+ All Categories
Home > Documents > R12 Manufacturing Cycle

R12 Manufacturing Cycle

Date post: 04-Apr-2018
Category:
Upload: saqi22
View: 228 times
Download: 6 times
Share this document with a friend

of 15

Transcript
  • 7/30/2019 R12 Manufacturing Cycle

    1/15

    Manufacturing Cycle in Oracle Apps R12

    Following topics are covered in this document:

    1. Creating new items of type ATO MODEL, purchased items.

    2. Create Bill of Material for the new created ATO MODEL.

    3. Create a Routing for the ATO model.

    4. Manufacture the ATO Model using WIP transactions, and increase the on hand in inv.

    5. Run the complete Order Cycle for the ATO model.

    CREATE ITEMS

    Goto master inventory organization V1 and create the following items:

    NG_PEN_ASSMBLY (Attach item template @ATO_MODEL)

    NG_PEN_CAP (Attach item template Purchased Item)NG_PEN_REFILL_BLACK (Attach item template Purchased item)

    NG_PEN_REFILL_BLUE (Attach item template Purchased Item.)

    1. Goto Order Management Super User Responsibility

    2. Inventory --> Items --> Master Items

  • 7/30/2019 R12 Manufacturing Cycle

    2/15

    Attach @ATO MODEL template : Tools--> Copy From

    Assign the item to M1 (child) inventory org.

    Tools --> Organization Assignment

  • 7/30/2019 R12 Manufacturing Cycle

    3/15

    Similarly, follow the above steps and create other items with template Purchased Items and assign to M1.

    CREATE BOM

    1. Goto M1 inventory org

    2. Bills of Material --> Bills --> Bills

    DEFINE ROUTINGS

    Routings --> Routings

  • 7/30/2019 R12 Manufacturing Cycle

    4/15

    Copy the BOM and Routing in V1 also.

    ORDER CYCLE for ATO item.

    Enter order header

  • 7/30/2019 R12 Manufacturing Cycle

    5/15

    Enter order line

    Click on Configurator:

  • 7/30/2019 R12 Manufacturing Cycle

    6/15

    Book order

  • 7/30/2019 R12 Manufacturing Cycle

    7/15

    Goto Lines. Click on Actions --> Progress Order

    Run the above program to create the config item.

  • 7/30/2019 R12 Manufacturing Cycle

    8/15

    Here line 1.1.0 is the config item line. The status of the config item line changes to Supply eligible.

    Run Autocreate Final Assembly orders/Assemble to Order Mass Load This program creates a wip job .

    View the output to take out the discrete job number(246343)

  • 7/30/2019 R12 Manufacturing Cycle

    9/15

    Increase on hand of all components(NG_PEN_CAP,NG_PEN_REFILL_BLUE,

    NG_PEN_REFILL_BLACK) since these components are need to manufacture NG_PEN_ASSMBLY.

  • 7/30/2019 R12 Manufacturing Cycle

    10/15

    Click on transaction lines

  • 7/30/2019 R12 Manufacturing Cycle

    11/15

    Goto WIP Discrete Jobs. Query for your job number and change its status from Unreleased to

    Released. This will change the status of the Sales Order Line to Production Open.

    Perform Move and Resource Transactions.

    Wip-> move transactions -> move transactions

  • 7/30/2019 R12 Manufacturing Cycle

    12/15

    Click on resources to do resource transaction.

    Complete the transaction.

    WIP --> Material Transactions -- > Complete transactions

  • 7/30/2019 R12 Manufacturing Cycle

    13/15

    Click on continue. Specify the sub inventory and quantity where the completed assembly will be stored.

    Click Done.

    The on hand will now increase, and the line status for the config item changes to Awaiting Shipping.

  • 7/30/2019 R12 Manufacturing Cycle

    14/15

    Perform pick release:

    Goto Shipping Transactions Form: Query for your order, and click on Launch Pick Release

    Perform Ship Confirm.

  • 7/30/2019 R12 Manufacturing Cycle

    15/15

    Line Status changes to Shipped.


Recommended