  • B SCHOOL FOR PRESIDENCY UNIVERSITY

    A N Prakash Construction Project Management Consultants Pvt. Ltd Page : 1

    PROJECT : PROPOSED PRESIDENCY UNIVERSITY B.SCHOOL Legend 95% less than Consultant's EstimateSUBJECT : COMPARATIVE STATEMENT - TENDER FOR EXTERNAL HT ELECTRIAL Between 95% & 105% to Consultant's Estimate

    105% greater than Consultant's Estimate

    Sl# Description Qty UnitsConsultant's Estimate ANPCPMC Estimate M/s Grid Electricals M/s Flutech Electricals M/s Veeresh Electricals M/s Megatron

    SUPPLY INSTALLATION SUPPLY INSTALLATION SUPPLY INSTALLATION SUPPLY INSTALLATION SUPPLY INSTALLATION SUPPLY INSTALLATIONRate Amount Rate Amount Rate Amount Rate Amount Rate Amount Rate Amount Rate Amount Rate Amount Rate Amount Rate Amount Rate Amount Rate Amount

    A External Electrical Works

    A.1 SINGLE POLE STRUCTURE:Supply, installation, interconnection (between EB line,GOSs,DOLO fuse, ), testing and commissioning of 1 No. 11Mtrs RCC Spun pole with following components mounted : a)1 set of 11KV, 500Amps,GOS b) 1 set of 11KV, DOLO fuseunit c) 1 set of 9KV, 5KA, lightning arrester. Rate shallinclude all necessary accessories like mounting bracket forGOS, DOLO , Interconnection of components using suitablesize of aluminium conductor thro alkathilene tube, excavation, refilling ,foundation for the RCC pole, etc etc complete .

    3 Each 95,000 285,000 12,000 36,000 72,000 216,000 14,500 43,500 58,000 174,000 8,770 26,310 70,000 210,000 22,000 66,000 70,000 210,000 13,000 39,000 90,000.00 270,000.00 32,000.00 96,000.00

    A.2 11KV metering cubicle Supply, installation, testing and commissioning of outdoor11KV metering cubicle made up of 14SWG CRCA sheet withpowder coating consisting of following:- 3nos Current Transformer, resincast, 2.75VA, Class:0.2. -- Potential tansformer, resincast, 25VA, class :0.2,-11KV/110V. - Electronic trivector meter,class:0.2,Parameters : KWh,KAVRh, MDI in KVA with all necessaryparameters as per EB. Rate shall include all necessary hardware complete.Make: MEI/Star switch gear/Banavathy 1 Each 175,000 175,000 3,500 3,500 180,000 180,000 8,000 8,000 190,000 190,000 6,200 6,200 180,000 180,000 10,000 10,000 191,500 191,500 7,500 7,500 194,238.00 194,238.00 20,000.00 20,000.00 (Rate shall exclude civil works for foundation)

    A.3 11KV VCB PANEL (For Transformer-500KVA):Supply, installation, testing and commissioning of Outdoortype 11KV Vaccum circuit breaker for 1000KVA TransformerProtection Unit made up of 16SWG CRCA sheet for bodyand 14 SWG CRCA sheet for door, floor mounting, powdercoated, with necessary hard ware, interconnection wiring &accessories complete.Comprising of following:-1 no's of 11KV 400A 350MVA 26.3KA 3P VCB Horizontaldrawout- Transformer protection relay( Minimum OC,SC, EL,W.Temp)- "RYB", " TRIP CIRCUIT HEALTH LED" , "ALL Faults" LEDtype indicator- ExpandableRate shall include all necessary hardwares for installationcomplete & shall be as per BESCOM requirement 1 Each 450,000 450,000 6,000 6,000 415,000 415,000 10,500 10,500 396,000 396,000 6,200 6,200 495,000 495,000 12,000 12,000 474,600 474,600 9,000 9,000 468,526.00 468,526.00 20,000.00 20,000.00 Make: ABB/ Scheinder(Rate shall exclude civil works for foundation)

    A.3 500kVA LOW LOSS TRANSFORMER WITH OLTCSupply of 11KV/433V 5000KVA transformer, copper wound,Delta/star grounded, 3 phase,50hz, Dyn11, + 5%or - 15%ON circuit tap changeover in 17 steps (1.25%/step), suitablefor floor mounting, Impedence as per IS, HT side cable box ,LT side cable box. Rate shall include factory routine tests asper IS.Important: 50%Load loss - 1600Watts , Full load loss -5500wattsFollowing accessories shall be provided as minimum:1. Bokholz relay2. Oil temperature guage/relay.3. Oil level guage.4. Winding temp. relayMake:OLTC: OLG/CRTRTCC Relay:Precission Measurements/Peacon 1 Each 1,520,000 1,520,000 8,000 8,000 1,215,000 1,215,000 18,500 18,500 1,148,500 1,148,500 11,840 11,840 1,185,000 1,185,000 10,000 10,000 1,235,500 1,235,500 9,000 9,000 894,672.00 894,672.00 22,000.00 22,000.00 (Rate shall exclude civil works for foundation)

    A.4 Out door LT boxSupply, installation, testing and commissioning of " L.TKIOSK" ,outdoor type, IP56, pole mounting, powder coated,make out of 14 SWG CRCA sheet steel for body and 14SWG for doors with1 No. of 800Amps 36KA TPN MCCB , 1 Set 65000 65,000 3,500 3,500 75850 75,850 6,000 6,000 73,570 73,570 3,250 3,250 75,750 75,750 8,500 8,500 79,000 79,000 3,800 3,800 71,888.00 71,888.00 6,000.00 6,000.00 outgoing cabel box , necessary mounting hard ware &accessories complete.(Rate shall exclude civil works for foundation)

  • B SCHOOL FOR PRESIDENCY UNIVERSITY

    A N Prakash Construction Project Management Consultants Pvt. Ltd Page : 2

    Sl# Description Qty UnitsConsultant's Estimate ANPCPMC Estimate M/s Grid Electricals M/s Flutech Electricals M/s Veeresh Electricals M/s Megatron

    SUPPLY INSTALLATION SUPPLY INSTALLATION SUPPLY INSTALLATION SUPPLY INSTALLATION SUPPLY INSTALLATION SUPPLY INSTALLATIONRate Amount Rate Amount Rate Amount Rate Amount Rate Amount Rate Amount Rate Amount Rate Amount Rate Amount Rate Amount Rate Amount Rate Amount

    A.5 YARD FENCING as per STANDARD ELECTRICALPRACTICESupply & installation of Chain linked fencing for transformeryard as per below specification:Frame Size 2.5m x 1.5mMS Angle 50 x 6mmChain Link 8swg GISupporting ISMB 75 x 40mmPaint - 2 coats Red oxide and 2 Coats Enamel. 50 Mtrs 1,600 80,000 250 12,500 2,750 137,500 250 12,500 2,450 122,500 480 24,000 3,100 155,000 500 25,000 1,875 93,750 150 7,500 2,600.00 130,000.00 240.00 12,000.00

    A.6 HT CABLE TERMINATIONA.6.1 Supply and installation of 3Cx185Sqmm 11KV cable heat

    shrinkable type end termination . Rate shall included allnecessary acessories like glands, copper lugs, mountingbrackets etc etc complete. Make: RaychemIndoor 3 Each 6,800 20,400 500 1,500 7,250 21,750 1,875 5,625 6,500 19,500 1,750 5,250 4,600 13,800 1,500 4,500 5,250 15,750 1,650 4,950 6,449.00 19,347.00 3,200.00 9,600.00 Outdoor 3 Each 5,000 15,000 400 1,200 - - 7,250 21,750 1,750 5,250 6,500 19,500 2,250 6,750 5,800 17,400 1,780 5,340 9,320.00 27,960.00 3,300.00 9,900.00

    A.6.2 Supply and installation of 3Cx95Sqmm 11KV cable heatshrinkable type end termination . Rate shall included allnecessary acessories like glands, copper lugs, mountingbrackets etc etc complete. Make: RaychemIndoor 2 Each 6,800 13,600 500 1,000 6,250 12,500 1,650 3,300 4,810 9,620 1,350 2,700 4,500 9,000 1,500 3,000 4,780 9,560 1,450 2,900 5,388.00 10,776.00 3,000.00 6,000.00

    A.7 MAIN L.T PANELSupply installation, testing and commissioning of followingL.T PANEL made up of 14SWG CRCA sheet for body and 14SWG CRCA sheet for door, Outdoor type, floor mounting,powder coated, with necessary hard ware, interconnectionwiring & accessories complete as per SLD drg#S668-E-S-Ext-01

    A.7.1 Main L.T Panel with PLC 1 Each 750,000 750,000 8,000 8,000 750,000 750,000 15,000 15,000 722,950 722,950 7,020 7,020 757,350 757,350 16,500 16,500 774,600 774,600 10,000 10,000 720,446.00 720,446.00 20,000.00 20,000.00

    A.8 H.T / L.T CABLES & CABLE TERMINATIONH.T / L.T CABLES Supply,Laying and testing of 1.1/13KV, armoured, PVCinsulated, alumnimum cables. Cable shall be laid inexisitng hume pipes/trench/cable tray.

    A.8.1 3C x 185 Sqmm XLPE 11KV Al.Armoured Cable 15 Mtrs 1300 19,500 120 1,800 1175 17,625 50 750 930 13,950 80 1,200 1,125 16,875 85 1,275 980 14,700 85 1,275 957.00 14,355.00 175.00 2,625.00 A.8.2 3C x 95 Sqmm XLPE 11KV Al.Armoured Cable 10 Mtrs 950 9,500 90 900 819 8,190 40 400 635 6,350 60 600 675 6,750 75 750 650 6,500 78 780 638.00 6,380.00 120.00 1,200.00 A.8.3 3.5C 240 Sqmm XLPE 1.1KV Al. Armoured cable 1400 Mtrs 1,100 1,540,000 90 126,000 960 1,344,000 72 100,800 775 1,085,000 95 133,000 845 1,183,000 85 119,000 870 1,218,000 110 154,000 842.00 1,178,800.00 175.00 245,000.00 A.8.4 4C 25 Sqmm XLPE 1.1KV Al. Armoured cable 1200 Mtrs 170 204,000 40 48,000 166 199,200 30 36,000 135 162,000 20 24,000 145 174,000 30 36,000 164 196,800 30 36,000 145.00 174,000.00 35.00 42,000.00 A.8.5 4C 16 Sqmm XLPE 1.1KV Al. Armoured cable 1500 Mtrs 140 210,000 20 30,000 125 187,500 25 37,500 105 157,500 15 22,500 110 165,000 25 37,500 115 172,500 28 42,000 110.00 165,000.00 32.00 48,000.00 A.8.6 4C 2.5 Sqmm copper. Armoured cable 200 Mtrs 120 24,000 20 4,000 137 27,400 20 4,000 130 26,000 12 2,400 125 25,000 15 3,000 150 30,000 24 4,800 120.00 24,000.00 25.00 5,000.00

    A.9 CABLE END TERMINATIONEnd terminations of the below listed cables including supplyof brass glands, solders long barrel type copper lugs etccomplete.

    A.9.1 3.5C 240 Sqmm XLPE 1.1KV Al. Armoured cable 14 Each 1,800 25,200 350 4,900 1,833 25,662 238 3,332 1,400 19,600 500 7,000 2,500 35,000 550 7,700 1,100 15,400 650 9,100 1,823.00 25,522.00 700.00 9,800.00 A.9.2 4C 25 Sqmm XLPE 1.1KV Al. Armoured cable 8 Each 125 1,000 70 560 311 2,488 50 400 150 1,200 50 400 225 1,800 150 1,200 200 1,600 150 1,200 155.00 1,240.00 90.00 720.00 A.9.3 4C 16 Sqmm XLPE 1.1KV Al. Armoured cable 12 Each 100 1,200 60 720 230 2,760 45 540 130 1,560 30 360 190 2,280 140 1,680 150 1,800 100 1,200 140.00 1,680.00 80.00 960.00 A.9.4 4C 2.5 Sqmm copper. Armoured cable 20 Each 60 1,200 35 700 140 2,800 35 700 75 1,500 25 500 150 3,000 125 2,500 100 2,000 75 1,500 60.00 1,200.00 30.00 600.00

    - - - - - A.10 9Mtrs RCC

    Supply & installation of 9Mtrs RCC pole, Rate shall includeall accessories like J-hook and suspension clamp formounting 3x 120Sqmm 11KV Aerial Bunched cable ABC ,sprial earthing, excavation , concreting etc etc complete 22 Each 7,000 154,000 1,000 22,000 6,500 143,000 1,500 33,000 5,750 126,500 880 19,360 6,050 133,100 1,575 34,650 6,800 149,600 1,875 41,250 6,159.00 135,498.00 2,200.00 48,400.00

    A.11 8Mtrs RCC Stud poleSupply & installation of 8Mtrs RCC pole (Note: Rate shallinclude sprial earthing, excavation , concreting etc etc 5 Each 4,000 20,000 750 3,750 5,975 29,875 1,250 6,250 5,800 29,000 880 4,400 5,750 28,750 1,075 5,375 6,037 30,185 1,650 8,250 5,886.00 29,430.00 2,000.00 10,000.00 complete)

    A.12 Guy set with No.15 strain insulator & Concreting materials 5 Each 1,100 5,500 300 1,500 1,500 7,500 500 2,500 1,620 8,100 435 2,175 1,250 6,250 1,000 5,000 1,905 9,525 1,600 8,000 1,400.00 7,000.00 400.00 2,000.00

    A.13 Over head Line(H.T)Supply, installation, testing and commissioning of Standardcompacted circular Aluminum conductor, conductor screened with extruded semi conducting compound followedby copper tape,each core sheathed with PVC type ST-2 compound, 3C twisted around XLPE insulated Aluminum

  • B SCHOOL FOR PRESIDENCY UNIVERSITY

    A N Prakash Construction Project Management Consultants Pvt. Ltd Page : 3

    Sl# Description Qty UnitsConsultant's Estimate ANPCPMC Estimate M/s Grid Electricals M/s Flutech Electricals M/s Veeresh Electricals M/s Megatron

    SUPPLY INSTALLATION SUPPLY INSTALLATION SUPPLY INSTALLATION SUPPLY INSTALLATION SUPPLY INSTALLATION SUPPLY INSTALLATIONRate Amount Rate Amount Rate Amount Rate Amount Rate Amount Rate Amount Rate Amount Rate Amount Rate Amount Rate Amount Rate Amount Rate Amount

    alloy messenger wire to form 11kV grade Aerial Bunched Cable (ABC) with specified to IS 7098/II/85 and confirming tothe GTP with wire rope.(Note:-Rateshall exclude RCC pole,Insulators & Cross arm)

    A.13.1 3Runs X 120 Sqmm 950 Mtrs 700 665,000 100 95,000 805 764,750 75 71,250 885 840,750 45 42,750 810 769,500 205 194,750 805 764,750 60 57,000 683.00 648,850.00 120.00 114,000.00

    A.14 Supply & installation of one set of dead end clamp andbracket sutiable for 3x 120Sqmm 11KV Aerial Bunchedcable ABC on existing 11Mtrs pole with accessories likebrackets , hardware etc. complete 8 Each 700 5,600 350 2,800 575 4,600 250 2,000 235 1,880 40 320 1,250 10,000 1,000 8,000 675 5,400 175 1,400 850.00 6,800.00 400.00 3,200.00

    A.14a EARTHINGA.14a.1 G.I PIPE EARTHING

    Supply, installation, testing and commissioning of G.Ipipe electrode type earth station as per IS 3043complete with 38mm dia class 'B' pipe, funnel, testlink, brick masonry chamber with heavy duty cover,etc etc complete. 10 Each 3,500 35,000 1,250 12,500 4,800 48,000 1,500 15,000 4,800 48,000 1,315 13,150 3,500 35,000 2,500 25,000 4,600 46,000 1,750 17,500 5,700.00 57,000.00 1,800.00 18,000.00

    A.14a.2 COPPER PLATE EARTHINGSupply, installation, testing and commissioning ofCopper plate 600x600x3mm electrode earth station asper IS 3043 complete with 38mm dia class 'B' pipe,funnel, test link, brick masonry chamber with heavyduty cover, etc etc complete. 2 Each 13,500 27,000 2,000 4,000 13,500 27,000 1,500 3,000 12,500 25,000 1,750 3,500 11,500 23,000 4,000 8,000 13,800 27,600 2,250 4,500 12,000.00 24,000.00 1,800.00 3,600.00

    A.14a.3 MIANTENANCE FREE EARTH STATIONSupply , Installation , testing and commissioning of 1number of 3mtr length 5/8" dia JK steel rod moleculerlybonded with 250 microns copper with SS U clamps & nutsfor interconnecting along with alternative layers of soil and grounding enchancing matrerial (GEM) which consists of 1set of 5 Kgs Part 1 (mixture of calcium carbonate,tetrasodium hexacynoferrate & sodium sulphate) + Part 2 +1 set of 5Kgs Part 2 (copper sulphate). Rate shall includeexcavation, refilling, with heavy duty weather proofpolyplastic earth pit chamber & cover(model#PPC02) etccomplete.Contact # 09886008218(Mr. Shanth Kumar) 2 Each 12,000 24,000 2,000 4,000 12,250 24,500 2,000 4,000 22,000 44,000 1,750 3,500 15,500 31,000 4,500 9,000 11,000 22,000 2,000 4,000 13,000.00 26,000.00 1,800.00 3,600.00

    A.15 EARTHING STRIPSupply , laying & termination of following earth strip. Rateshall include all necessary accessories including clampingto the walls, cables, cable trays etc complete.

    A.15.1 40x6mm Hotdipped 80micron GI Strip 110 Mtrs 228 25,080 55 6,050 170 18,700 30 3,300 180 19,800 35 3,850 165 18,150 75 8,250 340 37,400 40 4,400 177.00 19,470.00 55.00 6,050.00 - -

    A.15.2 25x6mm Hotdipped 80micron GI Strip 100 Mtrs 175 17,500 44 4,400 130 13,000 16 1,600 110 11,000 28 2,800 95 9,500 40 4,000 182 18,200 32 3,200 118.00 11,800.00 40.00 4,000.00 - -

    A.15.3 25x3mm GI Strip 250 Mtrs 90 22,500 34 8,500 50 12,500 12 3,000 75 18,750 22 5,500 65 16,250 35 8,750 108 27,000 28 7,000 48.00 12,000.00 38.00 9,500.00

    A.15.4 25x6 copper Flat 20 Mtrs 950 19,000 60 1,200 945 18,900 20 400 950 19,000 28 560 795 15,900 40 800 875 17,500 32 640 979.00 19,580.00 45.00 900.00

    A.15a STREET LIGHTING PANEL (out Door)Supply, installtion, testing and commissioning of STREETLIGHT PANEL made up of 16SWG CRCA sheet for bodyand 14 SWG CRCA sheet for door, outdoor type, floormounting, powder coated,Degree of projection IP56, withnecessary hard ware, interconnection wiring & accessoriescomplete comprising of the following

    + 2 nos. 32A 3P AC1 contactor + 2 nos. 24hrs Timer

    2 Each 25,000 50,000 2,000 4,000 22,250 44,500 2,500 5,000 21,170 42,340 2,455 4,910 27,500 55,000 2,500 5,000 22,000 44,000 1,250 2,500 20,143.00 40,286.00 2,400.00 4,800.00

    A.16 MISCELLANEOUS ITEMS

    A.16.1 Supply and laying of 150mm Dia 6KG PVC pipe. Rateshall included excavation and refilling(for incoming Cable) 75 Mtrs 560 42,000 175 13,125 465 34,875 175 13,125 520 39,000 40 3,000 350 26,250 45 3,375 480 36,000 40 3,000 350.00 26,250.00 225.00 16,875.00

    A.16.2 Supply and laying of 75mm Dia 6KG PVC pipe. Rateshall included excavation and refilling(for incoming Cable) R/O Mtrs 200 120 250 165 365 35 225 35 210 30 250.00 180.00

    A.16.3 Supply and laying of 50mm Dia 6KG PVC pipe. Rate shall

    Incomming : 40A 4P 10KA MCB

    Outgoings : 8 Nos 20A 10KA SP MCB

  • B SCHOOL FOR PRESIDENCY UNIVERSITY

    A N Prakash Construction Project Management Consultants Pvt. Ltd Page : 4

    Sl# Description Qty UnitsConsultant's Estimate ANPCPMC Estimate M/s Grid Electricals M/s Flutech Electricals M/s Veeresh Electricals M/s Megatron

    SUPPLY INSTALLATION SUPPLY INSTALLATION SUPPLY INSTALLATION SUPPLY INSTALLATION SUPPLY INSTALLATION SUPPLY INSTALLATIONRate Amount Rate Amount Rate Amount Rate Amount Rate Amount Rate Amount Rate Amount Rate Amount Rate Amount Rate Amount Rate Amount Rate Amount

    included excavation and refilling(for incoming TV & Tel Cable) R/O Mtrs 85 90 165 150 148 30 175 35 175 28 191.00 150.00

    A.16.4 Supply & Installing Danger name plates of approved shapeand size 4 Each 325 1,300 50 200 250 1,000 25 100 100 400 5 20 500 2,000 150 600 450 1,800 75 300 750.00 3,000.00 50.00 200.00

    - A.16.6 Supply & installing Shock chart as approved by the

    electrical inspectorate 2 Each 298 596 50 100 250 500 25 50 480 960 - 750 1,500 100 200 980 1,960 100 200 800.00 1,600.00 50.00 100.00

    A.16.7 Excavation and refilling upto a depth of 750mm for Cables 12000 Cft - 12 144,000 - 9 102,000 - 15 180,000 - 25 300,000 - 12 144,000 22.00 264,000.00

    A.16.8 Sand for cable laying 1200 Cft 100 120,000 10 12,000 60 72,000 10 12,000 45 54,000 10 12,000 75 90,000 20 24,000 - 70 84,000 70.00 84,000.00 25.00 30,000.00

    A.16.9 Burnt bricks for cable laying 2100 Cft 60 126,000 15 31,500 15 31,500 10 21,000 25 52,500 5 10,500 55 115,500 15 31,500 60 126,000 - 70.00 147,000.00 25.00 52,500.00

    A.16.10 Cast iron cable route marker 30 Nos 450 13,500 50 1,500 250 7,500 100 3,000 195 5,850 35 1,050 250 7,500 50 1,500 275 8,250 75 2,250 650.00 19,500.00 70.00 2,100.00

    A.17 PROFESSIONAL AND LAISONING CHARGES (With EB and INSPECTORATE)Liasion with EB/ Electrical inspectorate, preparation &getting approval of drawings by Electriciity Board(EB),obtaining clearence from CEIG for the installation, filingapplication and follow-up at different levels with EB,co-ordinating with MRT dept etc etc complete upto servicing 1 - 300,000 300,000 - 300,000 300,000 - 140,000 140,000 - 320,000 320,000 - 275,000 275,000 375,000.00 375,000.00 of power. (Note : Including Deposits)

    TOTAL PART 6,783,176 970,905 6,145,425 908,922 5,739,880 743,325 6,107,255 1,370,605 6,134,130 1,019,235 5,719,094 1,546,230

    VAT 14.5% and 5.5% Included N/A 730,537 609,794 N/A 650,389 N/A 889,449 N/A 829,269 N/A

    Service Tax 14.0% N/A Included 127,249 N/A 104,066 N/A 191,885 N/A 142,693 N/A 216,472

    GRAND TOTAL 7,754,081 7,912,133 7,197,065 8,320,134 8,185,507 8,311,065 L1 L4 L2 L3

  • A.N.Prakash CPMC Pvt. Ltd. P: 5/8

    COMPARATIVE STATEMENT TECHNO COMMERCIAL PROJECT : PRESIDENCY UNIVERSITY ' B' SCHOOL @ DIBBUR , BANGALORE.

    PROJECT : PROPOSED PRESIDENCY UNIVERSITY B.SCHOOLSUBJECT : TECHNO COMMERCIAL STATEMENT FOR EXTERNAL HT ELECTRICAL WORKS - R1Sl. # Sub Heads As per TENDER M/s.Grid Electricals M/s.Flutech Electricals M/s.Veeresh Electricals M/s.Megatron

    COMMERCIAL1 Type of Tender Item Rate Item Rate Item Rate Item Rate Item Rate

    2 Validity of tender 60 days from the date of submission Accepted Accepted Accepted

    3 Period of completion Accepted Accepted Accepted Accepted

    4 Accepted Accepted Accepted Accepted

    5 Release of Retention Accepted Accepted Accepted Accepted

    6 Performance guarantee Accepted Accepted Accepted Accepted

    7 Mobilization Advance Accepted Accepted Accepted Accepted

    8 Accepted Accepted Accepted Accepted

    9 Defect Liability Period Accepted Accepted Accepted Accepted

    11 Liquidated damages Accepted Accepted Accepted Accepted

    12 Milestone Penalty Accepted Accepted Accepted Accepted

    13 Vendor scope Accepted Accepted Accepted Accepted

    14 Power & water supply Accepted Accepted Accepted Accepted

    15 Accepted Accepted Accepted Accepted

    30 days from the date of submission.

    2 calender months from the date of commencement of work

    Retention money from interim bills (interest free)

    5% of the value of work done from each interim bill will be retained by client in cash. The Amount so retained shall not bear any interest for duration retained.50% with the final bill. Balance 50% on expiry of defects liability period of 1 year subject to deduction of amount paid for rectification of any defects by the client.

    Contractor shall furnish performance guarantee in the form of a bank guarantee of a value equal to 10% of the contract value less the value of materials supplied by the client.10% of contract value will be paid as mobilisation advance on production of bank guarantee for the same amount.

    Recovery of Mobilization Advance

    Mobilisation advance paid shall be recovered from Ist RA bill on pro-rata basis.12 (Twelve) months from the date of issue of virtual completion certificate from client. 0.5% of value of contract per week of delay, subject to maximum of 5% of the value of contract.1% of the value of work pending in the milestone event shall be withheld (interest free) from running bills

    Site offices / Godowns/Labour campus

    Power shall be provided by the Client at one point on chargeable basis; respective vendor has to do the required cabling & metering for tap the power supply from one point. The contractor, if need be, shall install a diesel generator set of required capacity to augment or replace the power obtained from electricity board for construction and administrative purposes. The cost of such installation and running (including consumables operational cost) the DG set shall be entirely borne by the contractor.*Contractor should inform client peak load requirement before the commencement of work. Any delay in the progress of work due to non-availability of power shall not be acceptable.

    Date of commencement of works

    On award of work, the day of commencement date shall be mutually discussed between Client & contractor.

  • A.N.Prakash CPMC Pvt. Ltd. P: 6/8

    Sl. # Sub Heads As per TENDER M/s.Grid Electricals M/s.Flutech Electricals M/s.Veeresh Electricals M/s.Megatron

    16 Submission of RA bills Contractor shall submit RA bills Once in a month.

    17 Certification of bills Accepted Accepted Accepted Accepted

    18 Payment terms Accepted Accepted Accepted Accepted

    19 Final Bill Accepted Accepted Accepted Accepted

    20 Accepted Accepted Accepted Accepted

    21 Taxes deduction at source

    22 Price Validity Accepted Accepted Accepted Accepted

    23 Extra works As per Tender Accepted Accepted Accepted Accepted24 Safety Applicable Accepted Accepted Accepted Accepted25 Insurances / Policies Contractor scope Accepted Accepted Accepted Accepted

    26 Taxes Applicable

    27

    28 ESI / PF Contractor scope Accepted Accepted Accepted Accepted29 Labour cess Applicable30 Makes of equipment As per Tender Accepted Accepted Accepted Accepted

    Interim bill: Advance payment certification of 50% of RA bill value within 10 (Ten) days and full certification within 21 (twenty one) working days from the date of complete bill submission and as per the approved format will be done by Engineer incharge/site inchargeFinal bill: Within 90 (Ninty) days from the submission of complete bill.

    Interim bill: Advance payment within 10 (Ten) days from the receipt of certificate of EIC/Site team and balance payment shall be paid with all recoveries within 21 (Twenty One) days from the date of receipt of payment certificate from the EIC/site team and all statutory compliances (like ESI,PF etc., details for specific period.

    Final bill: Within 90 (Ninty) days from the date of receipt of payment certificate from the Engineer In Charge.

    Payment terms

    A. Supply 60%against delivery of materials at site. 30% against Erection. 10% against testing, commissioning & Handing overB. Installation.* 90% against Installation* 10% against testing,commissioing & handing over

    Tax shall be deducted at source in accordance with the statutory requirements from all payments made to the contractor, including that in respect of the mobilisation advance, if paid.

    Taxes are shown seperately, Any increase in the taxation will be implemented accordingly.

    The quoted price in the tender is to be held firm throughout, till the project is completed.

    Taxes are shown separately. Any increase in the taxation will be implemented accordingly.

    Statutory Variations like taxes, levies, etc.

  • A.N.Prakash CPMC Pvt. Ltd. P: 7/8

    Sl. # Sub Heads As per TENDER M/s.Grid Electricals M/s.Flutech Electricals M/s.Veeresh Electricals M/s.Megatron

    31 Test certificates.

    32 Exclusions Civil works ( Foundation for equipments )

    33 Others -

    Required test certificates from manufacturer to be handed over to client.

    Required test certificates from manufacturer to be handed over to client.

    Required test certificates from manufacturer to be handed over to client.

    Required test certificates from manufacturer to be handed over to client.

    All relevant test certificates and test reports issued by manufacturers/ vendors and in house testing pertaining to materials will be handed over to you as a part of project document. Additional intensive testing from external agencies like CPRI, Civil Aid etc. has not been included in this quote and will be at an additional cost

    Civil works ( Foundation for equipments )

    Civil works ( Foundation for equipments )

    Civil works ( Foundation for equipments )

    All civil works are excluded from our scope.

    Considered single compression glands with Al lugs for Al cables and Cu lugs for Cu cables *Quoted rate does not include deposits as we require to know the sanctioned load.

  • A.N.Prakash CPMC Pvt. Ltd. P: 8/8

    PROJECT : PROPOSED PRESIDENCY UNIVERSITY B.SCHOOLSUBJECT : LIST OF MAKES

    S/L# Material As per Tender - Make M/s Grid Electricals M/s Flutech Electricals M/s Veeresh Electricals M/s Megatron1 Transformer : Kamath/Vijay/Universal : Kamath/Vijay/Universal : Kamath/Vijay : Kamath : Vijay

    2 MCB & DB's : LEGRAND/Schneider/ABB : LEGRAND/Schneider/ABB : LEGRAND/Schneider/ABB : LEGRAND/Schneider/ABB : LEGRAND/Schneider/ABB

    3 MCCB : LEGRAND/Schneider /ABB : LEGRAND/Schneider /ABB : LEGRAND/Schneider /ABB : LEGRAND/Schneider /ABB : LEGRAND/Schneider /ABB

    4 LT/HT cable : Unistar/ KEI/RPG/havells : Unistar/ KEI/RPG/havells : KEI : Havells : KEI

    5 Wires : Anchor / RR /havells/Walna : Anchor / RR /havells/Walna : Anchor / RR /havells/Walna : Anchor / RR /havells/Walna : Anchor / RR /havells/Walna

    6 HT Metering Cubical : Bhanavathy : Bhanavathy : Bhanavathy : Bhanavathy : Bhanavathy

    7 Cable glands and lugs : Dowells/Multi : Dowells/Multi : Dowells/Multi : Dowells : Dowells/Multi

    8 Meters : MECO/RISHAB : MECO/RISHAB : MECO/RISHAB : MECO/RISHAB : MECO/RISHAB

    9 Indicating lamp : Technic/Siemens : Technic/Siemens : Technic/Siemens : Technic/Siemens : Technic/Siemens

    10 Selector switch : Kaycee/Salzer : Kaycee/Salzer : Kaycee/Salzer : Kaycee/Salzer : Kaycee/Salzer

    11 ELR : Prok Device / Enercon : Prok Device / Enercon : Prok Device / Enercon : Prok Device / Enercon : Prok Device / Enercon

    12 Capacitors : Ducati / Epcos : Ducati / Epcos : Ducati / Epcos : Ducati / Epcos : Ducati / Epcos

    13 C.T & P.T : Kalpa / Paras. : Kalpa / Paras. : Kalpa / Paras. : Kalpa / Paras. : Kalpa / Paras.

    14 L.T Panel : SB Enterprise (9448477089) : SB Enterprise (9448477089) : SB Enterprise (9448477089) : SB Enterprise (9448477089) : SB Enterprise (9448477089)JMJ Switch Gears (8884569411) JMJ Switch Gears (8884569411)

    15 HT Panel : GE/ABB/Schneider : GE/ABB/Schneider : ABB : ABB : GE/ABB/Schneider

    16 Insulators : BHEL/Jayashree : BHEL/Jayashree : BHEL/Jayashree : BHEL/Jayashree : BHEL/Jayashree

    A-ExternalTechno commList of Makes


Recommended