qc Manual Edited for Audit

    2/25

    ABLINDUSTRIES,LLC

    Rev#0Date:6/19/13

    SectionB Date:June19,2013

    TABLEOFCONTENTSandREVISION

    CONTROLSECTION

    SECTION TITLE REVISION DATE

    A TitlePage 0 6/19/13

    B TableofContents 0 6/19/13

    C StatementofAuthorityandResponsibility 0 6/19/13

    D

    OrganizationalChart

    0

    6/19/13

    1 QualityControlResponsibilities 0 6/19/13

    2 Drawings,Calculations,andSpecifications 0 6/19/13

    3 MaterialControl 0 6/19/13

    4 ExaminationandInspection 0 6/19/13

    5 CorrectionofNonconformance 0 6/19/13

    6 Welding 0 6/19/13

    7

    NondestructiveExaminations

    0

    6/19/13

    8 HeatTreatment 0 6/19/13

    9 CalibrationsandTesting 0 6/19/13

    10 RecordRetention 0 6/19/13

    11 AuthorizedInspector 0 6/19/13

    12 RepairsandAlterations 0 6/19/13

    13 AssemblyatFieldSites 0 6/19/13

    14 Exhibits 0 6/19/13

    By:_________________________ Date:________________

    QualityControlManager

    AcceptedBy:__________________________ Date:________________

    AuthorizedInspector

  • 8/22/2019 Qc Manual Edited for Audit

    3/25

    ABLINDUSTRIES,LLC

    Rev#0Date:6/19/13

    SECTIONC

    STATEMENTOFAUTHORITYANDRESPONSIBILITY

    ThisManualoutlinesanddescribestheQualityControlProgramimplementedtoinsurethat

    ABLINDUSTRIES,LLC(Company)isatalltimesincompliancewiththeminimumrequirements

    oftheASMEBoilerandPressureVesselCodeandtheNationalBoardInspectionCode

    requirements,hereaftertobereferredtoastheCode.

    TheQualityControlManualhasbeenpreparedforfabricationofPressureVesselsandParts

    inaccordancewithASMESectionVIIIDiv.1,RepairsandAlterations(Metallic)toPressure

    VesselsandotherPressureRetainingItemsdefinedinAccordancewiththeNationalBoard

    InspectionCode,andJurisdictionalRequirements.

    TheseactivitiesmaybecarriedoutintheShoporFieldsitescontrolledbythislocationand

    shallbeunderfullcontroloftheQualityControlManager.

    ThePresidentofABLINDUSTRIES,LLCfullysupportsthisQualityControlSystemandgivesthe

    QualityControlManagercompleteauthority,responsibility,andtheorganizationalfreedom

    toidentifyQualityControlProblemsandtoprovidesolutions.Allpersonnelareresponsible

    forqualityandareherebyinstructedtogivefullcompliancetothisManualandtotheCode.

    AnyproblemsconcerningCodecompliancethatisunabletoberesolvedbytheQuality

    ControlManager,

    shall

    be

    brought

    to

    the

    President

    of

    ABL

    INDUSTRIES,LLC

    for

    final

    resolutionwithoutcompromiseoftheCodeandthisQualityControlManual.

    __________________________________ Date:____________________

    Presidentof

    ABL

    INDUSTRIES,

    LLC

  • 8/22/2019 Qc Manual Edited for Audit

    4/25

    ABLINDUSTRIES,LLC

    Rev#0Date:6/19/13

    SECTIOND

    ORGANIZATIONALCHART

    PRESIDENT

    SUPERINTENDENT

    SHOPANDFIELD

    WELDERSSHOPANDFIELD

    QualityControlManager

    QualityControlInspectorSHOP

    ANDFIELD

    MATERIALCONTROLCLERKSHOPANDFIELD

    PURCHASINGAGENT

    CHIEFENGINEER

    CONSULTINGENGINEER

    CUSTOMERSENGINEER

  • 8/22/2019 Qc Manual Edited for Audit

    5/25

    ABLINDUSTRIES,LLC

    Rev#0Date:6/19/13

    SECTION1

    QUALITYCONTROLRESPONSIBILITIES

    1.1 TheQualityControlManagershallhavethefullauthorityandresponsibilityfortheadministrationandimplementationoftheQualityControlProgram.

    1.2 TheQualityControlManagershallberesponsibleforthepreparation,revision,approval,distributionandcontroloftheQualityControlManual.ControlledcopiesofthisManualwillbeissuedwiththeControl

    numberontheTitlePage. AllCodeEditionandAddendumswillbereviewedasissued,andifnecessary,

    revisionstothemanualswillbeimplementednolaterthansixmonthsaftertheissuedate.TheQuality

    ControlManagershallmaintainarecordofallcontrolledManualsissuedontheQualityControlManual

    IssueForm.(Exhibit14.1)

    1.3 Priortotheissueofthe QualityControlManualallrevisionsmustmeettheQualityControlManagersapprovalandtheacceptanceoftheAuthorizedInspectorand shallberecordedonTableofContentsand

    RevisionControlasissuedand/orrevised.ManualrevisionswillbeissuedbySection,exceptforExhibits,

    whichwillbeissuedbypage.

    1.4 TheQualityControlManagershallberesponsibleforassigningtheNationalBoardnumbertoeachvesselinsequentialorderat/orpriortothetimeoffinaltesting.TheQualityControlManagershallkeepalogofall

    numbersusedtoassurethatnumbersarenotduplicatedorskipped.Thelogshallcontainthefollowing

    information:Manufacturersserialnumber,typeofvessel,dateissued,NationalBoardnumberassigned,

    anddatesenttotheNationalBoard. TheQualityControlManagerwillsendoneoriginalManufactures

    DataReporttotheNationalBoardforeachvesselsoregisteredwithin60daysofcertification.

    1.5 TheQualityControlManagershallpreparetheappropriateManufacturersDataReport,andafterinsuringitsaccuracyandcompleteness,shallcertifyitforthecompany.Aftercertificationitwillbepresentedtothe

    AuthorizedInspectorforreviewandsignaturewhensatisfiedtheCodeItemisincompliancewiththeCode.

    1.6 TheQualityControlManagershallberesponsibleforthecustodyandcontrolofallCodeStamps;allcodestampswillbekeptinasecureareatopreventlossorunauthorizeduse.

  • 8/22/2019 Qc Manual Edited for Audit

    6/25

    ABLINDUSTRIES,LLC

    Rev#0Date:6/19/13

    SECTION2

    DRAWINGS,CALCULATIONS,andSPECIFICATIONS

    2.1Drawings,BillofMaterials,(Exhibit14.3)Calculations,andSpecificationsmaybepreparedbytheConsultant,

    Engineer,CustomersEngineer,ortheChiefEngineer,alldesigndocumentsshallbereviewedforCode

    compliancetotherequiredEditionandAddendumsbytheChiefEngineer.Ifapprovedthedocumentsare

    submittedtotheQualityControlManagerforreviewandapproval.Approvalsshallbedatedandsignedor

    initialedbytheQualityControlManager.TheQualityControlManagermayusetheoptionalApprovedfor

    Fabrication(Exhibit14.2)stamp.

    2.2 TheChiefEngineerandtheQualityControlManagershalladdtothedrawingsordesigndocumentsall

    requireddataforeachCodeitemtoinclude:uniqueserialnumber,shopordernumber,codeeditionand

    addenda,weldingprocedurespecifications,numbersforalljoints,jointdesignandweldsize,nondestructive

    examinationrequirements,

    heat

    treatments,

    pressure

    test,

    and

    temperature,

    code

    stamping

    details,

    minimum

    designmetaltemperature,(MDMT)maximumallowableworkingpressure(MAWP)andanyadditional

    requirementsforCodeFabrication.

    2.3Whencomputerprogramsareutilizedfordesign,theresponsibilityfortheinputofcorrectdataandverified

    outputshallbecontrolledbytheChiefEngineer.ReviewofrevisionstotheCodetodetermineifcomputer

    programsarecurrentandacceptabletotheCodeEditionandAddendaused,willbetheresponsibilityofthe

    ChiefEngineeranddocumentedasper2.2listedabove.Preparationsofalternatecalculationstoverifyoutput

    willbeprovideduponrequestoftheAuthorizedInspector.

    2.4TheBillofMaterialsshallbepreparedbytheChiefEngineerortheQualityControlManagerfromdesign

    documentstoincludeallCodeorderingrequirementstoinsurematerialscomplywithrequirementsandto

    specificationsasdesignatedinthematerialtablesofthefabricationcodeusingSAand/orSB numbers.Ordering

    requirementswillbelistedonthePurchaseOrder.(Exhibit14.4)

    2.5AnyrevisiontotheabovedocumentsshallbereviewedandapprovedbytheChiefEngineerorQuality

    ControlManager.

    2.6TheQualityControlManagershallmaintain:allDrawings,BillofMaterials,Calculations,andSpecifications

    intheJobFileandissueacopyoftheapprovedDrawings, revisionsasapplicable totheShoporField

    Superintendent(SFS)andacopyoftheapprovedBillofMaterialstothePurchasingAgentandtheMaterial

    ControlClerk.IftheQualityControlManagerisunabletophysicallyissuetheaboveinformationtothefieldsite

    aCoverLetter(Exhibit14.14)withtherequiredinformationshallbesuppliedtotheShoporFieldSuperintendent

    whowill

    initial

    and

    date

    the

    Cover

    Letter

    to

    indicate

    his

    receipt

    of

    the

    information

    and

    return

    to

    the

    Quality

    ControlManager.AsrevisionsareissuedtheQualityControlManageshallrecoveranddestroyallobsolete

    copiesormaymaintaincopiesverifiedVOIDintheJobFilefordocumentation.

    2.7Alldesignspecifications,calculations,drawings,revisions,andproceduresshallbemadeavailabletothe

    AuthorizedInspector(AI)forreviewandacceptance.

  • 8/22/2019 Qc Manual Edited for Audit

    7/25

    ABLINDUSTRIES,LLC

    Rev#0Date:6/19/13

    SECTION3

    MATERIALCONTROL

    3.1.ThePurchasingAgentshallprepareaPurchaseOrder(PO)forallCodematerialfromdataontheapproved

    BillofMaterials.WeldingconsumablesmaybeorderedbyverbalrequestbytheShoporFieldSuperintendent

    perASMEandSFASpecificationand/orAWSClassification.ThePOshallbeforwardedtotheQualityControl

    ManagerforreviewandapprovalbysignatureanddatepriortoissuetoinsurethatallCoderequirementshave

    beenincluded.

    3.2TheapprovedPOandallrevisionsshallbedistributedbythePurchasingAgentasfollows:

    a.vendor b.purchasingfile c.QualityControlManager d.MaterialControlClerk

    3.3.Nosubstitutionsofmaterialsshallbealloweduntilalldocumentsaffectedhavebeenrevisedasdescribedin

    thisManual

    and

    approved

    by

    the

    Chief

    Engineer,

    the

    Quality

    Control

    Manager,

    and

    the

    Authorized

    Inspector.

    3.4.AllCodematerialsreceivedwillbeinspectedbytheMaterialControlClerk(MCC)forcompliancetoCode.

    TheMaterialControlClerkinspectionshallreportanyevidenceofphysicaldefectordamage,theresultsofthis

    inspectionshallberecordedonthe ReceivingandInspectionReport(Exhibit14.5)whichshallbeforwardedto

    theQualityControlManagerforreview,andfilingintheJobFile.

    3.5MaterialTestReportsshallbereviewedforCodecompliancetoASMESectionIIbytheQualityControl

    Inspector(QCI)whowillindicatereviewbyinitialanddateonMaterialTestResults.CoderequiredMaterialTest

    ResultsshallbepartoftheCodefileandavailabletotheAuthorizedInspectorforreview.Whenadditional

    materialtestingisrequired,theChiefEngineerandQualityControlManagershalladdressallapplicable

    procedures

    for

    control

    of

    this

    project.

    3.6Codeacceptablematerialsstoredforpressurepartswillbemarkedwith:grade,heatnumber,andapplicable

    slabnumber.Nonpressurepartswillbeidentifiedwiththegradeorheatnumberforthatmaterial.Material

    manufacturemarkingsmaybehighlighted.Smallitemsmaybestoredincontainersmarkedwithmaterial

    identification.

    A)CodedMarkingSystem:EachjobwillbegivenatwoletteridentifierandeachitemwithintheBillof

    Material forthatjobwillbenumberedasitarrivesontheCodedMarkingLog(Exhibit14.17). Thetwo

    letterjobidentifierandmaterialspecificnumbermaybeusedthroughoutfabricationinlieuof

    identificationmarkingsdescribedabove.

    B)When

    using

    stock

    material,

    the

    Material

    Transfer

    Form

    (Exhibit14.18)

    shall

    be

    used

    to

    maintain

    traceability

    3.7UnacceptablematerialshallbemarkedHOLDorhaveaHOLDTAG(Exhibit14.6)attachedandaNon

    conformanceReport(Exhibit14.7)completedbytheQualityControlManagerfordispositionperthisManual.

    ThismaterialwillbeseparatedfromCodeacceptablematerials.

  • 8/22/2019 Qc Manual Edited for Audit

    8/25

    ABLINDUSTRIES,LLC

    Rev#0Date:6/19/13

    SECTION3(Continued)

    3.8All

    Code

    material

    will

    be

    issued

    to

    the

    Shop/Field

    Superintendent

    by

    the

    Quality

    Control

    Inspector

    after

    verificationthatitisacceptableandcomplieswithallapplicableCodes,BillofMaterialsandVesselDrawings.

    PressurematerialsandfitupsmayberecordedonQualityControlInspectiondrawingthentransferredtothe

    TravelerbytheQualityControlInspector,afterwhichthedrawingmaybekeptforreference,voidedor

    destroyed.

    3.9Materialdeliveredtosubcontractorsforrolling,and/orformingshallbetaggedorstampedwiththeJob

    NumberandanyotherrequiredidentifyinginformationtraceabletoaMaterialTestReport.

    3.10PartsandmaterialsthatdonotmeetCodeandcustomerrequirementsareconsiderednonconformingand

    shallbeeithercorrectedorremoved.

    3.11MaterialremovedfromstockorreceivedfromthecustomertobeusedinaCodeitemshallbeinspectedby

    theMaterialControlClerkforcompliancewiththeDrawingandCodeandwillthenberecordedontheReceiving

    InspectionReport.

    3.12Whenadditionalmaterialtestingisperformedatreceivinginspectionorduringmanufacturingoperation,

    documentsshallbeobtainedtodeterminethattheymeettherequirementsofthematerialspecification.The

    QualityControlManagerisresponsibleforreviewofthisdocumentationforcompliancewithprocedureand

    Code.

  • 8/22/2019 Qc Manual Edited for Audit

    9/25

    ABLINDUSTRIES,LLC

    Rev#0Date:6/19/13

    SECTION4

    EXAMINATIONandINSPECTION

    4.1TheQualityControlManager,priortofabrication,shallpreparetheTraveler(Exhibit14.8A&B)foreachCode

    Itemand

    present

    it

    to

    the

    Authorized

    Inspector

    with

    the

    applicable

    Drawings

    and

    Calculations

    for

    review,

    acceptance,andinsertioninhisrequiredinspectionHOLDPOINTS.

    4.2AllexaminationspointsnotmarkedNAbytheQualityControlManageraremandatoryHOLDPOINTSfor

    QualityControl.AlldesignatedHOLDPOINTSshallnotbepassedwithouttheQualityControlManagerand

    AuthorizedInspectorsacceptance.

    4.3Whenmaterialidentificationmarkingsarelocatedwhereitwillberemovedduringthefabricationprocess,

    orthematerialisdividedintotwoormorepieces,theQualityControlInspectorshallverifythatallrequired

    materialidentificationsaretransferredtoeachpiecepriortothecontinuationofthefabrication.Alternatively,

    thecodesystemdescribedinSection3.6(A),traceabletotheMaterialTestingReport,ortothematerial

    specification,ifnoMaterialTestingReportisrequired,maybeutilized.

    4.4ThefitupofallweldedjointspriortoweldingshallbeexaminedbytheQualityControlInspectorand

    individuallyrecordedontheQualityControlDrawingand/ortheTravelerand/orinitialedanddatedontheCode

    Item.FinalsignoffofallweldedjointsshallbeindicatedontheTraveler.AtthistimetheQualityControl

    InspectorshallrecordmaterialidentificationasbuiltintotheCodeItemontheTravelerasrequired.

    4.5TheQualityControlInspectorshallmonitorallfabricationoperationsandallnonconformancesshallbe

    handledasperSection5ofthismanual.

    4.6Thehydrostaticand/orpneumatictestingshallbeconductedbytheSFSasperspecificationonthe

    fabricationdrawings.TheQualityControlInspectoraswellastheAuthorizedInspectorshallwitnessandaccept

    thepressuretest.UponacceptanceofthetesttheQualityControlInspectorandtheAuthorizedInspectorwill

    makeavisualexaminationofallweldjointsatapressurenolessthantheMAWP.

    4.7AllrepairstopressureretainingmaterialsshallbereferredtotheAuthorizedInspectorforhisconcurrenceof

    themethodutilizedandtheextentofrepairspriortoperformingsuchrepairs.

    4.8TheQualityControlInspectorisresponsibleforverifyingtheCodeNameplateDataand/orCodestamping

    (ASMENameplate(Exhibit14.9))oftheCodeItemasspecifiedonthedrawingwiththeconcurrenceofthe

    AuthorizedInspector.TheQualityControlInspectorsapprovalandtheacceptanceoftheAuthorizedInspector

    oftherequiredstampingshallberecordedontheTraveler.

    4.9TheCertificationMarkandNBStampshallbeinthecustodyandcontroloftheQualityControlManager.The

    CertificationMark

    with

    U

    Designator

    may

    be

    applied

    to

    the

    Code

    Item

    only

    with

    the

    concurrence

    of

    the

    AuthorizedInspector.

    4.10WheninternalinspectionsofaCodeItemcannotbemadebyentering,afterthefinalclosureweldismade,

    acompleteinternalexaminationshallbeperformedpriortothefinalclosure.

  • 8/22/2019 Qc Manual Edited for Audit

    10/25

    ABLINDUSTRIES,LLC

    Rev#0Date:6/19/13

    SECTION5

    CORRECTIONOFNONCONFORMANCE

    5.1NonconformanceshallbedefinedasanyconditionthatdoesnotcomplywiththeCode,thisQualityControl

    Manual,or

    Customer

    specifications.

    There

    are

    normally

    two

    types

    of

    non

    conformance

    issues:

    a.Thosefoundinmaterialsorpartsatreceivinginspectionsuchasdocumentation,markings,

    dimensions,orphysicaldamage.

    b.Thosefoundonitemsduringfabrication,examination,inspectionorfinaltesting.

    5.2Whenanonconformanceisdiscovered,theQualityControlManagershallbenotifiedforpreparationofa

    NonConformanceReport(NCR)andidentificationoftheitemormaterialwiththeword,HOLDinspraypaint

    oraHOLDtagattached.ThisidentificationmayonlyberemovedbytheQualityControlManagerafter

    correctionofthenonconformance.

    5.3.TheQualityControlManagershallapprovetheproposeddispositionbyinitialinganddatingontheNCR

    afterconsultationwiththeChiefEngineer,PurchasingAgentandCustomerasrequired.Theapproved

    dispositionshallbepresentedtotheAuthorizedInspectorforacceptanceandhisinitialing,priortoany

    correctiveaction,forinsertionofanyinspectionpointsrequired.

    5.4WhentheNonconformancehasbeenresolved,tobeusedasisthereasonsforacceptanceofthenon

    conformanceshallbestatedbytheQualityControlManagerontheNCRandsubmittedtotheAuthorized

    Inspectorforacceptance.AnyrequiredrevisionstoDrawings,calculations,orotherManualrequireddocuments

    shallbemadeasdescribedinthisManualwiththesameapprovalsnecessaryastheoriginal.

    5.5Whenthenonconformancerequiresreworkorrepair,theQualityControlManagershallpreparethe

    procedureto

    be

    followed

    and

    present

    this

    information

    to

    the

    Authorized

    Inspector

    for

    review,

    approval

    and

    designationofinspectionpoints.

    5.6TheQualityControlManagershallberesponsibleforallinspectionsinvolvingthereworkorrepairofthe

    nonconformance.Whentheinspectionrevealsthecorrectiveactionisacceptable,theNCRshallbesignedand

    datedbytheQualityControlManagerindicatingapproval.TheAuthorizedInspectorwillbenotifiedof

    completionofcorrectiveactionandtheNCRwillbepresentedforreviewandsignedanddatedacceptable.The

    NCRwillbeplacedintheappropriateJobFile.

    5.7Whenthenonconformancerequirestherejectionofmaterialsoritems,thematerialsoritemsshallbe

    scrappedand/orreturnedtothevendor.Rejectedmaterialsoritemsshallberemovedfromtheworkareaand

    taggedclearlywith,REJECTEDtopreventitsinadvertentusepriortodisposal.

    5.8Repairofnonconformancebyweldingshallbecompletedinaccordancewithaqualifiedrepairprocedureas

    describedintheNCR,andshallbeperformedonlyafterconcurrenceoftheAuthorizedInspector.

    5.9OnlytheQualityControlManagermayremoverejectiontagsormarkingsonitemsaftercorrectiveaction

    hasbeentaken.TheNCRshallbeindicatedbyasequentialnumberontheCodeTravelerandplacedintheJob

    File.

  • 8/22/2019 Qc Manual Edited for Audit

    11/25

    ABLINDUSTRIES,LLC

    Rev#0Date:6/19/13

    SECTION6

    WELDING

    6.1Allweldingprocedures,welders(WelderorWeldingOperator),shallbequalifiedandcertifiedtoASME

    SectionIX

    with

    any

    additional

    requirements

    specified

    in

    the

    Fabrication

    Code.

    6.2TheQualityControlManagershallpreparetheWeldingProcedureSpecificationswhichwillberevisedifa

    nonessentialvariablechangesandwillberequalifiedwhenthereisachangeinessentialorsupplementary

    essentialvariables.

    6.3TheShop/FieldSuperintendentshallassignandsupervisepersonneltoperformtheprocedurequalification

    testsunderthecontroloftheQualityControlManager.Therequiredspecimensmaybepreparedandtestedin

    house,orbyatestinglaboratory.ResultsoftheexaminationswillbereviewedforCodecompliancebythe

    QualityControlManagerwhowillcompleteandcertify,theProcedureQualificationsRecord(PQR)when

    acceptabletoCode.TheQualityControlManagerwillmaintainafileofallWeldingProcedureSpecification

    (WPS)andPQR.

    6.4TheShop/FieldSuperintendentshallsuperviseWeldersintheperformanceoftheirqualificationtestunder

    thecontroloftheQualityControlManager.Thetestspecimensmaybepreparedandtestedinhouseorthetest

    couponradiographedortestedbyatestinglaboratory.ResultsoftheexaminationwillbereviewedforCode

    compliancebytheQualityControlManagerwhowillcompleteandcertifytheWelderPerformanceQualification

    (WPQ)orWelderOperatorPerformanceQualification(WQPQ)reportwhenacceptabletoCode.TheQuality

    ControlMangerwillmaintainafileofalltestdocumentation.

    6.5TheQualityControlManagershallmaintainonfiletheWelderContinuityLog(Exhibit14.11)withapplicable

    WelderQualificationvariableslistedbyprocessandhavecopiesavailablefortheShop/FieldSupervisorandthe

    AuthorizedInspector. TheWelderContinuityLogshallbecheckedforcompliancenolessthaneverysixmonths

    bythe

    Quality

    Control

    Manager

    to

    maintain

    current

    qualifications.

    Welders

    shall

    re

    qualify

    if

    they

    have

    not

    performedweldinginaspecificprocessinaperiodofsixmonths,oratanytimetheirabilitytoperformCode

    weldingappearsquestionable,orwhenthereisachangeinaperformanceessentialvariable.

    6.6TheSFSshallassignqualifiedWeldersorWeldingOperatorstoCodeWeldingfromtheWelderContinuity

    Log.TheSFSshallmaketheapplicableWeldingPerformanceSpecificationsavailabletotheweldersasspecified

    ontheapproveddrawing,maintainingsupervision,andcontrolthroughoutproductionwelding.

    6.7AlltackweldsshallbemadetoaqualifiedWPS.Theyshallberemovedpriortoweldingthejointunless

    weldedbyaQualifiedWelder,inwhichcasetheywillbeproperlypreparedandinspectedfordefectsbythe

    Welder(ifdefectivetheyshallbecompletelyremoved)priortoincorporatingintothefinishedweld.All

    subcontractorstackweldsshallberemoved.

    6.8TheQualityControlManagershallassigneachWelderorWeldingOperatorauniquesymbolstampto

    identifywelds.AllCodeweldsshallhavethewelderssymbolstampedadjacenttotheweldatintervalsofnot

    morethanthreefeet.Ifstampingisnotpermitted,theQualityControlInspectorshallrecordtheWelders

    SymbolforeachweldontheQualityControlDrawing.Inthecaseofsimilarweldsmadebythesamewelderor

  • 8/22/2019 Qc Manual Edited for Audit

    12/25

    ABLINDUSTRIES,LLC

    Rev#0Date:6/19/13

    SECTION6(Continued)

    fortackweldsleftinplace,thewelderssymbolshallbenotedonthedrawingbytheQualityControlInspector

    indicatingeachgroupofweldsortacksmadebyaspecificwelder.

    6.9TheQualityControlInspectorshallmaintainaFillerMaterialLog(Exhibit14.10)intherodstorageareato

    recordtheissuanceandreturnofLowHydrogenelectrodes.LowHydrogenelectrodesareissuedforamaximum

    offour(4)hoursuse,afterwhich,oratcompletionofweldorshift,theyarereturnedtotheQualityControl

    Inspectorforstorageintheholdingoven;foraminimumperiodoffour(4)hourspriortoreissue.Redryingof

    LowHydrogenelectrodesshallbeasrecommendedbytheelectrodemanufacturer.Unidentified,damaged,or

    dirtyelectrodesarenottobeusedforcodework.

    6.10TheAuthorizedInspectormayrequireandwitnesstherequalificationofaWelderorWelderOperatorat

    anytime.

    6.11WeldersnotintheemployofABLINDUSTRIES,LLCmaybeusedonCodeworkprovidedthefollowing

    conditionsaremet:

    A.AllCodeworkshallbedeemedtheresponsibilityofABLINDUSTRIES,LLC.(ABL)

    B.AllweldingshallbeperformedinaccordancewithABLsWeldingProcedureSpecificationsunlessan

    itemissuppliedasaCodeacceptedStandard.

    C.AllWeldersshallbequalifiedbyABLINDUSTRIES,LLCinaccordancewiththerequirementsofASME

    Section9

    D.TheQualityControlManagershallprovidethefollowingdocumentation:

    1.Requirements

    for

    complete,

    exclusive

    administrative

    and

    technical

    supervision

    of

    all

    WeldersbyABLINDUSTRIES,LLC

    2.EvidenceofABLINDUSTRIES,LLCauthoritytoassignandremoveWeldersatitsdiscretion

    withouttheinvolvementofanyothermanufacturer.

    3. RequirementforassignmentofWelderidentificationsymbolsbyABLINDUSTRIES,LLC

    4.EvidencethatthisprocedurehasbeenacceptedbyABLINDUSTRIES,LLCandtheAuthorized

    Inspector.

    E.ABLINDUSTRIES,LLCshallberesponsiblefortotalCodecomplianceoftheCodeItem,includingthe

    Code StampingandtoprovideallappropriateDataReportsproperlyexecutedand

    countersignedbytheAuthorizedInspector.

  • 8/22/2019 Qc Manual Edited for Audit

    13/25

    ABLINDUSTRIES,LLC

    Rev#0Date:6/19/13

    Section6(Continued)

    6.12.InSeptemberof2010ABLENTERPRISEShaschangeditsnametoABLINDUSTRIES,LLC.

    1)ABL,

    INDUSTRIES,

    LLC

    takes

    responsibility

    for

    all

    Procedure

    Qualification

    Records

    and

    Welding

    ProcedureSpecificationqualifiedbyABLENTERPRISES.

    2)AllexistingWeldingProcedureSpecificationqualifiedbyABLENTERPRISESwillberevisedtoreflect

    thenamechange.

    3)ProcedureQualificationRecordswillkeeptheexistingnameABLENTERPRISESandisthesourceofthe

    ProcedureQualificationRecordsusedinproductionwithABLENTERPRISESnamelistedasthe

    Manufacture.

  • 8/22/2019 Qc Manual Edited for Audit

    14/25

    ABLINDUSTRIES,LLC

    Rev#0Date:6/19/13

    SECTION7

    NONDESTRUCTIVEEXAMINATION

    7.1NonDestructiveExaminationmaybesubcontractedorperformedInHouse.

    7.2TypesofNonDestructiveExaminationtobeused:Radiography,Ultrasonic,MagneticParticle,andLiquid

    Penetrate.

    7.3SubcontractpersonnelresponsibleforperformingNonDestructiveExaminationshallbequalifiedand

    certifiedtotheirWrittenPracticeinaccordancewithSNTTCIAlatesteditionapplicabletotherequiredCode

    EditionandAddendaorperASMESectionVrequirementsaspermittedbytheapplicableCode.

    7.4TheNonDestructiveExaminationSubcontractorsWrittenPracticeshallcontainprovisionsfortraining,

    experience,qualifications,andcertifications.ThisWrittenPracticeandtheCertificationandExamination

    Recordsofpersonnelshallbesubmittedto,andacceptedby,theQualityControlManagerincompliancewith

    theCode.ThiscertificationshallbedocumentedandfiledbytheQualityControlManagerandmadeavailableto

    theAuthorized

    Inspector

    for

    review.

    7.5TheNonDestructiveExaminersLevelIIIqualificationsandcertificationsshallbereviewedbytheQuality

    ControlManagerwhowilluponacceptance,submitaLetterofAppointmentoftheLevelIIItoactasthe

    CompanyLevelIIIExaminerforall typesofNonDestructiveExamination.AcceptancebytheLevelIIIshallbe

    acknowledgedbysignatureanddate,ontheLevelIIILetterofAppointment.

    7.6InHousepersonnelresponsibleforperformingMagneticParticleandLiquidPenetrateshallbequalifiedand

    certifiedinaccordancewithASMESectionVIII,Div.1Appendix6&8.

    7.7AllNonDestructiveExaminationdocumentationshallbeonfileandavailabletotheAuthorizedInspectorfor

    review.

    7.8RadiographicFilm,InterpretationTechniqueSheets,andotherNonDestructiveexaminationrecordsshallbe

    reviewedandacceptedbytheQualityControlInspectorpriortoavailabilitytotheAuthorizedInspectorforhis

    review.

    7.9Radiographicfilmviewingfacilitiesanddensitycomparisonequipmentshallbeavailableforreviewoffilm

    forCodecompliancebytheQualityControlInspectorandtheAuthorizedInspector.

    7.10Non DestructiveExaminationProcedures(methodsandtechniques)shallbedemonstratedtothe

    satisfactionoftheAuthorizedInspectorandsodocumented.

    7.11TheAuthorizedInspectormayrequestrequalificationofNonDestructiveExaminationProceduresor

    examinerswhenever

    there

    is

    reason

    to

    question

    Code

    Compliance.

    7.12CalibrationoftheSubContractorsNonDestructiveExaminationequipmentshallbereviewedbythe

    QualityControlManagerandmadeavailabletotheAuthorizedInspector.

  • 8/22/2019 Qc Manual Edited for Audit

    15/25

    ABLINDUSTRIES,LLC

    Rev#0Date:6/19/13

    SECTION8

    HEATTREATMENT

    8.1AllheattreatmentshallbeperformedbyanoutsideContractoratthefieldsite,shop,orattheirlocation.

    TheChief

    Engineer

    shall

    prepare

    the

    Heat

    Treatment

    Record

    (Exhibit

    14.2),

    which

    describes

    the

    placement

    of

    thermocouples,temperaturegradientsforheatingandcooling,timeattemperature,andrequiredrecordsfor

    approvalbytheQualityControlManagertobesuppliedtotheoutsideContractoralongwiththePOstatingthe

    serialnumberandallspecialrequirements.

    8.2TheQualityControlManagershallreviewandaccepttheSubContractorsequipmentandcalibration

    recordstoassureCodeCompliancebeforeplacementofanorder.

    8.3TheSubContractorshallprovideABLINDUSTRIES,LLCwithrecordsofheattreatmentconsistingof:dated

    heattreatmentcharts,Jobnumbers,itemserialnumber,currentcalibration,andnumberandlocationof

    thermocouples.Therecordsshallbesignedanddatedbytheoperatorand/orSubContractorpersonnel.

    8.4Code

    Items

    to

    be

    sent

    for

    heat

    treatment

    shall

    be

    tagged

    or

    stamped

    with

    aserial

    number

    and

    any

    other

    identificationnumbers.ThesenumbersshallbeverifiedbytheQualityControlInspectorpriortoshipmentto

    outsidecontractoranduponreturntotheshoporfieldsitewhichwillberecordedintheTravelerwhendeemed

    acceptable.

    8.5TheQualityControlManagershallreviewtheHeattreatmentchartsanddocumentationforcompliancewith

    theproceduresandCoderequirementswhichshallbeinitialedanddateduponacceptance.

    8.6TheheattreatmentchartanddocumentationshallbesubmittedtotheAuthorizedInspectorforreviewand

    becomepartoftheJOBFILE.

    8.7TheQualityControlInspectorshallinspectallreturneditemsforconditionandshippingdamage.

    Unacceptableitems

    will

    be

    handled

    per

    Section

    5of

    this

    manual;

    acceptance

    of

    items

    will

    be

    recorded

    in

    the

    Traveler.

  • 8/22/2019 Qc Manual Edited for Audit

    16/25

    ABLINDUSTRIES,LLC

    Rev#0Date:6/19/13

    SECTION9

    CALIBRATIONandTESTING

    9.1Allgaugesshallbecalibratedaminimumofonceperyear,ifbelievedtobeinerror,theyshallbetested

    priorto

    one

    year

    utilizing

    adead

    weight

    tester

    or

    calibrated

    master

    gauge.

    9.2TheQualityControlInspectorshallmaintainaCalibrationLog(Exhibit14.13)toidentifyeachgaugeby

    numberwiththedateofthetest,testresults,andthedateofthenexttest.Eachgaugeshallhaveasticker

    attacheddocumentingthegaugenumberandthecalibrationdate.

    9.3AlltestgaugesshallbeissuedtotheSuperintendentbytheQualityControlInspectorandreturned

    immediatelyaftertestingiscompleted.

    9.4Measurementdevicessuchasmicrometersshallbecheckedusingstandardtestblocksinaccordancewith

    themanufacturersrecommendedprocedurespriortouse.

    9.5Gauges

    and

    measurement

    equipment

    shall

    be

    stored

    in

    asafe

    and

    protected

    area.

    9.6Weldingmachinesettings,voltandampmetersshallbecheckedbyasubcontractorinaccordancewiththe

    Manufacturersspecificationswhenevertheyarebelievedtobeinerror.Theyshallbecalibratedusing

    calibratedinstrumentswhenrequiredforimpacttesting.

    9.7SubContractorsareresponsibleforthecalibrationoftheirownequipment.Calibrationrecordsshallbe

    reviewedbytheQualityControlManagerandmadeavailabletotheAuthorizedInspectorifrequested.

    9.8Anyequipmentbelievedtobeinerrorshallberecalibratedorremovedfromservice.Anyitempreviously

    checkedwithouttheuseofcalibrationequipmentshallbeconsiderednonconforminguntilreviewedbythe

    QualityControlManagertodetermineretestingrequirements.

  • 8/22/2019 Qc Manual Edited for Audit

    17/25

    ABLINDUSTRIES,LLC

    Rev#0Date:6/19/13

    SECTION10

    RECORDRETENTION

    10.1TheQualityControlManagershallmaintainaJobFilewiththefollowingdocumentationtobemaintained

    untilthe

    Quality

    Control

    Manager

    and

    Authorized

    Inspector

    have

    certified

    the

    Manufacturers

    Data

    Report

    for

    ASMESectionVIIIDivision1items

    a.Drawings,Calculations,BillofMaterials,andProofTest.

    b.Travelers

    c.MaterialTestReports,CertificatesofCompliance,andPartialDataReports,PressurePartsDocumentation

    andCertification

    d.RadiographicExaminationReports

    e.Visual,Ultrasonic,MagneticParticleandLiquidPenetrantExaminationReports

    f.PWHTandHeatTreatmentrecordsandtestresults

    g. AllWPSsPQRs,WPQsandWOPQsandContinuityRecordsForEachWelderWhoWeldedOnTheVessel

    h.Repairprocedures,Nonconformancereportswithdispositions.

    i.Pressuretestreports

    10.2 Alloftheabovedocumentationandanyother,theAuthorizedInspectormayrequestshallbemadeavailabletoallowhisassuranceoffullCodecompliance.

    10.3 ForASMESectionVIIIDivision1items:Theabovedocumentationin10.1shallberetainedandkeptonfileforaperiodofthree(3)years.TheDataReportmayberegisteredandfiledwiththeNationalBoardof

    BoilerandPressureVesselInspectorsinlieuofthreeyearretention.

    10.4 DistributionofManufacturesDataReportsshallbetheresponsibilityoftheQualityControlManagerasfollows:

    a.IfNationalBoardRegistered,anoriginalshallbesenttotheNationalBoardwithinsixty(60)daysof

    certification.

    b.Onecopyforcompanyfilesaslistedin10.3above

    c.One

    copy

    to

    the

    owner/user

    d.OnecopytotheAuthorizedInspectorifrequested

    e.OnecopytotheenforcementauthorityintheJurisdictioninwhichthevesselwillbeinstalled.(IF

    Required)

  • 8/22/2019 Qc Manual Edited for Audit

    18/25

    ABLINDUSTRIES,LLC

    Rev#0Date:6/19/13

    SECTION11

    AUTHORIZEDINSPECTOR

    11.1TheAuthorizedInspectorasdefinedintheASMECodeshallhavebeenqualifiedbyawrittenexamination

    undertherulesofanyStateoftheUnitedStatesorProvinceofCanadawhichhasadoptedtheCode.The

    AuthorizedInspectorwillberegularlyemployedbytheASMEaccreditedAuthorizedInspectionAgencyin

    accordancewiththerequirementsinthelatesteditionoftheASMEQAI1withwhichtheCompanyhasa

    currentagreementforinspectionservice.TheQualityControlManagershallnotifytheASMEwheneverthe

    agreementiscancelledorchangedtoanotherAIA.

    11.2TheQualityControlManagerand/ortheQualityControlInspectorshallactasliaisonwiththeAuthorized

    Inspector.AdvancenotificationshallbeprovidedtotheAuthorizedInspectorallInspectionHOLDPOINTS

    givingsufficienttimetoperformrequireinspectionsdeemednecessarybytheAuthorizedInspectortoverify

    CoderequirementsduringthefabricationofCodeItemsandweldrepairstopressureretainingpriortoweld

    repairs.

    11.3WhereCodeworkisinprocess(shoporfield)theAuthorizedInspectorshallhavefreeaccesstoperformall

    requiredinspectionsandmonitoringtoinclude:SubContractorsfacilities,andCodematerialSuppliersashe

    deemsnecessary.

    11.4TheAuthorizedInspectorshallhavefreeaccesstoalldocumentationrequiredtoperforminspections.

    11.5TheAuthorizedInspectorshallbefurnishedwithacurrentcontrolledcopyoftheQualityControlManual.

    11.6AllaccessaffordedtheAuthorizedInspectorshallbeextendedtohisSupervisortoconductanyrequired

    auditsorreviews.

    11.7ProposedchangestotheQualityControlManualshallbesubmittedtotheAuthorizedInspectorforhis

    reviewandacceptancepriortoimplementation.

    11.8TheQualityControlManagershallfurnishtheAuthorizedInspectorwithaTravelerpriortonew

    fabrication,alterations,orrepairs,forreviewandplacementofHOLDPOINTS.Noworkshallproceedbeyond

    theAuthorizedInspectorsHOLDPOINTSuntilacceptedandindicatedbydatedinitials,orconsenttoproceed

    isgivenbytheAuthorizedInspector.

    11.9TheQualityControlManagershallprepare,certify,andsubmitappropriateManufacturersDataReports

    totheAuthorizedInspectorforhisreviewandcompliancewiththeapplicableCodespecifications.The

    AuthorizedInspectormaysigntheManufacturersDataReportwhenassuredthatallCoderequirementshave

    beenmet.

    11.10TheQualityControlManagershallassisttheAuthorizedInspectionSupervisorandAuthorizedInspector

    duringrequiredauditsorreviewswhilemonitoringtheQualityControlSystem.

  • 8/22/2019 Qc Manual Edited for Audit

    19/25

    ABLINDUSTRIES,LLC

    Rev#0Date:6/19/13

    SECTION12

    REPAIRSandALTERATIONS

    DEFINITIONSOFTERMSUSEDINTHISSECTION

    ALTERATIONS:anychangeintheCodeItemdescribedontheoriginalManufacturersDataReportwhichaffects

    thepressurecontainingcapabilityofthepressureretainingitem.Nonphysicalchangessuchasanincreaseof

    pressureintheMAWP(internalorexternal),ordesigntemperatureofapressureretainingitemshallbe

    consideredanalteration.Reratingshallbeconsideredanalteration.

    AUTHORIZEDINSPECTIONAGENCY(AIA):An AuthorizedInspectionagencyiseitheraJurisdictional

    AuthorityasdefinedintheNationalBoardConstitutionoranentitythatisaccreditedbytheNationalBoard

    meetingNB369.

    JURISDICTIONORJURISDICTIONALAUTHORITY:agovernmentalentitywhichadministersand/or

    enforces

    one

    or

    more

    sections

    of

    the

    ASME

    Code

    one

    of

    which

    shall

    be

    Section

    I.

    All

    references

    to

    jurisdiction

    in

    thissectionareapplicableonlyifinvolvementisrequired.

    INSPECTOR:anindividualwhoholdsavalidandcurrentNationalBoardCommission

    ORIGINALCODEOFCONSTRUCTION:documentspromulgatedbyrecognizednationalstandardswriting

    bodiesthatcontaintechnicalrequirementsforconstructionofpressureretainingitemsorequivalenttowhichthe

    pressureretainingitemwascertifiedbytheoriginalmanufacturer.

    REPAIR:theworknecessarytorestorepressureretainingitemstoasafeandsatisfactoryoperatingcondition.

    OtherThanASME:apressureretainingitemwhichwasnotdesignatedorconstructedtoanycodeof

    constructionoranitemwhichwasdesignedinaccordancewiththeASMECodebutnotinspected,certified,and

    stampedwithanASMECertificationMarkandDesignator.

    ROUTINEREPAIRS:thoserepairslistedanddefinedintheNBIC.

    NBIC:NationalBoardInspectionCode

  • 8/22/2019 Qc Manual Edited for Audit

    20/25

    ABLINDUSTRIES,LLC

    Rev#0Date:6/19/13

    Section12(Continued)

    REPAIRSandALTERATIONS:thissectiondefinestherequirementsestablishedforrepairsand

    alterationsasdefinedbytheNBICforPressureRetainingItems:

    12.1Repairs

    and

    Alterations

    to

    Code

    or

    Items

    Other

    Than

    ASME

    shall

    be

    performed

    in

    accordance

    with

    the

    requirementsoftheJurisdictionalAuthority,thecurrentmandatoryNationalBoardInspectionCode,the

    applicableASMECodeEditionandAddendaandthisQualityControlManualprovidedABLINDUSTRIES,LLChas

    theconcurrenceoftheInspectorandthejurisdictionwherethepressureretainingitemisinstalled.

    ROUTNEREPAIRS: shallbecarriedoutonASMECodeItemsonly.RoutineRepairswillbeinaccordancewiththe

    requirementsoftheNBIC,thisQualityControlManualandJurisdictionalrequirements(whenapplicable)and

    shallconformtotheapplicableASMECode;however,therequirementsforinprocessinvolvementofthe

    Inspectorandstampingarewaivedprovidedallofthefollowingconditionsaremet:

    a. ABLINDUSTRIES,LLCshallverifytothesatisfactionoftheInspectorthatroutinerepairsareacceptabletothejurisdiction.

    b. PriorapprovalforroutinerepairsshallbeobtainedfromtheInspectorc. RoutinerepairsshallbedocumentedonaFormR1withastatementinremarks,RoutineRepair

    12.2ExamplesanddefinitionsofRepairs,AlterationsandtheapplicableNationalBoardformsaredescribedin

    theNationalBoardInspectionCode.

    12.3The

    Quality

    Control

    Inspector

    shall

    assume

    overall

    responsibility

    for

    the

    performance

    of

    repairs

    and

    alterationsandfororiginatingtheconstructionproceduresnecessarytodirectthepositivecourseofwork.

    12.4ThemethodofrepairoralterationshallbemadeavailabletotheAuthorizedInspectionAgencyresponsible

    fortheinserviceinspectionoftheitemortheinspectionagencyofrecord.

    a.TheQualityControlManagershallprepareandmakeavailabletotheInspectoraproposed

    Repair/AlterationPlan(Exhibit14.16) forthemethodandextentofrepairsoralterations.

    Ifsoapplicable,DrawingsandCalculationswillalsobemadeavailable.

    b.UndernocircumstancesshallworkbestartedwithoutauthorizationoftheInspector.TheInspector

    makingtheacceptanceinspectionshouldbethesameInspectorwhoauthorizedtheproposedwork,

    butinallcases,employedbythesameorganizationoragencyunlesstherequirements of THENBIC

    aremet.

    c.NeworexistingmaterialwillcomplywiththeapplicablepartsofSection3ofthismanual.

  • 8/22/2019 Qc Manual Edited for Audit

    21/25

    ABLINDUSTRIES,LLC

    Rev#0Date:6/19/13

    Section12(Continued)

    12.5ReratingofapressureretainingitemshallonlybeperformedonASMECodestampeditemsandonly

    afterthefollowingrequirementshavebeenmettothesatisfactionofthejurisdictionatthelocationofthe

    installation:

    a. RevisedcalculationsverifyingthenewserviceconditionsshallbepreparedinaccordancewiththisQualityControlManual.

    b. AllreratingsshallbeestablishedinaccordancewiththeapplicableASMECode.c. Verificationthatthepressureretainingitemissatisfactoryfortheproposedserviceconditions.d. Thepressureretainingitemhasbeenpressuretested,asrequiredfornewserviceconditions.

    12.6

    Design

    engineering

    shall

    conform

    to

    the

    requirements

    of

    this

    Manual,

    the

    National

    Board

    and

    the

    ASME

    Codemostapplicabletotheworkinvolved.

    12.7NewmaterialsusedinmakingrepairsandalterationsshallconformtotheapplicablesectionoftheASME

    Code.

    a.IfABLINDUSTRIES,LLCprovidesallmaterials,theprocurement,inspectionandhandlingofallmaterialsshall

    be inaccordancewiththeapplicablesectionsofthisQualityControlManual.

    b.Ifthematerialsareprovidedbyanotherentity,sufficientdocumentationandmaterialidentificationshallbe

    providedforacceptanceofthematerialbyABLINDUSTRIES,LLC andtheInspector.Receivinginspectionand

    handlingofmaterialshallbeinaccordancewiththeapplicablesectionsofthisQualityControlManual.

    c. PressurepartsforwhichASMEManufacturersPartialDataReportsarerequiredshallbefabricatedandinspectedtotheapplicableCode,stampedwiththeappropriateASMECertificationMarkwithDesignator

    andthewordPART,andreportedontheapplicableManufacturersPartialDataReport.Whensuchparts

    areforrepairoralteration,theManufacturersPartialDataReportinformationshallbereportedonthe

    applicableR1orR2Formsandattach

    d. WhenexistingmaterialscannotbeidentifiedtheQualityControlManagershallberesponsibleforany

    requiredmaterialtesting.ThemethodandresultsshallbemadeavailabletotheInspector.

  • 8/22/2019 Qc Manual Edited for Audit

    22/25

    ABLINDUSTRIES,LLC

    Rev#0Date:6/19/13

    Section12(Continued)

    12.8Allwelding,nondestructiveexaminations,andheattreatmentshallbeinaccordancewiththeNBIC,

    theASME

    Code,

    and

    the

    applicable

    Section

    of

    this

    Manual.

    12.9ExaminationandtestmethodsshallconformtotherequirementsoftheNationalBoardandwillbe

    witnessedbytheInspectorasrequired.ABLshallberesponsibleforallrelatedactivities.

    12.10Undercertainconditions,postweldheattreatmentinaccordancewiththeOriginalCodeof

    Constructionmaybeinadvisableorimpractical.AlternativemethodsallowedbytheNBICmaybeused.

    12.11WhenarepairoralterationrequirestheremovaloftheportionbearingtheoriginalCodeStamping,the

    Inspectorshallwitness,subjecttotheapprovaloftheJurisdiction,themakingofafacsimileofthestamping,

    andthe

    transference

    of

    such

    stamping

    to

    the

    portion.

    The

    re

    stamping

    or

    replacement

    of

    the

    ASME

    Certification

    MarkwithUDesignatorshallbeperformedonlyaspermittedbythegoverningcodeofconstruction.When

    thestampingisplacedonanameplate,theInspectorshallwitnessthetransferofthenameplatetothenew

    locationontheitem.AnyrelocationofstampingwillbereportedontheapplicableNationalBoardForm.

    12.12TheQualityControlManagershallberesponsibleforthecustodyanduseoftheNationalBoardR

    SymbolStamp.NationalBoardCodeStampingornameplateinformationsuchas:size,location,and

    attachmentshallconformtotherequirementsoftheNationalBoardandwillbeappliedwiththe

    concurrenceoftheInspectorandtheJurisdiction(RepairandAlterationNameplate(Exhibit14.15)).

    12.13AcopyoftheoriginalManufacturersDataReportfortheitembeingalteredorreratedshallberequired

    andattachedtothecompletedFormR2.Whennotpossible,agreementsonmethodofestablishing

    designbasisforthealterationshallbeobtainedfromtheInspectorandJurisdiction.

    12.14TheQualityControlManagerortheQualityControlInspectorshallinitiatetheapplicableNationalBoard

    ReportFormandwithallsupportingdocumentationtotheInspectorforreviewandacceptance.

    DistributionoftheapplicableFormistheresponsibilityofABLINDUSTRIES,LLCandshallbeperformedby

    TheQuality

    Control

    Manager

    as

    follows:

    REPAIRS:LegiblecopiesoftheFormR1,togetherwithallrequiredattachments,shallbedistributedto

    Theowneroruser,theInspector,theAIAresponsiblefortheinserviceinspectionofthepressure

    retainingitem,andJurisdiction(ifrequired).TheFormR(s)mayberegisteredwiththeNational

    BoardinaccordancewiththeNBIC.

  • 8/22/2019 Qc Manual Edited for Audit

    23/25

    ABLINDUSTRIES,LLC

    Rev#0Date:6/19/13

    Section12(Continued)

    ALTERATIONSANDRERATING:LegiblecopiesoftheFormR2withallrequiredattachments,shallbe

    Distributedto:

    the

    Inspector,

    the

    AIA

    being

    responsible

    for

    the

    in

    service

    inspection

    of

    the

    pressure

    retainingitem,theowneroruser,andtheJurisdictionifsorequired.

    IfthepressureretainingitemisregisteredwiththeNationalBoard,theFormR(s)shallbesubmittedto

    TheNationalBoardwithin60dayswithaFormRNumberassignedinsequentialorderandrecorded

    withtheitemsnumberanddescriptionintheLog.

    TheNBICReportFormsshallnotbeusedtorecordarepairoralterationunlesstheworkhasbeen

    performed

    in

    accordance

    with

    the

    NBIC.

    ForRFormsnotregisteredwiththeNationalBoardacopyshallbemaintainedbyABLforaminimum

    offiveyears.

  • 8/22/2019 Qc Manual Edited for Audit

    24/25

    ABLINDUSTRIES,LLC

    Rev#0Date:6/19/13

    SECTION13

    ASSEMBLYATFIELDSITES

    13.1ASMECodeAssemblyatfieldsiteswillbecontrolledbytherequirementsofthis

    QualityControlManualfromtheABLINDUSTRIES,LLC facilityasreferencedonthe

    Organizationalchartwiththefollowingmodifications:

    A. MaterialreceiptinspectiononsiteshallbeperformedbyaFieldQualityControlInspectorinaccordancewiththisQualityControlManual.

    B. Weldingconsumableswillbereceived,stored,issuedandcontrolledbytheFieldSuperintendentinaccordancewiththisQualityControlManual.Duringtimesofinclement

    weatheraprotectiveblindorshieldshallbeutilizedwhenweldingisinprocess.Lowhydrogen

    weldingrodswillbeissuedinportableheatedrodovensorinunopenedsealedelectrode

    containersandstoredtospecificationsasoutlinedinthisQualityControlManual.

    C. AllfielddocumentationshallbeinaccordancewiththisQualityControlManual.DocumentationwillbecontrolledbytheFieldQualityControlInspectorandreturnedtoABL

    INDUSTRIES,LLCforreviewbytheQualityControlManager.Documentationofallprocedures

    willbemaintainedandplacedintheJobFile.

    D. IfafieldassemblyshouldrequireanymodificationtothisManual,thechangeswillbepresentedtotheAuthorizedInspectorforhisacceptanceasanaddendum.Whenaccepted,

    theaddendumshallbeincludedinallManualsonthejobsiteaswellasthecopyinthe

    possessionof

    the

    Quality

    Control

    Manager.

    Upon

    completion

    of

    the

    field

    job,

    acopy

    of

    onsite

    addendashallbeplacedintheJobFile.AllotherAddendasshallbedestroyed.

  • 8/22/2019 Qc Manual Edited for Audit

    25/25

    ABLINDUSTRIES,LLC

    Rev#0Date:6/19/13

    SECTION14

    EXHIBITS

    SECTION TITLE REV# DATE

    14.1 QUALITYCONTROLMANUALISSUEFORM 0 6/19/13

    14.2 APPROVEDFORFABRICATIONSTAMP 0 6/19/13

    14.3 BILLOFMATERIALS 0 6/19/13

    14.4 PURCHASEORDER 0 6/19/13

    14.5 RECEIVINGANDINSPECTIONREPORT 0 6/19/13

    14.6 HOLDTAG 0 6/19/13

    14.7

    NONCONFORMANCEREPORT

    0

    6/19/13

    14.8A TRAVELERPage1of2 0 6/19/13

    14.8B TRAVELERPage2of2 0 6/19/13

    14.9 ASMENAMEPLATES 0 6/19/13

    14.10 FILLERMATERIALLOG 0 6/19/13

    14.11 WELDERSQUALIFICATIONRECORDS 0 6/19/13

    14.12 HEATTREATMENTRECORD 0 6/19/13

    14.13 CALIBRATIONLOG 0 6/19/13

    14.14 COVERLETTER 0 6/19/13

    14.15 REPAIR/ALTERATIONNAMEPLATES 0 6/19/13

    14.16 REPAIR/ALTERATIONPLAN 0 6/19/13


Recommended