Date post: | 22-Oct-2015 |
Category: |
Documents |
Upload: | vaibhav-kumar |
View: | 23 times |
Download: | 1 times |
Name: ID:
Email:
ERP MID_TERM TEST @ IMT - 30 Dec 2013
Multiple ResponseIdentify one or more choices that best complete the statement or answer the question.
1.W.r.t. SD Module, ________ is the highest organization hierarchy
a.Distribution Channel
c.Sales Area
b.
Sales Office d
.
Sales Organization
2.** W.R.T. the “Stock Overview: Basic List” screen shot given.Which of the following statements are FALSE ?
a.Invoice is received by the customer
d.
Delivery process has started
b.
Sales Order has an open status e.
Ownership of the goods ordered is transferred
c.The Actual inventory is 100 units
3.**. The activities/functions which overlap across all SD, MM and FI modules are:
a.Post receipt of customer payment
d.
Creation of Sales Order
b.
Creation of Invoice e.
Post Goods Issue
c.Check Stock Status
4.**. In ‘order to cash’ process (SD Case Study Execises), check stock status is usually carried out after:
a.Creation of quotation
d.
Creation of delivery document
b.
Creation of sales order e.
Creation of inquiry
c.Post Goods issue
Yes/NoIndicate whether you agree with the statement.
5.W.r.t. the “Document Flow” screen shot given, IS there any flaw in the SD process?
Multiple ChoiceIdentify the choice that best completes the statement or answers the question.
6.W.r.t. the “Display Inquiry” screen shot given, If the order probability value is changed to 80 from 75, which of the following field(s) will undergo change in its valuea. Neither a nor b c. Both a and bb. Net value (of the order) d. Expected Order Value
7.___ event finalizes the shipping process and prevents changes in the shipping documents.a. Sales Order d. Packingb. Post goods issue e. Pricingc. Quotation
8.In IBM’s case, “Virtual Enterprises” refers toa. integrating their entire technology
group through ERPc. integrating the SSD division
spread around the globeb. Shifting to Cloud services
platformd. integrating internal and external
partners to satusfy IBM’s cutsomer’s need
The following screen shot gives “ stock Overview” of Deluxe Touring Bike (Black) @ Miami Plant (warehouse).
9.From the above “Stock Overview” screen shot, once the “Post Goods Issue” exercise is done in SD Cycle, which of the following change will happen:a. All values in the screen shot
remains same till the goods are delivered to Customer.
d. cost of inventory will come down by the amount equivalent to goods delivered
b. ‘schedule for delivery’ column will increase by 5 quantity
e. the quantity mentioned in the ‘sales order’ column will become 10.
c. Stock in unrestricted use will remain same at 95
10.
Legal set of books are maintained for:a. Client d. Distribution Channelb. Company Code e. Sales Organizationc. Credit Control Area
11.
A legally binding offer to deliver goods at predefined price is given in:a. Inquiry d. Invoiceb. Delivery Document e. Sales Order
c. Quotation
12.
The term used for repeated implementation of ERP in other centres of the same organization:a. Recurrent Implementations d. Extended Implementationb. Redundant Implementation e. Roll Outsc. Repeated Go Live
13.
----- represents pool of data which is created centrally and accessed by all in SAP ERP.a. Minor Data c. Master Datab. Global Data d. Univesal Data
14.
In Deployment stage ERP implementation, unless --- is processed, it might not be possible to move from Development Server to Quality Servera. Transport Request c. Movement Requestb. Acceptance Request d. Completion Request
15.
With respect to ERP implementation ------ is a step which involves both customer and implementation mutually agree on what is completed.a. Sign-Off c. Sign-Inb. Write-Off d. Write-in
16.
In ------- Case, ERP implementation approach involved “Rapid Iterative prototyping”, wherein the implementation was broken into series of phases called -----:a. CIGNA, Internal Re-engineering
Groupsc. CISCO, Conference Room Pilots
(CRP)b. CIGNA, Conference Room Pilots
(CRP)d. IBM, Conference Room Pilots
(CRP)
The screen shot given below represent ‘payment posted by Customer (Philly Bikes) to Global Bike Inc (GBI).’ In the field marked “Not Assignment.” The Value “0.00” signifies that:
17.
The value “0.00” signifies thata. Customer is requesting for Cash
Discountd. Customer has not paid to GBI
b. Customer has bought items on credit
e. represents the balance amount that needs to be paid from GBI to Customer
c. represents the balance amount that needs to be paid from Customer to GBI
18.
Which of the following kind of projects SAP AG does:a. All of the above d. Roll Outsb. Application Outsourcing (or)
Supporte. Maintenance
c. System Integration (or)
Implementation Projects
19.
____ provides an integrated technology computing platform that forms the foundation for all the SAP applications.a. SAP Business suite d. SAP All-in-oneb. SAP Business one e. SAP Netweaverc. SAP Business by Design
20.
The customer master information is divided into 3 areas:a. Client, Company code and Sales
Organizationc. Global data, Company Code data
and Sales Office datab. Client data, Company Code data
and Sales Office datad. General data, Company Code data
and Sales Area data
21.
In SAP system, ___ gives the order process status at any point in time.a. Post goods issue d. Document flowb. Sales order e. Billing documentc. Delivery document
22.
W.r.t.the “Document Flow” screen shot given above, What is the internal price of the goods sold?a. There is no such term as Internal
Priced. 15000 USD
b. Not possible to figure out e. 8000 USDc. 7000 USD
23.
Most important factor that aided CIGNA Inc in successfuly institutionalizing its Re-engineering efforts in its divisions is:a. Using Outside Consultants c. Dedicated Internal Reengineering
Groupsb. Top Management Support d. Ensure bottom-up buy in.
24.
Transaction code used to display Sales Ordera. VA01 c. VA03b. VA02 d. VA04
25.
Cigna P&C , provided first opportunity for “second wave of re-engineering,” the focus of second wave of re-engineering was to:a. Improve financial performance c. develop new core competenciesb. Re-think the business strategy d. Reduce operation cost, improved
quality and cycle times
26.
In Cisco’s case none of the functional managers came up with idea of ERP implementation. The main reason for managerial resistance is because :a. it may change the way they used
to work.c. the new system maynot be upto
their expectationb. it would intrude with the regular
work flowd. of affinity to old system
27.
Pricing Conditions for the sales activities are determined bya. Sales Area d. Sales Organizationb. Company code e. Sales Officec. Sales Team
28.
The four digit Alphanumeric used to get “table view” isa. ES16 c. SE16b. TE16 d. VA01
29.
W.r.t.the “Document Flow” screen shot given above, What is the profit per unit of bike?a. 1400 USD d. 3000 USDb. 1500 USD e. Not possible to figure outc. 1600 USD
30.
Cisco was highly successful with its ERP effort. The main contributing factor for the success is:a. it devoted their top talented
employees to the projectc. it changed the process, not the
softwareb. smart partnering d. it made ERP as high IT priority
31.
In “Order-to-Cash” process, Determination rule for Shipping Point involves information on:a. Shipping Condition, Loading
Group and Plantc. Shipping Condition, Loading
Group and Sales Orderb. Shipping Condition, Sales order
and Loading Pointd. Shipping Condition, Sales order
and Plant
32.
The main concern for IBM to execute “Virtual Enterprise” concept is:a. Whether the concept is next best
step for IBMc. relative in experience of Extricity,
the service providerb. novelty of Alliance System d. whether Alliance system would
interact with other EAI software
33.
The posting of the customer payment receipt is done ina. Company code d. Sales Areab. Sales Team e. Sales Organizationc. Sales Office
34.
In ‘order to cash’ process, __ will update customer’s credit status.a. Billing process d. Sales orderb. Shipping process e. Delivery notec. Invoice
35.
Reengineering effort was successful in “CIGNA International” mainly because of -------a. clear goals and objectives c. effective communication between
unitsb. top management support d. Greenfield opportunity
36.
Four digit code used to see Tablular view of all SALES ORDER created in SD Module is:a. VBAI c. VBACb. VA01 d. VBAK
37.
when you enter “/ova03” in the command line of “SAP Easy Access”,it woulda. remains in the same session and
takes us to “Create Sales Order” Screen
c. remains in the same session and takes us to “Display Sales Order” Screen
b. Opens a new session in which it will have “Display Sales Order” Screen
d. Opens a new session in which it will have “Create Sales Order” Screen
38.
The foremost benefit realized from SAP R/3 implementation at IBM’s technology groupa. worldwide inventory control c. worldwide common processesb. customer responsiveness d. warranty tracking
39.
The “Change Customer” task in the Sales & Distribution process is to:a. Change customer’s behavior d. Say good bye to the customerb. Create new customers e. Change customer’s outfitc. Assign customer as business
partners
40.
____ is used by most of the business modules within the SAP system.a. Vendor Master data d. Material Master datab. Sales area data e. Customer Master datac. Condition Master data
41.
The decision regarding “System Landscape” will be taken in ---- stage during ERP Implementation Project.a. Business Process Mapping d. Deployb. Build e. Go Livec. Design
Matching
W.R.T. entry of Codes in SAP screensa. 0 e. RA00b. IN f. ORc. 01 g. 0001d. K004 h. 02
42.
Net Discout ‘ % of discount from net’ is represented as
43.
Inquiry is represented as
44.
Order Type: ‘Standard Order’ is represented as
45.
Shipping Conditions: ‘Standard’ is represented as
46.
Tax Classification: ‘Exempted’is represented as
47.
Delivery Priority: ‘Normal’
48.
Material Discount: ‘Discounted amount per unit’is represented as
49.
Payment Terms: ‘Payable immediately without due’ is represented as
True/FalseIndicate whether the statement is true or false.
50.
Almost every MENU PATH in SAP Easy Access screen ends with either of the three transaction process as given here: Create, Uncreate and Display