Quarterly report ScotGrid Quarter 02 2005 Fraser Speirs
Transcript
Page 1: Quarterly report ScotGrid Quarter 02 2005 Fraser Speirs.

Quarterly report

ScotGridQuarter 02 2005

Fraser Speirs

Page 2: Quarterly report ScotGrid Quarter 02 2005 Fraser Speirs.

2005 Q1 Quarterly report: ScotGrid

Current site status data

Site Service nodes

Worker nodes

Local network connectivity

Site connectivity

SRM Days SFT failed

Days in scheduled maintenance

Security incidents this quarter which impact on Grid

Durham SL3 LCG2.4.0

SL3LCG2.4.0

100Mb/s 1Gb/s No 8 7 0

Edinburgh SL3LCG2.5.0

SL3LCG2.5.0

1Gb/s 1Gb/s dCache (not fully deployed)

34 6 0

Glasgow SL3LCG2.4.0

SL3LCG 2.4.0

1Gb/s 1Gb/s No 27 35 0

1) Local network connectivity is that to the site SE2) It is understood that SFT failures do not always result from site problems, but it is the best measure

currently available.

Page 3: Quarterly report ScotGrid Quarter 02 2005 Fraser Speirs.

2005 Q1 Quarterly report: ScotGrid

All GridPP Resources

Site Promised Actual

Average kSI2K

available in this

quarter

CPU (kSI2K)

Storage (TB)

Average kSI2K

available in this

quarter

CPU Storage (TB)

Durham 86 86 5 18 22 2

Edinburgh

7 7 39 2.7 5 19

Glasgow 245 245 12 75 240 1.8

Total 338 338 56 95.7 267 22.8

1) The GridPP-Tier-2 MoUs made reference to integrated CPU over the 3 years of GridPP2. Under the “Promised – integrated kSI2K hours until this quarter” an estimate is provided of what the Tier-2 would have expected to provide to this quarter on the basis of planned installations. “Static kSI2K” shows what would currently be expected if all purchases planned to this quarter had been made and implemented. The actual columns show what has been delivered.

Page 4: Quarterly report ScotGrid Quarter 02 2005 Fraser Speirs.

2005 Q1 Quarterly report: ScotGrid

LCG resources

Site Estimated for LCG Currently delivering to LCG

Total job slots

CPU (kSI2K)

Storage(TB)

Total jobs slots

CPU(kSI2K)

Storage (TB)

Durham 87 9 0.5 22 22 2

Edinburgh 5 7 25 5 4 19

Glasgow 249 101 4.8 230 52 1.8

Total 341 115 30 257 31 22.8

1) The estimated figures are those that were projected for LCG planning purposes:http://lcg-computing-fabric.web.cern.ch/LCG-Computing-Fabric/GDB_resource_infos/Summary_Institutes_2004_2005_v11.htm

2) Current total job slots are those reported by EGEE/LCG gstat page.

Page 5: Quarterly report ScotGrid Quarter 02 2005 Fraser Speirs.

2005 Q1 Quarterly report: ScotGrid

VOs supported by site

Site ALICE ATLAS Biomed

CMS Sixt dTeam

Zeus LHCb Total

Durham 1 1 0 1 1 1 0 1 6

Edinburgh 1 1 1 1 1 1 0 1 7

Glasgow 1 1 1 1 1 1 1 1 8

Total 3 3 2 3 3 3 1 3

0 => not supported 1 => supported

Page 6: Quarterly report ScotGrid Quarter 02 2005 Fraser Speirs.

2005 Q1 Quarterly report: ScotGrid

CPU used per VO over quarter (KSI2K hours)

Site ALICE ATLAS BABAR CMS LHCB ZEUS abc Total

Durham 3 3

Edinburgh 113 2 162 276

Glasgow 3 13 16

Total

1) Information currently available from APELhttp://goc.grid-support.ac.uk/gridsite/accounting/tree/gridpp_view.php - please note these pages are still under development! Nb. This could be automated with an SQL/R-GMA query

Page 7: Quarterly report ScotGrid Quarter 02 2005 Fraser Speirs.

2005 Q1 Quarterly report: ScotGrid

Usage by VO for Tier-2

Jobs Apr 2005 May 2005 Jun 2005

alice

atlas 516 235 192

cms 2 1 20

dteam

lhcb 453 1141 257

abc

CPU(KSI2K hours)

Apr 2005 May 2005 Jun 2005

alice

atlas 25 16 75

cms 3

dteam

lhcb 17 86 71

abc

Page 8: Quarterly report ScotGrid Quarter 02 2005 Fraser Speirs.

2005 Q1 Quarterly report: ScotGrid

Usage by VO (jobs)

Nb: This can be extracted from APEL

Page 9: Quarterly report ScotGrid Quarter 02 2005 Fraser Speirs.

2005 Q1 Quarterly report: ScotGrid

Storage resources in use per VO (TB)

Site Storage ALICE ATLAS CMS dTeam

Lhcb Sixt Zeus Total

Durham 0 0.001 0 12 12.001

Edinburgh 0 0.003 0 0.003

Glasgow 0 0.98 0 0 0 0 0.3 1.28

Total 0.984 12 0.3

Difficult to provide this for the period but we can at least show *current* usage. If we can get the information averageand maximum per VO over the period would be useful parameters to record.

Page 10: Quarterly report ScotGrid Quarter 02 2005 Fraser Speirs.

2005 Q1 Quarterly report: ScotGrid

CPU Usage by VO (KSI2K hours)

Nb: This can be extracted from APEL – http://goc.grid-support.ac.uk/gridsite/accounting/custom.php

Page 11: Quarterly report ScotGrid Quarter 02 2005 Fraser Speirs.

2005 Q1 Quarterly report: ScotGrid

Progress over last quarter

Site Successes Problems/Issues

Durham •Upgrade to LCG2.4•Significant reliability improvement

•Documentation•Late release of LCG 2.6 meant problems

Edinburgh Upgrade to LCG2.5Participation in SC3Deployment of dCache SRMTrials of DPM

DocumentationLots of difficulty with dCache - mostly solved but v. Time consuming

Glasgow Deployment of all CPU resourcesPre-production deployment of DPM SRM

DocumentationAvailability of staff to troubleshootLate release of 2.6 caused problems

Page 12: Quarterly report ScotGrid Quarter 02 2005 Fraser Speirs.

2005 Q1 Quarterly report: ScotGrid

Tier-2 risks

General risks

•Lack of documentation for middleware threatens meeting MoU commitments.•Concern over migration strategy from Classic SE to dCache•Feel that scheduled LCG release plan has been abandoned•Possible resistance to Scientific Linux for future shared cluster at Glasgow

Mitigating actions

•Using GOC Wiki entries as substitute•Writing ‘experience’ documentation•None known. Tool support and migration strategy is required.•Inevitably lowers priority of doing upgrades - can’t just drop everything and upgrade.•Virtualisation?

Institute specific risks

• Some concern over reinvestment at Durham

Mitigating actions

• Attempts to secure further funding are ongoing.

Page 13: Quarterly report ScotGrid Quarter 02 2005 Fraser Speirs.

2005 Q1 Quarterly report: ScotGrid

Tier-2 planning for next quarter

• Maintaining presence on grid• Complete DPM SRM deployment at Glasgow, Durham• Reliability/metrics a focus• Focus on team communication and coordination at Glasgow

(see: http://www.scotgrid.ac.uk/wiki)• Better internal monitoring of cluster performance and uptime

(Ganglia/Nagios)

Page 14: Quarterly report ScotGrid Quarter 02 2005 Fraser Speirs.

2005 Q1 Quarterly report: ScotGrid

Objectives and deliverables for last

quarter

Objective/deliverable Due date Status

All sites to 2.4.0 April 1st (or release date) + 3 weeks

Done

dCache deployed at Glasgow April 1st + 3 weeks Not done - choosing DPM

dCache deployed at Edinburgh April 1st + 3 weeks Done, although dCache issues delayed

Increase disk space at Glasgow End Q2 Not done - awaiting SRM deployment

Refurbishment of server room at Glasgow

End Q2 Done

dCache deployed at Durham None set Not done - waiting on results of Glasgow DPM evaluation

Continue planning for network upgrades in respect of service challences

None set Ongoing. Using experience of SC3 at Edinburgh to guide.

Page 15: Quarterly report ScotGrid Quarter 02 2005 Fraser Speirs.

2005 Q1 Quarterly report: ScotGrid

Objectives and deliverables for next

quarter

Objective/deliverable Due date Metric/output

All sites to 2.6.0 Set by ROC

DPM deployed at Glasgow End Q2

SRM deployed at Durham End Q2

Full Ganglia implementation across T2 End August

Continue planning for network upgrades in respect of service challences

None set SC4-capable network connectivity

Page 16: Quarterly report ScotGrid Quarter 02 2005 Fraser Speirs.

2005 Q1 Quarterly report: ScotGrid

Meetings, papers & effort

Tier-2 coordinator effort Comments

3.0

Area Description

Talks Scotgrid status - GridPP13

Conferences •GridPP13LCG Ops Workshop - BolognaEGEE 3 - Athens

Publications

For Tier-2 coordinator:

Page 17: Quarterly report ScotGrid Quarter 02 2005 Fraser Speirs.

2005 Q1 Quarterly report: ScotGrid

Summary & outlook

• Good progress this quarter on resource deployment, especially Glasgow CPU and Edinburgh disk.

• Progress on SRM deployment promising, although we still need a story about migration from Classic SE.

• Improvement in team coordination at Glasgow

• Outlook is good for hardware refresh at Glasgow, Edinburgh• Lack of enthusiasm for Scientific Linux across Glasgow’s local

userbase leads us to believe that there is a pressing need to research and solve the problem of LCG co-existence inside a shared cluster. (Portability/Xen?)

• Need to find ways to make SFT results match reality. Currently, they make the situation look worse than it is because of full queues.