Quality Control System Manual for Shop and Field Fabrication of Items in accordance with
ASME B31.1, ASME Section I and ASME Section VIII, Div. 1 and Repairs and Alterations inAccordance with the National Board Inspection Code and Jurisdictional Requirements at
Shop and Field Locations.
Edition: 1 Date: XXXXX
Approval:
A.I. Acceptance:
Manual Control: Assigned To:
MANUFACTURER QUALITY MANAUAL
NAME:
ADDRESS:
7/31/2019 Qc Sample Manual Generic
2/34
Table of Contents
1. STATEMENT OF AUTHORITY Page 1
2. ORGANIZATIONAL CHART Page 2
3. GLOSSARY OF TERMS Page 3
4. QUALITY CONTROL DEPARTMENT Page 7
5. AUTHORIZED INSPECTOR Page 8
6. DRAWINGS, DESIGN CALCULATIONS AND SPECIFICATIONS Page 9
7. MATERIAL CONTROL Page 11
8. EXAMINATION AND INSPECTION PROGRAM Page 14
9. CORRECTION OF NON-CONFORMITIES Page 16
10. WELDING CONTROL Page 18
11. NON-DESTRUCTIVE EXAMINATION (NDE) Page 20
12. HEAT TREATING Page 22
13. CALIBRATION OF MEASUREMENT AND TEST EQUIPMENT Page 23
14. RECORDS RETENTION Page 24
15. REGISTRATION WITH NATIONAL BOARD Page 25
16. REPAIRS & ALTERATIONS Page 26
17.
EXHIBITSPage 32
7/31/2019 Qc Sample Manual Generic
3/34
1. STATEMENT OF AUTHORITY
The Quality Control System of MANUFACTURERS NAME. shall comply with ASME B31.1,
ASME Section I, and ASME Section VIII Div. 1 for fabrication in both shop and field locations
and Repairs and Alterations (Shop and Field) in accordance With The National Board Inspection
Code. Manufacturers Name gives the Quality Control Manager the authority, the responsibility,
and the organizational freedom to identify quality control problems and to initiate, recommend,
and provide solutions. The Quality Control Manager is responsible for the editing of the Quality
Control Manual and the compliance of it.
The Quality Control Manager has the full support of the management ofManufacturers Name,
Inc. to carry out his responsibilities and to fulfill his purpose. The Quality Control Managers
authority and responsibility include both shop and field sites. Any disagreement between the
Quality Control Manager and other Departments shall be settled by myself. Resolutions, when
made, shall not compromise the Code.
Signed,
Manufacturers Name
Name: PRESIDENT
Page 1
7/31/2019 Qc Sample Manual Generic
4/34
2. ORGANIZATIONAL CHART
Page 2
President
Shop Fabrication &
Field Activities
Quality Control
ManagerPurchasing Engineering Sales
Q.C. Inspectors
Shop & Field
Material Receiving
Legend
Line of Authority
Technical Coordination
Shop & Field
Vice-President
Forman
7/31/2019 Qc Sample Manual Generic
5/34
3. GLOSSARY OF TERMS
Page 3
ALTERATION :
ASME:
AUTHORIZED INSPECTOR (AI):
AUTHORIZED INSPECTION AGENCY (AIA):
CODE:
COMPANY:
DEPARTMENT:
3.0.1 Any change in the item described on the original Manufacturers Data
Report which affects the pressure containing capability of the pressure retaining
item. Non-physical changes such as an increase in the maximum allowableworking pressure (internal or external) or design temperature of a pressure
retaining item shall be considered an alteration. A reduction of the MDMT such
that additional mechanical tests are required shall also be considered an alteration.
3.0.2 The American Society of Mechanical Engineers.
3.0.3 The Authorized Inspector shall be an Inspector regularly employed by an ASME
Accredited Authorized Inspection Agency, i.e., the inspection organization of a state ormunicipality of the United States, a Canadian province, an insurance company
authorized to write boiler and pressure vessel insurance. The inspector shall not
be in the employ of the Manufacturer. All Inspectors shall have been qualified by
a written examination under the rules of any state of the United States or province
of Canada which has adopted the Code.
3.0.4 An AIA shall be either a Jurisdiction or an Insurance Company which
meets the requirements as defined in the National Board Inspection Code.
3.0.5 The ASME Boiler and Pressure Vessel Code, Section I, Section VIII,
Div. 1, and ASME B31.1 including addenda and code cases approved by the council of
the ASME and latest Addenda.
3.0.6 Manufacturers Name.
3.0.7 Where department is referred to in this manual, it shall be the responsibility is
the person in charge of that department.
7/31/2019 Qc Sample Manual Generic
6/34
Page 4
EXAMINATIONS:
FOREMAN:
INSPECTIONS:
MTR:
NDE:
NON-CONFORMITY:
PQR:
PRINT:
QCM:
QC:
REPAIR
3.0.8 Are those performed by Manufacturers Name. Quality Control
personnel.
3.0.9 Shop and field fabrication
3.0.10 Are those performed by the AI in all Code work for compliance to Code
Rules.
3.0.11 Mill Test Reports, or Material Test Reports.
3.0.12 Non-destructive examination.
3.0.13 Any condition existing in raw material, or work in process, or finished
product that does not comply with drawings, specifications, Code, or Company Name
3.0.14 Procedure Qualification Record
3.0.15 Drawing
3.0.16 Quality Control Manager
3.0.17 Quality Control Department
3.0.18 The work necessary to restore a pressure retaining item to a safe and satisfactory
operating condition.
standards and procedures and this Quality Control Manual.
7/31/2019 Qc Sample Manual Generic
7/34
Page 5
SN:
SNT-TC-1A
VESSEL:
WPS:
JURISDICTION OR JURISDICTIONAL AUTHORITY:
INSPECTOR:
ORIGINAL CODE OF CONSTRUCTION:
RE-RATING:
3.0.19 Serial number
3.0.20 Recommended Practices, America Society of Non-destructive Testing -a set of guidelines to assist the manufacturer in developing uniform procedures for
the qualification and certification of NDE personnel to the latest Code accepted
Edition & Addenda will be used.
3.0.21 Visual Examination
3.0.22 Any Code Item manufactured to B31.1 Section I, or Section VIII Division 1.
3.0.23 Welding Procedure Specification
3.0.24 A governmental entity which administers and enforces one or more
sections of the ASME Code, all references to jurisdiction in this section are
applicable only when involvement is required by jurisdictional policy.
3..0.25 An individual who holds a valid and current National Board Commission,
3.0.26 Documents promulgated by recognized National Standards Writing
Bodies that contain technical requirements for construction of pressure retainingitems or equivalent to which the pressure retaining items were certified by the
original manufacturer.
3.0.27 SeeAlteration
Addenda
VT:
7/31/2019 Qc Sample Manual Generic
8/34
Page 6
NON-CODE ITEM:
ROUTINE REPAIRS:
NBIC:
3.0.28 A pressure retaining item which was not designed or constructed to any
code of construction or an item which was designed in accordance with the
ASME Code but not inspected, certified, and stamped with the Code Symbol.
3.0.29 Those repairs listed and defined in the NBIC as Acceptable Routine
Repairs.
3.0.30 Nation Board Inspection Code
RT:
UT:
MT:
3.0.31 Radiographic Examination
3.0.32 Ultrasonic Examination
3.0.33 Magnetic Particle Examination
PT:3.0.34 Liquid Penetrant Examination
WPQ:
3.0.35 Welder Performance Qualification. WPQ: Welding Operator
Performance Qualification.
PRI: Pressure Retaining Item:Any boiler, pressure vessel, piping or material used for the containment of
Pressure, either internal or external.
7/31/2019 Qc Sample Manual Generic
9/34
4. QUALITY CONTROL DEPARTMENT
Page 7
4.1 The Quality Control Manager is responsible for preparation, revision,
distribution, control, and implementation of the Quality Control System Manual.
4.2 Any revision of the manual, however, results in a new edition and is presented
to the Authorized Inspector for his acceptance prior to implementation.
4.3 The ASME accredited Authorized Inspection Agency (AIA) will be presented
with a controlled copy of the Quality Control System Manual.
4.4 The QCM has custody of the Code Symbol Stamps and controls them.
A Code Symbol Stamp may be applied only with the concurrence of the AI.
4.5 The QCM heads the Quality Control Department and is responsible for
performance of required examinations and tests. He will prepare and sign the
Traveler and Manufacturers Data Report. In case of his absence, his designee
will prepare and sign the Traveler (Exhibit 3a, 3b, & 3c) and ManufacturersData Report.
4.6 Controlled Quality Control Systems Manuals are issued by the QCM. Revision
to manuals are treated as new editions and previous edition filed. Records of issuance
of each edition are kept by the QCM. (See Exhibit #8).
7/31/2019 Qc Sample Manual Generic
10/34
5. AUTHORIZED INSPECTOR
Page 8
5.1 The QCM is the company Liaison with the Authorized Inspector.
5.2 The AI shall have free access to the premises ofManufacturers Name. for
the surveillance of records, specifications, design drawings, calculations, procedures
and other documents relating to Code fabrication and inspection of materials, partsand appurtenances, and to field sites where ASME Code work is in progress. The AI
has the privilege of visiting any vendor or supplier of materials, parts, and service to
Manufacturers Name. that he deems necessary to satisfy inspection requirements
of such materials, parts and service. All access afforded the authorized inspector shall
be extended to his supervisor to perform any required audits or reviews.
5.3 A controlled copy of the Quality Control System Manual is provided for use by
the AI
5.4 Any non-conformity requiring AI acceptance is referred to him for his
concurrence of proposed resolution.
5.5 The Authorized Inspector, as defined by the ASME Code, shall have
been qualified by a written examination under the rules of any State of the
United States or Province of Canada which has adopted the Code. He will
be employed by an AIA with which Manufacturers Name has a current
agreement for services.
7/31/2019 Qc Sample Manual Generic
11/34
6. DRAWINGS, DESIGN CALCULATIONS AND
Page 9
SPECIFICATIONS
6.1 The QCM along with Engineering will perform the review of customers
specifications, and drawings to assure Code compliance can be attained.
6.2 Each vessel is given a SN. SNs are listed in a log to avoid duplication.
(Exhibit #9).
6.3 Engineering prepares and checks all design calculations. Customers
calculations are not used. Calculations are based on allowable stress listed
in ASME Section II, Part D, for use by the applicable construction Code and
not from information on MTRs.
6.4 Drafting prepares in-house drawings. Drafting specifies on drawings:
Construction Code Section; Edition and Addenda; NDE Requirements; Post
Weld Heat Treatment requirements; Design Parameters such as temperature and
pressure; Hydrostatic Test Pressure; Material Specifications; Job Number;Welding Procedures; and stamping information. Welding procedures to be used
are determined by the Q.C. Manager.
6.5 Engineering specifies materials to be used in Code fabrication. Materials are
specified as SA, SB, SFA, AWS or identical ASTM specifications (see Section II,
Part A & B)
6.6 Drawings, Specifications and Design Calculations must be approved by the
QCM. (By initialing and dating)
6.7 Distribution of prints is the responsibility of QC. Upon receipt of prints fromDrafting, an appropriate number of sets are distributed to the applicable departments.
Prints are issued to Foremen by QC.
6.8 QC hand carries one set of revised prints to the Foreman (or Foremen) over the
job. Old prints are destroyed before new prints are substituted. Other prints are
distributed appropriately to QC and Fabrication. Any drawings affected by a revision
will be exchanged. Unissued sets of prints are also destroyed.
6.9 QC reviews drawings and calculations, prior to the start of fabrication, with the
A.I. so that he may designate on the Traveller his required inspection points.
6.10 Any revisions or change will be handled as the originals.
6.11 Engineering for field jobs shall be handled in the same manner as shop jobs,
and by the same personnel.
7/31/2019 Qc Sample Manual Generic
12/34
Page 1Page 10
6.12 Access to computer programs for mechanical design calculations or stress and
fatigue analysis shall be only through engineering. Before computer programmed
results are used, the engineering shall have the accuracy of the original programs
and their revisions checked by running manually calculated test problems. The
accuracy shall be demonstrated to the satisfaction of the A.I. Engineering shall review
each Code Edition or addenda for impact upon design programs and assure the design
program is accurate for Edition/ addenda in use.
The design programs shall conform to any and all changes in the Code, a record of this
review shall be kept on file
7/31/2019 Qc Sample Manual Generic
13/34
7. MATERIAL CONTROL
Page 11
MATERIAL REQUISITION:
7.1 The Engineering Department shall prepare and check all Bills of Material
(Exhibit #1), except for welding materials which are requisitioned (Exhibit #10)
by the Foreman.
7.2 The Bill of Material shall include the following:
A. Material Specifications using the appropriate SA, SB, SFA, AWS, or
identical ASTM designation.
B. Material Size.
C. Number of pieces.
D. Job Number.
E. Mill Test Reports when required by Code.F. Forming requirements as required by the construction code
G. Any other special requirements when applicable.
7.3 All Bills of Material will be sent to the QCM, who will check them for ASME
Code and customer requirements and if acceptable, forward them to Purchasing.
MATERIAL PURCHASING:
7.4 The Purchasing Department shall order and purchase material required as
shown of the Bill of Materials (Exhibit #1). When material is purchased for morethan one (1) job, the QC Department shall mark all materials with Job Numbers, or
SN. Small parts shall be in marked container, or in a marked bundle. Any material
change or substitution must have prior approval by the Engineering Department.
7.5 A copy of the Bill of Material (Exhibit #1) will be sent to receiving, QC and
placed in job file.
7.6 When purchasing parts of a vessel that have been fabricated by welding with
filler metal added, a Manufacturers Partial Data Report will be required and partial
stamping as required by the applicable Code Section.
7.7 When ordering cold formed materials, Code requirements shall be requested.
7.8 Welding material for field work will be procured through Purchasing by QC, and
prepared by Foremen in the same way as for shop work.
7/31/2019 Qc Sample Manual Generic
14/34
CUSTOMER FURNISHED MATERIAL:
Page 12
7.9 Customer furnished material will be handled in the same manner as material
purchased by the Company, upon receipt and throughout fabrication.
RECEIVING INSPECTIONS:
7.10 Upon receipt of material the Quality Control Inspector will notify the QCM.
7.11 Upon notification of receipt of material, the Quality Control Inspector shall
perform the following physical inspections:
7.11.1 A. Check surfaces and edges for visible defects.
7.11.2 B. Check for physicals and forming specs.
7.11.3 C. Check Heat Numbers and document on Receiving Inspection Report.
7.11.4 D. Check materials to Bill of Materials for requested special marking
requirements and/or documentation.
7.11.5 E. Materials ordered for a specific vessel shall be marked with the Serial
Number when received. (Small items shall be placed in a container marked with
the Job Number or Serial Number.)
7.12 The QC Inspector shall record the results of the above inspection on Receiving
Inspection Reports (Exhibit #2) and send to QCM for filing.
7.13 The QC Inspector indicates on the Receiving Inspection Report at this time if
material is acceptable. Receiving Inspection Report is forwarded to QCM for review
and sign off indicating release for fabrication.
DOCUMENTATION VERIFICATION:
7.14 The QC Inspector shall verify the MTR as follows:
7.14.1 A. Check Material Heat Number against heat Numbers on MTR.
7.14.2 B. Check Chemical and Physical properties against specifications in
Section II of ASME Code.
7.14.3 C. After checking MTR to Section II ASME, QC shall sign and date.
7.15 The QC Inspector shall record vessel SN on MTRS for traceability to vessel.
7.16 The QCM shall file the MTR in the job folder.
7/31/2019 Qc Sample Manual Generic
15/34
MATERIAL IDENTIFICATION:
Page 13
7.17 Prior to cutting material, identification will be transferred to the part to be cut,
by the person doing the cutting. For Section I construction, all original markings
shall be transferred for plate.
RECEIVING INSPECTIONS:
7.18 Non-conformities found in material receiving will be controlled as outlined in
Manual on page 16.
7.19 When further material testing is performed by other than the material
manufacturer, documents shall be obtained to determine that they meet the
requirements of the material specification or construction Code. The Quality
Control Manager is responsible for review of documentation for compliance with
procedure and Code.
7/31/2019 Qc Sample Manual Generic
16/34
8. EXAMINATION AND INSPECTION PROGRAM
Page 14
DUTIES OF QUALITY CONTROL MANAGER:
8.1 The QCM shall be responsible for in process examination and acceptance or
rejection of fabrication.
INSPECTIONS:
DUTIES OF CHIEF ENGINEER:
8.3 Engineering Department shall inform the QC Manager and Foreman of any
Engineering change.
DUTIES OF FOREMEN:
8.4 The Foreman is responsible for the overall quality of the
fabrication item and for job progress notification to the QCM for inspection andexamination purposes.
8.5 The QC Inspector shall be responsible for but not limited to the following
typical examination and verification for conformance to Code requirements:
A. Weld Procedure Specification and Procedure Qualification Record, and
Welder / Welding Operator Performance Qualifications.
B. Fit-up Inspection to include edge preparation, fitting of edges on longitudinal
seams, girth seams, heads, nozzles and pipe. NOTE: Fit-up inspection or
examination is performed after components have been tacked in place, and
prior to root pass.
C. Finished Weld Inspection or Examination to include the weld size and weld
appearance and welders symbols.
D. Perform any other required examination for completed quality product.
8.6 The QC Inspector shall record the above examinations on the Traveler andnotify the AI reasonably in advance of his up-coming inspection point.
FINAL CHECKS:
8.2 The QCM shall prepare the Traveler and present it to the AI prior to the startof fabrication.
8.7 The AI will witness the hydrostatic testing of all ASME items.
7/31/2019 Qc Sample Manual Generic
17/34
Page 15
8.9 The Manufacturers Data Reports shall be prepared, checked and signed by the
QCM or his designee prior to presenting to the AI for his review, acceptance and
signature. Safety valve info shall be recorded on a P-7 or P-3 per PG 112.2.8.
8.10 The QCM shall check the nameplate stamping information for correctness priorto applying the Code stamp symbol. Boilers shall be Code stamped as required by Section I.
8.11 Responsibilities for field work and examination are identical to shop work and
examination.
8.12 All material for field site work will be received and processed the same as shop
material prior to transfer to field.
8.13 When received at field site all materials will be examined for damage due to
transit.
8.14 Any damages will be handled as a non-conformity. (See pg. 16)
PNEUMATIC TESTING:
8.15 Boilers shall not be pneumatically tested. Pressure Vessels may be
pneumatically tested in accordance with the applicable Code Section and paragraph.
8.8 The Code Symbol stamp shall be applied only on concurrence of the AI.
7/31/2019 Qc Sample Manual Generic
18/34
9. CORRECTION OF NON-CONFORMITIES
Page 16
NON-CONFORMING MATERIAL:
9.1 The QCM shall notify the Foreman in the event non-conforming material is
received.
NON-CONFORMITY (FABRICATION):
9.9 The AI is included in the proposed resolution and the final disposition of all
non-conformities except return to vendor.
9.10 Records concerning non-conformities shall be kept in the job file of each Code
Vessel.
9.2 The QCM shall Chair a Material Review Board consisting of the following
members:
9.2.1 A. Purchasing Department Representative
9.2.2 B. Engineering Department Representative
9.2.3 C. Foreman
9.3 Based on the findings of the Material Review Board, the non-conforming
material will be repaired by the Company or returned to the Vendor or use as is.
9.4 Material to be repaired by welding shall have the concurrence or the Authorized
Inspector for the method and NDE to be used for repairs on the NCR Form prepared
by the QCM.
9.5 Non-conformity is defined as any deviation from accepted standards for a given
finished product. At time when a deviation is noted, a Hold Tag (Exhibit #4) will be
filled out and placed on the product (all work stops on it until resolved) and a
Non-conformance Report (Exhibit #5) will be initiated by the QC Department. The
Non-conformance Report will then be forwarded to the QCM who is responsible for
determining an acceptable course of action. As an alternative to the hold tag, holdmay be written on the nonconforming item with a paint stick.
9.6 Fabrication Errors. These errors could be in design or fabrication after welding
has started, and requires repair by welding to correct. Engineering Department will
determine the welding procedure to be used.
9.7 When a repair procedure has been devised by the Engineering Department and
reviewed by the QCM, then it will be presented to the AI prior to commencing work
for his acceptance.
9.8 The QCM is primarily responsible for resolution and disposition of all problemsthat may arise.
7/31/2019 Qc Sample Manual Generic
19/34
Page 17
9.11 After repairs have been completed and accepted by the AI, the QCM will
remove the Hold Tag or hold written on the item.
9.12 Non-conformities shall be handled in the same manner for both shop and field.
7/31/2019 Qc Sample Manual Generic
20/34
10. WELDING CONTROL
Page 18
WELDING PROCEDURES:
10.1 All Welding Procedures Specifications are written and non-essential variables
revised, when required, by the Engineering Department. A Welder is assigned by the
Foreman to weld a test specimen using the variables of the specification as a guide.
This coupon is tested by a testing laboratory, in accordance with Section IXof the ASME Code. All welding procedures shall be qualified in accordance with
Section IX with additional requirements of the applicable Code section to which work
is performed and a Procedure Qualification Record filled out and certified by the QCM.
PROCEDURE ASSURANCE:
10.2 Written Welding Procedures Specifications for each process to be performed
are filed in Manufacturers Name. files.
WELDING QUALIFICATIONS:
10.3 Prior to any welding on a Code Vessel, the welder or welding operator shall
pass a welding qualification test in accordance with the procedure to be used and
Section IX of the ASME Code. A Welder Performance Qualification or record form
is filled out and certified by the QCM (QW-484) for a competent welder or Welder
Operator Performance Qualification for welding operators.
10.6 The Welding Procedure(s) to be used on a job are indicated on the Approved
Design Drawing.
10.7 The QCM and Foreman will both monitor the welding to assure the correct
procedure is being used during fabrication.
WELDER IDENTIFICATION:
10.8 The QC Manager is responsible for issuing the Welders and WeldingOperators unique symbol.
10.9 The QCM shall record the symbol of the welder on the Traveler and the Welder
shall apply his stamp to each three (3) feet or less of weld, when required, or a Weld
Map will be used.
10.4 Written welder qualification forms are kept on file and maintained by the QC
Manager.10.5 A Welder Continuity Log (Exhibit #6) will be initiated by and maintained
as a record by the QCM. This log will be initialed by QCM, at least every three months,
to assure welders continuity.
7/31/2019 Qc Sample Manual Generic
21/34
WELDING MATERIAL CONTROL:
Page 19
10.10 The Foreman will submit a purchase requisition (Exhibit 10) for welding material
to the QCM for review per Code compliance. If acceptable, it will be forwarded to the
Purchasing Department with a copy for receiving inspection. Receiving inspection
shall be by the QC Department.
10.11 The Foreman shall supervise the distribution and storage of the welding
materials.
10.12 All open cans of low Hydrogen Electrodes shall be maintained in a heated oven.
No more than a four (4) hour supply will be issued at one time. All unused low
Hydrogen Electrodes will be turned in to the Foreman at the end of the shift or four (4)
hours, whichever is less. Electrodes shall be stored in a temperature controlled area as
recommended by the Manufacturer or 50 degrees F.above ambient temperature.
10.13 Welding material storage and use for field work is the responsibility of the
Foreman. Storage and use is monitored by QC the same as in the shop.
TACK WELDS:
10.15 All tack welds shall be applied by a Welder Qualified to a Qualified Procedure
in accordance with Section IX to the ASME Code. Tack welds made by a vendor
shall be removed. Vendor must supply copy of WPS used for tacks welds.
10.16 All tack welds shall be feather-ground prior to filling and capping all welds. If
tack weld is found defective, it will be removed.
WPS QUALIFICATIONS FOR TEST:
10.17 The Engineering Department shall be responsible for preparing the Welding
Procedures Specification and Procedure Qualification Record in accordance with
ASME Code Section IX.
10.18 The WPS will be made available to all welders and welding operators.
TRAINING AND SUPERVISING:
10.19 The Foreman shall be responsible for training and supervision of all welders and
welding operators.
10.20 Joint preparation and alignment will be checked by the QC Department and/or
the Foreman.
10.21 The AI shall have the right at anytime to call for and witness
tests of the welding procedure or the ability of any welder or welding operator.
7/31/2019 Qc Sample Manual Generic
22/34
11. NON-DESTRUCTIVE EXAMINATION (NDE)
Page 20
RESPONSIBILITY:
11.1 NDE PROCEDURE MUST BE APPROVED BY LEVEL III
11.2 For Section VIII, Div. 1 construction. RT, UT, and MT shall be subcontracted
to a qualified testing firm. The subcontractors Level III shall be appointed by
Manufacturers Name. PT, and VT may be performed by company personnel in
accordance with written procedures that meet Code requirements and are acceptable to
the A.I. For Section I construction, all NDE methods, except V.T., shall be
subcontracted.
11.3 All RT, UT and MT testing shall be performed by Level II or III personnel qualified
in accordance with the applicable acceptable edition and addenda of SNT-TC-1A.
Level I may perform the above function if under the direct supervision of a Level II or III.
NDE Subcontractors written practice shall be held on file by the QC and approved by the
AI.
ACCEPTANCE:
11.4 Acceptance criteria for NDE testing shall be in accordance with the applicable
section of the ASME Code. Interpretation of the results of subcontracted NDE shall
be by Level II or Level III examiner.
11.5 After the RT films have been accepted by the QCM, they shall be presented to
the AI for his review.
11.6 Viewing equipment and calibrated density strip shall be available to the AI.
QUALITY CONTROL MANAGER:
11.7 The QCM shall maintain a copy of all NDE procedures and personnel
qualifications. These records shall be available to the AI for his review.
11.8 All NDE requirements shall be prepared by the Engineering Department,
recorded on drawing and shall be in accordance with the ASME Code with respect to
design conditions.
RE-QUALIFICATION:
11.9 The Authorized Inspector may request requalification of NDE procedures or
examiners whenever he has reason to question their code compliance.
NDE AT FIELD SITE:
11.10 NDE at field site is the responsibility of QC Department in conjunction with the
foreman and will be conducted in accordance with this manual.
7/31/2019 Qc Sample Manual Generic
23/34
NDE PROCEDURES:
Page 21
11.11 Subcontract NDE procedures will be written by Level III and demonstrated as
being capable of obtaining meaningful results to the satisfaction of the AI. The AIs
acceptance may be noted by initialing the NDE procedure. The procedures, practices,
and qualifications must be acceptable to the AI. The VT procedure shall be prepared
and approved by Manufacturers Name QC M and must be accepted by the
AI. The VT Examiner shall be certified to perform visual examination by the company.
NDE TEST REPORTS:11.12 All NDE reports including RT film shall be reviewed and accepted by QCM
and then presented to the AI.
7/31/2019 Qc Sample Manual Generic
24/34
12. HEAT TREATING
Page 22
HEAT TREATING REQUIREMENTS:
12.1 All heat treatments, required by ASME Code or Customer Specification shall
be indicated on the production drawings. All heat treatment will be performed in
accordance with written procedures. The written procedures shall be prepared by the
Engineering Department in accordance with the ASME Code with respect to designconditions. The procedure number will be noted on the production drawings. The
heat treatment will be subcontracted.
Quality control will inspect all returned items for conditions and shipping damage.
Unacceptable items will be handled per Section 9.0; acceptance of items will be recorded
on the Traveler.
When conditions for post weld heat treating in accordance with the original code of
Construction are inadvisable or impractical, alternative methods as allowed in RD-1000
may be used.
Thermocouple attachment by capacitor discharge welding for Section VIII, Div. 1
Vessels will be performed using a welding procedure specification meeting the
Requirements of UW-37 (h).
HEAT TREAT PROCEDURE:12.2 The Heat Treat Procedure shall require that the subcontractor furnish records
that show the following:A. Strip chart containing heating, holding and cooling times and temperatures.
B. Identification of item heat treated.
C. Name of the heat treat firm.
D. Date of heat
treatment.E. Signature of responsible official of heat treating firm.
F. Copy of heat treat recording instruments calibration certification.
RECORDS:12.3 The QCM will review all heat treat records.
12.4 The heat treat records shall be made available to the AI.
HEAT TREATING, FIELD SITE:12.5 Heat treating as required at field site will be the responsibility of QC
Department in conjunction with the foreman and will be performed in accordance
with this manual.
12.6 QC Manager has the responsibility of monitoring heat treat facilities to assure
thermo-couples placement at intervals provided by the applicable Code and proper
equipment used.
7/31/2019 Qc Sample Manual Generic
25/34
13. CALIBRATION OF MEASUREMENT AND TEST
EQUIPMENT
Page 23
RESPONSIBILITY:
13.1 The QCM shall be responsible for the calibration and storage of measuring and
test equipment and for maintenance of the calibration records.
13.2 NDE Calibration shall be maintained by the Subcontractors when such NDE is
not performed by the Company. Calibrations shall be in accordance with National
Standards where such standards exist.
CALIBRATION:
13.4 All test gauges shall be calibrated by a subcontractor at any time there is
a reason to believe they are in error.A. All test gauges shall be numbered.
B. All calibration shall be recorded on a test gauge calibration form showing
gauge number, date and calibrators initials. Calibration records are available
to the AI upon request.
.
13.3 Micrometers and calipers will be checked against a known calibrated thickness
before each use, in lieu of calibration.
13.5 All test equipment shall be stored by the QCM.
STORAGE:
C. Indicating Pressure Gauges used in testing shall preferably have dials
graduated over a range of about double the intended maximum test pressure,
but in no case shall the range be less then 1 1/2 times nor more than 4 times
that pressure. Specific ranges shall be per applicable Code Section.
7/31/2019 Qc Sample Manual Generic
26/34
14. RECORDS RETENTION
Page 24
RESPONSIBILITY:
14.1 It is the responsibility of the QCM to initiate a job file on a start of a job and
collect the following data and maintain through-out fabrication. This data shall be
available to the AI; including but not limited to:
A. Calculations, prints and Bill of Materials.
B. Receiving Inspection Reports
C. Material Test Reports and/or Partial Data Reports, when required.
D. Non-conformance Report (if applicable)
E. Heat Treat Charts (if applicable)
F. Hardness Test Results (if applicable)
H. Charpy V-Notch Test Results (if applicable)
PERMANENT RECORDS:
14.2 The Manufacturers Data Reports, UT Reports, RT Film, RT Reports, and
location maps shall be retained for retention period required by the applicable Code.
G. RT Film, Reader Sheets and NDE Reports (film location map when
applicable)
I. Traveller
7/31/2019 Qc Sample Manual Generic
27/34
15. REGISTRATION WITH NATIONAL BOARD
Page 25
15.1 National Board and serial numbers shall be controlled and issued by the QCM. He
shall maintain a record showing date issued, type of vessel, and manufacturers serial
number. The QCM shall submit to the National Board an original of all ASME
Manufacturers Data Reports requiring registration within 60 days. Registration with the
National Board will be made when required by Jurisdiction and/or Customers. NationalBoard numbers shall begin with the number 1 and shall continue without skips, gaps, or
omissions. (See Exhibit #9)
7/31/2019 Qc Sample Manual Generic
28/34
16. REPAIRS & ALTERATIONS
Page 26
SCOPE:
16.1 This section defines the requirements established for repairs and alterations as
defined by the current Edition and Addenda of the National Board Inspection Code
(NBIC) for pressure retaining items.
REPAIRS AND ALTERATIONS TO ASME CODE ITEMS:
16.1.1 Shall be carried out in accordance with the requirements of the NBIC,
this Quality Control Manual, and Jurisdiction requirements (when applicable)and shall conform to the Edition and Addenda of the applicable ASME Code
Section.
REPAIRS AND ALTERATIONS TO NON-CODE ITEMS:
16.1.2 Repairs and Alterations shall be carried out in accordance with the
requirements of the NBIC, this Manual, Jurisdictional Requirements when
applicable shall conform insofar as possible, to the Edition and Addends of the
ASME Code Section most applicable to the work, provided Manufacturers
Name has the concurrence of the Jurisdiction and the Inspector.
7/31/2019 Qc Sample Manual Generic
29/34
Page 27
ROUTINE REPAIRS:
16.1.3 Routine Repairs to ASME Code items shall be carried out in the
accordance with the requirements of NBIC, this Quality Control Manual, and
Jurisdictional requirements (when applicable) and shall conform to the Edition
and Addenda of the applicable ASME Code; however, the requirement for
in-process involvement of the Inspector and stamping may be waived provided
all of the following conditions are met:
1. Manufacturers Name shall verify, to the satisfaction of the Inspector,
that routine repairs are acceptable to the jurisdiction.
2. Prior approval for routine repairs shall be obtained from the Inspector.
3. Routine repairs shall be documented on a Form R-1 with a statement on
line 10, Remarks: Routine Repair.
RESPONSIBLE PARTY:
16.1.4 Manufacturers Name shall assume overall responsibility for the
performance of repairs and alterations and for originating the construction
procedures necessary to direct the course of the work.
METHOD OF REPAIR OR ALTERATION:16.1.5 Shall be made available to the Authorized Inspection Agency (AIA)
responsible for the in-service inspection of the item or the AIA of record.
a. The Quality Control Manager shall make available to theInspector a proposed Repair Plan (Exhibit 11) for the method and
extent of repairs or alterations. If applicable, drawings and
calculations shall be made available.
b. Under no circumstances shall work be started without authorization of the
Inspector. The Inspector making the acceptance inspection should
be the same Inspector who authorized the repair or alteration, but, in
all cases, shall be an employee of the same organization as that of the
Inspector that authorized the repair or alteration.
7/31/2019 Qc Sample Manual Generic
30/34
RERATING OF A PRESSURE RETAINING ITEM:
Page 28
16.1.6 Shall only be performed only after the following requirements have been
met to the satisfaction of the jurisdiction at the location of the installation.
a. Revised calculations verifying the new service conditions shall be
prepared in accordance with this Quality Control Manual.
b. All re-ratings shall be established in accordance with the Edition and
Addenda of the applicable ASME Code Section.
c. Current inspection records verify that the pressure retaining item is
satisfactory for the proposed service conditions.
d. The pressure retaining item has been pressure tested, as required, for
the new service conditions.
DESIGN ENGINEERING:
16.1.7 Shall conform to the requirements of this Quality Control Manual, the
NBIC, and insofar as possible, the ASME Code section most applicable to the
work involved.
MATERIALS:
16.1.8 Used in making repairs and alterations shall conform to the applicable
section of the ASME Code.
a. IfManufacturers Name provides the materials, the procurement,
inspection, and handling of materials shall be in accordance with theapplicable sections of this manual.
b. If the materials are provided by others, sufficient documentation and
material identification shall be provided for acceptance of the material
by Manufacturers Name and the Inspector. Receiving Inspection
and handling of these materials shall be in accordance with the
applicable sections of this manual.
c. When existing materials cannot be identified, the Quality Control
Manager shall be responsible for any testing required to establish the
material specification. The method used and the results shall be
available to the Inspector.
7/31/2019 Qc Sample Manual Generic
31/34
Page 29
PRESSURE PARTS:
16.1.9 Pressure parts for which ASME Manufacturers Partial Data Reports are
required shall be fabricated and inspected to the applicable Code, stamped with the
appropriate Code symbol and the word Part, and reported on the applicable
Manufacturers Partial Data Report. When such parts are a part of the repair or
alteration the Manufacturers Partial Data Report shall be reported on the FormsR-1 or R-2, as applicable, and attached thereto.
WELDING, NDE, & HEAT TREATMENT:
16.1.10 All welding, non-destructive examination (NDE), and heat treatment
(HT), as required, shall be in accordance with the NBIC, the ASME Code, and
the applicable sections of this Quality Control Manual.
PRESSURE TESTS:
16.1.11 Shall conform to the requirements of the NBIC and will be witnessed by
the Inspector. Manufacturers Name is responsible for all activities relating to
pressure testing.
16.1.11a When this is not possible or practical, other methods as
described
in the NBIC may be used provided the required concurrences have
first been obtained. As an alternative to the pressure test, an
examination or NDE method that will verify the integrity of therepair or alteration, subject to the concurrence of the Inspector,
jurisdiction and customer (when required) may be used.
7/31/2019 Qc Sample Manual Generic
32/34
Page 30
RE-MOVING ORIGINAL CODE STAMPING:
16.1.12 When a repair or alteration requires the removal of that part of the item
bearing the original Code stamping, the Inspector shall witness, subject to the
approval of the Jurisdiction, the making of a facsimile of the stamping, the
obliteration of the old stamping, and the transfer of such stamping to the new
item. The ASME Code symbol is not to be restamped. When the stamping is on
a nameplate, the Inspector shall witness the transfer of the nameplate to the newlocation.
Any relocation is to be reported on the applicable NBIC Report Form
CUSTODY OF R STAMP:
16.1.13 The Quality Control Manager shall be responsible for the
custody and use of the National Board R Symbol stamp.
REPAIR, ALTERATION, or RE-RATING, stamping or nameplate
information, size, location, and attachment (nameplates) shall conform to therequirements of the NBIC and will only be applied with the concurrence of the
Inspector.
ORIGINAL MANUFACTURERS DATA REPORT:
16.1.14 A copy of the original Manufacturers Data Report for the item being
altered or re-rated shall be required and attached to the completed Form R-2.
When this is not possible, agreements on the method of establishing design basis
for the alteration shall be obtained from the Inspector and the jurisdiction when
applicable.
7/31/2019 Qc Sample Manual Generic
33/34
Page 31
NBIC REPORT FORM:
16.1.15 The Quality Control Manager or his/her designee shall initiate the
applicable NBIC Report Form and sign the applicable Certification before
presenting it, together with all supporting documentation, to the Inspector
for review and signature.
Distribution of the applicable NBIC Report Forms is the responsibility of
Manufacturers Nameand shall be performed by the Quality Control Manager
as follows:
REPAIRS - Legible copies of the Form R-1, together with all required
attachments, shall be distributed to the owner or user, the Inspector, the AIA
responsible for the in service inspection of the item, and the Jurisdiction (if
required). The Form R-1, may be registered with the National Board in
accordance with the NBIC or they have to be retained for 5 years.
ALTERATIONS AND RE-RATING - Legible copies of the Form R-2,
together with all required attachments, shall be distributed to the Inspector, the
AIA responsible for the in-service inspection of the pressure retaining item, the
owner or user, and the Jurisdiction (if required).
If the item is registered with the National Board, one original copy
shall be submitted to the National Board.
If the item is not registered with the National Board, the Form R-2 may be
registered with the National Board.
The NBIC Report Forms shall not be used to record a repair or alterationunless the work has been performed in accordance with the NBIC.
Parts fabricated by welding for non Code items shall be stamped R Part and
documented on an R 3.
When R forms are registered with the National Board, the Q.C. Manager will
establish and maintain an R Number Log Exhibit 7. These numbers shall be
assigned in sequential order. The NBIC Report Forms shall not be used to record
a repair or alteration unless the work has been performed in accordance with
the NBIC. R forms not registered with the National Board will be retained for
5 years.
16.1.16 Revisions to this Quality Control Manual shall have the acceptance of
the AIA prior to issuance of the manual and implementation.
REVISIONS:
7/31/2019 Qc Sample Manual Generic
34/34
Page 32
17.0 Exhibits:
1. BILL OF MATERIAL Page 33
2. RECEIVING INSPECTION REPORT Page 34
3A. TRAVELLER (PRESSURE VESSEL)
3B. TRAVELLER (POWER BOILER)
Page 35
Page 36
3C. TRAVELLER - PIPING Page 38
4. HOLD TAG Page 39
5. NON-CONFORMANCE Page 40
6. WELDER CONTINUITY LOG Page 41
Page 43
Page 44
Page 45
Page 46
7. R NUMBER LOGPage 42
8. MANUAL ISSUE LOG
9. SERIAL NO./NATL. BD. N. LOG
10. PURCHASE REQUISITION
11. REPAIR PLAN