+ All Categories
Home > Documents > R evi ew of C adre st rengt h V i s-à-vi s W o rk L oad of...

R evi ew of C adre st rengt h V i s-à-vi s W o rk L oad of...

Date post: 14-Mar-2020
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
14
Transcript
Page 1: R evi ew of C adre st rengt h V i s-à-vi s W o rk L oad of ...indianrailways.gov.in/railwayboard/uploads/... · Wagon Repair Shop/Raipur is situated at Raipur, 7.5 Kilometers away
Page 2: R evi ew of C adre st rengt h V i s-à-vi s W o rk L oad of ...indianrailways.gov.in/railwayboard/uploads/... · Wagon Repair Shop/Raipur is situated at Raipur, 7.5 Kilometers away

Review of Cadre strength Vis-à-vis WorkLoad of safaiwalas  

a t W a g o n R e p a i r

S h o p / R a i p u r

Page 3: R evi ew of C adre st rengt h V i s-à-vi s W o rk L oad of ...indianrailways.gov.in/railwayboard/uploads/... · Wagon Repair Shop/Raipur is situated at Raipur, 7.5 Kilometers away

S O U T H E A S T C E N T R A L R A I L W A Y

B I L A S P U R

A S T U D Y R E P O R T O N R E V I E W O F C A D R E S T R E N G T H V I S - À - V I S

W O R K L O A D O F S A F A I W A L A S A T W A G O N R E P A I R S H O P / R A I P U R .

G U I D E D B Y S R I S . K . G U P T A

S R . D Y . G E N E R A L M A N A G E R

L E D B Y S R I S . N . P A T T N A I K

A S S T . W O R K S T U D Y O F F I C E R

C O N D U C T E D B Y

W O R K S T U D Y C E L L S . E . C . R A I L W A Y

B I L A S P U R S T U D Y N O .

S E C / 2 1 / 2 0 1 7 - 1 8

SRI A.C. BEHERA CH. WORK STUDY INSPECTOR

SRI ANSHUMAN HALDER WORK STUDY INSPECTOR

Page 4: R evi ew of C adre st rengt h V i s-à-vi s W o rk L oad of ...indianrailways.gov.in/railwayboard/uploads/... · Wagon Repair Shop/Raipur is situated at Raipur, 7.5 Kilometers away

पृष्ठ कं्र॰ एक कार्य अध्र्र्न प्रकोष्ठ ,वर्ूप पिक्षय मध्र् रेलक्ष े

CONTENTS

Chapter Description Page No.

- Summary of Recommendations 2

I Introduction 3

II Observations 4 - 7

III Critical analysis and Recommendation 8 - 10

IV Financial Evaluation 11

Page 5: R evi ew of C adre st rengt h V i s-à-vi s W o rk L oad of ...indianrailways.gov.in/railwayboard/uploads/... · Wagon Repair Shop/Raipur is situated at Raipur, 7.5 Kilometers away

पृष्ठ कं्र॰ वो कार्य अध्र्र्न प्रकोष्ठ ,वर्ूप पिक्षय मध्र् रेलक्ष े

SUMMARY OF RECOMMENDATIONS

Recom No.

Description Para

Reference

1 Thus, total sanctioned of 07 posts of Safaiwala (vac-03) in WRS Raipur are identified as surplus and should be surrendered.

3.7.1

2 In order to reduce the financial implication and expenditure incurred on departmental Safaiwalas, it is suggested that the work of Safaiwala may be outsourced and given on Contractual System.

3.7.2

Page 6: R evi ew of C adre st rengt h V i s-à-vi s W o rk L oad of ...indianrailways.gov.in/railwayboard/uploads/... · Wagon Repair Shop/Raipur is situated at Raipur, 7.5 Kilometers away

पृष्ठ कं्र॰ तीन कार्य अध्र्र्न प्रकोष्ठ ,वर्ूप पिक्षय मध्र् रेलक्ष े

CHAPTER-I

INTRODUCTION

SAFAI-KARMACHARI WORKING IN WAGON REPAIR SHOP/RAIPUR

Indian Railway is the biggest transport organization in India and playing an important role in

the development and economy of the country. Along with the Commercial activities, the

Railways have to fulfil the social obligations also, especially in the time of natural calamity and

towards the weaker sections of the society. For the healthy existence of such an important

organization it is necessary to be financially viable, which can be achieved by ensuring optimum

utilization of the resources i.e. Man, Material and Machinery.

With the implementation of 7th pay commission, the establishment charges have gone up

drastically and hence manpower has become an important factor in bringing economy in the

system. In order to check the cost of manpower, the Railway administration issues guidelines

from time to time, in the form of yardsticks, circulars etc.

Productivity has acquired a new and broader meaning in the light of highly competitive

economic environment, increasing educational levels, degradation of physical environment and

increasing population, creating pressure on the limited available resources.

All efforts should be made to ensure that the revenue is spent carefully over assets,

infrastructure and manpower. In other words, Railway administration should curtail wasteful

expenditure in operational and maintenance costs so as to bring down the operating ratio which

is the prime indicator of Railway’s financial efficiency.

Keeping in view of the above mentioned factors, the Work Study of Safai-Karmcharis in Wagon Repair Shop, Raipur has been undertaken to review the existing workload and requirement of

staff, in view of Railway Board’s instructions communicated vide letter No. E(MPP)2006/1/89,

dated 04.10.2006 the cleaning activities of all departments to be outsourced, improve

efficiency by implementing the multi skilling/MTS concept. The following methodology has been adopted for conducting the study:

(I) Collection of relevant field data, (II) Examination of records, (III) Direct observations regarding working of staff, (IV) Interaction with officers and staff and (V) Critical Analysis.

Page 7: R evi ew of C adre st rengt h V i s-à-vi s W o rk L oad of ...indianrailways.gov.in/railwayboard/uploads/... · Wagon Repair Shop/Raipur is situated at Raipur, 7.5 Kilometers away

पृष्ठ कं्र॰ चार कार्य अध्र्र्न प्रकोष्ठ ,वर्ूप पिक्षय मध्र् रेलक्ष े

CHAPTER – II

OBSERVATIONS

2.1 Staff Position:- The position of Safaiwala in Wagon Repair Shop, Raipur as per data collected is as under:-

S# Catagory P.B. Level Sanc. Act. Vac.

1 M/Safaiwala 18000-56900 L-1 04 02 02

2 J/Safaiwala 18000-56900 L-1 03 00 03

3 Safaiwala 18000-56900 L-1 00 02 -02 Grand Total 07 04 03

2.2 Set up of Wagon Repair Shop, Raipur:- Wagon Repair Shop/Raipur is situated at Raipur, 7.5 Kilometers away from Raipur Railway station in Raipur Division of S.E.C. Railway located in Chhattisgarh. The WRS/Raipur is headed by Chief Workshop Manager assisted by Dy.CME, Works Manager, WPO and AFA. The workshop performs overhauling of BG Wagons, Diesel & Electric locomotive wheels, ICF wheels etc. Wagon Repair Shop, Raipur is one of the Premier Workshops on Indian Railways planned to cater for repairs to different classes of Broad Gauge Wagons. This workshop is spread over an area of 222.86 hectares. The First wagon was turnout in the month of July’1968. During the year 1968-69 (from July’1968 to March’1969), 443 vehicle units, equivalent to 1115 FWU (Four wheel unit) was turned out. At present the target of wagon POH for 2017-18 is 400 vehicle units which is achieved during the month Nov 2017 with total on roll staff strength of 1674.

2.2.1 Comprehensive Housekeeping of Wagon Repair Shop, Raipur A intensive search is done by Work Study team to find out the comprehensive

housekeeping of WRS/R. For that a detail Sq mtr area of all non movable assets in WRS/R is given below:-

Sr No

Locations Area in Sq. Mtrs.

1.0 Shops Area 1.1 Body-II 6500 1.2 Body-I 6500 1.3 CBC 200 1.4 Fitting 2300 1.5 Air Brake 500 1.6 Bogie 6000 1.7 Wheel & CTRB 3294

Total 25294 2.0 Shop Offices & other buildings 2.1 Body-II 42 2.2 Body-I 50.8 2.3 New Supervisors Office Building 151.2 2.4 CBC 7.5 2.5 Fitting 27 2.6 Air Brake 4 2.7 Bogie 144

Page 8: R evi ew of C adre st rengt h V i s-à-vi s W o rk L oad of ...indianrailways.gov.in/railwayboard/uploads/... · Wagon Repair Shop/Raipur is situated at Raipur, 7.5 Kilometers away

पृष्ठ कं्र॰ पााँच कार्य अध्र्र्न प्रकोष्ठ ,वर्ूप पिक्षय मध्र् रेलक्ष े

Sr No

Locations Area in Sq. Mtrs.

2.8 Wheel & CTRB 35.5 2.9 CMT 51.5

2.10 Machine & MW 36.5 2.11 Smithy 45.6 2.12 Transport 14 2.13 BTC 24 2.14 Electrical 44 2.15 PCO-II 100.8 2.16 Yard 34 2.17 Time office 123.5 2.18 Paint 18 2.19 Ladies rest room 44.8 2.20 Library 292 2.21 Lunch Room near Body-II 88 2.22 Compressor Rooms 5 2.23 PCO-I inspection cell above NTXR office 117 2.24 NTXR Office 42 2.25 First Aid Post & CTK 55 2.26 JE & SSE Office (bogie) 19.5 2.27 SSE Fit Line Body-l 9.3 2.28 Store Depo office 125 2.29 Work Station 3 Body-l 8.3 2.30 Work Station 2 Body-l 6.16 2.31 Work Station 1 Body-l 6.72 2.32 Work ststion 1& JE Fit Line Body-ll 22 2.33 SSE Fit Line Body-ll 14.8 2.34 SSE Corrosion Body-ll 12 2.35 Work Station 2 Body-ll 19.5 2.36 Work Station 3 Body-ll 14.62

Total 1855.6 3.0 Admin Building Etc 3.1 CWM office 1396.4 3.2 IT centre 272.4 3.3 Drawing 46.8 3.4 Stores office 600 3.5 Accounts 1000 3.6 RPF office 50 3.7 Pass Office 173

Total 3538.6 4.0 Canteen, meeting hall, & ladies rest room 4.1 Canteen floor 583

4.2 Meeting Hall (including first aid and safety office) 260 4.3 Ladies rest room 36

Total 879 5.0 Roads,track ways & circulating areas 5.1 R1(IT centre to Main gate) 770 5.2 R2(Main Gate to Canteen) 175

5.3 R3(Main Gate to Yard office via Smithy, Machine, Stores) 3137

5.4 R4(Main Gate to Yard office via ladies rest room) 1688

Page 9: R evi ew of C adre st rengt h V i s-à-vi s W o rk L oad of ...indianrailways.gov.in/railwayboard/uploads/... · Wagon Repair Shop/Raipur is situated at Raipur, 7.5 Kilometers away

पृष्ठ कं्र॰ छः कार्य अध्र्र्न प्रकोष्ठ ,वर्ूप पिक्षय मध्र् रेलक्ष े

Sr No

Locations Area in Sq. Mtrs.

5.5 R5(Smithy shop junction to Wheel shop(near wheel press machine) 728 5.6 R6(Ganesh Temple to Yard office via bogie cleaning section) 544 5.7 R7(Yard office to hanuman temple through bogie, fitting & CBC) 1336 5.8 R8(Road between Bogie shop and wheel park area) 912 5.9 R9( Road from gas godown to CTRB section) 476

5.10 R10(Road from new stripping shed to end of Body-II shed via compressor house)

2416

5.11 R11(Road between Smithy shop & Machine Shop) 400 5.12 R12(Road between BTC to R3 junction) 376 5.13 R13(Road between Stores Depot and new Stripping Shed) 320 5.14 R14(Road in front of Stores Depot in front of Hanuman temple 316

Total 13594 6.0 Water booths & Tiffin Booths etc. 6.1 Canteen 09 6.2 Main gate 09 6.3 Smithy 04 6.4 Machine & MW including tiffin & coffee booth 06 6.5 PCO-II 04 6.6 Stores 04 6.7 Near B.T.C 09 6.8 Body-II Entrance 17.75 6.9 Opposite of Compressor Rooms including tiffin and coffee booth 27

6.10 Opposite Weigh bridge 13 6.11 Near Body-II Corrosion Office 09 6.12 Body-I Pit line office 52.25 6.13 Adjacent to Body-I office & A/Brake Section 14.5 6.14 Opposite SSE Bogie office including tiffin and coffee booth 30 6.15 Adjacent to Cycle stand near new bore well 09 6.16 Behind SSE Bogie office 09 6.17 Behind Ganesh Temple 04 6.18 Between TFW section and Wheel shop 04 6.19 Opposite HYT CNC wheel lathe including tiffin and coffee booth 09 6.20 Near entrance of CTRB cleaning section 09 6.21 Behind CTRB mounting section 04 6.22 3 water booths in CWM office 15 6.23 Pass Office 04

Total 275.5 7.0 Toilets & urinals 7.1 Near WRS canteen 21.25 7.2 Near RPF office 21.25 7.3 Near Body-I Pit Line 41.25 7.4 Between wheel park & Bogie shop 21.25 7.5 Behind PCO-II office 25.25 7.6 Supervisor Room near Body-I Store (Kalptaru) 15 7.7 Near Electrical Office 15 7.8 Near Wheel shop SSE Office 30 7.9 Near Body-I & Body-II Office 15

7.10 Ladies rest room 09 7.11 First aid and Meeting hall 21.25 7.12 Yard Office 09

Page 10: R evi ew of C adre st rengt h V i s-à-vi s W o rk L oad of ...indianrailways.gov.in/railwayboard/uploads/... · Wagon Repair Shop/Raipur is situated at Raipur, 7.5 Kilometers away

पृष्ठ कं्र॰ सात कार्य अध्र्र्न प्रकोष्ठ ,वर्ूप पिक्षय मध्र् रेलक्ष े

Sr No

Locations Area in Sq. Mtrs.

7.13 Near Compressor Room 60 7.14 Account Office near Administrative Building 12 7.15 Pass Section 09

7.16 Administrative building 1st floor 31

7.17 Administrative building Ground floor 31 7.18 Conference hall in administrative building 20 7.19 IT section 18 7.20 At Machine shop 43.2 7.21 Near stripping line 65 7.22 Near store 12

7.23 1st floor at Body Shop I & II office 30

Total 575.7

2.3 Duties of Safailwala: - Main duties of Safaiwala are :-

a. Sweeping. b. Cleaning of yard, platform, stores, office and garden including drains/ latrines. c. Cleaning of sewer pipe lines, septic tanks holes. d. Removing dead animals in the vicinity. e. Sprinkling of saw dust, scrapping and collection of garbages/rubbish, mud, silt

etc. f. Attending works related to complaint/reports.

2.4 Details and schedule of duty of the Safailwalas:-

Out of sanction 07 posts of Safaiwala, 04 staff are on roll at present in WRS/R. There details are as follows:-

NAME

1.

RANJEET

2.

NARSINGH BIRTHDATE 01/06/1977 25-12-1969 FATHER'S NAME LATE BASUDEO LATE KUMAR RAILWAY JOINING DATE 26/10/2005 05-10-1993 DATE OF RETIREMENT 31/05/2037 31-12-2029 NAME

3.

PATEL KUMAR LUN

4.

MOHAN LAL DONGRE BIRTHDATE 28-06-1972 10-10-1966 FATHER'S NAME GONDA SRI TETUL RAILWAY JOINING DATE 04-11-2004 14-02-2005 DATE OF RETIREMENT 30-06-2032 31-10-2026

Description of work Schedule of work

Sweeping and cleaning of Railway area including workshop and administrative buildings.

As and when required due to less staff. Cleaning of out fall drain, open big and small drains.

2.4 Duty Hours:

As per information given by staff, the safaiwala staff starts their duty at 07.00 Hrs. in morning and take lunch 12.00 to 13.00. Their post lunch duty starts 13.00 to 16.00 on week days. Sunday is the weekly rest day.

CHAPTER-III

Page 11: R evi ew of C adre st rengt h V i s-à-vi s W o rk L oad of ...indianrailways.gov.in/railwayboard/uploads/... · Wagon Repair Shop/Raipur is situated at Raipur, 7.5 Kilometers away

पृष्ठ कं्र॰ आठ कार्य अध्र्र्न प्रकोष्ठ ,वर्ूप पिक्षय मध्र् रेलक्ष े

CRITICAL ANALYSIS & RECOMMENDATIONS

3.1 The critical analysis has been done based on existing workload of Safai Karmchari, outsourcing and Multi-Tasking concept.

3.2 Requirement of Safaiwala: It is found that there is shortage of Safaiwala in Wagon Repair Shop, Raipur and all the cleaning activities will possible only increasing outsourced staff strength. A sample analysis for major cleaning on daily basis is given as below:-

Sr No

Locations Area in

Sq. Mtrs.

Batch No.

No. of Staff

Required*

1. Pass Office 173 I Morning

and evening

04 staff 2. Canteen 540

Garden etc.

I + II + III

in mid hours

12 staff + 01

supervisor

3. Garden No. 1 (Infront of CWM office) 4313

4. Garden No. 2 (Infront of BTC,Transport and Smithy adjacent to drain)

9900

5. Garden No. 3 (Infront of Machine Shop,PCO-II) 3600

6. Garden No. 4 (adjacent to ladies rest Room and infront of hindi library)

1200

7. Garden No. 5 (Infront of BTC) 2682 8. Wheel park jungle cutting 7600 9. Disc park jungle cutting. 2500

Roads, track ways & circulating areas 10. R1(IT centre to Main gate) 770 11. R2(Main Gate to Canteen) 175

12. R3(Main Gate to Yard office via Smithy, Machine, Stores)

3137

13. R4(Main Gate to Yard office via ladies rest room 1688

14. R5(Smithy shop junction to Wheel shop (near wheel press machine)

728

15. R6(Ganesh Temple to Yard office via bogie cleaning section)

544

16. R7(Yard office to hanuman temple through bogie, fitting & CBC)

1336

17. R8(Road between Bogie shop and wheel park area)

912

18. R9( Road from gas godown to CTRB section) 476

19. R10(Road from new stripping shed to end of Body-II shed via compressor house)

2416

20. R11(Road between Smithy shop & Machine Shop)

400

21. R12(Road between BTC to R3 junction) 376

22. R13(Road between Stores Depot and new Stripping Shed)

320

23. R14(Road in front of Stores Depot in front of Hanuman temple

316

Water booths etc. III Morning

04 24. Canteen 09

Page 12: R evi ew of C adre st rengt h V i s-à-vi s W o rk L oad of ...indianrailways.gov.in/railwayboard/uploads/... · Wagon Repair Shop/Raipur is situated at Raipur, 7.5 Kilometers away

पृष्ठ कं्र॰ नौ कार्य अध्र्र्न प्रकोष्ठ ,वर्ूप पिक्षय मध्र् रेलक्ष े

25. Smithy 04 and evening

26. Machine & MW including tiffin & coffee booth 06 27. PCO-II 04 28. Stores 04 29. Body-II Entrance 17.75

30. Opposite of Compressor Rooms including tiffin and coffee booth

27

31. Opposite Weigh bridge 13 32. Near Body-II Corrossion Office 09 33. Body-I Pit line office 52.25 34. Adjacent to Body-I office & A/Brake Section 14.5

35. Opposite SSE Bogie office including tiffin and coffee booth

30

36. Adjacent to Cycle stand near new borewell 09 37. Behind SSE Bogie office 09 38. Behind Ganesh Temple 04 39. Between TFW section and Wheel shop 04

40. Opposite HYT CNC wheel lathe including tiffin and coffee booth

09

41. Near entrance of CTRB cleaning section 09 42. Opposite shop floor meeting room 04 43. 3 water booths in CWM office 15 44. Pass Office 04 Toilets & urinals

II Morning

and evening

04

45. 02 toilets in IT centre 16.3 46. 02 Toilets in CWM office for officers 23 47. 02 Toilets in CWM office for staff 31.77 48. 02 toilets in Accounts and Stores building 12 49. 02 toilets in canteen 21.25 50. 01 toilet in RPF building 06 51. 01 toilet in Elect. Substation office 2.25 52. 01 toilet behind Smithy shop 24 53. 01 toilet in Machine shop 43.2 54. 01 toilet in behind PCO-II 21.25 55. 01 toilet behind Stripping shed body-II 65

56. 01 toilet between Compressor room and weighbridge

21.25

57. 01 toilet near Body-I pit line office 21.25 58. 02 toilet adjacent to SSE/Body-I office 30

Total Staff Required 13 *It is a general assumption and the workload and staff may be varied.

3.3 Finally considering the minimum staff requirement form above table, It is established that the sanction post for safaiwala activity is not sufficient for general cleaning activities including with multitasking concept (gardening, watering plant, cleaning utensils in canteen etc.)

Page 13: R evi ew of C adre st rengt h V i s-à-vi s W o rk L oad of ...indianrailways.gov.in/railwayboard/uploads/... · Wagon Repair Shop/Raipur is situated at Raipur, 7.5 Kilometers away

पृष्ठ कं्र॰ वस कार्य अध्र्र्न प्रकोष्ठ ,वर्ूप पिक्षय मध्र् रेलक्ष े

3.4 Scope of outsourcing: It is observed that no technical aspect is involved in the job of Safaiwala, also no specific skill is required for Maintenance of Sanitation and upkeep i.e. for Sweeping/ cleaning of all types of drains, toilets, cleaning of sewer pipe lines, roads etc. Hence, in order to reduce the financial implication and expenditure incurred on departmental Safaiwalas, it is suggested that the work of Safaiwala may be outsourced and given on Contractual System.

3.5 Presently Outsourced Cleaning Activity: The Works Contract for “Cleaning & general upkeep of toilet blocks, water booths & Tiffin Booths and sweeping & moping of floor of canteen, meeting hall and ladies rest room” was given to M/s VR Enterprises, Raipur vide acceptance letter No. WRS/R/09/17-18/03/TC/27/3457 dated 11/11/2017.

3.6 Reference Orders: 1. RB letter No. E/MPP2006 /1/89 Dated 04.10.2006 2. RB letter No. E/MPP2016 /1/59 Dated 10.01.2016

3.7 RECOMMENDATION & SUGGESTION:

On the basis of above observations and critical analysis, the following recommendations are made:

3.7.1 Thus, total sanctioned of 07 posts of Safaiwala (vac-03) in WRS Raipur are identified as surplus and should be surrendered.

3.7.2 In order to reduce the financial implication and expenditure incurred on departmental Safaiwalas, it is suggested that the work of Safaiwala may be outsourced and given on Contractual System.

Page 14: R evi ew of C adre st rengt h V i s-à-vi s W o rk L oad of ...indianrailways.gov.in/railwayboard/uploads/... · Wagon Repair Shop/Raipur is situated at Raipur, 7.5 Kilometers away

पृष्ठ कं्र॰ ग्र्ारह कार्य अध्र्र्न प्रकोष्ठ ,वर्ूप पिक्षय मध्र् रेलक्ष े

CHAPTER-IV

FINANCIAL EVALUATION & RESULTS

4.1 Savings due to surrender of 07 identified surplus posts:-

De

sig

na

tio

n

Sca

le o

f p

ay

Le

ve

l

No

. of

Po

st t

o

be

su

rre

nd

ere

d

Me

an

pa

y

Co

st p

er

Mo

nth

pe

r st

aff

(M

ea

n

Ba

sic

pa

y+

D

.A. @

5%

)

To

tal

cost

pe

r m

on

th (

in R

)

T

ota

l co

st p

er

ye

ar

(in

R)

Safaiwala/ Khalasi

18000-56900

L-1 07 37450 39320 275240 3302880

TOTAL 07 R 33,02,880

Thus, recurring savings to the tune of R 33,02,880 say R 33 lakhs Per annum can be achieved due to surrender of 07 posts of Safaiwala working from WRS Raipur and surrender memorandum to be issued by WPO/WRS/R/SECR.

-x-x-


Recommended