Quality Maintenance(Hinshitsu Hozen)
Background
Defects were high
No structured approach to analyze defects
No sustained effortsFor defect prevention
Process condition are not standardized
High process variation
No customer satisfaction
for survival
Background – QM Pillar
Survival
ZeroDefect
Competition
Quality
Customer Demand
Globalization
Customer Satisfaction
Why Quality
Aim – QM Pillar
To establish defect free manufacturing process where Quality is
built into the process leading to consistent product And Quality into the hands of Customer
Category Parameters UOMBM
(May'08)BAL Award
CriteriaTarget
(Mar'10)
Current Status
(Aug'09)Remarks
PProduction loss due to Defective Input Material
Hrs. -- -- -- 0 0Sustaine
d
Q
Customer complaints (PPM) PPM 19 -- 0 0 2Not
Achieved
In-house Rejection (PPM) - Plant Level
PPM 411980%
Down824 0 532 Achieved
In-house Rejection Phenomena - Plant Level
Nos. 60 -- -- 0 16 Achieved
Early Failure (PPM) PPM 0 0 0 0 0Sustaine
d
Warranty (PPM) PPM 1574 -- <100 <100 2779Not
Achieved
Supplier parts (PPM) PPM 23114 -- -- 0 2819Not
Achieved
C Scrap Cost (Rs/Comp) Rs. 1.2080%
Down0.24 0 0.21 Achieved
M QM Kaizens/employee/month Nos. 0.2 -- -- 1 1.2 Achieved
Target – QM Pillar
7
Identify defective component
Defect phenomena identification
Review Insp. Std. for adequacy of
Prepare QA matrix gauges, checking method, frequency
Stratify defect phenomena A,B,C wise Prepare revised std. PFMEA ,Process flowControl Plan
Analyze by why-why
Plan & implement counter measure
Trend graph
1.Make kaizen / countermeasurePrepare QM Matrix 2. Simplification of Inspection Method
Check conditions as per QM matrix and take actions before defect occurs identify Q component which have already caused defect and monitor it to sustain zero defect
Review results for effectiveness
•Achieving – •“Zero Defect”
Sustaining – “Zero Defect”
Approach
QM Master Plan
Master plan for Quality Maintenance is planning of various activities in this pillar with respect to the time frame in months and years. According to the stage of TPM implementation it can start at various levels. In the beginning it will start with data collection on defects to improving conditions to sustaining zero defect conditions.
10
QM Pillar – Master Plan
11
Defect Prevention
1.Customer complaint2.EFR /Warranty defects3.Inhouse defects (In process + Vendor parts)
12
Customer Complaint: Why do you have customer complaint?Because, you do not inspect the defect of your product. So, your customer inspects your product instead of you.On the other hand, even if you dispatch good quality, during transportation time, product gets damaged either due to poor packaging or products hitting each other.
When I ask, why customer complaint happens, usually your answer is “due to product defect”. The answer is correct. But I say this is not correct. May be you have big doubt. So I ask next question, why do you have in process and final inspection? You say, because if we do not do inspection, customer complaint will happen.
So finally customer complaint links to inspection.
13
Customer Complaint: Many companies have sampling inspection. Sampling means inspect some products, not all products. So, customer complaint comes from sampling inspection (not inspecting all). Even if 100% inspection, visual inspection is dangerous. Because Poka (Missing, mistake by human being) problem. Poka is very natural. If you say, I never mistake, it is already a mistake.
When I ask the company, why you do not do 100% inspection perfect final inspection? They say, we need a lot of time, manpower, some investment money. I ask the next question, which is important between customer complaint zero and additional money? They have some excuse. This answer depends on top management, not operator.
I ask operator, how many defects did you observe today? Operator replies “Zero”. I say, you did not inspect all products. So, of course, defect is zero, but at next process customer complaint is not zero. Defect and customer complaint is like a balance. (A) (B) 0-----------------------------0 (A) – Defect (B) – Customer complaint
14
Customer Complaint: Next case: if in process is zero, do we need final inspection? I say, you do not need. But I ask, is it possible that in process defect is zero? If you say “Yes”. Please explain “ how to do”. If you can not explain, I say inspection is necessary.
Conclusion:To challenge “Zero” Customer Complaint, you must change inspection method.
* Sampling inspection to 100% inspection* 100% visual inspection to 100% gauge inspection* 100% gauge inspection to 100% Instrument / machine inspection with Poka Yoke.
* How to prevent Poka is very important.
15
Warranty: Warranty happens due to weak strength, forced deterioration, especially Poka, wrong parts and slight defect, which is very dangerous. TOYOTA says, Quality is the guarantee for product life (part’s life). That is, you can confidently say, after market, up to 40,000 KM no problem. Quality means exactly “No problem”
In-process defect: When I ask why do you need in process inspection? What is your answer? If you say, prevent customer complaint, this is not correct. The correct answer is , we have to know whether all 4MT conditions are OK or not. 4MT conditions; machine, material, process method, man (Poka yoke),tool and then especially Deterioration is within limit or not.Processed product is the result after processing. We need to ensure the cause side of condition before processing. Generally your in process inspection is against processed product. That is after defect, you need some adjustment.In this case maintaining in process defect “Zero” is very difficult. Hence inspection is necessary during in process.
16
How to achieve / prevent Zero customer complaint?
Customer Complaint Prevention Customer Complaints (BAL)
Suppliers (Varroc)
Understanding the complaints
Stratifying the complaint
Accepted Not Accepted Customer Arriving at Consensus
Cause side Defect Matrix
Technical
Analysis
Finding Root cause/s
Kaizen/ Poka Yoke / Action
Non-Technical
Revisit Facilities
Strengthen/Input Facilities
Education to operators
OJT
Audit by supervisors
Course Correction/Demonstration
Sustenance
Inspection side
Strengthening Inspectionmethod
Implement
Analysis
Sustenance Action
See Result
OK
Not OK
Sustenance Action
See ResultOK
Not OK
18
How to sustain Zero customer complaint?
Sustenance Action Zero Customer Complaint
Zero CC
How ?
Ensure Improvement
of working
PM of inspectionequipment. PokaYoke to prevent
failures
PreventSkip case
Prevent mix up of not ok
with ok
Sustain Zero CC
Inspection Improvement
Customer Complaint (CC)
Interlock
Kaizen, Poka yoke,Design Improvements etc
JH check sheet for checking whether working or not.PM check sheet for repair if not working
1) Verify present status2) Survey of process which generated defect3) Survey and analysis of 4M conditions4) Study of malfunction countermeasures5) Analysis of conditions for non-defective units that
are not confirmed6) Improve 4M condition defects7) Setting 4M conditions8) Intensification and improvement of check methods9) Deciding check reference value10) Standard revision and trend control
10 Steps of Quality Maintenance
Data Collection on defectsIdentify total no. of defect phenomenaShop /Cell wise stratificationPreparation of Defect matrixSelecting component for further study based on priorityStudy the component drawing for inspection & inspection standard availability
Step-1 – Verify present status
Defect Classification
OK
OK
NOT-OK
‘A’ TYPE DEFECT
Action taken by Operator
Limit of output
specification
•The output is (OK ) initially
•Becomes Not ok
•Corrective action action by operator
•Becomes OK
Root causes analysis Tool
Why Why Analysis
Defect Classification
LSL USL
A type Defect - Examples
PU Foam Short MouldingMirror Finger Mark
Flywheel Magneto Pulsar pip radius undersizeStarter Motor Core cut during unbalance correction
Gear Face damageCrank pin Chamfer not ok
Division Product Category A Type Defect
Polymer
Electrical
Metallic
NOT-OK
‘B’ TYPE DEFECT
No Action by operator
Limit of output
specification•The output is (OK ) initially
•Becomes Not ok
•NO action taken by operator
•Becomes OK
Root causes analysis Tool
PM Analysis or
C & E Diagram
OK
OK
Defect Classification
LSL USL
Division Product Category B Type Defect
PolymerPU Foam Foam uneven feel
Extrusion Black spot
ElectricalFlywheel Magneto Rotor case damage
Flywheel Magneto Dent mark on taper
Metallic Gear Bore ovality
Crank pin Pitting mark
B type Defect - Examples
OK
‘C’ TYPE DEFECT
Action by taken operator
Limit of output
specification •The output is (Not OK ) initially
•Action taken by operator
•Becomes OK (Setting scrap)
Root causes analysis Tool
Why ,Why Analysis or
C & E Diagram
Not OK
OKLSL USL
Defect Classification
Plastics Flow markExtrusion Zig Zag cutting
Flywheel Magneto Marking not visibleStarter motor Commutator tag melts during hot stacking
Gear Span oversizeCrank pin Outer diameter damage
Division Product Category C Type Defect
Polymer
Electrical
Metallic
C type Defect - Examples
Sr. No.
DEFECT PHENOMENON (IN-PROCESS)
DEFECT TYPE
Sept'07 Oct'07 Nov'07 Dec'07 Jan'08 Feb'08 Mar'08 Apr'08 May'08 Jun-08 Jul-08 Aug-08
1 Drill hole through during balancing C 27 6 5 0 0 0 0 0 0 0 0 0
2 Rivet head damage A 5 4 0 1 0 2 0 0 0 0 0 0
3 Bolt broken B 25 24 13 0 4 3 0 0 0 0 0 0
4 Double marking A 11 12 0 0 0 0 0 0 0 0 0 0
5 Pip radius oversize (>57.75mm) B 121 140 7 0 3 0 0 0 0 0 0 0
6 Boss thread damage A 0 25 21 12 17 8 26 15 8 21 12 10
7 Magnet case scratch mark A 31 32 1 2 0 0 0 0 0 0 0 0
8 Plate starter clutch damage A 77 67 12 7 2 11 7 0 0 0 0 0
9 Magnet case up B 57 124 11 2 1 8 4 0 0 0 0 0
10 Pip radius undersize (<57.95mm) B 60 80 29 0 0 0 0 0 0 0 0 0
11 Magnet case shift A 31 35 7 3 0 0 1 0 0 0 0 0
12 Taper dent mark B 12 9 7 6 9 12 7 8 3 0 0 0
13 Keyway damage A 25 48 12 8 7 5 12 10 12 6 12 0
14 Pip damage A 11 15 12 9 11 15 12 10 9 12 9 9
15 Magnet case damage B 101 86 57 33 31 62 65 74 67 49 52 33
Sr. No.
DEFECT PHENOMENON (VENDOR PARTS)
DEFECT TYPE
Sept'07 Oct'07 Nov'07 Dec'07 Jan'08 Feb'08 Mar'08 Apr'08 May'08 June'08 Jul-08 Aug-08
1 Cup notch shift A 21 6 32 5 0 0 0 0 0 0 0 0
2 Rotor ID gauge tight due to cup F/O more B 96 76 31 14 37 27 15 0 0 0 0 0
3 Rotor ID gauge tight due to cup Magnet profile B -- -- -- -- -- -- 17 0 0 0 0 0
4 Boss Ø 85 oversize A 8 27 14 9 3 3 2 2 5 0 5 0
5 Boss thread miss A 2 16 11 1 4 5 2 2 2 0 2 0
6 Boss thread oversize A 43 56 79 0 45 52 29 47 35 22 24 32
7 Cup poor plating -- 49 20 17 36 67 93 32 30 52 48 52 0
8 Boss thread undersize A 84 46 39 0 1 1 0 0 0 52 0 0
9 Others -- 18 27 46 32 8 12 6 0 0 0 0 0
PHENOMENA WISE MONTHLY REJECTION QUANTITY MATRIX ROTOR ASSEMBLY
Study of possible and happened defect phenomena in past for similar component.
QA Matrix for quality characteristics based on process survey (Possibility)QA Matrix updation based on defects occurred
Step-2 – Survey of process which generated defect
Prepare Quality Assurance matrix & reflection in standards
QA Matrix – QA (Quality Assurance) Matrix is used to find out sources of defects in product. QA matrix shows the relation ship between defect/defect mode & the process which causes it. It requires data collection for defects at various process stages to prepare a QA Matrix. Hence QA matrix is to be made quality defect wise, process wise and machine wise.
SupplierInward
InspectionRiveting Soldering
Switch Mfg. Line
Testing on Switch
Line
Handle Bar Mfg.
Line
Final Testing
Transportation
Throttle not self return
Adjuster nut loose
Switch loose with twist force
Front brake cable bellow spring end bend
Switch not working ( Horn some time continue)
P
Horn switch continous on
P
P
Clutch lever stickyBlinker switch not operate
P
Head light switch not working
P
Front Brake cable thread damage
Handle bar assembly - Platina ( 52DU0033 )
DEFECT OCCURANCE STAGE IN PROCESS INSPECTION
PROCESS CHANGE POKA-YOKE P
BOLD - ACTION TO BE TAKEN
NOT BOLD - ACTION COMPLETED
QA Matrix
Step-3 – Survey and analysis of 4M conditions
This analysis is a set of conditions with respect to Man, machine, material and method for obtaining a good products. It helps in identifying 4M standards and checking is possible against these standards. Removing this variability can some times eliminate Quality defects in the product.
Caused by Raw Material conditions
Caused by Equipment precision
Caused by Method Conditions
Caused by Condition of people involved
Producing materials not generate defect
Search for materials not generate defects
Fostering vendors not cause defects
Set condition of material not to generate defect
Manufacturing equipment not generate defects
PMAnalysis
Improvements to Equipment not generate
defects
Set Conditions of equipment not generate
defects
Devising methods not generate defects
Search for Methodsnot generate defects
Improvements to Methods not generate
defects
Set Condition of method not generate defects
Fostering operators strong in equipment and job
Autonomous maintenance & skill Education training
Management of conditions not generate defects
Zero Quality Defect
Trouble finding
Process and recovery
Maintenance & mgt
Quality Defect factors -4MT
Pursue relationship Between Quality Char &
Material / EquipmentMethod conditions
Manufacturing Equipment not generate defects
4MT Condition to decide Quality4M 4M Conditios: Machine What will happen if conditions are not observed.
Equipment Conditions:
1) Cleaning is thorough1) If not cleaned, dust will drop during processing to cause attaching or mixing of foreign matter to cause defects.
2) Lubrication is precise2) If not oiled properly, machines do not operate smoothly and cause process defects.
3) Bolts and nuts are tight3) If loose,machine parts will have rattle and cause process defects.
4) Equipment parts are tight 4) If there is rattle, process defects will result.Jigs Conditions:1) Scratches and press marks cannot be found on jig mounting parts
1) Any press marks will cause process defects.
2) Scratches and press marks cannot be found on mounting reference planes of processed articles
2) Any press marks will cause scratches on products or process defects.
3) Wear and chipping cannot be found on jig parts 3) Any wear will cause process defects.
Tools Conditions:
1) Right tools are used1) If the right tools are not used, bolt can not be tightened fully and processing defects will results.
2) Tools are set correctly 2) Improper centering will cause process defects.3) Tools do not have chipping or wear 3) Any chipping or wear will cause process defects.Measuring device conditions:1) Probes of meters are free of dust 1) Dust on probes will cause measuring errors.2) Measuring devices operate smoothly 2) If not smooth, measurement errors will result.
3) Measuring devices are within calibration period 3) If precision is not accurate, measurement errors will result.
Equipment, Jigs, Tools, Measuring
devices
4MT Condition to decide Quality
4M
A) Is quality of materials that affect process quality good?
A) Is before process quality that effects process quality good?
1) Materials are free of scratches and dust 1) Before - processed goods are free of scratches and dust
2) Material composition and texure are stable. 2) Before - Process dimensions are not dispersed … & others
3) Material hardness is stable ….. & others
4M Conditios: Material
Materials
4MT Condition to decide Quality
4MA) Are processing conditions to produce good quality good?
B) Are the right work methods used?
1) Are rpm and feed speed settings good?1) Are processes goods mounted correctly on reference planes? Are not they mounted with dust attached?
2) Are decided conditions followed? 2) Are measurements made with right measuring procedure?
3) Are temperature and density settings good? Are they followed?
3) Are measuring specifications prepared for measuring devices? Are they followed?
4) Are pressure and flow rate settings good? Are they follwed? … and othersC) Are measuring methods right?1) Are measurements made without errors?2) Are measurements made with right measuring procedure?3) Are measuring specifications prepared for measuring devices? Are they followed?
4M Conditios: Method
Processing conditions,
Work methods and Measuring
methods
4MT Condition to decide Quality
4M 4M Conditios: Men
Men (Morale) Strong will that always following standards will produce good quality
Morale mentioned here is the " will to do". It is the will to improve quality and is a strong problem-consciousness to be concerned very much with slight defects that impair quality and to solve them by all means.
Strong problem-consciousness to thoroughly extract 3M malfunctions points (slight defects) if defects are found.Overconcerned with a phenomenon which is strange or is slightly different from the usual in daily
Corrective action (Kaizen / Pokayoke) for the defect phenomena.Refer QA Matrix prepared earlier.Consider all 4M conditions for the defect.Analyze the defect & implement countermeasures for the root cause and possible causes.
Step-4 – Study of malfunction countermeasures & restore malfunctions.
41
The word “KAIZEN” is basically Japanese word. “KAI” means Continuous & “ZEN” means Improvement.So Kaizen is nothing but Continuous improvement.
The starting point of any improvement is to recognize the need of change. It comes from recognizing a problem which comes from individual eye-capability to see what is not right.What is MUDA (Waste), MURI ( Inconsistency) & MURA (Strain) loss.
Kaizen topic includes : 1) Rejection (defect) 2) Manpower 3) Technique 4) Method 5) Time 6) Facilities 7) Jigs / Tools 8) Materials 9) Production volume 10) Inventory 11) Place (space) 12) Safety etc.
Kaizen for eliminating defects
There are mainly 3 types of Kaizen.
1. 2 Quadrant Kaizen
2. 4 Quadrant Kaizen
3. Concentrated Kaizen
42
TPM Circle No.: Activity KK JH QM PM SHE OT DM E&T
COMPANY LOGO / NAME TPM Circle Name: Loss no./StepResult Area P C D S M
Cell No.: Cell Name: Operation :
Kaizen Theme: Idea:
Bench Mark Problem / Present status: Target
KAIZEN StartKAIZEN FinishTeam Members:
Benefits:
Why Why Analysis : Results: What to do :
TargetDate
Registration no. & Date : Registered by :Manager's Sign :
Responsibility StatusSr no
E.g. Increase production, Reduce time / cost etc
(Indicating "Howt to check / audit to ensure that
Scope & Plan for Horizontal Deployment
Model
(Implementating this kaizen at all possible cases in existing product.(Check & confirm repurcations of changes being suggested before implementating)
(Always starting with "Providing / Changing)
Dept: Kaizen No.:
COUNTERMEASURE :
(E.g. Poka Yoke, More friction, Fully, More bolts, More coolant, Big, Short, Can detect, Easy)
Machine :
(Correct observation. Use of 5W 1H)(When = Trend / Time / Period: Contienous / Discontineous / Rare, Start up / Seasons / Set up),(Who =Men:Day shift / Night shift / New employee / Temporary help), (What =Materials: Lots / Type), (Where = Locations: Part / Range / Process / Equipment), (Which = Trend: Direction e.g. possitive, Negative, Rear, Left, Right etc / Increase / Reduction), (How -How much/How many) = Status: Equipment / Jig / Tools / Accuracy / Machining conditions etc)
Q - Def. A / B / C
Process / Stage :
How to do :
KAIZEN SUSTAINANCE :
(Always opposite to root cause)
(E.g. Reduce time, Reduce frequency, Eliminate, Increase life etc.)
(E.g. Poka, Less friction, Partly, Less bolts, No coolant, Small, Long, Can not detect, Difficult)
Always start with To prevent /To Reduce / To Increase ( Prevent for failure / rejection / accident etc. To Reduce for time parameters like set up & cost, To increase for productivity)
the kaizen will be effective in long run"
the kaizen will be effective in long run"
Root Cause :
(Indicating "What to check / audit to ensure that
Please insert graph indicating appearance of the defect on which action is taken. Monitoring for few months is necessary to check effectiveness.(Rejection for the specific problem)
Why Why analysis in brief: Analysis showing as how the REAL root cause was identified.
(Implementating this kaizen at all the possible case in the existing / similar products to arrest possibilities of this defect in similar current products.
Pokayoke for eliminating defects
Poka yoke is a technique for avoiding simple human errors at work.
Poka is a Japanese word meaning “Inadvertent error” and Yoke comes from Japanese word Yokerie meaning “to avoid”.
This has been termed as “Mistake / Fool Proofing”.
ERROR ARE INEVITABLE BUT CAN BE ELIMINATED
People always make mistakes. These can be reduced or even eliminated. Some of the Poka-Yoke devices, which can help to avoid defects are:
Guide Pins / Locators of different sizesError Detection Buzzers & AlarmsLimit Switches, Proximity & Photo sensorsCountersChecklists
Pokayoke for eliminating defects
Basic classification of Poka yoke
• PREDICTION V/s DETECTION
• ALARM V/s SHOTDOWN Vs CONTROL
• CONTACT V/s FIXED VALUE V/s MOTION READING METHODS
Example : Prediction or Prevention :
Pins
• Figure A shows that holes are wrongly drilled due to incorrect positioning of plate.
• Figure B shows that incorrect positioning of plate is prevented by locating 4 reference pins.
A B
Pokayoke
Example : Detection
• Figure A shows that plate with 4 holes drilled is to be dispatched to the customer. Customer complaints show many plates with 3 holes drilled.
• Figure B shows that mistake of less drilled holes is detected through a check by using 4 locator pins on a gauge.
A B Pins
Pokayoke
Type of sensing Devices :
1. Limit switches, Micro switches
2. Proximity switches
3. Photoelectric switches
4. Beam sensors
5. Sensor to detect changes in physical condition like temperature, pressure etc. (Pressure switches, thermostats etc.)
Pokayoke for eliminating defects
POKA-YOKE SHEET Varroc Engineering Pvt Ltd.
Problem :
Key Improvement :
Solution :
AFTERBEFORE
Prevent Error
Alarm
Control
Prevent Error
Detect Error
Sustenance Plan :
6W2H Format
Action plan - 6W2HSustenance
Qty. of defect actionsJul-07 Aug-07 Sep-07 BEFORE AFTER BEFORE AFTER
Def
ect
Com
pone
nt
Pro
cess
/ O
pera
tion
Roo
t cau
se
Qua
ntity
of r
ejec
tion
in 3
con
secu
tive
mon
ths
Insp
ectio
n st
atus
bef
ore
impr
ovem
ent w
ith
poss
ibili
ty o
f def
ect n
ot n
otic
ing
due
to
1. In
spec
tion
skip
2. N
o In
spec
tion
3. In
spec
ted,
but
def
ect n
ot id
entif
ied
( W
eakn
ess
in In
spec
tion
)
Insp
ectio
n st
atus
afte
r im
prov
emen
t with
act
ions
on
1.
Insp
ectio
n sk
ip2.
No
Insp
ectio
n3.
Insp
ecte
d, b
ut d
efec
t not
iden
tifie
d
Sta
tus
at th
e st
age
whe
re d
efec
t is
man
ufac
ture
d
Cou
nter
mea
sure
at t
he s
tage
to e
limin
ate
defe
ct
1. P
rovi
de2.
Mod
ify
Per
son
resp
onsi
ble
for
Insp
ectio
n im
prov
emen
t, C
ount
erm
easu
re a
t sta
ge a
nd s
uste
nanc
e
Dat
e of
com
plet
ion
of a
ctio
ns.
A -
Act
ion
not y
et p
lann
edB
- A
ctio
n un
der
prog
ress
C-
Act
ion
com
plet
ed a
nd e
ffect
iven
ess
conf
irmed
.
JH o
r P
M a
ctiv
ities
to e
nsur
e th
at d
eter
iora
tion
in
wha
t we
have
1. P
rovi
ded
2. M
odifi
ed
is n
otic
ed b
efor
e de
fect
occ
urs
and
rest
ored
.
HOW MUCH WHO WHEN STATUSINSPECTION SIDE CAUSE SIDE
HOW TO DONo
WHAT WHICH WHYWHERE
Study of other possible reasons for a defect, PM Analysis in some cases.
Find out conditions / control items from actual defects & possibility study for contributing non defective units.
Step-5 – Analyze conditions for non defective units that are not confirmed.
Execution of PM Analysis for exposure and handling of malfunctions
What is PM Analysis Deviation from Normal to
abnormal Physical principles behind an
abnormal event.
Understand the mechanics of abnormal event and
understand the mechanism of equipment.
Understand the relations between the abnormal event and 4M.
Phenomena
Physical
P
Mechanism
Machine
M
ManMaterialMethod
PM Analysis is one of the most effective techniques to handle B types of defects. PM denotes (P) Physical phenomena (M) Mechanism. In this analysis we try to establish the relationship between phenomena and the physical mechanism behind it which explain the contributing conditions to cause such physical mechanisms.
These contributing conditions are then elaborated in terms of relationship with primary (man, material, machine, method) conditions. Usually these primary conditions are not measurable so they are once again converted into secondary conditions that can usually be physically inspected against a standard.
Execution of PM Analysis for exposure and handling of malfunctions
Survey, analysis & implementation of 4M conditions for possible and happened defects.
Carry out possibility study, identify all 4M conditions to ensure that defect does not occur.
Step-6 – Improve 4M Condition defect Step-7 – Setting 4M conditions
ManMachi
neMateri
alMetho
dTool / Fixt.
Control Item Check PointSpecification /
CriterianJH PM- MC/TM
PartName
Check Point
SpecificationInspectio
n Location
Inspection at Stage
P Cutter Face Runout < 0.010 mm Max Face Run out Monitoring on graph - Monthly
---
P Cutter Adoptor OD Ø 31.73 / 31.74 mm OD Monitoring on graph - Monthly ---
P Cutter Adoptor OD Runout < 0.010 mm Max OD Monitoring on graph - Monthly ---
P Locator OD Ø 68.63 -0.005/ -0.015 mm
OD Monitoring on graph - Weekly Replace the Locator - Frequency - 6 months
P Locator OD Runout < 0.010 mm Max Run out Monitoring on graph - Weekly
Replace the Locator - Frequency - 6 months
P Locator Face Runout < 0.010 mm Max Run out Monitoring on graph - Weekly
Replace the Locator - Frequency - 6 months
P C Washer Condition No wear & Crack Check Daily Grind the washer face - Frequency - 3 months
P Fixture Fixture Face Free from chips Clean the fixture face by Air J et - after Every J ob
Grind the fixture face - Frequency - 3 months
P Cutter Cutter Wear Change cutter after 300 nos.
Monitoring by Tool Life Record and Tool counter
---
P
Cutter Cutter Life Total no of Resharpening - 15 (Life - 45,000) (No Overuse)
Monitoring of Tool Resharpening by Tool store
---
P Cutter Setting Cutter Setting as per Procedure displayed
--- ---
P Component Face
No Burr on Resting area
--- Visual
P ID 68.63/ +0.03 By Plug Gauge
P Width 15.5 15.5±0.10 By Dial & Comparator
P Width Variation
15.5±0.10 By Dial & Comparator
P
Notch Milling Presence of Notch Milling
Supplier End by Special Gauge
---
P
Cutting oil Coolant flow-Pressure & Direction
Coolant flow guided on cutting point
1)Check coolant oil level as per Minimum & Max. mark-Daily2)Check coolant knob position as per mark-Daily
Replace cutting oil as per PM plan-One year
P Punch Locator OD Ø 68.63 -0.015/ -0.025 mm
- Replace - Yearly
P Marking Punch Point Wear No wear & Crack Visual - Daily Ground - monthly
Sr No
Output
1Span 32.22 -0.05/-0.15
over 4 Teeths
4M-T In Process
Part Name & No : Starter Gear 3 W 4S ( 52 AA 0208) Operation : Gear Shaping3 M & 4 T Conditions
Input Material
4 M & T Condition
MAN
MATR
L
M/C
METH
OD
TO
OL A B C
* *Air
pressureHigh pressure
Pressure regulator error
2.5~3.8 BarPressure gauge
SOS Operator JH sheet* Check point added in TBM for regulator output.* Pressure gauge callibration as per plan.* Pressure switch to be provided on machine.
* *Valve
opening time
Opening time more
Timer malfunctioning
To be specified by PED & verified by
Maint.
* To arrive method for valve opening time & check point to be added in m/c TBM.
* *Valve
opening distance
Distance more
Pressure regulator error
To be specified by PED & verified by
Maint.
* Check point added in TBM for regulator output.* Pressure gauge callibration as per plan.* Pressure switch to be provided on machine.
* *Air
pressureLow pressure
Line pressure variation
2.5~3.8 BarPressure gauge
SOS Operator JH sheet* Pressure switch to be provided on machine.* Pressure switch callibration as per plan.
* *Valve
opening time
Opening time less
Timer malfunctioning
To be specified by PED & verified by
Maint.
* To arrive method for valve opening time & check point to be added in m/c TBM.
* *Valve
opening distance
Distance lessPressure
regulator error
To be specified by PED & verified by
Maint.
* Check point added in TBM for regulator output.* Pressure gauge callibration as per plan.* Pressure switch to be provided on machine.
* *Home
position sensor
Home position sensor
disturbed
Home position sensor mounting
loose
Sensor to match the marking line
Visual SOS Operator SOP
* Check point to be added in TBM check sheet.* Check point to be added in JH check sheet to confirm home position.
* *Adhesive
lay patternPattern shrink Timer belt slip
Pattern as per master pattern
Visual SOS Operator SOP* Check point to be added in JH check sheet for pattern lay.* Add timer belt in TBM part's calander.
2Passivaion removal
Passivatiov partially removed
* *Buffing time
Time lessTimer
malfunctioning8 Seconds Timer 100% Operator SOP
* Buzzer provided to prevent early removal of yoke & interlocked with next cycle
* *Input
voltageVoltage low
Variation in input voltage 225±25 Volt Voltmeter 100% Operator SOP
* Stabaliser to be provided with magnetizer to maintain reqd input voltage.* Calibration of voltmeter
* *Coil
ResistanceResistance
lowCoil short 8 .0 +/- 1.0 ohm Multimeter
1/3 months
Maintenance
TBM check sheet
* magnetizer coil PM as per TBM plan.
Less removal of passivation
* *Passivation removal
Less removal of passivation
Early removal of yoke from buffing m/c
Passivation removal time 8 sec.
Timer 100% Operator SOP*Buzzer provided to prevent early removal of yoke & interlocked with next cycle
Less removal of passivation
* *Buffing pad change frequency
Non removal of passivation
Excess usage of buffing pad
replace after every 30 cycles
counter1/30 cycles
Operator SOP* Counter interlocked with m/c.* Check point added in JH check sheet.
Foreign particles in yoke I.D
* *Yoke ID cleanliness
Foreign particles in yoke ID
Buffing dust inside yoke ID
Yoke ID should be clean
Visual 100% Operator SOP* Yoke ID cleaning with cotton cloth check point added in SOP.
1
3
4
Pre-magnetization
clamping force not enough
Passivation removal
Anabond qty more
Anabond qty less
Anabond pattern shift
Anabond application
RECORD/ DOCUMENT
ACTION TAKENCRITERIA
(Specification) CHECKING METHOD
FREQ. RESP.
DEFECT TYPE
CONTROL ITEM
ABNORMALITYCAUSE OF
ABNORMALITYSr No
MACHINE / STAGE NAME
DEFECT PHENOMENA
4MT CONDITIONS
4M1T Condition Study For Magnet Bonding Process
Review 4M conditions set before and after actions implementation.
Step-8 – Intensification & improvement of checking method
Review QM (Quality Maintenance )Matrix for control items identified to produce non defective itemsPrepare inspection manual for control items, to simplify inspection activityIntroduce control items as check points in JH, PM check sheets for effective monitoring.
Step-9 – Deciding check standard valueStep-10 – Revise standards
Feedback
* DAILY INSPECTION
MP DESIGN
KK
JH
PM
DM
E & T
PM ANALYSIS
KAIZENS
7 STEPS OF JH
Application ofEquipment diagnosis Technology
Fostering proficiency of Employee in Equipment operation & maintenance
Quality Maintenance
EQUIPMENT: NOT PRODUCING QUALITYDEFECT
SETTING OF CONDITIONS (Decide Rightly)
CONDITION MANAGEMENT (Follow Strictly)
ACCOMPLISH ZERO DEFECTS
Relationship between the pillars of TPM activities and Quality maintenance