+ All Categories
Home > Documents > Qinghe Zhang 1,2 , M. W. Dunlop 1 1 Rutherford-Appleton Laboratory, Chilton, Didcot, UK

Qinghe Zhang 1,2 , M. W. Dunlop 1 1 Rutherford-Appleton Laboratory, Chilton, Didcot, UK

Date post: 01-Jan-2016
Category:
Upload: blake-house
View: 34 times
Download: 2 times
Share this document with a friend
Description:
Cluster/TC-1/THEMIS observations of FTEs and the boundary layer on different flanks of the dayside magnetopause. Qinghe Zhang 1,2 , M. W. Dunlop 1 1 Rutherford-Appleton Laboratory, Chilton, Didcot, UK 2 Department of Earth and Ocean Sciences, University of Liverpool, Liverpool, U.K. - PowerPoint PPT Presentation
Popular Tags:
14
Cluster/TC-1/THEMIS Cluster/TC-1/THEMIS observations of FTEs and observations of FTEs and the boundary layer on the boundary layer on different flanks of the different flanks of the dayside magnetopause dayside magnetopause Qinghe Zhang Qinghe Zhang 1,2 1,2 , M. W. Dunlop , M. W. Dunlop 1 1 Rutherford-Appleton Laboratory, Chilton, Didco Rutherford-Appleton Laboratory, Chilton, Didco t, UK t, UK 2 Department of Earth and Ocean Sciences, Univer Department of Earth and Ocean Sciences, Univer sity of Liverpool, Liverpool, U.K sity of Liverpool, Liverpool, U.K . .
Transcript

Cluster/TC-1/THEMIS Cluster/TC-1/THEMIS observations of FTEs and the observations of FTEs and the boundary layer on different boundary layer on different

flanks of the dayside flanks of the dayside magnetopausemagnetopause

Qinghe ZhangQinghe Zhang1,21,2, M. W. Dunlop, M. W. Dunlop11

11 Rutherford-Appleton Laboratory, Chilton, Didcot, UK Rutherford-Appleton Laboratory, Chilton, Didcot, UK22 Department of Earth and Ocean Sciences, University of Department of Earth and Ocean Sciences, University of

Liverpool, Liverpool, U.KLiverpool, Liverpool, U.K..

FTE on 3 May 2007FTE on 3 May 2007

All 10 SC near the Mp in different flank

IMF: Bz mainly positive and near zero with a dawnward By

Z =-12 RE

Z =-5 RE

TC-1THEMIS C

TC-1: Vn= -0.525854 0.849068 -0.0506160

V = 212.660 km/s

THEMIS C: Vn= -0.749904 0.658616 0.0622055

V = 262.390 km/s

Observation: dt= 314s

Cooling model:

dt= 273s

Cluster 1: Vn= -0.627514 -0.771083 -0.771083 V = 454.707 km/s

THEMIS C: Vn= -0.766413 0.638716 -0.0682137 V = 423.314km/s

Cluster 1

THEMIS C

Observation: dt= 152s

Cooling model:

dt= 158s

FTEs on 13 Jun 2007

FTEs on 21 Jun FTEs on 21 Jun 20072007

Coordinated Cluster/ THEMIS/Double Star TC-1 observations of dayside MP

Stokkseyri Radar Observations

Monitor the plasma flow and magnetic field deflexed in MSH

FTEs on 14 Jun FTEs on 14 Jun 20072007

All 10 SC near the Mp in different flank

IMF: Bz mainly positive and near zero with a duskward By


Recommended