Kelkan Contracting Ltd.
Quality Manual ISO 9001:2008
This manual describes the process of quality insurance of products and specialized services of
Kelkan Contracting Limited (Kelkan), which complies with the ISO 9001:2008 standard and the
process of implement the quality management system.
Quality Management System
ISO 9001:2008 Quality Manual
Version No. 00 Revision No. 2 Date October 2014 Code QM-422-M00 Page 2 of 44
Preparation and Approval This manual prepared by the Quality Management System (QMS) committee of Kelkan
Contracting Limited.
Intellectual Property
All documents and information contained in this manual are the property of Kelkan
Contracting Ltd. and cannot be used, reproduced in whole or in part, without the written
consent from the Managing Director.
Prepared by QMS Committee and Wael Jasim Muhammad.
Prepared by
QMS committee
Reviewed by Management
Representative
Approved by Managing Director
Signature
Name Eng. Wael Jasim
Muhammad
Post QMS coordinator
Date
Quality Management System
ISO 9001:2008 Quality Manual
Version No. 00 Revision No. 2 Date October 2014 Code QM-422-M00 Page 3 of 44
Distribution List
No. A hard copy of this manual submit to Type of copy
1 Managing Director
Controlled copy 2 Management Representative
3 Quality Management Managers
4 Clients
Non Controlled copy
5 Suppliers
6 Sub-contractors
7 Others as Company CV
8 New employees as training materials
Quality Management System
ISO 9001:2008 Quality Manual
Version No. 00 Revision No. 2 Date October 2014 Code QM-422-M00 Page 4 of 44
Revisions page
Revision
No.
Revision
Date
Revised Item
No. Revision Description
1 19-7-2014 Organizational
chart
Updating the Organizational chart of
departments & jobs also
2 28 /12 /
2014
Organizational
chart
Updating the Organizational chart of departments & jobs also
Adding explanation of QMS system as per ISO 9001:2008
3
4
5
6
7
8
9
10
After 10 Revisions a new version will be Issued
Quality Management System
ISO 9001:2008 Quality Manual
Version No. 00 Revision No. 2 Date October 2014 Code QM-422-M00 Page 5 of 44
Table of Contents
Contents
Revision History Table ............................................................................................................................. 2
Distribution List ....................................................................................................................................... 3
Figures & Table ....................................................................................................................................... 6
Introduction ............................................................................................................................................ 7
Definitions and Terminology ................................................................................................................... 8
Method of establishing and implementing the system: ......................................................................... 8
Components of the Quality Manual .................................................................................................. 9
1. Scope of Quality Management System ..................................................................................... 9
2. Exclusions ................................................................................................................................... 9
3. Purpose ....................................................................................................................................... 9
4. General ....................................................................................................................................... 9
5. Company profile ......................................................................................................................... 9
6. Our Mission Statement ............................................................................................................ 10
7. Regulation ................................................................................................................................. 11
8. Description of quality management system ........................................................................... 11
9. The Organization Charts & Process Map ................................................................................. 12
10. Quality Policy ........................................................................................................................ 17
11. Quality Objectives & KPIs ..................................................................................................... 19
12. Responsibilities, authorities and communication ............................................................... 23
13. Documentation System:- ..................................................................................................... 26
14. Document's Coding System.................................................................................................. 26
15. The Manuals & Procedures of Quality management system ............................................. 27
16. Design & establishment Of the Quality Management System (QMS): .............................. 28
17. References ............................................................................................................................ 44
Quality Management System
ISO 9001:2008 Quality Manual
Version No. 00 Revision No. 2 Date October 2014 Code QM-422-M00 Page 6 of 44
Figures & Table
Figures / Table Title Page No.
Table 1: Contact Addresses and its Related Information. 11
Table 2: Core Processes and its Related Information. 12
Figure 1A: The Organizational Chart of Departments 13
Figure 1B: The Organizational Chart of jobs 14
Figure 2: The Process Map 15
Figure 3: Quality Policy 18
Table 3: Quality Objectives and KPIs 19
Table 4 Matrix of Responsibilities' 24
Figure 4: Documentation Pyramid & Coding system 26
Table 5: List of procedures 27
Quality Management System
ISO 9001:2008 Quality Manual
Version No. 00 Revision No. 2 Date October 2014 Code QM-422-M00 Page 7 of 44
Introduction
Founded in 2004 as a private limited liability company, Kelkan Contracting Limited is
registered and actively working in the Kurdistan Region of Iraq. Kelkan is the leading
company in providing oil services, assisting international oil companies (IOCs) in civil and
earth works, rig site preparation, camp management, catering, fabrication, personnel and
machinery in addition to the supply of provisions and all other sourcing issues.
Kelkan operates throughout the Kurdistan Region and has experience and resources to
operate on rugged and remote terrains. Kelkan has the capability and know-how to
undertake tough assignments and meet clients’ deadlines. Pioneers in their field, Kelkan
has implemented many projects in the region for various international oil companies and
its service partners. Through applying for the ISO certificate and applying the Quality
Management System procedures, Kelkan ensures to satisfy its clients by committing to
applying an international management system. The system will ensure higher satisfaction
level by efficient performance of work related activities in accordance to the specification
(ISO 9001:2008) for the following purposes:
1. Description of the Quality Management System of the company.
2. Assisting the staff to further understand their roles within the organization,
thus giving them an increased sense of the purpose and importance of their
work.
3. Increase the confidence of the clients by increasing the quality of products
and specialized services offered by the company based on a global
documented system.
4. Clearly specifying the requirements for the quality of products and services
provided by suppliers and sub-contractor. Also, by to provide objective
evidence that specified requirements have been achieved.
5. Define the adopted work methods by the company, which will guarantee the
quality of products, specialized services, and the adopted quality policy.
6. Implemented as a profile to introduce the company to clients and as a
training material for new employees.
7. Implemented as a base for continual improvement to ensure continuity of
increasing the quality level of services.
8. Implemented as a basis to check the quality of the products.
9. Implemented as a basis to assess the effectiveness of the quality
management system.
Quality Management System
ISO 9001:2008 Quality Manual
Version No. 00 Revision No. 2 Date October 2014 Code QM-422-M00 Page 8 of 44
Definitions and Terminology
For the purposes of this Manual, the following words have been defined as:
The company: Kelkan contracting Limited.
Quality: is defined as a product's compliance with its design specifications. These
specifications include the customer's requirements and local statutory and regulatory
legislation (ISO 9001:2005)
Quality Management System (QMS): is defined as a system established to ensure
achievement of the quality objectives by the quality policy adopted by top management
in accordance to the requirements of the standard of the standard (ISO 9001:2008).
Method of establishing and implementing the system:
The system has been established by all departments with the supervision of IQDC Company
and Quality Management committee.
Four steps have been taken to implement this system:
1. Gap analysis.
2. Recommending corrective actions which include control methods.
3. Establishment and documentation of the system.
4. Implementing and auditing the system.
Personal meetings have been used for data collection during the gap analysis stage. The
meetings have been organized by IQDC consultants and QMS Committee, the Standard ISO
9001:2008 and the Iraqi local statutory and regulatory legislation have been used as an
assessment criteria to establish the system.
Quality Management System
ISO 9001:2008 Quality Manual
Version No. 00 Revision No. 2 Date October 2014 Code QM-422-M00 Page 9 of 44
Components of the Quality Manual
1. Scope of Quality Management System
The scope includes products, specialized services, and activities, which conforms the requirements of ISO 9001:2008 Standard. 1.1. Oilfield civil works.
1.2. Fabrication & installation.
2. Exclusions
There is no exclusions.
3. Purpose
The purpose of this Quality Manual is to define the Quality management System in
its entirety for Kelkan Contracting limited.
4. General
This Quality Manual addresses the requirements of the ISO 9001 Standard. All
reference to the ISO 9001 Standard forward shall be considered as the current
revision of the ISO 9001 Standard. The Quality Manual defines the Quality
Management System as it applies to Kelkan Contracting limited.
5. Company profile
Kelkan Contracting Limited was formed in 2004 as a private limited liability company,
registered and actively working in the Kurdistan Region of Iraq (KRG). Kelkan is a leading
company in providing oil field services within the KRG and has proven itself to be an
outstanding example in its field. Kelkan is an experts contracting, assisting international
oil companies (IOCs) in civil and earth works, camp management, construction, providing
qualified personnel and supplying reliable machinery in addition to the supply of
provisions and all other sourcing issues.
Kelkan operates throughout the Kurdistan Region and has experience and resources to
operate on rugged terrains as well as the capability and know-how to undertake tough
assignments and meet client's deadlines. Pioneers in their field, Kelkan has implemented
many projects in the region for various international oil companies and it has successfully
supplied many internationally recognized oil and gas companies with construction
services in site preparation, access road construction and camp construction.
Kelkan staff are fully trained and experienced to work along with international companies
and adhere to HSE standards in the oil and gas sector. Kelkan is a local company that has
the advantage of experience and locality that adds to its’ expertise in cultural customs
Quality Management System
ISO 9001:2008 Quality Manual
Version No. 00 Revision No. 2 Date October 2014 Code QM-422-M00 Page 10 of 44
and sensitivities when it comes to assisting clients with local issues and communal
relationships.
6. Our Mission Statement
Kelkan Contracting Limited “Kelkan “is wholly customer and service focused. We work
closely with our clients to fully understand their business, their objectives and their
expectations in order to provide optimum value and support. The company is
committed to surpassing the highest of expectations, working within an environment of
continuous improvement and allied with a total appreciation of the criticality of
compliance in every aspect of our day to day business.
Behind every contract, supply chain solution, communication and rapport with our
client is at the core of our policy. Whether we are managing the entire supply chain or
offering a specialized service, our ability to listen and learn before taking action is what
makes our employee’s partners in your business which makes our solutions more
effective and long lasting.
The energy sector has unique and pressing construction, civil, mechanical, electrical,
and logistical requirements. Kelkan recognizes the need to keep the vital components
flowing to maintain production and operations around the region.
As our customer you can be absolutely confident that your project is always managed in
a professional and timely manner. Our experienced operations team will do everything
necessary to make sure the time schedule of the project is strictly followed, quality
management is up to the international standard, all necessary procedures are in place
for environmental and safety requirements and the necessary personnel, material and
equipment are on site and on time.
As the energy sector expands in our region, our company has an extensive network of
partners throughout the country with whom we look forward to being of service to you
as a generic local service provider. With this combined strength and our long-standing
network relationships, we are now poised to enter a paradigm of excellence, becoming
the strongest regional player in Kurdistan Region of Iraq, providing full-featured
construction, electrical , mechanical and logistical solutions on a single point of contact
by upholding our motto “Local Knowledge, International Standards”..
Quality Management System
ISO 9001:2008 Quality Manual
Version No. 00 Revision No. 2 Date October 2014 Code QM-422-M00 Page 11 of 44
Table 1: Contact Addresses and Its Related Information
7. Regulation
7-1 Control
Any changes and/or distribution of this Quality Manual are controlled and approved by
the management representative.
7-2 Distribution
This Quality Manual is a controlled document (see Distribution List, page 2). There are
hard copies created for reference, or temporary distribution, but the only the controlled
copy is maintained in the database containing QMS Procedures and Work Instructions.
Distribution of Quality Manuals is subject to approval of management representative.
7-3 Revisions
Requests for changes to this Quality Manual can be submitted by any department. Each
Request for Change must be submitted to management representative. Revisions to the
Quality Manual are at the discretion of the management representative and tracked by
use of the Quality Manual (revision history table, page 4).
8. Description of quality management system
The core process of the system is shown in the table below. These processes and their
related clients, input and output is highlighted in table 1. However, the system is a bit
more complicated than how it is indicated. There are more processes. Those processes
and the interaction between them are addressed in figure 1.
Address and Contact Information
Sulaymaniyah Office House 4, Street 6, Baxtiary District 111 Sulaymaniyah, Kurdistan Region of Iraq.
E-mail [email protected]
Website http://www.kelkan.com
Phone +9647707706661
Contact for tenders [email protected]
Contact for services [email protected]
Quality Management System
ISO 9001:2008 Quality Manual
Version No. 00 Revision No. 2 Date October 2014 Code QM-422-M00 Page 12 of 44
Clients Input Core processes Output
Oil and Gas sector companies
Clients’ requests.
1- Civil Works. 2- Fabrication.
Satisfied Client: Products manufactured & services supplied exactly according to client requirements and statutory and regulatory legislation, supplied in right time to the right place.
Table 2: Core Processes and its Related Information
9. The Organization Charts & Process Map
The organization chart of Kelkan Contracting Limited, Figure 1 A, is based on several
management levels starting from top level where it is represented by the Managing
Director, second level is the departments, third is the sections and then the units in forth
level.
While Figure 1 A describe the organization chart of managements, Figure 1 B describes
the organization chart of jobs.
The Process Map demonstrates the interaction methods of the departments to complete
the client's request and how to gain their satisfaction. It has been created through the
Organizational Chart and from the perspective of quality management system (ISO 9001).
It starts from reception of the client's request and ends with after sales services as shown
in Figure 2.
Quality Management System
ISO 9001:2008 Quality Manual
Version No. 00 Revision No. 2 Date October 2014 Code QM-422-M00 Page 13 of 44
Commercial
Department
HSE
Department
Finance
Department
Civil &
Construction
Department
HSE Clinic
section
HSE
section
IT section
HR
Department
Project
section
Construction
Deputy
site
engineers
unit
Camps
coordinators
section
Business
development &
Client Relations
Dep.
Logistic
section
QM
Department
Fabrication
section
Installation &
general
maintenance
section
Bazyan Supply
Base (BSB)
HSE (BSB)
section
Supply Chain Department
warehouse
section
Buyers
Legal unit
Design
section
Camps
Operation
Department
Camps
bosses
units
QC section
Managing
Director
Community
relations
section
Auditing
section
Data analyst &
Documents
controller
Commercial
Deputy
Head of
Camps
coordinators
Guards Receptionist
Equipment's &
generators
Maintenance
supervisor
Figure 1 A: Organizational Chart of managements
Quality Management System
ISO 9001:2008 Quality Manual
Version No. 00 Revision No. 2 Date October 2014 Code QM-422-M00 Page 14 of 44
Commercial
Manager *
HSE
Manager
Finance
Manager
Civil &
Construction
Manager
Paramedic
HSE
supervisors
IT supervisor
HR
Manager
Projects
Managers
Construction
Deputy
sites
engineers
Camps
coordinators
Business
development &
Client Relations
Manager
Logistic
Coordinator
QM Manager
Fabrication
supervisor
Installation &
general
maintenance
supervisor
Bazyan Supply
Base (BSB)
Manager
Supply Chain Manager
warehouse
supervisor
Lawyer
Design
supervisor
Camps
Operation
Manager
Camps
bosses
Managing
Director
Auditors
Head of
auditors
Data analyst
& documents
controller
Receptionist
Cleaners
Buyers
Helper
Painter
Carpenter
Supervisor
assistant
Fabricator
assistant
Fabricator
Welder
A.C
technician
Labor
Electrician
Plumber
Guards
Receptionist
Foremans Surveyors
Labours
Ca
mp
m
ain
ten
an
ce
team
Laundry operator
Generator Operator
Camp Boss
Assistant / Admin
Chef
Chef Assistant
Cleaners
Tenders
Processors
Commercial
Assistant
Tenders
Processors
QC
engineer
QC
supervisor
Commercial
Deputy
Projects
warehouse
keepers
Community
relations
coordinators
Head of
Camps
coordinators
Financial
controller
Accounts Receivable
Clerk
Accounts Payable
ClerkCashier
Accounts Payable Auditor
Accounts Receivable supervisor
Cash Book Supervisor
Accounts Payable
supervisor
Equipment's
& generators
Maintenance
supervisor
Wireman
Assist Mechanic
Mechanical technician
Mechanical Engineer
Admin
Operators
Equipment Generators
Wireman
Assist Mechanic
Mechanical technician
Mechanical Engineer
Operators
* Management Representative
Figure 2 B: Organizational Chart of Jobs
Quality Management System
ISO 9001:2008 Quality Manual
Version No. 00 Revision No. 2 Date October 2014 Code QM-422-M00 Page 15 of 44
final inspection
& monitoring
Cli
en
t's R
eq
uir
em
en
ts
Clie
nts
satis
factio
n
Managing Director
Management Representative
Control of
Records
Control of
Document Internal Audit
Monitoring and
measurement of
processes
Control of
nonconforming
product
Analysis of dataCorrective
action
Preventive
actionQMS
Rec
eip
t a
nd
id
en
tifi
cati
on
of
cu
sto
me
r re
qu
ire
me
nts
Rev
iew
th
e
Clie
nt'
s
req
uir
em
en
ts
Pla
nn
ing
of
pro
du
ct
rea
liza
tio
n
Civil &
construction
Warehouses
Design and
development
supplying
of material
Co
ntr
act
wit
h t
he
cli
en
t
Activities of Monitoring and Measuring
Maintenance Activities
Final
product
&
service
Storage
/ supply
Ensure of the quality
Co
mp
leti
on
Tic
ket
Rec
eip
t o
f d
ue
s
fro
m t
he
cli
en
ts
HSEFinancial
Issues
Human
Resources
Information
Technology
Planning and
Follow-up
No
yes
Clients feedback
Co
nta
ct
the
Clien
ts
Clien
ts
req
uir
em
en
ts
inspection &
monitoring
of the Activities
Construction
Activities
Fabrication
&
installation
Fabrication
& installation
Activities
Management Review
Inspection
of materials
Commercial
activities
Figure 2: The Process Map
Quality Management System
ISO 9001:2008 Quality Manual
Version No. 00 Revision No. 2 Date October 2014 Code QM-422-M00 Page 16 of 44
The Process Map
Figure 2 above highlights the process map of Kelkan Contracting Limited. There are two kind
of processes: core processes and supporting processes. The Core process is the process which
should be done in order to produce a physical product, or provides the specialized services.
The supporting process is the assurance that client requirements are being fulfilled.
Since all of the products and services of Kelkan provides are requested by the client, thus the
process starts when the company receives a request from a client. The requests and enquiries
is received by Business Development & Client Relations Department. The requests shall
include the client’s requirements (technical information, properties, quantities, timing,
delivery these conditions, etc.).
The Business Development & Client Relations Department will then forward the details to the
related departments (e.g. Civil & Construction Department, Camps Department, Bazyan
Supply Base, or HSE Department) for a review of the request information, analyzing, and
converting it to the department’s specifications. After the department has reviewed the
details to ensure that the company has the capability in providing the required products
and/or services in the requested quantity, a time schedule will be generated for the required
specification. Then, through the planning of product realization, the request will be reviewed
and the decision will be made based on the Company’s capability to perform the work. The
information is then returned to Business Development & Client Relations Department. If the
company cannot implement the client requested services or products, then alternatives will
be suggested; such as a longer implementation time or different method for providing the
service.
Upon an agreement between the two parties, a contract will be signed between the company
and the client through either a tendering process or purchase orders. The contract will include
a technical section, or annex, containing all the technical details, specifications, quantities,
and time schedule of the work required. The contract or the technical annex of the contract
will be sent to the related departments for implementation and follow-up. If there is a need
for design to implementation, the contract, or a part of it, will be designed, reviewed, and
approved, to match the client requirements. The design will be sent with an implementation
plan, which will be planned by planning department, to related departments to start
implementation.
While the implementation process is running, the Quality Control department will carry out
continual inspections and tests on incoming materials, process activates, final product, and
services to ensure the defined specifications are met. In the meantime, the planning
department will be performing regular follow up on the progress of the implementation
process based on the certifications of completion issued by the Quality Control Department.
Quality Management System
ISO 9001:2008 Quality Manual
Version No. 00 Revision No. 2 Date October 2014 Code QM-422-M00 Page 17 of 44
While the implementation process is finished or at a stage described as per contract
condition, the Planning Department will informs Business Development & Client Relations
department to notify the client regarding the payment of financial dues.
The client satisfaction survey will be submitted at the end or during implementation process
of each contract. The QMS committee, Management Representative, Managing Director will
keep the implementation of the quality management system under control by programed
internal auditing and by the decisions of management review meetings. Furthermore, the
performance of the supporting departments will provide support to the QMS by providing
training and human resources, information technology, and financial issues related to clients.
For more information about the implemented procedure, please refer to procedures manual
(PM-00).
10. Quality Policy
The Quality policy was prepared by QMS committee, reviewed by management
representative and approved by the Managing Director, and distributed to all departments of
the company.
The Quality Policy (QPo) of KELKAN Contracting Limited is based on three basic concepts: (CIC)
Commitment to providing suitable quality of products and services to meet our
clients' requirements and exceed their expectations.
Implementation and continual Improvement of the Quality Management System
according to the standard ISO 9001:2008, to ensure client satisfaction. &
reviewing of quality objectives.
Compliance with local statutory and regulatory legislation related with company
work.
Hiwa Talabani - Managing Director
___________________________
February 9, 2014
Quality Management System
ISO 9001:2008 Quality Manual
Version No. 00 Revision No. 2 Date October 2014 Code QM-422-M00 Page 18 of 44
Figure 3: Quality Policy
Quality Management System
ISO 9001:2008 Quality Manual
Version No. 00 Revision No. 2 Date October 2014 Code QM-422-M00 Page 19 of 44
11. Quality Objectives & KPIs
The quality objectives of Kelkan contracting Ltd. Are shown in below tables:
Goal Satisfying our clients or exceed their expectations.
Aim(s) 1- Provide the product or service within the required time to the requested place as per required specifications 2- Respect all of our client & dealing with them in a professional manner.
The quality objectives of departments, KPIs, inputs, outputs & resources.
# Department Goal Target of the 1st half of
2015 KPIs Inputs Outputs Recourses ***
1
QM department
1. Ensure continuous application of Quality Management System
(ISO 9001:2008) and verify its effectiveness.
2. Ensure achievement of company objectives in accordance with company quality policy.
Achieve average clients' satisfaction not less than 70% by the end of 2014.
{∑ All clients satisfaction ÷ Clients No.} ≥ 70 %
1- Auditing reports 2- Clients feedback 3- Corrective action
requests 4- Preventive action
requests
1- Satisfy clients 2- Efficient
system. 3- Continual
improvement
1- The standards ISO 9001:2008
2- Kelkan QMS
3- Internal auditors
Client's complaints should not exceed 3% of the total enquiries received in the 2nd half of 2014.
{(∑ clients complaints ÷ Contract No.) *100 % } ≤ 3%
Achieve max. 5% of client complaint due to product technical specifications.
{(Σ client complaint due to product technical specifications ÷ total No. of client complaint) *100% } ≤ 5%
QC section
Implements accurate inspection and tests and ensures those tests are completed on time.
80% of the finished products & incoming materials should be inspected.
{(Σ inspected finished products & incoming materials ÷ total No. of finished products &
1-products to be tested
2- measuring tool to be calibrated
1- Test reports & certifications
2- Calibrated measuring tool
1- Design specification &acceptance criteria
Quality Management System
ISO 9001:2008 Quality Manual
Version No. 00 Revision No. 2 Date October 2014 Code QM-422-M00 Page 20 of 44
incoming materials) *100% } ≥ 80%
2- Measuring Tools & equipment
2 Civil &
construction dept.
Estimate the correct time that ensures the delivery of products according to the required specification at the right time to the right place.
Achieve minimum 85 % of implementation of the plans.
{(∑ implementation in time ÷ total implemented planned) *100 % } ≥ 85 %
Client request for civil project
completed civil project as per
required specification &
time
1-Contracts / Scope of work.
2- Time schedule
3-Civil Machineries
increase meeting the clients’ deadlines
Increase 10 % in the target of meeting the clients’ deadlines and time schedule.
{1-(∑ No. project in time in 1st half of 2014 ÷ ∑ No. project in time in 2nd half of 2014) *100% } ≥ 20%
High response to client enquiries
Achieve of 0% error in contracts & quotations
details.
No Client's complaints regarding to contracts or quotations
3 Camp
department
Provide the products & services according to plans
Achieve 90% of fabrication &
installation plans in time and as per the
required specifications.
{(∑ No. services in time in & as per required specifications ÷ total No. of services ) *100% } ≥ 90%
Client request for camp of fabricated
units
Finished camp as per required specification
1-Contract / Scope of work.
2- Time schedule
4 BSB /
fabrication section
Supply a products and services to clients as per required specification, in time, at competitive prices.
Achieve 90% of the production plans in time and as per the required
specifications.
{(∑ No. products in time in & as per required specifications ÷ total No. of products ) *100% } ≥ 90%
Client request for fabricated product
Finished product as per required specification, quantity & time
1-Contract / Scope of work. 2- Time schedule 3- Machines & tools
Quality Management System
ISO 9001:2008 Quality Manual
Version No. 00 Revision No. 2 Date October 2014 Code QM-422-M00 Page 21 of 44
5
Business development & client
relation Department
Ensure of fully understanding of client needs & requirements and convert it to specific clear specifications with a quick response to him.
Achieve max. 5% defects in the finished products due to design.
{(∑ defects due to design ÷ total design done) *100 % } ≤ 5 %
1-All client requests 2-Clients feedback
1-Satisfy clients 2-Business development report
1-Client specification
2- analyze data of client's feedback
6 Design section
Achieve 0% of Client's complaints regarding to design.
No Client's complaints Client requirements
Design drawings covers Client requirements as a clear specifications
Design software
7 Commercial Department
Ensure correct tendering processes in a competitive prices.
Achieve 100% accuracy in tenders details
No Client's complaints Offers / tenders Priced & approved
Offers / Quotations
Local materials
prices
8 Supply chain
Department
Supplying, storage & handling the required materials to the required places at the right time in the required quantity & quality in a suitable price.
90% of requested materials should be delivered to the required place at the required time.
{(∑ correct delivery ÷ total delivery) * 100 %} ≥ 90%
Materials requests
Supplied materials as per
required specification,
quantities, time & location.
1- Local material suppliers
2- Financial budget
3- Warehouse
70% of All purchases to be done from approved suppliers
{(∑ purchases from approved suppliers ÷ total purchases) * 100 %} ≥ 70%
Not more than 5 % of materials defects during storage and handling
{(∑ defects during storage & handling ÷ total stored of this material *100% } ≤ 5 %
9
HR
Recruit appropriate personnel for jobs and increasing their skills by training & awareness.
Achieve minimum average 60% improvement in employees' efficiency after training.
{(∑ improvement percentages of Trainees ÷ Trainees No.) *100 % } ≥ 60 %
1-Staff request 2-Training
requirements
1- Recruitment of staff as per required qualifications
1- Staff jobs description
2- Training plan
Quality Management System
ISO 9001:2008 Quality Manual
Version No. 00 Revision No. 2 Date October 2014 Code QM-422-M00 Page 22 of 44
Minimum 10 % of employees' shall get training in a year.
{(∑ Trainees No. ÷ No. employees') *100 % } ≥ 10 %
2- Enhance staff efficiency by training
3- Training budget
10
BSB / Equipment
maintenance section
Ensure maintaining company
infrastructure in good condition able to
provide products & services in required
specifications.
Implement minimum 80 % of Preventive
maintenance as per schedule.
{(∑ implemented maintenance actions ÷ planned maintenance actions) *100 % } ≥ 80 %
machineries & generators to be
maintained
maintained machineries &
generators
1- Catalogs 2- Spear parts 3- Tools &
equipment
11
BSB / Installation &
general maintenance
section
1. Installation of the fabricated units as per client requirements according to schedule.
2. Ensure maintaining company infrastructure in good condition able to provide products & services in required specifications.
Implement minimum 80 % of Installation works
as per schedule.
{(∑ implemented Installation actions ÷ planned Installation
actions) *100 % } ≥ 80 %
1- Installation plan & fabricated units
2- Maintenance request for company infrastructure
1- Installed camps.
2- Maintained infrastructure
1- Machineries 2- Tools &
equipment 3- Action plan
for installation
12 IT
Ensure maintaining company infrastructure (computers, printers, networks, emails & backup the departments’ data.) in good condition able to provide products &
1-Implement minimum 80 % of IT maintenance requests in time.
2- Achieve 100% of data
backup for
1- {(∑ implemented IT maintenance requests ÷ total IT maintenance requests) *100 %} ≥ 80% (of the same period)
2- All backup activity for department managers
1. IT maintenance request
2. Data for Backup
1. Maintained IT hardware
2. Backup data
1. IT hardware
2. IT software
3. Company server
Quality Management System
ISO 9001:2008 Quality Manual
Version No. 00 Revision No. 2 Date October 2014 Code QM-422-M00 Page 23 of 44
services in required specifications & ensure of updating and keeping of the soft documents.
department managers in time.
data implement in time.
13 HSE
provide a management strategy to effectively manage Health and Safety
Implement minimum 90% of HSE plans (Implement plans ÷ all
plans ) *100% ≥ 90 % HSE requirements
Safe work environment
HSE manual
14 Finance
department
Increase company turnover
by 30% for the second half of 2014
{(Turnover of 2nd half ÷Turnover of 1st half)-1} *100 % ≥ 30 %
Budget financial
statements Quick box software
*** Human resources & hardware are parts of resources for all departments.
Table 3 – The quality objectives
12. Responsibilities, authorities and communication
12-1 Responsibilities & authorities are defined individually for the employees in their jobs description (ReC-621-F02) within the HR system and based on the company organizational chart of jobs chart (Figure 4 B).
12-2 Company email accounts are the main source of communication. Also, the QMS forms are to be used between sections, departments, or to top management.
12-3 While the Responsibilities of the departments, and other activities, toward QMS are defined in the Matrix of Responsibilities (table 4).
Quality Management System
ISO 9001:2008 Quality Manual
Version No. 00 Revision No. 2 Date October 2014 Code QM-422-M00 Page 24 of 44
Matrix of Responsibilities'
ISO 9001:2008 Standard Requirements (as per clauses)
Man
agin
g D
irec
tor
QM
dep
artm
ent
HSE
dep
artm
ent
Co
mm
erci
al
dep
artm
ent
Cam
ps
dep
artm
ent
HR
dep
artm
ent
Civ
il &
C
on
stru
ctio
n D
ep.
Bu
sin
ess
dev
elo
pm
ent
Dep
.
Baz
yan
Su
pp
ly B
ase
(BSB
)
Sup
ply
Ch
ain
dep
artm
ent
Des
ign
sec
tio
n
Qu
alit
y C
on
tro
l se
ctio
n
Mai
nte
nan
ce
sect
ion
s
IT s
ect
ion
4.1 General requirements XX XX X X X X X X X X X X X X
4.2 Documentation requirements XX XX X X X X X X X X X X X X
4.2.2 Quality Manual XX XX
4.2.3 Control of Documents X XX X X X X X X X X X X X X
4.2.4 Control of Records X XX X X X X X X X X X X X X
5.1 Management Commitment XX X X X X X X X X X X X X X
5.2 Customer focus X XX X XX XX X XX XX XX X X X X X
5.3 Quality policy XX X X X X X X X X X X X X X
5.4 .1 Planning (Quality objectives) XX X X X X X X X X X X X X X
5.4 .2 QMS Planning XX X X X X X X X X X X X X X
5.5 Responsibility, authority and communication XX X X X X X X X X X X X X X
5.6 Management review XX X X X X X X
6.1 Provision of resources XX X X XX XX XX XX X XX XX X X X X
6.2 Human resources X X X X X XX X X X X X X X X
6.3 Infrastructure XX X X X X X X X X X X X XX X
6.4 Work environment XX X XX X X X X X X X X X X X
7.1 Planning of product realization X X X X X X X XX X X XX X
7.2 Customer-related processes X X X X XX X XX XX XX X XX X X
7.3 Design and development X X X X X X X X X XX X
Quality Management System
ISO 9001:2008 Quality Manual
Version No. 00 Revision No. 2 Date October 2014 Code QM-422-M00 Page 25 of 44
7.4 Purchasing X X X X X X X X X XX X X X X
7.5.1 Control of production and service
provision X X X XX X XX XX XX X XX XX X
7.5.3 Identification and traceability X X X X X X XX XX X X X
7.5.4 Customer property X X X X X X X XX X X X X
7.5.5 Preservation of product XX XX
7.6 Control of monitoring and measuring equip. X XX XX XX XX
8.1 General X XX XX
8.2.2 Internal audit X XX X X X X X X X X X X X X
8.2.3 Monitoring and measurement of processes X X X X X
8.2.4 Monitoring and measurement of product XX
8.3 Control of nonconforming product X X XX
8.4 Analysis of data X XX
8.5.1 Continual improvement X X X X X X X X X X X X X
8.5.2 Corrective action X XX X X X X X X X X X X X X
8.5.3 Preventive action X XX X X X X X X X X X X X X
XX: Major Responsibility. X : Shared Responsibility.
Table 4 Matrix of Responsibilities'
Quality Management System
ISO 9001:2008 Quality Manual
Version No. 00 Revision No. 2 Date October 2014 Code QM-422-M00 Page 26 of 44
13. Documentation System:-
The figure 5 explain the Documentation System of QMS
Figure 4 – Documentation Pyramid
14. Document's Coding System
Aaa-111-A00
Abbreviated document name
Refer to Clause No.
Of
ISO 9001:2008
M manuals 00 P Procedure 01, 02, etc. W Work Instruction 01, 02, etc. F Forms 01, 02, etc. R Records 01, 02, etc.
L List 01, 02, etc. C Chart S Sheet
Quality Management System
ISO 9001:2008 Quality Manual
Version No. 00 Revision No. 2 Date October 2014 Code QM-422-M00 Page 27 of 44
15. The Manuals & Procedures of Quality management system
The company has established two manuals & 26 procedures to control all the processes that are highlighted in the process map. List of procedures is addressed in table 5, and detailed explanation is indicated in Procedures & Work Instructions Manual (PWI-Req-M00).
# Manual name Clauses (code)
1 Quality Manual 4-2-2 QM-422-M00
2 Procedures & Work Instructions Manual QMS Requirements PWI-Req-M00
Table 5 - List of Procedures
# Document Name Clauses Code
1 Document Control procedure 4-2-3 Control of documents DoC-423-P01
2 Records Control procedure 4-2-4 Control of records ReC-424-P02
3 Management review procedure 5-6 Management review MRv-65-P03
4 Recruitment Procedure 6-2-1 Human resources/General Rec-621-P04
5 Competence training and awareness Procedure
6-2-2 Competence, training and awareness
CTA-622-P05
6 Information technology procedure 6-3 Infrastructure IT-63-P06
7 Maintenance Work Instruction 6-3 Infrastructure Man-63-W01
8 HSE 6-4 Work environment HSE manual (HSE-
SMSM-001)
9 Procedure of planning & follow up of civil & construction projects
7-1 Planning of product realization
Pln1-71-P09
10 Procedure of planning & follow up the fabrication & installation activities
7-1 Planning of product realization
Pln2-71-P10
11 Procedure of processing clients' request 7-2 Customer-related processes Bus-72-P11
12 Design and development Procedure 7-3 Design and development Des-73-P012
13 Purchasing Procedure 7-4 Purchasing Pur-74-P13
14 Procedure of Control the activities of Civil & construction
7-5-1 Control of production and service provision
Cons-751-P14
15 Procedure of Control the activities of fabrication & installation
7-5-1 Control of production and service provision
Fab-751-P15
16 Identification and traceability procedure 7-5-3 Identification and traceability Idn-753-P16
17 Procedure of clients property 7-5-4 Customer property CPro-754-P17
18 Procedure of storage and handling of materials
7-5-5 Preservation of product SHM-755-P18
Calibration 7-6 Control of monitoring and measuring equipment
It has been included within QC procedure
19 Client satisfaction Procedure 8-2-1 Customer satisfaction CLSa-821-P19
20 Internal Auditing procedure 8-2-2 Internal audit Aud-822-P20
Monitoring and measurement of processes
8-2-3 Monitoring and measurement of processes
It has been covered with in QMS
21 Quality Control Procedure 8-2-4 Monitoring and measurement of product
QC-824-P21
22 Procedure of Control of nonconformity cases
8-3 Control of nonconforming product
NPro-83-P22
23 Data analyzing Procedure 8-4 Analysis of data DaAn-84-P21
24 Continual improvement procedure 8-5-1 Continual improvement CoIm-851-P23
25 Corrective action procedure 8-5-2 Corrective action CorA-852-P25
26 Preventive Actions Procedure 8-5-3 Preventive action PreA-853-P26
Quality Management System
ISO 9001:2008 Quality Manual
Version No. 00 Revision No. 2 Date October 2014 Code QM-422-M00 Page 28 of 44
16. Design & establishment Of the Quality Management System (QMS):
QMS of Kelkan Contracting Limited has been designed with accordance of the clauses of
(ISO 9001:2008) as follows:
16-1 (Clause 4) Quality Management System
The company (Kelkan Contracting Limited) has established documented and implemented
a Quality Management System (QMS) in accordance with the requirements of ISO
9001:2008. The system is maintained and continually improved through the quality policy,
Key performance indicators, audit results, analysis of data, corrective and preventive
actions and management reviews.
To design and implement the QMS Kelkan Contracting Limited has:
• Identified the processes needed for the QMS and their application throughout the
company and documented them in the Process Map (figure 2) in this Quality Manual.
• Determined the sequence and interaction of these processes, and clarify them in the
Process Map.
• Determined the criteria and methods needed to ensure that the operation and control
of the processes are effective.
• Ensured the continuing availability of resources and information necessary to achieve
planned results and continual improvement of these processes.
• Established systems to monitor, measure and analyze these processes, and
• Established processes to identify and implement actions necessary to achieve planned
results and continual improvement of these processes.
Related Documents:
The Process Map (figure 2) in this manual.
Procedures & Work Instructions Manual (PWI-Req-M00).
Quality Management System
ISO 9001:2008 Quality Manual
Version No. 00 Revision No. 2 Date October 2014 Code QM-422-M00 Page 29 of 44
16-2 (Clause 5) Management responsibility
5.1 Management Commitment
Managing Director and Management Representative have been actively involved in
implementing the Quality Management System (QMS). They has provided the vision and
strategic direction for the growth of the QMS and established the key performance
indicators and the quality policy. To continue leadership and show commitment to the
improvement of the QMS, the Top Management commitment of meeting the requirements
of clients, statutory, and regulatory by:
Identify the quality objectives & related KPIs.
Identify the quality policy
Implement management review meetings.
Ensure the availability of resources.
(Clause 5.2) Customer Focus
To identify the clients’ needs to meet their requirements and exceed their expectations, to
enhance their satisfaction, Managing Director and Management Representative ensures
that clients requirements were fully understood, determined, converted into clear
specifications and then has been met.
(Clause 5.3) Quality Policy
Top Management ensures that the quality policy has been published in all company offices
& locations & it has been clear to all employees by awareness. The Quality Policy has been
designed in a shape of three circles based on three bases of company policy. Top
Management reviews the quality Policy in each management review meeting to determine
the policy’s suitability to company vision.
Related documents:
Item 10 in this manual.
Figure 3 in this manual: Quality Policy.
(Clause 5.4) Planning
5.4.1 Quality Objectives
The measurable Quality Objectives with their related KPIs has been determined to each
department in the company, it has been mentioned in this Quality manual, & the objectives
has been published to related departments as a support in achieving their Quality
Quality Management System
ISO 9001:2008 Quality Manual
Version No. 00 Revision No. 2 Date October 2014 Code QM-422-M00 Page 30 of 44
Objectives. A bi annually reviewed will be done to ensure of its suitability during
management review meeting.
Related documents:
Table 3 in this manual – The quality objectives
5.4.2 Quality Management System Planning
The quality system has been planned and implemented to meet the quality objectives and
the requirements of 4.1 of the ISO 9001:2008 standard. Quality planning takes place when
changes that affect the quality system are planned and implemented.
5.5 Responsibility, Authority and Communication
An organizational chart has been established to show the interrelation of personnel in the
company. Two of organizational chart has been established, the first one is the
organizational chart of departments to explain the relation connection of company
departments, while the second organizational chart was for jobs to explain the connections
of all job titles with company departments. The Job descriptions define the responsibilities,
authorities, minimum required qualification and communications for each job title. Job
descriptions and the organization charts are reviewed and approved by the Top
Management for adequacy. These documents are available throughout the company to help
employees understand responsibilities, authorities & communications.
5.6 Management Representative
Management Representative has been appointed by Managing Director. Management
Representative has the following responsibility and authority:
Ensure that processes needed for the quality management system are established and
implemented.
Report to the top management on the performance of the quality management system
and the needs for improvements
Promote awareness of client requirements throughout the company
Act as a liaison with external parties such as clients or auditors on matters relating to the
QMS.
5.7 Internal Communication
Processes are established for communication within the organization. Methods of
communicating the effectiveness of the QMS include department and management
meetings, management review, circulation of minutes of management review meetings,
Internal Audit Closing meetings, and other routine business communication.
Quality Management System
ISO 9001:2008 Quality Manual
Version No. 00 Revision No. 2 Date October 2014 Code QM-422-M00 Page 31 of 44
5.8 Management Review
5.8.1 General
Top management reviews the QMS every 6 months at management review meetings. This
review assesses the continuity of QMS, suitability, adequacy and effectiveness, identifying
opportunities for improvements and needs for changes. Records are maintained for each
management review meeting
5.8.2 Review Input
Assessment of the QMS is based on a reviewing of the input's information for management
review. These inputs include the following:
Result of audits.
Client’s feedback.
Supplier’s evaluation.
Training activities.
Decisions of the previous management review meeting.
Process performance and product conformity.
Status of correction and preventive actions.
Recommendations for improvements submitted to top management.
Follow-up actions that could affect the quality management system are discussed
and noted in management review.
5.8.3 Review Output
During the management review meetings appropriate actions to be taken in regarding of
the following issues:
Find solutions to cases of nonconformity, how to preventing their repetition in the
future and follow-up implementation of these actions.
Discuss and adopt decisions according to recommendations of management
representative & previous management review meeting.
Review / Approval training programs to develop staff efficiency when deeded.
Review and amendment of Quality Policy and Quality Targets.
Adopting a plan for improvements based on recommendations issued by
international organization or Consultative bodies.
Related documents:
Management review procedure (MRv-65-P03).
Quality Policy
Quality Management System
ISO 9001:2008 Quality Manual
Version No. 00 Revision No. 2 Date October 2014 Code QM-422-M00 Page 32 of 44
Chart of Targets – KPIs.
16-3 (Clause 6) Resource management.
6.1 Provision of Resources
Kelkan contracting Limited has implemented a Quality Management System that complies
with the standards ISO 9001:2008. This has been achieved by commitment of the top
management, and with sufficient resources for the implementation. To effectively maintain
and continually improve the system, top management determines and provides necessary
resources.
6.2 Human Resources
6.2.1 General
To ensure of the competence of company employees, job descriptions has been prepared to
identifying the qualifications required for each job title. Qualifications include education
requirements, experience & skills. Appropriate qualifications along with required training
certifications.
Related documents:
Recruitment Procedure (ReC-621-P04).
6.2.2 Competence, Awareness and Training
To ensure that the employees are competent to their jobs & to improve their performance,
the company adopted a training & awareness courses, which could be implemented as per
bi annual plans & as needed.
The aim of that is to ensure that the employees are competent & skilled in doing their duties
to achieve the required quality in company products & supplied services & also to achieve
the quality objectives. Training has been implemented & recorded has been kept according
to competence, awareness and training procedure (CTA-622-P05).
Related documents:
Competence, training and awareness Procedure (CTA-622-P05).
6.3 Infrastructure
The company has determined the infrastructure needed to ensure conformity to product &
service requirement. The infrastructure has been provided which is includes buildings,
workspace & machines, utilities, machineries, IT hardware, etc.
Quality Management System
ISO 9001:2008 Quality Manual
Version No. 00 Revision No. 2 Date October 2014 Code QM-422-M00 Page 33 of 44
The infrastructure will kept maintained to ensure product conformity. Maintenance
activities implemented according to planned & unplanned activities through maintenance
work instructions (Man-63-W01) & IT procedure (IT-63-P06) & the records has been kept
accordingly.
Related documents:
Information Technology Procedure (IT-63-P06).
Maintenance Work Instruction (Man-63-W01).
6.4 Work Environment
A suitable work environment to achieving the required quality in products & services has
been maintained by HSE system which is managed by HSE department. The requirements
has been determined through this system, the planning, implementation and
documentation to control the work environment has been done according to HSE system,
this system undergoes internal auditing according to ISO 9001:2008 requirements for work
environments.
16-4 (Clause 7) Product realization
7.1 Planning of product realization
The planning for product realization will take place in two stages:
1- During contracting stage with the client, an overall time schedule to implement the
required project will be prepared as per the scope of work of the client, this will be
approved by the client as a part of the contract or the agreement.
2- During implementation of the contract weekly plans will be prepared based on the
approved time schedule to divide the time schedule into weekly plans in order to achieve a
more control on activities of planning to ensure achievement of deadlines as per the time
schedule.
The activities of planning for product realization will be carried out according to:
1- Procedure of planning & follow up of civil & construction projects (Pln1-71-P09), which
guided by (ISO 10006:2003) Quality management systems — Guidelines for quality
management in projects. The quality plan will be prepared accordingly.
2- Procedure of planning & follow up of fabrication & installation activates (Pln2-71-P10).
During planning, related departments will determine:
The quality objectives and requirements for the product.
Quality Management System
ISO 9001:2008 Quality Manual
Version No. 00 Revision No. 2 Date October 2014 Code QM-422-M00 Page 34 of 44
Required processes, resources and documentation.
Verification, validation, monitoring, inspection and test activities.
Related documents:
Procedure of planning & follow up of civil & construction projects (Pln1-71-P09).
Procedure of planning & follow up of fabrication & installation (Pln2-71-P10).
7.2 Customer-related processes
7.2.1 Determination of Requirements Related to the product.
The company determines client requirements before acceptance of any tender. Client
requirements include those:
Client Requested (like tender).
Requirement for delivery and post-delivery activities.
Requirement not stated by the client but necessary for specified use or known and
intended use.
Statutory and regulatory requirements related to the product.
Additional requirements determined by the company.
7.2.2 Review of Requirements Related to the Service
The company is processing client requests & review his requirements related to the product
before submitting any quotation. This process ensures that:
The product's requirements has been clearly defined.
Contract or order requirements different from those previously expressed are resolved
The company has the ability to meet the defined requirements.
Records are maintained showing the results of the review and any actions arising from
the review.
If the client does not provide a documented statement of his requirements, the client
requirements will be confirmed before acceptance.
When product requirements are changed, the changes will be delivered to related
departments, and the related documents will be amended.
7.2.3 Customer communication
The company established an effective system to communicate with clients, this system
ensures:
Quality Management System
ISO 9001:2008 Quality Manual
Version No. 00 Revision No. 2 Date October 2014 Code QM-422-M00 Page 35 of 44
Collect product information,
Handling the enquiries, contracts or orders, and amendments.
Client feedback, including his complaints.
Related documents:
Procedure of processing clients' request (Bus-72-P11).
Procedure of planning & follow up of civil & construction projects (Pln1-71-P09).
Procedure of planning & follow up of fabrication & installation (Pln2-71-P10).
7.3 Design and development.
7.3.1 Design and development planning.
The company established an active method to planning & control design and development
activities, to define & ensure of:
The design and development stages.
The review, verification and validation that are appropriate to each design and
development stage.
The responsibilities and authorities for design and development.
A connection between the employees involved in design and development are continuously
occurs to ensure clear assignment of responsibility. The planning output updated, if
required, as the design and development progresses.
7.3.2 Design and development inputs
Inputs relating to product requirements will be determined and records maintained
according to design and development procedure (Des-73-P12). The inputs includes:
Requirements for use of the product.
Performance requirements.
The primary design of the product (if any).
Controls and regulations adopted by the company in relation to the manufacture of the
product.
Information's from similar designs.
7.3.3 Design and development outputs.
The outputs of design and development will be in a suitable form for verification that the
design and development outputs covers the input, and they will be approved prior to
release. The outputs will includes:
Quality Management System
ISO 9001:2008 Quality Manual
Version No. 00 Revision No. 2 Date October 2014 Code QM-422-M00 Page 36 of 44
The design & workshop drawings of the product.
The drawing of installation of the product.
Technical specification and acceptance criteria.
BOQ of materials used in the manufacture of the product and their specifications.
Instructions for installing of the product if needed.
Instruction of safe use, handling & storage of the product if needed.
7.3.4 Design and development review.
A systematic stages to reviews of design and development has been performed in
accordance with the planned arrangements to:
To evaluate the ability of the results of design and development to meet requirements,
and
To identify any problems and propose necessary actions.
Participants in these reviews includes representatives of department concerned with the
design and development stage(s). Records of the results of the reviews and any necessary
actions will be maintained as per the procedure (Des-73-P12).
7.3.5 Design and development verification.
Verification will be performed in accordance with the planned arrangements to ensure that
the design and development outputs have met the design and development input
requirements by design calculations. Records of the results of the verification and any
necessary actions has been maintained.
7.3.6 Design and development validation.
Design and development validation will be performed in accordance with the planned
arrangements to ensure that the resulting product is capable to meet the requirements for
the specified application or intended use, might be done by the client approval or by related
departments.
7.3.7 Control of design and development changes.
Design and development changes will be identified and recorded, it will be reviewed to be
verified and validated, as appropriate, and approved before implementation. The review of
design and development changes will include evaluation of the effect of the changes on
constituent parts and product. The results of the review of the changes and any necessary
actions will be recorded.
Quality Management System
ISO 9001:2008 Quality Manual
Version No. 00 Revision No. 2 Date October 2014 Code QM-422-M00 Page 37 of 44
Related documents:
Design and development Procedure (Des-73-P12).
7.4 Purchasing
7.4.1 Purchasing process.
Materials purchasing done according to material request form approved by an authorized
manager, after ensuring that the required materials not available in company warehouse.
The suppliers evaluated at least once annually using suppliers evaluation form, the
evaluation criteria has been determined & reviewed. A list of approved suppliers has been
prepared based on evaluation results, where the supplier take his location in the list
according to his evaluation degree. Annually this list will be updated & approved by top
management.
Related documents:
Purchasing Procedure (Pur-74-P13).
7.4.2 Purchasing information
Purchasing information of the materials to be purchased will be described including
materials quantities, specifications & delivery timing. The company ensures of the adequacy
of specified purchase requirements prior to their communication to the supplier.
7.4.3 Verification of purchased product.
The company established and implemented a test inspection program to ensuring that
purchased materials meets specified purchase requirements, the purchase materials
classified into:
Materials used to produce the company products or supply the company services, these
materials undergoes to Quality Control test & inspection program.
The rest of the purchased materials inspected by related employees as explained in "the
list of Incoming material test responsibilities (Pur-74-L02) & the chart of "Control of
incoming Materials (Pur-74-C01)"
All purchasing activities are recorded.
Related documents:
Control of incoming Materials flow chart (Pur-74-C01).
The list of Incoming material test responsibilities (Pur-74-L02).
Quality Control Procedure (QC-824-P21).
Quality Management System
ISO 9001:2008 Quality Manual
Version No. 00 Revision No. 2 Date October 2014 Code QM-422-M00 Page 38 of 44
7.5 Production and service provision
7.5.1 Control of production and service provision
The company planned and carried out production and service provision under controlled
conditions include, as applicable,
The availability of information that describes the characteristics of the product,
The availability of work instructions, as necessary,
The use of suitable equipment,
The availability and use of monitoring and measuring equipment,
The implementation of monitoring and measurement,
The implementation of product release, delivery and post-delivery activities.
Two procedures & many of work instructions has been written to explain the methods of
implementing the activities of Control of production and service provision.
Related documents:
Procedure of Control the activities of Civil & construction (Cons-751-P14).
Procedure of Control the activities of fabrication & installation (Fab-751-P15).
A lot of work instructions related to above procedures.
7.5.2 Validation of processes for production and service provision
All company processes of production and service provision can be controlled & verified by
monitoring and measurement, however if such a case it will be controlled within control of
production and service provision.
7.5.3 Identification and traceability
Where appropriate, the company will identify the product by suitable means throughout
product realization, the identification will done with respect to monitoring and
measurement requirements during product realization. Where traceability is required, the
company will control the unique identification of the product and maintain records.
Related documents:
Identification and traceability procedure (Idn-753-P16).
Traceability form (Idn-753-F01).
Name Plate form (Idn-753-F02).
Quality Management System
ISO 9001:2008 Quality Manual
Version No. 00 Revision No. 2 Date October 2014 Code QM-422-M00 Page 39 of 44
7.5.4 Customer property
The company take care of client property when it is under the company control or being
used. The company determine, document, protection and safeguarding the client property.
If a client property lost or damaged it will be reported to the client, recorded & a corrective
action will be taken.
Related documents:
Procedure of client’s property.
Client intellectual property record form (CPro-754-F01).
Client property record form (CPro-754-F02).
7.5.5 Preservation of Product
The company established an efficient storage & handling system for product's preservation,
according to this system, the products will be classified, coded and recorded, supplied and
delivered to required place in correct quantities & properties. Before that a suitable
warehouse has been established to provide suitable storage conditions for products.
Related documents:
Procedure of storage and handling of materials (SHM-755-P18).
Control of incoming Materials (Pur-74-C01).
The list of Incoming material test responsibilities (Pur-74-L02).
Receipt form (SHM-755-F01).
Materials Request Form (Pur-74-F01).
Incoming materials testing request form (SHM-755-F02).
Storage card (SHM-755-F03).
Delivery ticket form (SHM-755-F05).
Request order form (SHM-775-F14).
Delivery ticket form (SHM-755-F05).
Receiving document form (SHM-775-F15).
Quality control acceptance certificate (QC-824-F14).
7.6 Control of monitoring and measuring equipment.
The company used calibration to validate the measuring equipment. It will be calibrated and
verified annually. Calibration and verification of the measuring equipment implemented by
specialist bodies. All measuring equipment has been listed in calibration list, a calibration
Quality Management System
ISO 9001:2008 Quality Manual
Version No. 00 Revision No. 2 Date October 2014 Code QM-422-M00 Page 40 of 44
card has been recorded for each one of the measuring equipment & calibration label has
been attached on each measuring equipment includes equipment name & type, serial
number, calibration date & calibration validity date. This action will controlled with in
quality control procedure (QC-824-P21). More than one of each type of the measuring
equipment has been supplied to users, so that they can ensure of measuring equipment
reading by using another one if there is doubt in measuring equipment reading. If such a
case, measuring equipment will be sent for calibration even if it is within calibration validity
date. All these activates will be recorded. It is the responsibility of the department(s) who
use the measuring equipment to maintain it in good condition & control of it handling &
movements between different users.
Related documents
Quality Control Procedure (QC-824-P21).
Calibration list (QC-824-L04).
Calibration Card (QC-824-F16).
16-5 (Clause 8) Measurement, analysis and improvement
8.1 General
The company planned and implemented the monitoring, measurement, analysis and
improvement processes needed
To demonstrate conformity to product requirements,
To ensure conformity of the quality management system.
To continually improve the effectiveness of the quality management system.
These processes are identified in documented procedures and include determination of
applicable methods, including statistical techniques, and the extent of their use.
8.2 Monitoring and Measurement
8.2.1 Customer Satisfaction
As one of the measurements of the performance of the quality management system, the
company monitors information relating to client perception as to whether the company has
fulfilled client requirements. Client satisfaction survey has been used to obtaining the client
satisfaction at least once by finished of his contract. The result of this survey will be
calculated by the data analyzer to get a value represent the client satisfaction.
Related documents
Client satisfaction Procedure (CLSa-821-P19).
Quality Management System
ISO 9001:2008 Quality Manual
Version No. 00 Revision No. 2 Date October 2014 Code QM-422-M00 Page 41 of 44
8.2.2 Internal Audit
The company conducts internal audits at planned intervals to determine whether the quality
management system:
• Conforms to the planned arrangements and to the requirements of this International
Standard and to the quality management system requirements established by the
organization.
• Is effectively implemented and maintained.
An internal auditing program has been designed and implemented according to an audit
plan based on departments / sections to be audited. Audit scope, involved auditors, audit
criteria, reporting and maintaining results, are defined and documented as per Internal
Audit procedure. Follow-up activities include the verification of the actions taken and the
reporting of verification results.
Related documents
Internal Auditing procedure (Aud-822-P20).
8.2.3 Monitoring and Measurement of Processes
The company applies suitable methods for monitoring and where applicable, measurement
of the quality management system processes. These methods demonstrate the ability of the
processes to achieve planned results. When planned results are not achieved, correction
and corrective action is taken, as appropriate, to ensure conformity of the product.
8.2.4 Monitoring and measurement of product
The company established a monitors and measures system to control the characteristics of
the products & services to verify that products requirements are fulfilled. This is carried out
at three stages of the products realization process according three Quality Control
programs:
Incoming material quality program to control the materials used in produce the
product or supply the services to ensure it meet its required specifications.
In Process Quality Program to control the product during manufacturing to ensure
that product or its parts at the end of each stage has been done correctly.
Final product quality program to ensure that the product has met all required
specification.
A checklist used to control & ensure of Installation service (as a part of fabrication activities)
Quality Management System
ISO 9001:2008 Quality Manual
Version No. 00 Revision No. 2 Date October 2014 Code QM-422-M00 Page 42 of 44
Evidence of conformity with the acceptance certifications is maintained. Records indicate
the person authorized to release of product & service, and when possible by the client.
Related documents
Quality Control Procedure (QC-824-P21).
Installation Check List (Fab-751-F01).
8.3 Control of nonconforming product
The company ensures that products which does not conform to its requirements is
identified and controlled to prevent its unintended use or delivery. The controls and related
responsibilities and authorities for dealing with non-conforming products are defined in
Procedure of Control of nonconforming product (CNCo-83-P22).
8.4 Analysis of Data
The company determine, collect and analyses the appropriate data to demonstrate the
suitability and effectiveness of the quality management system and to evaluate where
continual improvement of the quality management system can be made. The process for
determining, collecting and analyzing this data is conducted regularly. Appropriate data
includes data generated as a result of monitoring and measurement and from other
relevant sources
The analysis of data provides information relating to:
• Client’s satisfaction.
• Conformance to product requirements.
• Characteristics and trends of processes and products including opportunities for
preventive action.
• Supplier performance.
• The result of monitoring and measurement of the products.
Related documents
Data analyzing Procedure (DaAn-84-P23).
Quality Management System
ISO 9001:2008 Quality Manual
Version No. 00 Revision No. 2 Date October 2014 Code QM-422-M00 Page 43 of 44
8.5 Improvement
8.5.1 Continual improvement
The company continually improves the effectiveness of the quality management system
through the use of the quality policy, quality objectives & KPIs, audit results, analysis of
data, corrective and preventive actions and management reviews.
Related Documents
Continual improvement procedure (CoIm-851-P24).
Internal Auditing procedure (Aud-822-P20).
Data analyzing Procedure (DaAn-84-P23).
Corrective action procedure (CorA-852-P25).
8.5.2 Correction Action
The company takes action to eliminate the cause of nonconformities in order to correct an
existing nonconformities by an appropriate Corrective actions. A documented procedure
defines requirements for:
• Reviewing nonconformities (including customer complaints)
• Determining the causes of nonconformities
• Evaluating the need for action to ensure that nonconformities do not reoccur
• Determining and implementing action needed
• Records of the result of action taken
• Reviewing corrective action taken
Related Documents
Corrective action procedure (CorA-852-P25).
8.5.3 Preventive action
The company takes action to prevent the expected cause of the nonconformities in order to
prevent occurrence by an appropriate prevents actions. A documented procedure defines
requirements for:
Quality Management System
ISO 9001:2008 Quality Manual
Version No. 00 Revision No. 2 Date October 2014 Code QM-422-M00 Page 44 of 44
Determining potential nonconformities and their causes,
Evaluating the need for action to prevent occurrence of nonconformities,
Determining and implementing action needed,
Records of results of action taken.
Reviewing the effectiveness of the preventive action taken.
Related Documents
Preventive Actions Procedure (PreA-853-P26).
The efficacy of the corrective & preventive actions will be checked after 1, 2 & 3 months of
corrective or preventive request, to assess the efficiency of these actions.
17. References
17-1 International organization for standardization 2001, Guidelines for quality
management system documentation, ISO/TR 10013, International organization for
standardization, Geneva.
17-2 International organization for standardization 2008, Quality management systems –
requirements, ISO 9001:2008, International organization for standardization, Geneva.
17-3 International organization for standardization 2005, Quality management systems –
fundamentals and vocabulary, ISO 9000:2005, International organization for
standardization, Geneva.
17-4 ISO 10006 Second edition 2003-06-15 : Quality management systems — Guidelines
for quality management in projects