REACH USA 20108th International Conference
13 – 14 April, Chicago
SIEF EXPERIENCES
organized by i Smithers
Quaker as an organization, products Quaker and REACH Pre-registrations and SIEF* formation Consortium and SIEF* How to organize a SIEF* Quaker active as LR** Expectations and bottle necks Time plan 2010
* Substance Information Exchange Forum** Lead Registrant
Agenda
Quaker as an Organization
Founded in 1918 in Philadelphia 27 locations in 21 countries Manufacturer of process liquids Quoted on the NYSE (KWR) Turnover of $581.6 in 2008 Employees: 1,252 ISO 9001 and 14001 certified
Quaker Chemical Quaker Chemical Conshohocken, PAConshohocken, PA
Est. 1918Est. 1918
Global Reach
Non Manufacturing Manufacturing R & D
Industries Served by Quaker
Environmental Heavy Duty Equipment Marine Mining Primary Metals Steel Tube & Pipe
Aerospace Aluminum Automotive Bearing Coatings Construction Materials Decorative Concrete
Started in 2005 with the Quaker REACH Team Senior Management as sponsor EU Substance investigations inside and outside the EU Create awareness inside and outside the EU Manufacturer and importer Middle of the supply chain
Quaker and REACH
Communicate internally (sales, laboratories, purchasing, operations)
Updates on a regular bases (costs)
External communication to suppliers and customers
Presentations to the Dutch Chemical Association (VNCI)
Roundtable discussions at Chemical Week
Project with TNO*, ES workshops at customers
*Toegepast Natuurwetenschappelijk Onderzoek Netherlands Organisation for Applied Scientific Research
Quaker and REACH
Approximately 100 substances pre-registered By volume band:
5 substances > 1000 ton5 substances < 1000 - > 100 tonrest < 100 ton
Yearly check on correctness of the tonnage band Late pre-registrations
Pre-Registrations
Cefic-defined 4 roles:
1. Lead registrant
2. Active
3. Passive
4. Dormant
Roles of Pre-Registrants in a SIEF
Consortium is more legally binding, more agreements are needed
SIEF needs discipline- Active participation for roles 1 & 2 (LR or LC) - Roles 3 and 4, passive / dormant
Consortium and SIEF
Information on the ECHA site, REACH-IT
SIEF Formation Facilitator, who takes the lead
Several IT systems available: Reach link, Reach suite
Feedback of pre-registrants is poor
Set up communication plan
How to Organize a SIEF
5 times LR for high volumes All now organized in consortium Trustee is needed Very time consuming
Quaker Active as LR
Expectations To have data available in time To be able to submit the file
Bottlenecks IT system will be overloaded Discussion with ECHA
Expectations and Bottlenecks
Compiling LR files July/August: submissions of LR files September/October: submission of joint files
Time Schedule 2010
Thank you for
your attention!
Presentation prepared by;Ton van der KaaijSr. Co-ordinator Safety, Health, Environmental & QualityREACh [email protected]+31-297-544422