  • 8/10/2019 Quality Dir Civil

    1/36

    SR. NO DATENAME OF THE

    INSPECTOR

    AREA VISITED

    1 23-May-12 S P Karmakar

    Cooling Tower #

    1 /Eliminator

    beams at cell no-

    01

    REPORT DATE : 24-05-2012

    NAME OF CLIENT : JINDAL INDIA THERMAL POWERNAME OF PROJECT : 2X6OOMW THERMAL PROJECT,

    DEPARTMENT : CIVIL

    INSPECTION DATE : 23-05-2012

  • 8/10/2019 Quality Dir Civil

    2/36

    2 23-May-12 S P Karmakar Laboratory

    3 23-May-12 S P Karmakar

    Cooling Tower #

    1 /Fan cylinder

    6B & 10A

    4 23-May-12 S P Karmakar

    Bottom Ash

    Storage Silo #

    1/column no - F2

    (2 nos) at grid C2

    & C3

  • 8/10/2019 Quality Dir Civil

    3/36

    5 23-May-12 S P Karmakar Laboratory

  • 8/10/2019 Quality Dir Civil

    4/36

    6 23-May-12 S P Karmakar Laboratory

  • 8/10/2019 Quality Dir Civil

    5/36

    ACTIVITY

    Concrete casting

    was in progress.

    OBSERVATION/DEVIATION

    Concrete casting was in progress at

    the mentioned structure about 10:30

    am. Checked the following items:

    1) Concrete constituents were found

    under limit of tolerance as per IS4925 in digital panel board of mini

    reversible mixture.

    2) Concrete slump checked and found

    80 mm.

    3) Concrete qty. - 05 m3

    approximately. Cube casted at site -

    09 nos.

    4) Needle vibrator was available at

    pouring point.

    DAILY INSPECTION REP

    LIMITEDRISSA

  • 8/10/2019 Quality Dir Civil

    6/36

    Concrete cube

    (15x15x15) cm.

    testing of M25

    grade.

    Moist curing was

    in progress.

    Mortar finishing incolumn at

    honeycomb

    portion.

    Concrete cube (15x15x15) cm. testing

    in lab. and found ok.

    The above test is conforming to IS

    456:2000.

    Moist curing was in progress at the

    mentioned structure about 10:45 am.

    Cement mortar finishing work was

    doing at the mentioned columnswhere small honeycombs were

    appeared. Moist curing was not in

    progress there.

  • 8/10/2019 Quality Dir Civil

    7/36

    Concrete cube

    (15x15x15) cm.

    testing of M25

    grade

    Witnessed the testing in lab. and

    found 01 sample was INVALID &other sample was failure (M25 grade

    concrete) of 28 days testing.

    Another 01 sample of 7 days testing

    was failure.

    The above test is conforming to IS

    456:2000.

  • 8/10/2019 Quality Dir Civil

    8/36

    Electric room no -

    2/foundation raft

    F2 at grid A1

    Concrete casting was in progress at

    the mentioned foundation about

    11:30 am. Concrete needle vibrator

    was available at pouring point.

    Concrete slump cone & cubes were

    not available at site.

  • 8/10/2019 Quality Dir Civil

    9/36

    REMEDIAL ACTION

    SUGGESTED

    NAME OF THE

    CONTRACTOR

    -

    M/s. Paharpur

    Cooling Towers

    Limited

    RT

  • 8/10/2019 Quality Dir Civil

    10/36

    -M/s. PaharpurCooling Towers

    Limited

    -

    M/s. Paharpur

    Cooling Towers

    Limited

    Suggested at site to

    the concern person of

    Contractor about this

    as per JITPL

    specification.

    M/s. Macawber

    Beekay Pvt. Ltd.

  • 8/10/2019 Quality Dir Civil

    11/36

    -M/s. Tecpro

    Systems Limited

  • 8/10/2019 Quality Dir Civil

    12/36

    Already suggested to

    Mr. Kashyap - QA/QC

    of TECPRO

    M/s. Tecpro

    Systems Limited

  • 8/10/2019 Quality Dir Civil

    13/36

    STATUS

    RECTIFICATION

    REFERENCE WITH

    DATE AND SR.NO.

    - -

  • 8/10/2019 Quality Dir Civil

    14/36

    Today 02 samples of 7

    days and 02 samples of

    28 days testing observed.

    Dimensions of concrete

    cube were ok.

    -

    - -

    Open -

  • 8/10/2019 Quality Dir Civil

    15/36

    Cubes dimensions were

    ok.

    Structure name:

    Stacker - Reclaimer wall

    module no -04/south

    side wall -2nd lift casting,

    BCN 6A/6B, TR-29/01 no

    raft, TR-13 & 13A -

    column casting. (basedon 28 days result)

    Concrete qty.-15.02m3

    -

  • 8/10/2019 Quality Dir Civil

    16/36

    Action not taken in spite

    of our strictly instruction.-

  • 8/10/2019 Quality Dir Civil

    17/36

    SR. NO DATENAME OF THE

    INSPECTOR

    AREA VISITED

    1 22-May-12 S P Karmakar Cooling Tower # 1 & 2

    2 22-May-12 S P Karmakar Laboratory

    3 22-May-12 S P Karmakar

    Cooling Tower # 1

    /Fan cylinder 6B &

    10A

    REPORT DATE : 23-05-2012

    NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMINAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORIS

    DEPARTMENT : CIVIL

    INSPECTION DATE : 22-05-2012

  • 8/10/2019 Quality Dir Civil

    18/36

    4 22-May-12 S P Karmakar

    Bottom Ash

    Silo/column no - F2 (2

    nos) at grid C2 & C3

    5 22-May-12 S P Karmakar Laboratory

  • 8/10/2019 Quality Dir Civil

    19/36

    6 22-May-12 S P Karmakar Laboratory

    7 22-May-12 S P KarmakarTownship / 01 no raft

    of B5 type quarter.

    8 22-May-12 S P KarmakarTownship/C1 type

    quarter

  • 8/10/2019 Quality Dir Civil

    20/36

    ACTIVITY

    Concrete casting was not

    in progress.

    No test has done

    Moist curing was in

    progress.

    DAILY INSPECTIO

    EDA

    OBSERVATION

    Concrete casting

    progress at the

    due to labour prob

    They have not arr

    materials & concr

    .

    Moist curing was

    the mentioned s

    10:25 am.

  • 8/10/2019 Quality Dir Civil

    21/36

    Concrete casting was

    going on.

    Concrete cube

    (15x15x15) cm. testing

    of M25 & M30 grade

    Concrete casting

    the mentioned col

    m3 concrete. Du

    checked the follow1) Concrete ingre

    of tolerance as

    digital panel b

    reversible mixture.

    2) Concrete slum

    (15x15x15) cm. w

    site. But, not taken

    3) Concrete vibrat

    at pouring point.

    Witnessed the tes

    found 02 samplconcrete) of 28 da

    failure at Pipe rac

    A/43 & B/45 up

    and 01 sample

    concrete) of 7 d

    found ok.

  • 8/10/2019 Quality Dir Civil

    22/36

    Concrete cube

    (15x15x15) cm. testing

    of M25 grade

    Concrete casting was

    going on.

    Field compaction test

    Witnessed the tes

    found 02 sampl

    testing were INV

    samples and one

    result was under

    ''Acceptance Cri

    456:2000. So, th

    not complianc

    'Acceptance Cri

    456:2000.

    Another 01 sam

    testing was found

    Concrete vibrator

    pouring point.

    cone and cubes w

    at site.

    Witnessed the fi

    test as per appr

    found ok.

  • 8/10/2019 Quality Dir Civil

    23/36

    REMEDIAL ACTION

    SUGGESTED

    NAME OF THE

    CONTRACTOR

    -

    M/s. Paharpur

    Cooling Towers

    Limited

    Suggested for testing

    to Mr. Ansari -

    Manager of PCTL

    M/s. Paharpur

    Cooling Towers

    Limited

    -

    M/s. Paharpur

    Cooling Towers

    Limited

    REPORT

    DEVIATION

    was not in

    entioned area

    lems.

    nge any test of

    te cube testing

    in progress at

    tructure about

  • 8/10/2019 Quality Dir Civil

    24/36

    Suggested to Mr.

    Santosh for

    rectification of item no

    - 1 & 2

    M/s. Macawber

    Beekay Pvt. Ltd.

    -M/s. Macawber

    Beekay Pvt. Ltd.

    as going on at

    umn about 1.75

    ring concreting

    ing items:ients were out

    er IS 4925 in

    ard at mini

    cone & cubes

    ere available at

    at site.

    r was available

    ting in lab. and

    s (M30 gradeys testing were

    pedestal /grid

    o plinth beam

    (M25 grade

    ys testing was

  • 8/10/2019 Quality Dir Civil

    25/36

    -M/s. Tecpro

    Systems Limited

    Already suggested toMr. Santosh as per

    approved FQP.

    M/s. Gammon

    India Limited

    -M/s. Gammon

    India Limited

    ting in lab. and

    s of 28 days

    LID out of 03

    individual test

    he limit as per

    teria'' of IS

    se result were

    with the

    eria'' of IS

    le of 7 days

    k.

    as available at

    oncrete slump

    re not available

    ld compaction

    oved FQP and

  • 8/10/2019 Quality Dir Civil

    26/36

    STATUS

    RECTIFICATION

    REFERENCE WITH

    DATE AND SR.NO.

    - -

    Quality Engineer

    was absent at

    site.

    -

    - -

  • 8/10/2019 Quality Dir Civil

    27/36

    Quality Engineer

    was absent at

    site.

    -

    Cubes

    dimensions were

    ok.

    Concrete qty.-

    3.20 m3

    -

  • 8/10/2019 Quality Dir Civil

    28/36

    Cubes

    dimensions were

    ok.

    Structure name:

    JNT - 6 F12 raft

    beam casting ,

    BCN 6A/6B, TR - 9

    & 9A tie beam, ER

    - 2/6 nos raft

    foundation.

    Concrete qty. -

    26.95 m3.

    -

    Action not taken -

    - -

  • 8/10/2019 Quality Dir Civil

    29/36

    SR. NO DATENAME OF THE

    INSPECTOR

    AREA VISITED

    1 13.06.2012 D.Banerjee Tecpro laboratory

    2 13.06.2012 D.Banerjee

    Paharpur cooling

    tower (1)&(2)

    REPORT DATE : 13.06.2012

    NAME OF CLIENT : JINDAL INDIA THERMAL POWER LINAME OF PROJECT : 2X6OOMW THERMAL PROJECT,O

    DEPARTMENT : CIVIL

    INSPECTION DATE : 13.06.2012

  • 8/10/2019 Quality Dir Civil

    30/36

    3 13.06.2012 D.Banerjee Tecpro laboratory

    4

    5

  • 8/10/2019 Quality Dir Civil

    31/36

    ACTIVITY

    Bulk density test of

    corse and fine

    aggrigate

    Curing of structure

    DAILY INS

    MITEDISSA

    OBSERV

    1.curing done by p

  • 8/10/2019 Quality Dir Civil

    32/36

    Cube test conducted 28 days cube test

  • 8/10/2019 Quality Dir Civil

    33/36

    REMEDIAL ACTION

    SUGGESTED

    ok

    Issued hassion cloth

    for curing

    ECTION REPORT

    TION/DEVIATION

    results found ok.

    ipes

  • 8/10/2019 Quality Dir Civil

    34/36

    ok onducted.results found ok.

  • 8/10/2019 Quality Dir Civil

    35/36

    NAME OF THE

    CONTRACTOR

    STATUS

    RECTIFICATION

    REFERENCE WITH

    DATE AND SR.NO.

    M/s. Tecpro

    systems Limitedclosed -

    M/s Paharpur

    cooling towerLimited

    OPEN -

  • 8/10/2019 Quality Dir Civil

    36/36

    M/s Tecpro

    system limitedclosed -

    -

    -

    -


Recommended