Quality Assur ance Process
8/12/2019 Quality Assurance Plan_Manoranjan
2/28
ontent
1. Project Rollout Overview2. Purpose of Quality Management & Setting Quality Obj3. Purpose of Quality Plan
3.1 Project KPI & Measurement Criteria4. Quality Organization Structure5. Key Roles & Responsibility6. Quality Resource Plan7. Six Key Points8. Quality Assurance Vs Quality Control9. Quality Assurance Activities10. Quality Control Activities
. me nes o comp e e au ac v es10.2 Schedule of Project Quality Review10.3 Reports
11. Document & Record Control12. Performance Ranking Criteria13. Penalty Clauses & WCC Signoff Timelines14. Subcon Management
15. H&S Management & Monitoring15.1 Health & Safety with tools requirement
> Internal Only
ectives
ZTE Corporation. All rights reserved.
8/12/2019 Quality Assurance Plan_Manoranjan
3/28
urpose of Quality Management and Sett
Quality management ensures that an organization, productplanning, quality control, quality assurance and quality improvemequality, but also the means to achieve it. Quality management theproducts to achieve more consistent quality.
Quality is seven attributes : Portability, Reliability, Efficiency, Usability,
Quality is conformance to requirements : Discuss, Confirm & Record t
Quality is fitness to use.
Core of Pro ect Qualit Mana ement is revention : Do the ri ht in first
problem reoccurrence.The performance standard of project quality management is ZERO def
Quality is an attitude (State of Mind)
The measurement of quality is the Price Of Non Conformance (PONC) :things (i.e. rework/rectification , frequent up-gradation of system & tro
> Internal Only
ing Quality Objectives
or service is consistent. It has four main components: qualityt. Quality management is focused not only on product and serviceefore uses quality assurance and control of processes as well as
estability, Understandability & Modifiability.
e customer requirement before the activity start.
time & Conduct root cause anal sis kee in backtrackin to avoid
ZTE Corporation. All rights reserved.
cts : Do the right in first time with out ignoring defects & minor faults.
PONC includes the quality-related costs incurred in making certain bleshooting etc.
8/12/2019 Quality Assurance Plan_Manoranjan
4/28
urpose of the Project Quality Plan
To provide an instrument which can contribute to qubuilt-up process/guidelines/specifications in systematicGuideline & reference are given which can be used to s
Quality can be defined to meet customers expectationsway of deliverables and/ or activities performed .
Objective of the Project Quality plan :
Control Project KPI within specified limit & Implementation LeaReduction of Material wastages.Implementation of proper Installation procedure , results cost rEnhance the relationship between Customer & ZTE.Enhance Management & Improvement.
> Internal Only
lity level & control of telecom implementation / Infradetailed description.
et-up & control the process.
or exceeding the customer expectations achieved by
ZTE Corporation. All rights reserved.
.
d time as set by ZTE.
ductions & time efficient.
8/12/2019 Quality Assurance Plan_Manoranjan
5/28
roject KPI Target & Measurement Crit
SLNo Description Target
MeasurementCycle
1 COQ (Penalty) Equal to 0 Monthly
2 SITR/ITR Rate >=80% Monthly
3 Self Check AcceptancePercentage >=70% Monthly
4 Sample Check Rate >=15% Monthly
5 Last Month Min >=100% Monthly
O
Calfor
6 Site Engg. CoverageRate >=70% Monthly
7 Sample CheckAcceptance Percentage >=90% Monthly
8Training CoverageRate >=90% Monthly
9 Model Site CoverageRate >=90% Monthly
10 ATC Rate >=70% Monthly11 OTP Rate >=80% Monthly
12 Circle Index >=.7 Monthly
SccritOwStacolMeUni
> Internal Only
riaKPI Quality Management Coefficient
jective To evaluate the performance of project on delivery quality point ofview
culationula
KPIQ= -(Q1*15%)+(Q2*15%)+(Q3*20%)+(Q4*10%)+(Q5*5%)+(Q6*5%)(Q7*10%)+(Q8*5%)+(Q9*15%)+(Q10*15%)
KPIQ: Indicates key performance indicator coefficientQ1 - Indicates the score of Critical of Quality
Q2 - Indicate the score of Site Issue Till Resolution/ Issue TillResolutionQ3 - Indicate the score of Self Check Acceptance RateQ4 - Indicate the score of Self Check Rate
ZTE Corporation. All rights reserved.
n on -Q6 - Indicate the score of Sample Check Acceptance RateQ7 - Indicate the score of Training Coverage Rate
Q8 - Indicate the score of Model Site Coverage Rate
Q9 - Indicate the score of Acceptance Test Coverage Rate
Q10 - Indicate the score of One Time Pass Rate
ringeria Project Quality Score (PQS)=KPIQ
ner fortisticsection
Quality Department
suringt
100 points
8/12/2019 Quality Assurance Plan_Manoranjan
6/28
8/12/2019 Quality Assurance Plan_Manoranjan
7/28
8/12/2019 Quality Assurance Plan_Manoranjan
8/28
uality Assurance Vs Quality Control
uality Assurance: QA is fault prevention throughprocess design & auditing
Creating process , procedure , tools etc to prevent faults
Examples: Templates, Checklists, Procedure and Guideline
uality Assurance Activities:
ey quality assurance activities are very important for assuringuality through out the project .
Confirm project acceptance procedure, Quality expectation &agreed with customer.Validation of project quality standard which meets customer
quality expectation.Review & Publish of site design documents.Built model site.Training & Competence development and certification / worklicense to team lead of subcon.(skill card & certificates)Adheres of Installation Procedure in Project as per guideline.
> Internal Only
uality Control- QC is fault/failure detection throughstatic & /dynamic testing artifacts
Examining the artifacts against pre-determined criteria tomeasure conformance.
Examples: Audit & Problem analysis through quality tools.
uality Control Activities:
ZTE Corporation. All rights reserved.
ey quality control activities are very important for controlling quality.
100% Self Check after site completion by the Subcon.Spot Check / Sample Audit must be performed by ZTE SE, CL,IM, Infra Lead , Quality Lead & CH/CPD.
Summarize , analyze & Review the project quality .Evaluate Subcon/Vendor Analysis quality performance.Site DocumentsOrganize routine meetings with Project ,Sub cons & Key teammembers
8/12/2019 Quality Assurance Plan_Manoranjan
9/28
Quality AssuranceSix Key Activities Fl
Key point 1
Key point 2
Key point 3
Confirm project q
Training to subcon atea
Model Sit
Key point 4
Key point 5
Key point 6
Subcontractor perfor
ZTE site engineer/cluste
performs qualit
Summarize, analyzedefe
> Internal Only ctivities: ow Chart
uality standard
nd ZTE Site Impl
Building
ZTE Corporation. All rights reserved.
. . .
s 100% self-check
leads/ infra leads/QL
spot-check
nd correct qualityts
8/12/2019 Quality Assurance Plan_Manoranjan
10/28
onfirm project acceptance procedure a
onfirm project acceptance procedure , Quality expecta
Project clarification meeting to be done with account/sales team b
Build team & define the deliverable/ownership of quality activities.
CH/CPD & PD should ensure that the site acceptance scheme, Q
Acceptance scheme must be signed by both ZTE & Customer.
s ou ensure t at customer s u y aware o agre
alidation of Project Quality Standard
CH/CPD/PD should communicate with customer and collect custoQuality Assurance Plan need to be concurred by PD and time to tim
Customer concurrence need to be taken on all standards /specific
The final project quality standards/spec, must be shared with all pr
> Internal Only
d Validation of Quality standard
tion as agreed with customer.
CH/CPD/PD prior to discussion with customer.
ality expectation, documentation are agreed with customer.
ZTE Corporation. All rights reserved.
t e n ra requ rements pr or to pro ect start.
ers installation specification and project quality requirement. information shared with PQM.
tion through built up Model Sites as part of record .
ject staffs & subcon.
8/12/2019 Quality Assurance Plan_Manoranjan
11/28
odel Site Process
Build model site in three levels (Project level, Circle Level & Vendo
Customer concurrence is mandatory for Model Site .
Deviations to agreed specs/guidelines, if any, must be recorded an
After the model site is accepted by customer , On site Training to oQuality teams ,it helps to understand the project quality expectatio
Photo Album need to be made neatly in capturing all specification .
Circle QL need to communicate the Model site photo album to resEach team of each subcon builds its first installed site as Model Sit
1
1. 2. 3. .
2
1. 2. 3. .
> Internal Only
r Level)
d signed by both ZTE & Customer.
ther subcons need to be arranged by respective circle projectand installation quality requirements.
ZTE Corporation. All rights reserved.
ective subcon teams and project implementation teams . e.
,
3
1. 2. , 3. .
8/12/2019 Quality Assurance Plan_Manoranjan
12/28
raining and Competence Development
Training to all project staff / sub-cons team lead/ Engineers/CPD m
Subcon trainings need to continue in every Quarter.
Issue of skill card, certificates /work licenses to subcon team whileModel site installation .Details may be referred to Training Regulati
Trainers could be QL/ IM/ PQM/ H&S Manager.
Module -1 (Prior to work start) Expectation of customer, Knowledgimplementation safety.
Module -2 (During project phase) Special training on installation dviolation implementation safety.
If any Subcon introduced during implementation period then separ
Only trained & certified team leader/engineers will be allowed to w
Assessment along with Training report must be in place after every
> Internal Only
ust be conducted prior to project start & should continue in quarter.
fulfilling preconditions of Test evaluation and becoming part ofns .
on equipment installation process/project quality standard and
ZTE Corporation. All rights reserved.
eviation, new products if any, improvement plan, Health & Safety /
te training Module 1 shall be arranged before work allocation.
rk at site.
training and uploaded in requisite servers.
8/12/2019 Quality Assurance Plan_Manoranjan
13/28
, .
. .
Adobe Acrobat
Document
Adobe AcrobaDocument
> Internal Only
& ,
/
ZTE Corporation. All rights reserved.
. . .
t
8/12/2019 Quality Assurance Plan_Manoranjan
14/28
ubcontractor performs 100% self-check
Subcon have to carry out self check after completion of each site..
The assessment has to as per agreed specs/drawing/ guidelines &Use correct checklist for the assessment..
Self check list need to be filled with punch points and due deligen
Documentation of Self check list need to be submitted to QL /PQM
The site assessment should be done by a qualified engineer/teamName ,Contact no ,Designation etc to be put .
IM, Infra Lead, Cluster Lead & SE has to ensure that this assessm
Penalty need to be imposed for non compliances .
Review of Self Check to be made as main agenda in Weekly /Fort
Appreciation /Reward /Recognition to be made for deserved Subc
> Internal Only
as per their deliverable in project.
e need to be taken for rectification
with in 4 days of time after completion of site .
lead from Subcon QC team.and duly Signature with details e.g
ZTE Corporation. All rights reserved.
ent process is being followed by each subcon.
ightly/Monthly meetings .
n teams , need to be recorded as part of process .
8/12/2019 Quality Assurance Plan_Manoranjan
15/28
8/12/2019 Quality Assurance Plan_Manoranjan
16/28
Control Process of Project Quality .
Process need to be in sequential manner as Summarize , Analyz
To Avoid occurrence of quality defects through preventive actions
Provide stack holder visibility w,r.t overall quality management pro
Circle QL collect quality defects , analyze the cause of common pro
share the project quality analysis report with concern stake holder
Suggest the process/guidelines/procedures/tools required to be u
Review the project quality as per schedule enclosed with all conce
Scheduled meeting to be held in presence of all stake holders an
Recognition of good workmanship need to be done and shared a
> Internal Only
& Review.
Keeping track of recurrence of past quality defects
ess .
blems & Quality KPI involved in project
eriodically.
ed to avoid the occurrence & communicate to PQM/HQ
ZTE Corporation. All rights reserved.
n..
action plan /timeline to be agreed upon in forum,
ong all subcons and project implementation teams
8/12/2019 Quality Assurance Plan_Manoranjan
17/28
uality Control Activities:imelines to complete the QC activities
Activity
Subcon performs 100% self check andsubmission of reports as per timeline Withi
Site Engineers performs the sample audit andvalidate self inspection report
Withicomp
QL performs quality audit on sample basis Sam
Lead time of closing punch points observed duringaudit
CritiMajoMino
> Internal Only
Timeline
4 days after the completion of hardware installation work
the time duration starting from 48hrs to 72hrs afterletion of hardware installation work
ZTE Corporation. All rights reserved.
le check of previous month installation work completed
al problem must be closed with 48hrs problem must be closed within 72hrsproblem must be closed within a week
8/12/2019 Quality Assurance Plan_Manoranjan
18/28
8/12/2019 Quality Assurance Plan_Manoranjan
19/28
eneration of Report
Project
Report Prepared by
Project Circle Weekly Report QL
Pro ect Circle Qualit Monthl Re ort QL
Project Weekly Report PQM
Project Quality Monthly Report PQM
> Internal Only
Report
Frequency Submit to
Weekly PQM
Monthl PQM
ZTE Corporation. All rights reserved.
Weekly CPD/PD/IM/Infra Lead/CL/QH
Monthly CPD/PD/IM/Infra Lead/CL/QH/HQ
8/12/2019 Quality Assurance Plan_Manoranjan
20/28
ocument and Record control
uality documents need to be handled only by authorized Quality DThese documents includes Site Checklists, ATP checklist & Qualityo be made thru Notice with copy of documents /manuals/copies with
QM & PM are responsible person to publish required quality docum
ll documents to be uploaded in the server as per the below docume
ocuments Control
. . .
ecord Control
lassification of records need to be made and kept back up documeong records need to be kept in server till further order of deletion /nssessment / HQ requirement
xpired record should be destroyed according to specific requiremen
# .
11 001
> Internal Only
partment officials and confidentiality of data to be maintainedtandards. Amendment on records to be done and proper publishingduly approved by Approver .
ents & procedure among the implementation team.
nt identification table.
ZTE Corporation. All rights reserved.
ts in requisite server ,PQM need to preserve same in safe /custodyeed to be produced while any requirement of submission of maturit
t. Record Control table is as shown below
8/12/2019 Quality Assurance Plan_Manoranjan
21/28
erformance Ranking Criteria
PQM will evaluate subcon engineering service quality and index b
Feedback Report w.r.t supplier performance on quality to be shar
Evaluate the site engineer performance through sample visit ..
Feedback of site engineers performance (Competency & process
Evaluate of subcons to be done on competency , capability & proc
> Internal Only
sed as per the measurement criteria.
d with CPD, PD and OSD.
ZTE Corporation. All rights reserved.
.
dherence). to be shared with IM, CL, Infra Lead , CPD
ss adherence.
8/12/2019 Quality Assurance Plan_Manoranjan
22/28
enalty Clauses & WCC Signoff Timelin
Regulation on punishment for ZTE Site engineer
f QA Engineer finds quality problems e.g weak supervision and timelssues to be intimated with out delay to CPD/CH keeping in loop to Phe PQM and CPD/CH must consult with PD to make a decision on
o be made )Regulation on punishment for Vendor
roject team/PQM can take action against concern subcon after conFor submission of fake reports.
egulation on punishment/ penalty clauses are as per below:
.
For not meeting Red line requirementFor not taking corrective action after getting the site quality problFor not giving proper response to project team.For damaging of material and for wasting of materials.For violation of implementation safety etc
CC Signoff Timelines:
. Submission of signed off documents in after the SLA e.g Hardwahe document to QL and the QC can give the sign off the same, so thhile sign off by Project Impl team /CH /CPD.
. if the site is having punch point, the QL cant give the sign off on th
> Internal Only
s
y rectification problems /issues having inadequate reasons All theseQM.unishment (Warning letter or Criticism letter or Penalty notice need
ulting with Outsourcing Manager in the following cases.
ZTE Corporation. All rights reserved.
m .
e Installation /Self Inspection documents. The subcon can submitat on the online system PQM can approve the document accordingl
document until the sites get rectified.
8/12/2019 Quality Assurance Plan_Manoranjan
23/28
ubcon Management
ollowing needs to be understand prior to work starts/w
Understand the deliverables which are incorporate in Subcon SO
Kick-off meeting with Subcon , prior to work starts.----Owner CPD/
Understand the deliverable capability /Skill set of each resource n
Make them aware the Quality Plan of the project & requirements.--
Documentation required to be produced at different stages of proje
Understand the Project & Quality organization of subcon. ----Owne
Communication & problem resolution methods. ----Owner-PQM/ C
Invoice & Financial status. ----Owner-CPD/CH
Technical performance of subcon team. ----Owner-IM/CL/Infra Lea
Define Reward & penalization scheme in contract ----Owner-OSD /
> Internal Only
ork allotment to Subcon
as per Contract /Agreement --Owner CPD/CH
H/PQM .
ed to be identified .----Owner-CPD/CH/PQM
--Owner-PQM
ct. ----Owner-CPD/CH/PQM
ZTE Corporation. All rights reserved.
r- PQM /CPD/CH
D/CH
/PQM
Project Technical Team /PD
8/12/2019 Quality Assurance Plan_Manoranjan
24/28
&S Management and Monitoring
D ev el o
pH
& S a s s
K e y c on
t r ol
A n
al y z e
pr o
j e c
m an a g em
en
t r e
q
D ev el o
p s u b c on
t r
m an
a g em
en
t a g
Or g
ani z e
t r ai ni n
g an
a c t i v i t i e s
E v al u
a t e pr o
j e c t
EstablishprojectPlan projectAnalyze project
r a
n c e pl an
c t i vi t i e
s
t H
& S
i r em en
t s
c t or H
& S
r e em en
t
d p u b l i c i t y
Smooth channel for comsu
Customer
H & S r i s k
> Internal Only
P er f or m
an
c em
an
C u s t om
er
s a t i sf
s u c c e s sf ul d
H
& S S p o t - c h e c k
a
I m pr ov e
aw
ar d
s a
s c h em
e
Hand overproject Close project
S umm
ar i z e
pr o
j e
H & S m
an
a g em
en
Implementproject
ZTE Corporation. All rights reserved.
g em
en
t
c t i on
an
d
el i v er y
d
s el f - c h
e c k
n d
p en
al t y
unication with the customer andcontractor
SubcontractorTE
t
t
8/12/2019 Quality Assurance Plan_Manoranjan
25/28
ealth & Safety with tools requirement.It is ZTE prime objective that all operations are to be carried out in
e taken to prevent personal injuries to our staff, contracts, customerave legitimate interaction with our work operations.
Few Key Points in Project H&S Management
Make H&S assurance plan
Record the H&S management regulations in the subcontractsAssess general risksTraining ( Preventive and Responsive )Self-check and spot-checkRewarding, punishment, and improvement
Hazard Prevention and ControlStart by determining that a hazard or potential hazard exists,If the hazard cannot be eliminated, use hazard controlsEliminate or control hazards in a timely mannerControlling the Hazards
Engineering controlsAdministrative controlsPersonal protective equipmentSafe work practices communicated via training, positive reinforcement , correAdditional Worksite AnalysisCollect near miss / Major and Minor ,Promotion of adherence of Safety Measure s on Sites .Building Safety as a Culture
Personal Safety and Site Safety
> Internal Only
a safe manner, and that every measure is toand members of the general public who
ZTE Corporation. All rights reserved.
tion of unsafe performance, and enforcement
PPE for Work at Height& Electrical Works
8/12/2019 Quality Assurance Plan_Manoranjan
26/28
. a e y wareincluding Vendors
2. Road Safety
3. Electrical Sa
ess o a ec n c ans& Customers
Defensive Driving Trainings
fety & Work at Height Demos
8/12/2019 Quality Assurance Plan_Manoranjan
27/28
PREVENTIVE
Defensive Driving Training Electrical Safety
Training Safe Height Work Training
RE
Tr
Fir
Re
PONSIVE
ining on Fire Fighting
t-Aid Training
scue Operations