Quantity Surveyor ASIF AZLAN AHMAD SYAFIQ DEEN KENNETT LIM LOK XUAN CHOW SU LING SHUM WEN JUN
Transcript
Page 1: Quantity surveyor

Quantity SurveyorASIF AZLANAHMAD SYAFIQ DEENKENNETT LIMLOK XUANCHOW SU LINGSHUM WEN JUN

Page 2: Quantity surveyor

IntroductionA QUANTITY SURVEYOR is • A Professional working position within the

construction industry concerned with building cost

• A specialist tradesman who prepares standardised schedules for a building project

Page 3: Quantity surveyor

Types of Quantity Surveyor

Contractor’s Quantity Surveyor

Senior Quantity Surveyor

Mechanical and Electrical (M&E) Quantity SurveyorProject Quantity Surveyor

Page 4: Quantity surveyor

Sector that Quantity Surveyor included in:

CommercialResidential Education

HealthcareUltilitiesTransport

Page 5: Quantity surveyor

Things Required to Know by Quantity Surveyor

Basic civil work

process and

costing

Component materials

Materials and

equipment selection and effect on cost

Building operation

cost

Page 6: Quantity surveyor

Role of Quantity Surveyor

Keeping project within budget

Ensuring project done

within estimated

time

Preparation of insurance and

contract

Risk management

Page 7: Quantity surveyor

Software used by Quantity SurveyorCostXQ-Script

Benefits of using software:

Maximize the efficiency of performance of a Quantity

Surveyor

Reuse data within jobs

Offers client faster fuller

service

Reduce error and improve

quality of work

Save time, effort and

money

Page 8: Quantity surveyor

Stages of work of a Quantity Surveyor

• Help with feasibility studies for the project• Studies architect’s and engineer’s plan• Estimated cost planning• Prepare tender documents

Before Construction Starts:

Page 9: Quantity surveyor

During Construction:• Keeping cost on track• Provide the bank with a project report • Prepare a drawdown certificate for

client• Resolving disputes between clients,

designers and building contractors

Page 10: Quantity surveyor

After Construction:

• Analyse the total cost of completed project

• Prepare a statement of final account

Page 11: Quantity surveyor

TenderA submission made by a prospective supplier in response to an invitation to tender.A formal written offer to provide goods or services for a particular price.

Types of documents used during tendering:• Tender Offer• Tender Acceptance Letter / Tender Decline Letter• Tender Notice • Tender Drawing• Specification (workmanship and material)

Page 12: Quantity surveyor

Example of tender documents used:

Tender Offer LetterSource: http://img.docstoccdn.com/thumb/orig/26603028.png

Page 16: Quantity surveyor

Tender DrawingDrawing used for estimating or pricing the cost of building to be constructed.

Tender Drawing Document includes:• Plan• Elevation• Structure• Electrical• Plumbing

Page 19: Quantity surveyor

Example of plan of electrical and plumbing

Source: http://www.pk.undp.org/content/pakistan/en/home/operations/procurement0/pu-it-2015-046--request-for-invitation-to-bid--for-procurement-o/_jcr_content/centerparsys/download/file.res/UNODC%20Additional%20Building.pdf