QUOTATION Date 1 st September 2018 Owner ??? Site Address Lot 111 Moresby Street, Endeavour Estate Nowra NSW 2541 Prepared By Skye Nelson White Sands Pty Ltd trading as G.J. Gardner Homes Shoalhaven Builders Licence 226776C 3/10 Central Avenue, Nowra NSW 2540 Phone: 02 4422 9400 Email: [email protected]
Transcript
Page 1: QUOTATION - paigcrm.s3.amazonaws.com€¦water is included if tank is empty. No allowance for tunnel or rubble trench for overflow. 4.3 Connect tank overflow from water tank to rear

QUOTATION

Date

1st

September 2018

Owner

???

Site Address

Lot 111 Moresby Street, Endeavour Estate

Nowra NSW 2541

Prepared By

Skye Nelson

White Sands Pty Ltd trading as G.J. Gardner Homes Shoalhaven

Builders Licence 226776C

3/10 Central Avenue, Nowra NSW 2540

Phone: 02 4422 9400 Email: [email protected]

Page 2: QUOTATION - paigcrm.s3.amazonaws.com€¦water is included if tank is empty. No allowance for tunnel or rubble trench for overflow. 4.3 Connect tank overflow from water tank to rear

QUOTATION

_______________________________________________________________________

Owners Initials:_______________ New Home Consultant Initials:__________

Quick Quote & Plans: 04452 Date Prepared: 1st September 2018

PAGE 2 of 10

1. CLIENT INFORMATION & HOUSE PRICE

Client Name: *****

*****

Site Address: Lot 111 Moresby Street, Nowra NSW 2541

Design Chosen: Cleveland 251

Façade Option: Classic

Inclusions Level: Coast

See our inclusions brochure dated 01.07.18 for more detailed

information

2. STANDARD SITE COSTS

2.1 Site preparation up to 1m (even cut and fill up to .500mm) Included

2.2 Underground power connection: single-phase provision to

house only (allowed 10.0 lineal metres to owner supplied and

installed connection point) Included

2.3 Water service connection to mains water only (allowed 10.0 lineal

metres to owner supplied and installed connection point), please

ensure the water service is extended onto your property Included

2.4 Stormwater connection (allowed 10.0 lineal metres overflow from

water tank to rear inter-allotment drainage). No allowance for

onsite detention. Includes charge system to tank. Included

2.5 Sewer connection to mail only (allowed 10.0 lineal metres) Included

2.6 Gas connection to owner supplied and installed connection point

Allowed to 10.0 lineal metres. Please ensure the service is extended

onto your property. If natural gas is not available in your area, the

installation of a LPG gas line, concrete slab, chain and regulator will

be supplied. (owners to supply and install 2 x 45kg gas bottles) Included

2.7 Concrete pump for pouring slab Included

2.8 Concrete pump for pouring piers Included

2.9 Surveyor house setout Included

2.10 Wind certification Included

2.11 Waste receptacle Included

2.12 Sediment control Included

2.13 Temporary toilet hire Included

2.14 Waffle Pod slab design allowance for ‘M’ Site Classification Included

Page 3: QUOTATION - paigcrm.s3.amazonaws.com€¦water is included if tank is empty. No allowance for tunnel or rubble trench for overflow. 4.3 Connect tank overflow from water tank to rear

QUOTATION

_______________________________________________________________________

Owners Initials:_______________ New Home Consultant Initials:__________

Quick Quote & Plans: 04452 Date Prepared: 1st September 2018

PAGE 3 of 10

3. SITE SPECIFIC SITE COSTS

3.1 Provide concrete bored piers up to 50 lm only are included in this

estimate. If any other type of piering is required such as steel screw

piles, timber driven piles or sleeve piering, additional costs will

accrue to the client. Included

3.2 Provide up to 80 lm of temporary site fencing during construction of

the proposed dwelling as required by Workcover. Included

3.3 Provide roof safety rail to the proposed dwelling as required by

Workcover. Included

3.4 Should a geotechnical report be required for the site, by council or

any other authority, in addition to the borehole report, additional

costs will accrue to the client. By Owner

3.5 Remove trees, stumps, roots and slash/scrape long grass and

undergrowth from building area. Where stumps have been removed

the ground is to be filled and compacted. By Owner

3.6 Retaining wall if required. See estate requirements if applicable. By Owner

3.7 Surface drainage if required. By Owner

3.8 Provide BASIX Report Included

3.9 Provide NatHERS Report Included

3.10 No allowance for rock excavation has been made in this quotation.

Any rock excavation required will be at the clients’ expense. By Owner

3.11 Any excess soil will be stockpiled on site, for use and/or removal at

the clients’ expense. By Owner

Page 4: QUOTATION - paigcrm.s3.amazonaws.com€¦water is included if tank is empty. No allowance for tunnel or rubble trench for overflow. 4.3 Connect tank overflow from water tank to rear

QUOTATION

_______________________________________________________________________

Owners Initials:_______________ New Home Consultant Initials:__________

Quick Quote & Plans: 04452 Date Prepared: 1st September 2018

PAGE 4 of 10

4. ENERGY, WATER & THERMAL EFFICIENCY REQUIREMENTS

4.1 Provide PVC 90mm downpipes & upgrade stormwater to 100mm

(Sewer grade) for charged downpipe system. Included

4.2 Provide above ground 5,000L poly round water tank within 50mm

from home on a concrete slab. Included

Flush out point is provided before tank.

Recycled water will be provided to toilets, washing machine

and one external tap only. Automatic switch over to mains

water is included if tank is empty.

No allowance for tunnel or rubble trench for overflow.

4.3 Connect tank overflow from water tank to rear inter-allotment

drainage. Included

4.4 Hot Water – Gas Continuous Flow system

(STC credits to be claimed by builder) Included

4.5 4 Star rated kitchen mixer Included

4.6 4 Star rated bathroom mixers Included

4.7 4 Star rated toilets Included

4.8 3 Star rated shower rose Included

4.9 Wall insulation R1.5 Included

4.10 Ceiling insulation R3.5 (no insulation over garage ceiling) Included

4.11 Sarking under Colorbond roof Included

Page 5: QUOTATION - paigcrm.s3.amazonaws.com€¦water is included if tank is empty. No allowance for tunnel or rubble trench for overflow. 4.3 Connect tank overflow from water tank to rear

White Sands Pty Ltd Trading as G.J.Gardner Homes - Shoalhaven A.B.N. 98 143 798 323

3/10 Central Ave NOWRA NSW 2541

Ph : 02 4422 9400 Fax : 02 4422 9399 Email : [email protected]

Friday, 31 August 2018 …

GJ Wholesale

NOWRA NSW 2541

Quote No : 04452 Site Address: Lot 111, 11 Moresby Street, Endeavour Estate, NOWRA.

Thank you for choosing GJ Gardner Homes. As discussed, please find below the quote for the standard Coast CDC Cleveland Granny Flat (832) design and our standard inclusions together with your individual options as listed :-

Additional Inclusions Requested • HOUSE DESIGN: Cleveland Granny Flat• INCLUSIONS LEVEL = COAST

see COAST brochure for more detailed overview of inclusions7 x LED downlights to porch, alfresco and outside laundry29 x Batten Lights31 x Double Power Points5 x Exhaust Fans2 x Fluoro for GarageNBN Provision Only

• SITE SPECIFIC SITE COSTS (foundations/slab/bushfire/marine/utilities)• Sewer Zone of Influence Engineering Design• CLIENT VARIATIONS / UPGRADES• --- Landscaping ---• 2 x 45ltr Native Tree to be selected by builder• Supply and Lay Kikuyu Turf, including 100mm soil/prep (tp to 272sqm)• Basic Garden 3.0 x 1.5 (3 x Plants, Mulch & Edging to Front of Property)• Letter Box on Post to Front Rail• Colorbond Fencing 1800 High at flat fee per block. Please contact Tovedale nearing the end of the

build and they will arrange to install fence to lot. This money is to be paid to Tovedale By GJGardner in payment for the fence. The fence is only side boundaries and rear boundaries to meetTovedales design guidelines.

• Colorbond Fencing 1800 High to separate yard and from side boundary to main dwelling (up to 8m)• Colorbond Single Gate o Either Side of Home (total 2)• Supply and Install 33m Clothesline on Posts to each unit (total 2)• Supply and Install crushed granite Path down Left Hand Side of Property and to each Clothesline

(up to 30m2)• --- Driveway ---• Plain Cove Finished Concrete Driveway (up to 50sqm)• --- Internal doors ---• Upgrade to Humes 2 Door smart robe sliding door system to rBeds 2 & 3 Robes of Main Home

(Total 2)• Upgrade to Humes 3 Door smart robe sliding door system to Beds 1 & 2 Robes of Granny Flat

Page 6: QUOTATION - paigcrm.s3.amazonaws.com€¦water is included if tank is empty. No allowance for tunnel or rubble trench for overflow. 4.3 Connect tank overflow from water tank to rear

Trading as G.J.Gardner Homes - Shoalhaven Page 2 Quote No : 04452

(Total 2) • --- Ensuite ---• Provide Tiled Niche to Shower, 600mm Wide x 300mm High (Total 1)• --- Kitchen ---• Omega Electrical Pack

- Omega Microwave- Omega Dishwasher- Omega Fridge

• --- Electrical ---• Alarm System Bosch Solution 880 3/Det• --- Plumbing & Gas ---• Credit Slimline 3335ltr Poly Tank• Provide 5000 litre Round Evo MkIII Tank Package with HighFlow• --- Floor Coverings ---• Provide Choice Category A Vinyl to Main floors (Up to 91sqm)• Provide Choices Carpet Coast Range for all Bedrooms (Up to 60sqm)• Provide Category A External Tiles to Porch & Alfresco (up to 30sqm)• --- Miscellaneous ---• Provisional Allowance for Window Coverings• FIXED PRICE QUOTATION• This quote is valid until 21st December 2018 subject to acceptance of quote within 14 days.

Site works are to commence prior to 21st December 2018. If the Site works do not commence bythis date, the Contract Price will be increased by a rate of 5% calculated annually. This will becharged at a daily rate.

The total cost (including GST) is: $420,162.00

This quote is subject to the final approval of the manager. If you have any queries about this quote please contact me on . This quote is valid for 14 days.

Yours faithfully,

Skye Nelson (Sales Consultant)

Page 7: QUOTATION - paigcrm.s3.amazonaws.com€¦water is included if tank is empty. No allowance for tunnel or rubble trench for overflow. 4.3 Connect tank overflow from water tank to rear

QUOTATION

_______________________________________________________________________

Owners Initials:_______________ New Home Consultant Initials:__________

Quick Quote & Plans: 04452 Date Prepared: 1st September 2018

PAGE 5 of 10

This quote is to be accepted by 15th September via a payment of $5,000.00 (deducted from

the quotation amount). All price rises after this period will be passed onto the client.

If the Site works do not commence by the specified date, the Contract Price will be increased

by a rate of 5% calculated annually. This will be charged at a daily rate.

This quote is subject to house siting by builder, contour survey, soil report and preliminary

drafting. This quote includes fees for standard development application approvals to the local

council authority.

This tender supersedes all previous correspondence.

HOUSE & LAND PACKAGE DETAILS

House Price - $420,162.00 Land Price - $215,000.00

Total Package Price - $635,162.00

Page 8: QUOTATION - paigcrm.s3.amazonaws.com€¦water is included if tank is empty. No allowance for tunnel or rubble trench for overflow. 4.3 Connect tank overflow from water tank to rear

QUOTATION

_______________________________________________________________________

Owners Initials:_______________ New Home Consultant Initials:__________

Quick Quote & Plans: 04452 Date Prepared: 1st September 2018

PAGE 6 of 10

Please Note:

Piering:

We have allowed in your new home estimate a nominated amount of piers. Should it be

necessary, due to filled or unsuitable ground conditions, or if affected by the “Zone of Influence” of a sewer main, to provide more piering than the allowance, additional piering will be charged to the client

No allowance, unless otherwise stated has been made:

1. Arising from Council or other public authority requirements

2. Arising from the double handling of materials due to site conditions.

3. No allowance has been made for the rectification to your kerb or gutter.

4. Marine Environment requirements being the potential use of: Exposure grade bricks.

Exposure grade mortar. Ultra Colorbond fascia and gutter. Ultra Colorbond roof

sheeting. Please note that some exposure grade bricks are included in the standard

brick range.

BASIX:

Basix requirements and inclusions are subject to a final position of the house, window

sizes, total house and site area and a NatHERS assessment (if applicable). Any outcomes

of these reports will be discussed with the home owner. Any additional cost

requirements as a result of these reports will be incurred by the home owner.

Taxes/Levies:

Should the Commonwealth and/or State Government and or Statutory Authorities

and/or Local Council introduce or increase or enforce any levy, tax, charge or other

requirement, or regulation after this agreement is signed, which affects the Builder,

Suppliers or Sub-Contractors, then any increase in costs will be passed onto the

Proprietor

Fixed Price

If the Site works do not commence by the specified date, the Contract Price will be

increased by a rate of 5% calculated annually. This will be charged at a daily rate.

Page 9: QUOTATION - paigcrm.s3.amazonaws.com€¦water is included if tank is empty. No allowance for tunnel or rubble trench for overflow. 4.3 Connect tank overflow from water tank to rear

QUOTATION

_______________________________________________________________________

Owners Initials:_______________ New Home Consultant Initials:__________

Quick Quote & Plans: 04452 Date Prepared: 1st September 2018

PAGE 7 of 10

Colour Consultant:

To assist you in making the right colour selections for your new investment, we offer as

part of our customer service, four hours with a professional Colour Consultant.

Our administration team will contact you and arrange your appointment time.

As part of your colour appointment you will also have a kitchen appointment to

overview your 3D drawings of your cabinetry.

You will meet our local preferred suppliers at your colour appointment, where you will

make your colour choices.

On completion of these preliminary selections a time will be appointed to meet at our

office to finalise the selection process.

Lending Authority:

When a lending authority is providing the funds for building of the proposed

development it is the owner’s responsibility to ensure they provide all the relevant and necessary documentation to the lending authority to enable the lending authority to

release the “Authority to Commence Construction” letter.

It is also the owner’s responsibility to provide the lending authority with any other documentation required during the course of construction for the prompt release of

progress payments.

Should a progress payment be delayed due to the lending authority waiting on

information from the owner, GJ Gardner Homes reserves its right to suspend building

works until GJ Gardner receives the outstanding progress payment.

If no lending is required, it is the responsibility of the owner to produce documentation

demonstrating their ability to pay, i.e. copies of bank statements or other relevant

material.

Bushfire Requirements:

This tender price does not include any requirements for building in a bushfire prone

area, unless otherwise stated. It is the responsibility of the client to provide a Bushfire

Assessment Report. If requested by the client, the builder will obtain the Bushfire

Assessment Report at a cost charged to the clients account.

Contributions:

All council contributions are to be paid by the owner of the property. A copy of the

receipt is to be provided to GJ Gardner Homes prior to the issuing of a Construction

Certificate.

Page 10: QUOTATION - paigcrm.s3.amazonaws.com€¦water is included if tank is empty. No allowance for tunnel or rubble trench for overflow. 4.3 Connect tank overflow from water tank to rear

QUOTATION

_______________________________________________________________________

Owners Initials:_______________ New Home Consultant Initials:__________

Quick Quote & Plans: 04452 Date Prepared: 1st September 2018

PAGE 8 of 10

Surveying:

The tender does not include an allowance to locate the boundaries of the property

unless noted otherwise.

A registered surveyor will provide off set pegs within the boundary of the property to

accurately locate the proposed development on the block of land.

AHD (Australian Height Datum): No allowance has been made to provide the finished

floor levels (FFL) of the proposed development to AHD unless noted otherwise. All

levels will work to an assumed datum generally to a benchmark on the street.

No allowance has been made to provide Identification Surveys during the course of

construction. Should the council or your lending authority require an Identification

Survey at any time the cost of the survey will be charged to you by way of a variation

including builder’s margin and GST.

Site Possession:

When GJ Gardner Homes release the Notice to Commerce Construction letter the

possession of the site becomes exclusively GJ Gardner Homes. No access to or storage

of materials on is allowed by any other individual without the express permission from

GJ Gardner Homes.

GJ Gardner Homes will exercise all due care but take no responsibility for any damage

caused to any existing structures on the site such as boundary fencing; retaining walls;

garages; garden sheds etc. whilst the site is in our possession.

No other works will be allowed to be carried out on the site i.e. swimming pools; sheds

etc whilst the site is in our possession. Any request to have another contractor or

tradesperson on the site will be denied.

Any item to be supplied by the owner is to be specified prior to issuing a “Notice to Commence Construction” letter. A product brochure is to be supplied with specifications and install procedures.

All products are to be delivered to site by the owner when requested by the

Construction Supervisor. No responsibility will be taken by GJ Gardner Homes for any

storage costs for products supplied by owner.

All due care but no responsibility will be taken by GJ Gardner Homes for any damage to

any product supplied by the owner. It is the responsibility of the owner to ensure all

products supplied are insured for damage, vandalism, theft etc. GJ Gardner Homes

insurance policies do not cover any items supplied by the owner.

Page 11: QUOTATION - paigcrm.s3.amazonaws.com€¦water is included if tank is empty. No allowance for tunnel or rubble trench for overflow. 4.3 Connect tank overflow from water tank to rear

QUOTATION

_______________________________________________________________________

Owners Initials:_______________ New Home Consultant Initials:__________

Quick Quote & Plans: 04452 Date Prepared: 1st September 2018

PAGE 9 of 10

AUTHORITY TO PROCEED (Client Copy) I/We accept the initial quotation subject to preliminary drafting, and authorises GJ Gardner

Homes Shoalhaven to proceed with ordering of the following reports:

Lot 111 Moresby Street, Endeavour Estate Nowra (545.5m2). Land payment of $215,000

payable direct to the developer through a standard exchange and settlement. Exchange

will require a deposit of $5,000 with balance required at settlement.

Contour Survey

Site Classification Report including Wind Loading

Preliminary drafting including elevations/siteplan/electrical layout with up to two revisions.

Any revision thereafter will incur a $200 fee.

A refundable amount of $5,000 is required to secure the land. This is refundable for a period of

14 days from receipt of land contract by solicitor/conveyancer. Upon exchange of land this

becomes non-refundable. Once the above deposit is non-refundable and this notification is

signed by the home owners we will then proceed to order the above.

I/We acknowledge that the initial quotation is subject to the outcomes in these reports and

drafting process. Any additional costs or changes to Inclusions, site costs or plans will be

requoted by G.J. Gardner Homes and presented to the client for their final approval, which will

form part of our fixed price building contract.

I/We consent to being contacted from time to time, by G.J. Gardner Homes, the Franchisor of

G.J.Gardner Homes and/or its related entities by way of phone, email or postal communication,

in relation to the products and services of G.J. Gardner Homes and/or its related entities.

This quotation provided will remain firm for 30 days or as outlined within the tender, and is

subject to the above payment (deducted from the quotation amount) being accepted within 14

days from the quotation date. Any price rises after this period will be passed onto the client.

We/I understand that all plans, whether standard or developed between myself/ourselves and

G.J. Gardner Homes or the Builder, remain copyright to G.J. Gardner Homes. We/I confirm that

any submitted plan is my/our design, and hereby indemnify G.J. Gardner Homes, the Builder,

its’ employees, directors, shareholders, subcontractors and servants against any claim or litigation which may occur prior to, during or after construction of this dwelling related to the

copyright over the submitted plan.

We thank you for your interest in G.J. Gardner Homes and look forward to working with you.

Site address: ..............................................................................................................

Client legal name/s: ..............................................................................................................

Client mailing address:…………………………………………………………………………………………………………

Client/s signature(s): ..............................................................................................................

Date: ...................................................... Our Bank Details, or EFT and cheque pay

BSB - 032 691

A/c No - 348 036

A/c Name - White Sands Pty Ltd (Trading as

G.J. Gardner Homes Shoalhaven)

Reference - your surname

Page 12: QUOTATION - paigcrm.s3.amazonaws.com€¦water is included if tank is empty. No allowance for tunnel or rubble trench for overflow. 4.3 Connect tank overflow from water tank to rear

QUOTATION

_______________________________________________________________________

Owners Initials:_______________ New Home Consultant Initials:__________

Quick Quote & Plans: 04452 Date Prepared: 1st September 2018

PAGE 10 of 10

AUTHORITY TO PROCEED (G.J. Gardner Homes Copy) I/We accept the initial quotation subject to preliminary drafting, and authorises GJ Gardner

Homes Shoalhaven to proceed with ordering of the following reports:

Lot 111 Moresby Street, Endeavour Estate Nowra (545.5m2). Land payment of $215,000

payable direct to the developer through a standard exchange and settlement. Exchange

will require a deposit of $5,000 with balance required at settlement.

Contour Survey

Site Classification Report including Wind Loading

Preliminary drafting including elevations/siteplan/electrical layout with up to two revisions.

Any revision thereafter will incur a $200 fee.

A refundable amount of $5,000 is required to secure the land. This is refundable for a period of

14 days from receipt of land contract by solicitor/conveyancer. Upon exchange of land this

becomes non-refundable. Once the above deposit is non-refundable and this notification is

signed by the home owners we will then proceed to order the above.

I/We acknowledge that the initial quotation is subject to the outcomes in these reports and

drafting process. Any additional costs or changes to Inclusions, site costs or plans will be

requoted by G.J. Gardner Homes and presented to the client for their final approval, which will

form part of our fixed price building contract.

I/We consent to being contacted from time to time, by G.J. Gardner Homes, the Franchisor of

G.J.Gardner Homes and/or its related entities by way of phone, email or postal communication,

in relation to the products and services of G.J. Gardner Homes and/or its related entities.

This quotation provided will remain firm for 30 days or as outlined within the tender, and is

subject to the above payment (deducted from the quotation amount) being accepted within 14

days from the quotation date. Any price rises after this period will be passed onto the client.

We/I understand that all plans, whether standard or developed between myself/ourselves and

G.J. Gardner Homes or the Builder, remain copyright to G.J. Gardner Homes. We/I confirm that

any submitted plan is my/our design, and hereby indemnify G.J. Gardner Homes, the Builder,

its’ employees, directors, shareholders, subcontractors and servants against any claim or litigation which may occur prior to, during or after construction of this dwelling related to the

copyright over the submitted plan.

We thank you for your interest in G.J. Gardner Homes and look forward to working with you.

Site address: ..............................................................................................................

Client legal name/s: ..............................................................................................................

Client mailing address:…………………………………………………………………………………………………………

Client/s signature(s): ..............................................................................................................

Date: ......................................................

BSB - 032 691

A/c No - 348 036

A/c Name - White Sands Pty Ltd (Trading as

G.J. Gardner Homes Shoalhaven)

Reference - your surname


Recommended