Clinical CaseQuadrant Dentistry By Jason Smithson, BDS
1 Pre-op.
2 Wave-Wedges in place to protect rubber dam during cavity prep.
3 Old restorations removed.
4 Cavity prep complete. At this stage Dr Smithson changes two of the pink wedges for larger, purple, wedges.
5 V3 Rings in place. Note the relative distance between the tines of the Narrow (yellow) premolar ring and the Universal (green) molar ring.
6 Completed case.