Quick Reference. ESSENTIAL REPORTS ~ top five reports you are most likely to need during an audit and how to print them. Nexcor Technologies, Inc. PO Box 1959 Suwanee, GA 30024 Tel: (770) 831.9191 Fax: (770) 831.9185. WWW.NEXCORTECH.COM. Labor / History Forecast Report. - PowerPoint PPT Presentation
Popular Tags:
22
Quick Reference Nexcor Technologies, Inc. PO Box 1959 Suwanee, GA 30024 Tel: (770) 831.9191 Fax: (770) 831.9185 WWW.NEXCORTECH.COM ESSENTIAL REPORTS ~ top five reports you are most likely to need during an audit and how to print them
Transcript
Page 1: Quick Reference

Quick Reference

Nexcor Technologies, Inc.PO Box 1959Suwanee, GA 30024Tel: (770) 831.9191Fax: (770) 831.9185

WWW.NEXCORTECH.COM

ESSENTIAL REPORTS ~ top five reports you are most likely to need during an audit and how to print them

Page 2: Quick Reference

Labor / History Forecast Report1

2

3

4

This report generates the MSCS (Master Sanitation Cleaning Schedule) and will give you an overall view of your entire facility and trends.

From the Main Menu go to Reporting. Expand Labor and choose Labor History Forecast.

Report Parameters Screen appears. Set date back, depending on how much history you or your auditor wishes to see.

This report no matter what start date you set it for will give you 52 weeks of information. After choosing your start date, take all the defaults and then choose OK.

The system will check each piece of equipment/area for the time period selected and the report will then display on your screen.

5

Page 3: Quick Reference

Labor / History Forecast Report

Page 4: Quick Reference

Labor / History Forecast Report

Page 5: Quick Reference

Labor / History Forecast Report

Page 6: Quick Reference

Labor / History Forecast Report

Page 7: Quick Reference

Labor / History Forecast Report

Page 8: Quick Reference

Labor / History Forecast Report

Note: A CAWO was written up on this monthly task – most likely reason was task was not previously completed when due.

Page 9: Quick Reference

Labor / History Forecast Report

Note: A CAWO was written on this weekly task that is being completed each week. This alerts you to further explore the cause – is it a training issue? Is the employee not accurate? Does the SSOP need to be revised?

Page 10: Quick Reference

Training Level Report1

2

3

This report documents the level of training your employees have, when they were certified and the % of employees certified for that particular training.

From the Main Menu go to Training. Expand Training Reports and choose Training Level Report.

Report Parameters Screen appears. Take all the defaults and choose OK.

Page 11: Quick Reference

1

2 It shows the % of employees that are certified for a particular training. It will show certification dates and whether an employee is in training, certified or expired. If the employees’ training has expired it shows the expiration date.

This report shows all the training you are tracking in the KLEANZ program in alphabetical order.

Training Level Report

Page 12: Quick Reference

2

3

This report shows all equipment and the specific task to be completed along with the interval, last completed date, next due date, and if this task is calculated on a master schedule or calculated based on last completion date.

From Main Menu, click on Setup, expand Task Information and choose Review Worksheets by Equip/Area.

Note: This report can be ran showing detail of just a single line, a single piece of equipment/area or a group.

1

Report Parameters Screen appears. Take all the defaults and choose OK. This will show all tasks that are associated with the equipment / area for your entire facility.

Worksheets by Equip/Area Report

Page 13: Quick Reference

Calculated on a “M”- Master Schedule,

or “L”- Last Done.

Worksheets by Equip/Area Report

Page 14: Quick Reference

Identifies whether or not the task can be completed

while the equip/area is running or not.

Worksheets by Equip/Area Report

Page 15: Quick Reference

Weekly Interval

Worksheets by Equip/Area Report

Page 16: Quick Reference

Last Completion

Date

Worksheets by Equip/Area Report

Page 17: Quick Reference

Next Due Date

Worksheets by Equip/Area Report

Page 18: Quick Reference

Forecast Time in minutes to

complete the task.

Worksheets by Equip/Area Report

Page 19: Quick Reference

1

2

3

This report will provide you with all inspection details within a given time frame. Including date and time of inspection, type of inspection, who performed inspection, what rating/score was given and any comments.

From Main Menu, choose reporting, Inspection, Inspection History Report.

When the report parameters screen appears enter date you want the report to run from and then click “OK”. Note: this will give you history for all inspections within that dated time frame.

Inspection History Report

Note: You may also view a specific inspection and time frame, as demonstrated on the left.

Page 20: Quick Reference

Inspection History Report

Page 21: Quick Reference

1

2

3

This report provides you with a list of corrective action work orders that were written during a specific inspection. It will tell you who wrote the CAWO, who it was assigned to, the date you assigned it and when the CAWO was completed and who completed the work along with what work was performed with additional comments relating to parts needed to complete the work that was requested.

From Main Menu, choose reporting, expand Inspection, then choose Work Order by Inspection Report.

The report parameters screen appears in which you will choose the time frame you wish the report to include CAWO from Inspections and then click “OK”.Note: You may also narrow your search down if you want to view only a certain piece of equipment/area or just a specific production line, or specific inspection and time frame, as demonstrated on the left. This is most helpful when an auditor shows back up 6-8 months later and wants to know when and how the previous deficiencies were corrected.

Work Order by Inspection Report

Page 22: Quick Reference

Work Order by Inspection Report