RAB
103
4 Pek. List Ornament plat dak Ta Lantai 1 Lantai 2
Transcript
Page 1: Rab Anime Class

4 Pek. List Ornament plat dak Tampak SampingLantai 1

Lantai 2

Page 2: Rab Anime Class

Total Luas List Ornament Plat Dak

Page 3: Rab Anime Class

Pek. List Ornament plat dak Tampak Samping

Segmen 1 + segmen 2

Segmen 1 + segmen 2

Total Luas

Page 4: Rab Anime Class

Total Luas List Ornament Plat Dak Total Luas

Page 5: Rab Anime Class

Segmen 1 + segmen 2 L. list dinding = P x

= 5.10 x= 1.02 m²

Segmen 1 + segmen 2 L. list dinding = P x

= 4.40 x= 0.44 m²

Total Luas = 1.5 m²

Page 6: Rab Anime Class

Total Luas = 8.81 m²

Page 7: Rab Anime Class

t0.20

t0.10

Page 8: Rab Anime Class
Page 9: Rab Anime Class

1.5 m²

Page 10: Rab Anime Class
Page 11: Rab Anime Class

NO URAIAN PEKERJAAN

1 2

C. Bekisting tangga

Page 12: Rab Anime Class
Page 13: Rab Anime Class

BekistingAnak Tangga

V1

BekistingBordes

V3

Page 14: Rab Anime Class

URAIAN PEKERJAAN PERHITUNGAN

2 3

- Optrade ( b )- Antrade ( c )- Lebar anak tangga- J.tangga - t. pelat- P. plat- t. bordes- L. bordes- P.bordes

a2

a2

Page 15: Rab Anime Class

a

P. plat

- V1

- V2

- V3

Page 16: Rab Anime Class

BekistingPlat Tangga - V total

V2

Page 17: Rab Anime Class

PERHITUNGAN

3

= 0.20= 0.30= 1.90= 10= 0.20

P. plat = 3.60= 0.20= 1.85= 3.80

= +

= +

b2 c2

0.20² 0.30²

Page 18: Rab Anime Class

= 0.36

= 0.36 x

= 3.60 m= 7.20 m

= 0.20 x

= 3.8

= 7.6

= (pxl)+(p x t)= (3.60 x 1.90) + (3.60 x 0.2)

= 7.56

= 15.12

= (p x l)

m2

m2

m2

m2

Page 19: Rab Anime Class

= (3.80 x 1.85)

= 7.03

= 7.6

= 29.75

m2

Page 20: Rab Anime Class

PERHITUNGAN

3

0.20 m0.30 m1.90 m10 Bh

0.20 m (ditentukan)3.60 m0.20 m1.85 m3.80 m

Page 21: Rab Anime Class

10

x 2

1.90 x 10x 2

x 2

Page 22: Rab Anime Class

+ 15.12 + 7.03

m2

Page 23: Rab Anime Class

PERHITUNGAN JUMLAH

3 4

Page 24: Rab Anime Class

29.75 m2

Page 25: Rab Anime Class

7.03

Page 26: Rab Anime Class

Rencana Anggaran Biaya

Program : TUGAS AKHIRPekerjaan :

Lokasi : JL. M. YaminTahun Anggaran : 2015

No. URAIAN PEKERJAAN

1 2

LANTAI 1

I PENDAHULUAN

II PEKERJAAN STRUKTUR

III PEKERJAAN ARSITEKTUR

IV PEKERJAAN MEKANIKAL DAN ELEKTRIKAL

LANTAI 2

II PEKERJAAN STRUKTUR

III PEKERJAAN ARSITEKTUR

IV PEKERJAAN MEKANIKAL DAN ELEKTRIKAL

LANTAI 3

II PEKERJAAN STRUKTUR

III PEKERJAAN ARSITEKTUR

IV PEKERJAAN MEKANIKAL DAN ELEKTRIKAL

JUMLAH

PPN 10 %

TOTAL

DIBULATKAN

Pembangunan Anime Class dan Cosplay Center di Samarinda

Page 27: Rab Anime Class
Page 28: Rab Anime Class

Rencana Anggaran Biaya

JUMLAH HARGA

3

91,166,080.00

10,590,369,726.09

1,224,491,278.53

97,906,432.75

22,535,692,966.58

1,413,800,545.50

68,364,537.75

2,004,259,018.43

1,446,722,661.02

66,820,705.75

39,539,593,952.39

3,953,959,395.24

43,493,553,347.63

43,493,553,000.00

Anime Class dan Cosplay Center di Samarinda

Page 29: Rab Anime Class

Samarinda, Agustus 2015

Dibuat Oleh :

Nama Mahasiswa

BAYU AJI SETIAWAN

12 619 004

Page 30: Rab Anime Class

Rencana Anggaran Biaya

Program : TUGAS AKHIRPekerjaan :

Lokasi : JL. M. YaminTahun Anggaran : 2015

No. URAIAN PEKERJAAN VOLUME

1 2 3

I PENDAHULUAN1 Papan Nama Proyek 12 Pengukuran dan Pemasangan Bowplank 1933 Pembersihan Lokasi 2100

4 Pemasangan Seng Gelombang tinggi 2 M 193

II PEKERJAAN STRUKTURA Pekerjaan Tanah

1 Galian tanah pondasi Foot Plat 185.222 Urugan tanah kembali pondasi Footplat 156.63 Urugan pasir bawah lantai 21.34 Urugan pasir bawah Poer plat 6.14

B Pekerjaan Pondasi1 Pancang mini pile 20/20-6m 1162 Lantai kerja di bawah foot pile cap tebal 5 cm 2.8453 Cor rabat bawah lantai tebal 5 cm 26.15

C Pekerjaan Beton Bertulang1 Pondasi Footplat 200 x 200 x 40 30.62 Sloof 30/60 446.43 Sloof 20/40 5.044 Kolom 50x50 26.255 Kolom 15/15 4.873

6 Cor Rabat 35.75

III PEKERJAAN ARSITEKTURA Pekerjaan Pasangan dan Plesteran

1 Pasangan Bata 1 : 2 15.32 Pasangan Bata 1 : 4 193 Plesteran 1 : 2 15.34 Plesteran 1: 4 195 Kaca 241

Pembangunan Anime Class dan Cosplay Center di Samarinda

Page 31: Rab Anime Class

No. URAIAN PEKERJAAN VOLUME

1 2 3B Pekerjaan Penutup Lantai

2 Pasang lantai keramik 20 x 20 untuk km/wc 38.53 Pasang dinding keramik 20 x 25 untuk km/wc 49.355 Pasangan Lantai keramik 60x60 568

C Pekerjaan Kusen Daun Pintu dan Jendela Kaca1 Kusen 152 Daun Pintu P1 103 Daun Pintu P2 124 Daun Pintu P3 9

D Pekerjaan Kunci Penggantung1 Pekerjaan Pasangan Engsel Pintu 4" 442 Pekerjaan Pasangan Engsel Pintu 3" 104 Pekerjaan Pasangan Kunci KM/WC 7

F Pekerjaan Plafon1 Pasang rangka metal furing 668.542 Pasang plafond GRC board 668.543 List plafond GRC + Finishing 372

G Pekerjaan Sanitasi1 Floor Drain stainless 102 Kloset Duduk 74 Wastafel + aksesoris 45 Septictank + Resapan 1

H Pengerjaan Pengecatan1 Cat dinding interior & eksterior 34.33 Cat plafond 668.54

I Pekerjaan Lain-lain

1 Railing Tangga Besi hollow 11

IV PEKERJAAN MEKANIKAL DAN ELEKTRIKALA Pekerjaan Plumbing

1 Instalasi Pipa Air bersih dia. 1/2" 952 Instalasi Pipa Air Bekas dia. 2" 983 Instalasi Pipa Kotoran Padat dia. 4" 100

B Pekerjaan Elektrikal1 Instalasi Lampu 288

Page 32: Rab Anime Class

No. URAIAN PEKERJAAN VOLUME

1 2 32 Instalasi Stop kontak 273 Lampu TL 36 watt 1164 Lampu Downlight 4"+ SL 18 watt 1727 Stop Kontak 178 Pemasangan Box MCB 1

9 Penangkal Petir 3

LANTAI 2II PEKERJAAN STRUKTURA Pekerjaan Beton Bertulang

1 Kolom 50x50 30.252 Kolom 15/15 1.503 Balok 30/60 446.404 Balok 20/40 12.25

5 Plat Lantai 606.5

III PEKERJAAN ARSITEKTURA Pekerjaan Pasangan dan Plesteran

1 Pasangan Bata 1 : 2 35.42 Pasangan Bata 1 : 4 188.23 Plesteran 1 : 2 35.44 Plesteran 1: 4 188.25 Kaca 262

B Pekerjaan Penutup Lantai2 Pasang lantai keramik 20 x 20 untuk km/wc 38.53 Pasang dinding keramik 20 x 25 untuk km/wc 635 Pasangan Lantai keramik 60x60 676

C Pekerjaan Kusen Daun Pintu dan Jendela Kaca1 Kusen 123.82 Daun Pintu P1 23 Daun Pintu P2 74 Daun Pintu P3 4

D Pekerjaan Kunci Penggantung1 Pekerjaan Pasangan Engsel Pintu 4" 42 Pekerjaan Pasangan Engsel Pintu 3" 164 Pekerjaan Pasangan Kunci KM/WC 4

Page 33: Rab Anime Class

No. URAIAN PEKERJAAN VOLUME

1 2 3E Pekerjaan Plafon

1 Pasang rangka metal furing 7632 Pasang plafond GRC board 7633 List plafond GRC + Finishing 389.5

F Pekerjaan Sanitasi1 Floor Drain stainless 82 Kloset Duduk 64 Wastafel + aksesoris 6

G Pengerjaan Pengecatan1 Cat dinding interior 223.63 Cat plafond 763

H Pekerjaan Lain-lain

1 Railing Tangga Besi holo 11

IV PEKERJAAN MEKANIKAL DAN ELEKTRIKALA Pekerjaan Plumbing

1 Instalasi Pipa Air bersih dia. 1/2" 982 Instalasi Pipa Air Bekas dia. 2" 1003 Instalasi Pipa Kotoran Padat dia. 4" 112

B Pekerjaan Elektrikal1 Instalasi Lampu 2602 Instalasi Stop kontak 153 Lampu TL 36 watt 1084 Lampu Downlight 4"+ SL 18 watt 1527 Stop Kontak 15

8 Pemasangan Box 4 MCB 1

LANTAI 3II PEKERJAAN STRUKTURA Pekerjaan Beton Bertulang

1 Kolom D 40 22.7362 Kolom 15/15 3.873 Balok 25/40 2.1195

4 Balok 20/35 14.08

5 Balok 40/60 36

5 Plat Lantai 25.45

Page 34: Rab Anime Class

No. URAIAN PEKERJAAN VOLUME

1 2 3III PEKERJAAN ARSITEKTURA Pekerjaan Pasangan dan Plesteran

1 Pasangan Bata 1 : 2 36.62 Pasangan Bata 1 : 4 1373 Plesteran 1 : 2 36.64 Plesteran 1: 4 137.75 Kaca 357

B Pekerjaan Penutup Lantai2 Pasang lantai keramik 20 x 20 untuk km/wc 38.53 Pasang dinding keramik 20 x 25 untuk km/wc 334 Pasangan Lantai Keramik 60 x 60 726.8

C Pekerjaan Kusen Daun Pintu dan Jendela Kaca1 Kusen 102 Daun Pintu P1 63 Daun Pintu P2 84 Daun Pintu P3 10

D Pekerjaan Kunci Penggantung1 Pekerjaan Pasangan Engsel Pintu 4" 122 Pekerjaan Pasangan Engsel Pintu 3" 364 Pekerjaan Pasangan Kunci KM/WC 10

E Pekerjaan Plafon1 Pasang rangka metal furing 726.82 Pasang plafond GRC board 726.83 List plafond GRC + Finishing 350.45

F Pekerjaan Sanitasi1 Floor Drain stainless 102 Roof Drain stainless 83 Kloset Duduk 105 Wastafel + aksesoris 6

G Pengerjaan Pengecatan1 Cat dinding interior 174.33 Cat plafond 726.8

H Pekerjaan Lain-lain

1 Railing Tangga Besi holo 11

IV PEKERJAAN MEKANIKAL DAN ELEKTRIKALIV.A Pekerjaan Plumbing

Page 35: Rab Anime Class

No. URAIAN PEKERJAAN VOLUME

1 2 31 Instalasi Pipa Air bersih dia. 1/2" 1002 Instalasi Pipa Air Bekas dia. 2" 1103 Instalasi Pipa Kotoran Padat dia. 4" 120

IV.B Pekerjaan Elektrikal1 Instalasi Lampu 2452 Instalasi Stop kontak 213 Lampu TL 36 watt 984 Lampu Downlight 4"+ SL 18 watt 1477 Stop Kontak 21

8 Pemasangan Box 4 MCB 1

Page 36: Rab Anime Class

Rencana Anggaran Biaya

SATHARGA SATUAN JUMLAH HARGA

(Rp) (Rp)

4 5 6

Ls 500,000.00 500,000.00 67,540.00 13,035,220.00 15,000.00 31,500,000.00

239,020.00 46,130,860.00

Jumlah 91,166,080.00

63,500.00 11,761,470.00 18,020.00 2,821,932.00 145,400.00 3,097,020.00 145,400.00 892,756.00

Buah 305,975.00 35,493,100.00 M3 1,388,094.60 3,949,129.14

1,388,094.60 36,298,673.79

14,314,934.07 438,036,982.44 19,482,570.88 8,697,019,642.71

M3 18,535,223.55 93,417,526.69 M3 18,868,568.12 495,299,913.16 M3 24,361,288.00 118,712,556.42

M3 18,281,651.01 653,569,023.74

JUMLAH 10,590,369,726.09

130,205.00 1,992,136.50 248,460.00 4,720,740.00 57,991.20 887,265.36 52,772.00 1,002,668.00

M2 2,800,000.00 674,800,000.00

Anime Class dan Cosplay Center di Samarinda

M1

M2

M1

M3

M3

M3

M3

M3

M3

M3

M2

M2

M2

M2

Page 37: Rab Anime Class

SATHARGA SATUAN JUMLAH HARGA

(Rp) (Rp)

4 5 6

215,975.00 8,315,037.50 202,347.50 9,985,849.13 526,600.00 299,108,800.00

241,472.90 3,622,093.50 BH 2,000,000.00 20,000,000.00 BH 1,200,000.00 14,400,000.00 BH 700,000.00 6,300,000.00

BH 52,810.00 2,323,640.00 BH 38,900.00 389,000.00 BH 152,750.00 1,069,250.00

135,260.00 90,426,720.40 30,571.00 20,437,936.34

M1 48,345.00 17,984,340.00

BH 37,200.00 372,000.00 BH 2,410,343.00 16,872,401.00 BH 572,270.00 2,289,080.00 BH 4,300,000.00 4,300,000.00

29,750.00 1,020,425.00 23,770.00 15,891,195.80

M1 543,700.00 5,980,700.00

JUMLAH 1,224,491,278.53

21,815.75 2,072,496.25 25,449.88 2,494,087.75 47,274.00 4,727,400.00

Titik 143,628.25 41,364,936.00

M2

M2

M2

M1

M2

M2

M2

M2

M1

M1

M1

Page 38: Rab Anime Class

SATHARGA SATUAN JUMLAH HARGA

(Rp) (Rp)

4 5 6Titik 150,478.25 4,062,912.75 BH 91,400.00 10,602,400.00 BH 53,400.00 9,184,800.00 BH 35,400.00 601,800.00 Unit 267,400.00 267,400.00

Unit 7,509,400.00 22,528,200.00

JUMLAH 97,906,432.75

M3 18,868,568.12 570,774,185.64 M3 24,361,288.00 36,541,932.00 M3 23,730,094.00 10,593,113,961.60 M3 20,199,310.00 247,441,547.50

M3 18,281,651.01 11,087,821,339.84

Jumlah 22,535,692,966.58

130,205.00 4,609,257.00 248,460.00 46,760,172.00 57,991.20 2,052,888.48 52,772.00 9,931,690.40

M2 2,800,000.00 733,600,000.00

215,975.00 8,315,037.50 202,347.50 12,747,892.50 526,600.00 355,981,600.00

241,472.90 29,894,345.02 1,367,618.05 2,735,236.10 1,036,888.00 7,258,216.00 1,036,888.00 4,147,552.00

BH 52,810.00 211,240.00 BH 38,900.00 622,400.00 BH 152,750.00 611,000.00

M2

M2

M2

M2

M2

M2

M2

M1

M2

M2

M2

Page 39: Rab Anime Class

SATHARGA SATUAN JUMLAH HARGA

(Rp) (Rp)

4 5 6

135,260.00 103,203,380.00 30,571.00 23,325,673.00

M1 48,345.00 18,830,377.50

BH 37,200.00 297,600.00 BH 2,410,343.00 14,462,058.00 BH 572,270.00 3,433,620.00

29,750.00 6,652,100.00 23,770.00 18,136,510.00

M1 543,700.00 5,980,700.00

JUMLAH 1,413,800,545.50

21,815.75 2,137,943.50 25,449.88 2,544,987.50 47,274.00 5,294,688.00

Titik 143,628.25 37,343,345.00 Titik 150,478.25 2,257,173.75 BH 91,400.00 9,871,200.00 BH 53,400.00 8,116,800.00 BH 35,400.00 531,000.00

Unit 267,400.00 267,400.00

JUMLAH 68,364,537.75

M3 18,868,568.12 428,995,764.78 M3 24,361,288.00 94,278,184.56 M3 23,730,094.00 50,295,934.23

M3 20,199,310.00 284,406,284.80

M3 18,917,078.66 681,014,831.76

M3 18,281,651.01 465,268,018.30

JUMLAH 2,004,259,018.43

M2

M2

M2

M2

M1

M1

M1

Page 40: Rab Anime Class

SATHARGA SATUAN JUMLAH HARGA

(Rp) (Rp)

4 5 6

130,205.00 4,765,503.00 248,460.00 34,039,020.00 57,991.20 2,122,477.92 52,772.00 7,266,704.40

M2 2,800,000.00 999,600,000.00

57,991.20 2,232,661.20 52,772.00 1,741,476.00 189,768.00 137,923,382.40

202,347.50 2,023,475.00 1,367,618.05 8,205,708.30 1,036,888.00 8,295,104.00 1,036,888.00 10,368,880.00

BH 52,810.00 633,720.00 BH 38,900.00 1,400,400.00 BH 152,750.00 1,527,500.00

135,260.00 98,306,968.00 30,571.00 22,219,002.80

M1 135,260.00 47,401,867.00

BH 37,200.00 372,000.00 BH 37,200.00 297,600.00 BH 2,410,343.00 24,103,430.00 BH 572,270.00 3,433,620.00

29,750.00 5,185,425.00 23,770.00 17,276,036.00

M1 543,700.00 5,980,700.00

JUMLAH 1,446,722,661.02

M2

M2

M2

M2

M2

M2

M2

M1

M2

M2

M2

M2

M2

M2

M2

Page 41: Rab Anime Class

SATHARGA SATUAN JUMLAH HARGA

(Rp) (Rp)

4 5 6 21,815.75 2,181,575.00 25,449.88 2,799,486.25 47,274.00 5,672,880.00

Titik 143,628.25 35,188,921.25 Titik 150,478.25 3,160,043.25 BH 91,400.00 8,957,200.00 BH 53,400.00 7,849,800.00 BH 35,400.00 743,400.00

Unit 267,400.00 267,400.00

JUMLAH 66,820,705.75

Samarinda, Agustus 2015

Dibuat Oleh :

Nama Mahasiswa

BAYU AJI SETIAWAN

12 619 004

M1

M1

M1

Page 42: Rab Anime Class

P L T Area JUMLAH TOTAL

Bowplank 37 22 118P. Lokasi 37 22 814P. Seng 37 22 118

P L T Area JUMLAH TOTALGT. Footplat 1.4 1.4 1.65 39 126.126UT. Pondasi FT 1.2 39 46.8UP. B Lantai 0.1 476 47.6UP. Footplat 1.4 1.4 0.05 39 3.822

P L T Area JUMLAH TOTALPancang Mini Pile 39 156pancang ulin #REF! 119P. BT 0.48 238.97 114.7056

P L T Area JUMLAH TOTALPondasi Footplat 1.3 1.3 0.3 39 19.773sloof 30/40 0.12 164.67 19.7604sloof 20/30 0.2 0.3 68.5 4.11Kolom D 4 0.196 35 27.44KOLOM 15/15 4 0.0225 30 2.7PLAT LANTAI 0.1 476 47.6

P L T Area JUMLAH TOTAL4 68.5 2744 38 152

274 548152 304

119.47 477.88

Page 43: Rab Anime Class

P L T Area JUMLAH TOTALL. 20x20 37 37L. 20x25 1.6 50 80L. Parkit 239.4 239.4

P L T Area JUMLAH TOTAL

P L T Area JUMLAH TOTALEngsel 4 14 42Engsel 3 18 54K. WC 18 18

#REF!

Page 44: Rab Anime Class

P L T Area JUMLAH TOTALkolom 4 0.196 35 27.44kolom 15 4 0.0225 60 5.4balok 15/30 0.15 0.3 47.5 2.1375balok 20/40 0.2 0.4 198 15.84plat lantai 0.1 515 51.5

P L T Area JUMLAH TOTAL4 80 3204 54 216

P L T Area JUMLAH TOTAL52 5296 96

130 130

P L T Area JUMLAH TOTAL

Page 45: Rab Anime Class

P L T Area JUMLAH TOTAL4 0.196 29 22.736

0.15 0.15 4 43 3.870.15 0.3 47.1 2.1195

0.2 0.4 176 14.080.4 0.6 150 36

0.1 514 51.4

Page 46: Rab Anime Class

P L T Area JUMLAH TOTAL4 43.25 1734 37.5 150

P L T Area JUMLAH TOTAL

Page 47: Rab Anime Class
Page 48: Rab Anime Class

LUAS M2 LUAS M1B.2 213 60.67 26B.1 263 58.8 32

Sloof 20/30B.1 44B.2 24.5

B.1 164.8B.2 164.67

Page 49: Rab Anime Class

P1 5.9 59P2 5.8 69.6P3 5.7 51.3

Page 50: Rab Anime Class

P1 5.9 11.8P2 5.8 40.6P3 5.7 22.8

Page 51: Rab Anime Class
Page 52: Rab Anime Class

P1 5.9 35.4P2 5.8 46.4P3 5.7 57

Page 53: Rab Anime Class
Page 54: Rab Anime Class

DAFTAR ANALISA DAN UPAH

PROGRAM : TUGAS AKHIRPEKERJAAN : Pembangunan Martial Arts Center LOKASI : JL. A.W.SyahranieTAHUN ANGGARAN : 2015

NO1 2 31 PEKERJAAN PERSIAPAN1 Pengukuran dan Pemasangan Bouwplank M'

0.0120 M3 Kayu meranti 5/7 2,450,000.00

0.0070 M3 Papan Meranti 2,700,000.00

0.0200 Kg Paku biasa 1" - 3,5" 17,000.00

0.1000 Oh Pekerja 80,000.00

0.1000 Oh Tukang Kayu 90,000.00

0.0100 Oh Kepala Tukang 120,000.00

0.0050 Oh Mandor 140,000.00

Jumlah

2 Pembersihan Lokasi M2

0.1000 OH Pekerja 80,000.00

0.0500 OH Mandor 140,000.00

Jumlah

3 Pagar Sementara dari Seng gelombang tinggi 2 meter M1

1.2000 Lbr Seng Gelombang BJLS 20 32,000.00

0.0720 M³ Kayu 5/7 2,450,000.00

0.0600 Kg Paku biasa 2" - 5" 17,000.00

0.4000 OH Pekerja 80,000.00

0.2000 OH Tukang Kayu 90,000.00

0.0200 OH Kepala Tukang 120,000.00

0.0200 OH Mandor 140,000.00

Jumlah

2 PEKERJAAN TANAH1 Galian Tanah Biasa sedalam 1 M M3

0.7500 OH Pekerja 80,000.00

0.0250 OH Mandor 140,000.00

Jumlah

2 Urugan Kembali M3

0.1920 OH Pekerja 80,000.00

0.0190 OH Mandor 140,000.00

Jumlah

3 Urugan Pasir M3

1.2000 M3 Pasir Urug (Mahakam) 100,000.00

0.3000 OH Pekerja 80,000.00

0.0100 OH Mandor 140,000.00

Jumlah

4 Urugan Tanah dan Pemadatan M3

1.2000 M3 Tanah Urug 85,000.00

0.3000 OH Pekerja 80,000.00

0.0100 OH Mandor 140,000.00

Jumlah

URAIAN PEKERJAAN DANANALISA

SATUAN(Rp)

Page 55: Rab Anime Class

NO1 2 3

URAIAN PEKERJAAN DANANALISA

SATUAN(Rp)

3 PEKERJAAN PONDASI1 Pasangan Pondasi Batu Gunung Camp. 1 : 4 M3

1.2000 M3 Batu gunung 200,000.00

163.0000 Kg Semen 1,300.00

0.5200 M3 Pasir Pasang (Tenggarong) 165,000.00

1.5000 OH Pekerja Biasa 80,000.00

0.7500 OH Tukang Batu 90,000.00

0.0750 OH Kepala Tukang 120,000.00

0.0750 OH Mandor 140,000.00

Jumlah

2 Pasangan Anstamping M3

1.2000 M3 Batu gunung 200,000.00

0.4320 M3 Pasir Pasang (Tenggarong) 165,000.00

0.7800 OH Pekerja Biasa 80,000.00

0.3900 OH Tukang Batu 90,000.00

0.0390 OH Kepala Tukang 120,000.00

0.0390 OH Mandor 120,000.00

Jumlah

3 Pemancangan Mini Pile 25 x 25 cm M'

1.0000 M3 Mini Pile 25 x 25 cm 205,975.00

1.0000 LS Upah Pemancangan 100,000.00

Jumlah

4 Pekerjaan Water profing M2

1.1000 Kg Water profing 65,000.00

0.0300 OH Pekerja Biasa 85,000.00

0.0500 OH Tukang 115,000.00

0.0400 OH Kepala Tukang 126,000.00

0.0260 OH Mandor 138,000.00

Jumlah

4 PEKERJAAN DINDING DAN PASANGAN1 Pas. Batu Bata Tebal 1/2 Bata 1 : 2 M2

18.9500 Kg Semen Portland 50 Kg 1,300.00

70.0000 Bh Batu Bata Merah 900.00

0.0380 M3 Pasir Pasang (Tenggarong) 165,000.00

0.3000 OH Pekerja Biasa 80,000.00

0.1000 OH Tukang Batu 90,000.00

0.0100 OH Kepala Tukang 120,000.00

0.0150 OH Mandor 140,000.00

Jumlah

2 Pas. Batu Bata Tebal 1/2 Bata 1 : 4 M2

11.5000 Kg Semen Portland 50 Kg 1,300.00

70.0000 Bh Batu Bata Merah 900.00

0.0430 M3 Pasir Pasang (Tenggarong) 165,000.00

0.3000 OH Pekerja Biasa 80,000.00

0.1000 OH Tukang Batu 90,000.00

0.0100 OH Kepala Tukang 120,000.00

0.0150 OH Mandor 140,000.00

Jumlah

3 Pas. Batu Bata Tebal 1 Bata 1 : 4 M2

26.5500 Kg Semen Portland 50 Kg 1,300.00

140.0000 Bh Batu Bata Merah 900.00

Page 56: Rab Anime Class

NO1 2 3

URAIAN PEKERJAAN DANANALISA

SATUAN(Rp)

0.0930 M3 Pasir Pasang (Tenggarong) 165,000.00

0.6000 OH Pekerja Biasa 80,000.00

0.2000 OH Tukang Batu 90,000.00

0.0200 OH Kepala Tukang 120,000.00

0.0300 OH Mandor 140,000.00

Jumlah

5 PEKERJAAN PLESTERAN1 Plesteran Tebal 15 mm Camp. 1 : 2 M2

10.2240 Kg Semen Portland 50 Kg 1,300.00

0.0200 M3 Pasir Pasang (Tenggarong) 165,000.00

0.3000 OH Pekerja Biasa 80,000.00

0.1500 OH Tukang Batu 90,000.00

0.0150 OH Kepala Tukang 120,000.00

0.0150 OH Mandor 140,000.00

Jumlah

2 Plesteran Tebal 15 mm Camp. 1 : 4 M2

6.2400 Kg Semen Portland 50 Kg 1,300.00

0.0240 M3 Pasir Pasang (Tenggarong) 165,000.00

0.3000 OH Pekerja Biasa 80,000.00

0.1500 OH Tukang Batu 90,000.00

0.0150 OH Kepala Tukang 120,000.00

0.0100 OH Mandor 140,000.00

Jumlah

3 Acian M2

3.2500 Kg Semen Portland 50 Kg 1,300.00

0.2000 OH Pekerja Biasa 80,000.00

0.1000 OH Tukang batu 90,000.00

0.0100 OH Kepala Tukang 120,000.00

0.0100 OH Mandor 140,000.00

5 PEKERJAAN ORNAMENT DINDING1 1 M2 Pasangan Alluminium Komposit Panel

1.100 M2 Alluminium Composit Panel 864,600.00

0.100 HRG Perekat+Peralatan Bantu (35%) 302,610.00

1.000 Ls Upah Pemasangan 200,000.00

Jumlah

6 PEKERJAAN KAYU 1 Pemacangan kayu ulin 10/10 - 2 M + sunduk ulin 5/10 Ttk

0.0400 M3 Kayu Ulin Balok 3,750,000.00

0.0025 M3 Sunduk ulin 5/10 - 50 cm 3,750,000.00

1.0000 Ls Peralatan pancang 50,000.00

0.0650 OH Pekerja 80,000.00

0.1625 OH Kepala tukang 90,000.00

0.0163 OH Tukang kayu 120,000.00

0.0325 OH Mandor 140,000.00

Jumlah

2 1 M³ Memasang Kalang Ulin 2 x 2/20 cm M3

1.1000 M³ Papan Ulin 2/20 cm 4,000,000.00

0.1000 kg Paku Ulin 25,000.00

0.1000 OH Pekerja Biasa 80,000.00

0.2500 OH Mandor 140,000.00

Page 57: Rab Anime Class

NO1 2 3

URAIAN PEKERJAAN DANANALISA

SATUAN(Rp)

Jumlah

3 Listplank 2x20 + Finishing M2

0.0200 M³ papan kayu bengkirai 4,200,000.00

0.1000 Kg Paku biasa 2" - 5" 17,000.00

1.0000 M2 Pengecatan Bidang Kayu baru 44,145.00

0.1000 OH Pekerja 80,000.00

0.2000 OH Tukang kayu 90,000.00

0.0250 OH Kepala Tukang 120,000.00

0.0050 OH Mandor 140,000.00

Jumlah

7 PEKERJAAN ALLUMINIUM1 Pasang 1 M kusen pintu/jendela alluminium M1

1.1000 M3 Profil alluminium 200,000.00

2.0000 Kg Skrup fixer 5,500.00

0.0600 Ltr Sealant 39,215.00

0.0430 Oh Pekerja 80,000.00

0.0430 Oh Tukang Khusus Alluminium 90,000.00

0.0043 Oh Kepala Tukang 120,000.00

0.0021 Oh Mandor 140,000.00

Jumlah

2 Pasang 1 M2 Daun Pintu Kaca Rangka alluminium M2

4.4000 M2 Profil Alluminium 200,000.00

4.5000 M2 Kaca Bening 5mm 102,400.00

0.2700 Ltr Sealant 39,215.00

0.0850 Oh Pekerja 80,000.00

0.0850 Oh Tukang Khusus Alluminium / Kaca 90,000.00

0.0090 Oh Kepala Tukang 120,000.00

0.0050 Oh Mandor 140,000.00

Jumlah

3 Pasang 1 Buah Daun Pintu PVC untuk WC Bh

1.0000 M2 Pintu PVC 700,000.00

0.0850 Oh Pekerja 80,000.00

0.0850 Oh Tukang 90,000.00

0.0090 Oh Kepala Tukang 120,000.00

0.0050 Oh Mandor 140,000.00

Jumlah

4 Pasang 1 M2 Daun Jendela Kaca Rangka Alluminium M2

4.4000 M2 Profil Alluminium 200,000.00

0.7200 M2 Kaca Bening 5mm 102,400.00

0.2700 Ltr Sealant 39,215.00

0.4400 Oh Pekerja 80,000.00

0.4400 Oh Tukang 90,000.00

0.0440 Oh Kepala Tukang 120,000.00

0.0220 Oh Mandor 140,000.00

Jumlah

5 Pasang 1 M2 Kaca Bening 5mm untuk bouvenlight M2

1.1000 M2 Kaca Bening 5mm 102,400.00

0.0150 Oh Pekerja 80,000.00

0.1500 Oh Tukang 90,000.00

0.0150 Oh Kepala Tukang 120,000.00

0.0008 Oh Mandor 140,000.00

Page 58: Rab Anime Class

NO1 2 3

URAIAN PEKERJAAN DANANALISA

SATUAN(Rp)

Jumlah

6 Pasang 1 M2 kusen pintu geser bahan multiplex 12mm M2

1.0000 M2 Pintu Geser 700,000.00

0.4400 Oh Pekerja 80,000.00

0.4400 Oh Tukang 90,000.00

0.0440 Oh Kepala Tukang 120,000.00

0.0220 Oh Mandor 140,000.00

Jumlah

7 Pasang engsel pintu 4" M3

1.0000 Bh Engsel 4" 40,000.00

0.1250 OH Tukang 90,000.00

0.0130 OH Kepala Tukang 120,000.00

Jumlah8 Pasang engsel jendela 3" M3

1.0000 Bh Engsel 3" 30,000.00

0.1000 OH Pekerja 80,000.00

0.0100 OH Tukang 90,000.00

Jumlah

9 Pasang kunci tanam biasa M3

1.0000 Bh Kunci tanam biasa 150,000.00

0.5000 OH Pekerja 80,000.00

0.0500 OH Tukang 90,000.00

Jumlah10 Pasang kunci slot km/wc M3

1.0000 Bh kunci slot km/wc 130,500.00

0.2500 OH Pekerja 80,000.00 0.0250 OH Tukang 90,000.00

Jumlah

11 Pasang grendel pintu M3

1.0000 Bh Grendel pintu 20,000.00 0.1000 OH Pekerja 80,000.00

Jumlah

12 Pasang grendel jendela M3

1.0000 Bh Grendel jendela 17,500.00

0.1000 OH Pekerja 80,000.00

Jumlah

13 Pasang rel pintu geser bagian atas M3

1.0000 Bh Rel pintu geser atas 150,000.00 0.1000 OH Pekerja 80,000.00

Jumlah

14 Pasang rel pintu geser bagian bawah M3

1.0000 Bh Rel pintu geser bawah 120,000.00

0.1000 OH Pekerja 80,000.00

Jumlah

15 1 M2 Pasang Rangka Tangga Besi Hollow

1.0000 M2 Railing Tangga besi Hollow 400,000.00

1.0000 Ls Alat Bantu (Las) 50,000.00

0.0150 OH Pekerja 80,000.00

0.9000 OH Tukang 90,000.00

0.0900 OH Kepala Tukang 120,000.00

0.0050 OH Mandor 140,000.00

Jumlah

Page 59: Rab Anime Class

NO1 2 3

URAIAN PEKERJAAN DANANALISA

SATUAN(Rp)

15 1 M2 Pasang Rangka Pagar Besi Hollow

1.0000 M2 Railing Pagar besi Hollow 400,000.00

1.0000 Ls Alat Bantu (Las) 50,000.00

0.0150 OH Pekerja 80,000.00

0.9000 OH Tukang 90,000.00

0.0900 OH Kepala Tukang 120,000.00

0.0050 OH Mandor 140,000.00

Jumlah 140,000.00

8 PEKERJAAN BETON1 Beton Cor manual 1 Pc : 3 Ps : 5 Kr ( K-175 ) M3

0.7600 M3 Pasir Beton 173,000.00

326.0000 Kg Semen Portland 50 Kg 1,300.00

1.0290 M3 Koral Beton 300,000.00

1.6500 OH Pekerja Biasa 80,000.00

0.2750 OH Tukang Batu 90,000.00

0.0280 OH Kepala Tukang 120,000.00

0.0830 OH Mandor 140,000.00

Jumlah

2 Beton Cor manual 1 Pc : 2 Ps : 3 Kr ( K-225 ) M3

0.6980 M3 Pasir Beton 173,000.00

371.0000 Kg Semen Portland 50 Kg 1,300.00

1.0470 M3 Koral Beton 300,000.00

1.6500 OH Pekerja Biasa 80,000.00

0.2750 OH Tukang Batu 90,000.00

0.0280 OH Kepala Tukang 120,000.00

0.0830 OH Mandor 140,000.00

Jumlah

3 Beton cor readymix dengan mutu K 225 M3

1.0250 M3 Beton readymix K-225 2,154,734.54

0.5400 Oh Pekerja 80,000.00

0.0900 Oh Tukang batu 90,000.00

0.0090 Oh Kepala Tukang 120,000.00

0.0270 Oh Mandor 140,000.00

1.0250 M3 Concrete Pump 381,907.19

0.0100 hr Vibrator 54,446.15

0.1500 ltr Bensin 7,800.00

Jumlah

4 Beton cor readymix dengan mutu K 300 M3

1.0250 M3 Beton readymix K-300 2,173,635.77

0.5400 Oh Pekerja 80,000.00

0.0900 Oh Tukang batu 90,000.00

0.0090 Oh Kepala Tukang 120,000.00

0.0270 Oh Mandor 140,000.00

1.0250 M3 Concrete Pump 381,907.19

0.0100 hr Vibrator 54,446.15

0.1500 ltr Bensin 7,800.00

Jumlah

5 Bekisting untuk pondasi M2

0.0400 M3 Papan Meranti 2,450,000.00

0.3000 Kg Paku biasa 1" - 3,5" 17,000.00

Page 60: Rab Anime Class

NO1 2 3

URAIAN PEKERJAAN DANANALISA

SATUAN(Rp)

0.1000 Ltr Minyak begesting 25,000.00

0.5200 Oh Pekerja 80,000.00

0.2600 Oh Tukang Kayu 90,000.00

0.0260 Oh Kepala Tukang 120,000.00

0.0260 Oh Mandor 140,000.00

Jumlah

6 Bekisting Sloof/Tie Beam M2

0.0450 M3 Papan Meranti 2,450,000.00

0.3000 Kg Paku biasa 1" - 3,5" 17,000.00

0.1000 Ltr Minyak begesting 25,000.00

0.5200 Oh Pekerja 80,000.00

0.2600 Oh Tukang Kayu 90,000.00

0.0260 Oh Kepala Tukang 120,000.00

0.0260 Oh Mandor 140,000.00

Jumlah

Page 61: Rab Anime Class

NO1 2 3

URAIAN PEKERJAAN DANANALISA

SATUAN(Rp)

7 Bekisting Kolom M2

0.3500 Lbr Plywood 9mm 90,000.00

0.0400 M3 Papan Meranti 2,700,000.00

0.0150 M3 Kayu meranti 2,450,000.00

2.0000 Btg Dolken kayu galam dia. 8 - 10 cm 10,000.00

0.4000 Kg Paku biasa 1" - 3,5" 17,000.00

0.2000 Ltr Minyak begesting 25,000.00

0.6600 Oh Pekerja 80,000.00

0.3300 Oh Tukang Kayu 90,000.00

0.0330 Oh Kepala Tukang 120,000.00

0.0330 Oh Mandor 140,000.00

Jumlah

8 Bekisting Tangga M2

0.3500 Lbr Plywood 9mm 90,000.00

0.0300 M3 Papan Meranti 2,700,000.00

0.0150 M3 Kayu meranti 2,450,000.00

2.0000 Btg Dolken kayu galam dia. 8 - 10 cm 10,000.00

0.4000 Kg Paku biasa 1" - 3,5" 17,000.00

0.1500 Ltr Minyak begesting 25,000.00

0.6600 Oh Pekerja 80,000.00

0.3300 Oh Tukang Kayu 90,000.00

0.0330 Oh Kepala Tukang 120,000.00

0.0330 Oh Mandor 140,000.00

Jumlah

9 Bekisting Plat/Dak M2

0.3500 Lbr Plywood 9mm 90,000.00

0.0400 M3 Papan Meranti 2,700,000.00

0.0150 M3 Kayu meranti 2,450,000.00

6.0000 Btg Dolken kayu galam dia. 8 - 10 cm 10,000.00

0.4000 Kg Paku biasa 1" - 3,5" 17,000.00

0.2000 Ltr Minyak begesting 25,000.00

0.6600 Oh Pekerja 80,000.00

0.3300 Oh Tukang Kayu 90,000.00

0.0330 Oh Kepala Tukang 120,000.00

0.0330 Oh Mandor 140,000.00

Jumlah

10 Bekisting Balok M2

0.3500 Lbr Plywood 9mm 90,000.00

0.0400 M3 Papan Meranti 2,700,000.00

0.0180 M3 Kayu meranti 2,450,000.00

2.0000 Btg Dolken kayu galam dia. 8 - 10 cm 10,000.00

0.4000 Kg Paku biasa 1" - 3,5" 17,000.00

0.2000 Ltr Minyak begesting 25,000.00

0.6600 Oh Pekerja 80,000.00

0.3300 Oh Tukang Kayu 90,000.00

0.0330 Oh Kepala Tukang 120,000.00

0.0330 Oh Mandor 140,000.00

Jumlah

11 Pembesian Polos Kg

10.5000 Kg Besi Beton Polos 9,800.00

0.0150 Kg Kawat Beton/ Bendrat 20,400.00

Page 62: Rab Anime Class

NO1 2 3

URAIAN PEKERJAAN DANANALISA

SATUAN(Rp)

0.0070 Oh Pekerja 80,000.00

0.0070 Oh Tukang besi 90,000.00

0.0007 Oh Kepala Tukang 120,000.00

0.0004 Oh Mandor 140,000.00

Jumlah

12 Pembesian Ulir Kg

10.5000 Kg Besi Beton Ulir 10,300.00

0.0150 Kg Kawat Beton/ Bendrat 20,400.00

0.0070 Oh Pekerja 80,000.00

0.0070 Oh Tukang besi 90,000.00

0.0007 Oh Kepala Tukang 120,000.00

0.0004 Oh Mandor 140,000.00

Jumlah

Page 63: Rab Anime Class

NO1 2 3

URAIAN PEKERJAAN DANANALISA

SATUAN(Rp)

13 Sloof 25/30 (S1) M3

1.0000 M3 Beton cor readymix dengan mutu K 225 2,154,734.00

140.1236 Kg Pembesian Ulir 109,786.00

8.0000 M2 Bekisting Sloof/Tie Beam 124,610.00

Jumlah

14 Sloof 15/20 (S2)

1.0000 M3 Beton cor readymix dengan mutu K 225 2,154,734.00

142.6992 Kg Pembesian Ulir 109,786.00

13.3333 M2 Bekisting Sloof/Tie Beam 124,610.00

Jumlah

15 Kolom D 50 (K1) M3

1.0000 M3 Beton cor readymix dengan mutu K 300 2,173,635.00

129.0472 Kg Pembesian Ulir 109,786.00

11.6667 M2 Bekisting Kolom 216,630.00

Jumlah

18 Kolom praktis 15/15 (Kp) M3

1.0000 M3 Beton Cor manual 1 Pc : 3 Ps : 5 Kr (K-175) 1,035,710.00

173.0000 Kg Pembesian Ulir 109,786.00

20.0000 M2 Bekisting Kolom 216,630.00

Jumlah

19 Balok 40/60 (B1)

1.0000 M3 Beton cor readymix dengan mutu K 225 2,154,734.00

135.0000 Kg Pembesian Ulir 109,786.00

8.6670 M2 Bekisting Balok 223,980.00

Jumlah

20 Balok 30/40 (B2) M3

1.0000 M3 Beton cor readymix dengan mutu K 225 2,154,734.00

146.0000 Kg Pembesian Ulir 109,786.00

9.0000 M2 Bekisting Balok 223,980.00

Jumlah

21 Balok 15/30 (B3) M3

1.0000 M3 Beton cor readymix dengan mutu K 225 2,154,734.00

170.0000 Kg Pembesian Ulir 109,786.00

13.0000 M2 Bekisting Balok 223,980.00

Jumlah

24 Plat lantai tebal 15 cm

1.0000 M3 Beton cor readymix dengan mutu K 225 2,657,932.23

129.0000 Kg Pembesian Polos 104,536.00

8.3333 M2 Bekisting Plat/Dak 256,630.00

Jumlah

26 Foot Plat 130 x 130 x 30

1.0000 M3 Beton cor readymix dengan mutu K 225 2,657,932.23

111.0000 Kg Pembesian Polos 104,536.00

0.4762 M2 Bekisting Footplate/Pile Cap 112,360.00

Jumlah

30 Plat tangga beton

1.0000 M3 Beton cor readymix dengan mutu K 225 2,657,932.23

408.8303 Kg Pembesian Polos 104,536.00

29.7500 M2 Bekisting Plat Tangga 188,380.00

Jumlah

8 PEKERJAAN PENUTUP ATAP

Page 64: Rab Anime Class

NO1 2 3

URAIAN PEKERJAAN DANANALISA

SATUAN(Rp)

1 Pamasangan Atap Metal Deck M2

0.2000 Kg Paku 13,200.00

0.6100 Lbr Atap Metal Deck 200,000.00

0.2000 OH Pekerja Biasa 80,000.00

0.1000 OH Tukang Kayu 90,000.00

0.0100 OH Kepala Tukang 120,000.00

0.0010 OH Mandor 138,000.00

Jumlah

2 Pemasangan Rangka Atap Baja Ringan M2

1.1500 M2 Baja Ringan 125,000.00

0.0600 OH Pekerja 80,000.00

0.0600 OH Tukang Las Konstruksi 90,000.00

0.0600 OH Kepala Tukang 120,000.00

0.0030 OH Mandor 140,000.00

Jumlah

9 PEKERJAAN LANGIT-LANGIT

1 Rangka Metal Furing M2

2.0000 M1 Furing CR 10,000.00

1.6000 M1 Furing MR 8,500.00

4.0000 Bh Furing JC 1,100.00

1.0000 Ls Kawat Pengggantung 15,000.00

0.3000 OH Pekerja 80,000.00

0.3100 OH Tukang Kayu 90,000.00

0.2300 OH Kepala Tukang 120,000.00

0.0200 OH Mandor 138,000.00

Jumlah

2 Pasang Plafond GRC M2

0.3640 Lbr Gypsum GRC (120x240x9) mm 64,000.00

0.1100 Kg Paku GRC 25,300.00

0.0250 Zak Kompon 88,000.00

0.0300 Rol JointTape 32,400.00

0.1000 Oh Pekerja 85,000.00

0.0500 Oh Tukang 115,000.00

0.0050 Oh Kepala Tukang 126,000.00

0.0050 Oh Mandor 138,000.00

Jumlah

3 Pasang Plafond Calsium silicate board 6 mm(bebas Asbes) M2

0.3640 Lbr Calsium silicate board 6 mm(bebas Asbes) 140,000.00

0.0100 Ktk Paku Sekrup 13,200.00

0.0250 Zak Kompon 88,000.00

0.0300 Rol JointTape 32,400.00

0.1000 Oh Pekerja 85,000.00

0.0500 Oh Tukang 115,000.00

0.0050 Oh Kepala Tukang 126,000.00

0.0050 Oh Mandor 138,000.00

Jumlah

4 Pasangan list gypsum M1

1.0500 M1 List GRC 32,000.00

0.1500 Kg Lem GRC 10,500.00

0.0600 OH Pekerja Biasa 85,000.00

0.0600 OH Tukang Kayu 115,000.00

Page 65: Rab Anime Class

NO1 2 3

URAIAN PEKERJAAN DANANALISA

SATUAN(Rp)

0.0060 OH Kepala Tukang 126,000.00

0.0030 OH Mandor 138,000.00

Jumlah

10 PEKERJAAN LANTAI DAN DINDING KERAMIK

1 Pasang Dinding Keramik Uk. 25 x 20 cm M2

11.0000 Kg Semen Portland 50 Kg 1,300.00

1.6000 Kg Semen Warna 2,500.00

0.0215 M3 Pasir Pasang (Tenggarong) 165,000.00

20.0000 Buah Keramik 25x20 cm 3,950.00

0.6200 OH Pekerja Biasa 85,000.00

0.3500 OH Tukang Batu 115,000.00

0.0350 OH Kepala Tukang 126,000.00

0.0300 OH Mandor 138,000.00

Jumlah

2 Pasang Lantai Keramik Uk. 20 x 20 cm (unpolish) M2

10.4000 Kg Semen Portland 50 Kg 1,300.00

1.6200 Kg Semen Warna 2,500.00

0.0450 M3 Pasir Pasang (Tenggarong) 165,000.00

26.5000 Buah Keramik 20x20 cm (unpolish) 3,120.00

0.7000 OH Pekerja Biasa 85,000.00

0.3500 OH Tukang Batu 115,000.00

0.0350 OH Kepala Tukang 126,000.00

0.0300 OH Mandor 138,000.00

Jumlah

3 Pasang Lantai Keramik Uk. 60 x 60 cm (polish) M2

9.8000 Kg Semen Portland 50 Kg 1,300.00

1.3000 Kg Semen Warna 2,500.00

0.0450 M3 Pasir Pasang (Tenggarong) 165,000.00

6.6300 Buah Keramik 60x60 cm 19,200.00

0.2500 OH Pekerja Biasa 85,000.00

0.1250 OH Tukang Batu 115,000.00

0.0130 OH Kepala Tukang 126,000.00

0.0130 OH Mandor 138,000.00

Jumlah

4 Pasang Lantai Keramik Uk. 40 x 40 cm (unpolish) M2

11.3800 Kg Semen Portland 50 Kg 1,300.00

1.6500 Kg Semen Warna 2,500.00

0.0215 M3 Pasir Pasang (Tenggarong) 165,000.00

6.2500 Buah Keramik 40x40 cm 14,400.00

0.6200 OH Pekerja Biasa 85,000.00

0.3500 OH Tukang Batu 115,000.00

0.0350 OH Kepala Tukang 126,000.00

0.0300 OH Mandor 138,000.00

Jumlah

5 Pasang Lapis Batu alam acak M2

1.0000 M2 Batu alam 200,000.00

11.3800 Kg Semen portland 1,300.00

0.0215 M3 Pasir pasang 165,000.00

0.6200 Oh Pekerja 80,000.00

0.3500 Oh Tukang batu 90,000.00

0.0350 Oh Kepala Tukang 120,000.00

Page 66: Rab Anime Class

NO1 2 3

URAIAN PEKERJAAN DANANALISA

SATUAN(Rp)

0.0300 Oh Mandor 140,000.00

Jumlah

11 PEKERJAAN CAT-CATAN1 M2

0.1700 Kg Cat Dasar 25,000.00

0.2000 Kg Cat Meni 30,000.00

0.2600 Ltr Cat Kilap 45,000.00

0.1500 Kg Plamir Kayu 49,500.00

0.0700 OH Pekerja Biasa 80,000.00

0.0900 OH Tukang Cat 90,000.00

0.0060 OH Kepala Tukang 120,000.00

0.0025 OH Mandor 140,000.00

Jumlah2 Pengecatan dinding 2 lapis dengan roll M2

0.1000 Kg Plamir Tembok 35,000.00

0.4700 Ltr Cat tembok ex mowilex 38,000.00

0.0100 Bh Roll 20,000.00

0.5000 Lbr Amplas 3,300.00

0.0400 Oh Pekerja 80,000.00

0.0300 Oh Tukang Cat 90,000.00

0.0030 Oh Kepala Tukang 120,000.00

0.0020 Oh Mandor 140,000.00

Jumlah3 Pengecatan Plafon 2 lapis dengan roll M2

0.1000 Kg Plamir Tembok 35,000.00

0.2400 Ltr Cat tembok ex mowilex 38,000.00

0.0100 Bh Roll 20,000.00

0.5000 Lbr Amplas 3,300.00

0.0600 Oh Pekerja 80,000.00

0.0400 Oh Tukang Cat 90,000.00

0.0040 Oh Kepala Tukang 120,000.00

0.0030 Oh Mandor 140,000.00

Jumlah

11 PEKERJAAN LISTRIK

1 Pekerjaan Pasangan Instalasi Lampu Titik

3.5000 M Kabel 13,700.00

0.3500 % Kelengkapan harga kabel 4,795.00

1.0000 Oh Pekerja 80,000.00

0.1000 Oh Mandor 140,000.00

Jumlah

2 Pekerjaan Pasangan Instalasi Stop Kontak Titik

4.0000 M Kabel 13,700.00

0.3500 % Kelengkapan harga kabel 4,795.00

1.0000 Oh Pekerja 80,000.00

0.1000 Oh Mandor 140,000.00

Jumlah

3 Pekerjaan Pasangan Lampu TL 18 Watt Titik

1.0000 Bh Lampu TL 18 Watt 82,000.00

0.1000 Oh Pekerja 80,000.00

0.0100 Oh Mandor 140,000.00

Jumlah

Pengecatan Bidang Kayu Baru (1 Lapis Plamir) 1 Lapis Cat Dasar dan 3 Lapis Cat Penutup

Page 67: Rab Anime Class

NO1 2 3

URAIAN PEKERJAAN DANANALISA

SATUAN(Rp)

4 Pekerjaan Pasangan Lampu SL 18 Watt Titik

1.0000 Bh Lampu SL 18 Watt 44,000.00

0.1000 Oh Pekerja 80,000.00

0.0100 Oh Mandor 140,000.00

Jumlah

5 Pekerjaan Pasangan Lampu SL 13 Watt Titik

1.0000 Bh Lampu SL 13 Watt 37,500.00

0.1000 Oh Pekerja 80,000.00

0.0100 Oh Mandor 140,000.00

Jumlah

6 Pekerjaan Pasangan Stop Kontak Titik

1.0000 Bh Stop kontak 26,000.00

0.1000 Oh Pekerja 80,000.00

0.0100 Oh Mandor 140,000.00

Jumlah

7 Pekerjaan Pasangan Saklar Tunggal Titik

1.0000 Bh Saklar Tunggal 29,900.00

0.1000 Oh Pekerja 80,000.00

0.0100 Oh Mandor 140,000.00

Jumlah

8 Pekerjaan Pasangan Saklar Double Titik

1.0000 Bh Saklar Double 35,000.00

0.1000 Oh Pekerja 80,000.00

0.0100 Oh Mandor 140,000.00

Jumlah

9 Pekerjaan Pasangan MCB Titik

1.0000 M MCB 258,000.00

0.1000 Oh Pekerja 80,000.00

0.0100 Oh Mandor 140,000.00

Jumlah

10 Pekerjaan Pasangan Penangkal Petir Titik

1.0000 M Penangkal petir 7,500,000.00

0.1000 Oh Pekerja 80,000.00

0.0100 Oh Mandor 140,000.00

Jumlah

12 PEKERJAAN SANITASI

1 Memasang Satu Buah Kloset Duduk Porselin Bh

6.0000 Kg Semen Portland 50 Kg 1,706.00

0.0100 M3 Pasir Pasang (Tenggarong) 170,700.00

1.0000 Bh Kloset Duduk 2,125,000.00

1.0000 OH Pekerja Biasa 80,000.00

1.5000 OH Tukang Batu 90,000.00

0.3000 OH Kepala Tukang 120,000.00

0.1600 OH Mandor 140,000.00

Jumlah

2 Memasang 1m' Pipa PVC Type AW Diameter 1/2" M1

1.2000 M' Pipa PVC 1/2" 9,500.00

0.3500 Bh Perlengkapan 35 % Harga Pipa 3,325.00

0.0360 OH Pekerja Biasa 80,000.00

0.0600 OH Tukang Batu 90,000.00

0.0060 OH Kepala Tukang 120,000.00

Page 68: Rab Anime Class

NO1 2 3

URAIAN PEKERJAAN DANANALISA

SATUAN(Rp)

0.0018 OH Mandor 140,000.00

Jumlah

3 Memasang 1m' Pipa PVC Type AW Diameter 2" M1

1.2000 M' Pipa PVC 2" 8,750.00

0.3500 Bh Perlengkapan 35 % Harga Pipa 3,062.50

0.0540 OH Pekerja Biasa 80,000.00

0.0900 OH Tukang Batu 90,000.00

0.0090 OH Kepala Tukang 120,000.00

0.0027 OH Mandor 140,000.00

Jumlah

4 Memasang 1m' Pipa PVC Type AW Diameter 4" M1

1.2000 M' Pipa PVC 4" 20,000.00

0.3500 Bh Perlengkapan 35 % Harga Pipa 7,000.00

0.0810 OH Pekerja Biasa 80,000.00

0.1350 OH Tukang Batu 90,000.00

0.0135 OH Kepala Tukang 120,000.00

0.0041 OH Mandor 140,000.00

Jumlah

5 Memasang 1 Buah Floor Drain Stainless Bh

1.0000 Bh Floor Drain Stainless 27,000.00

0.1000 OH Tukang Batu 90,000.00

0.0100 OH Kepala Tukang 120,000.00

Jumlah

6 Memasang 1 Buah Roof Drain Stainless Bh

1.0000 Bh Roof Drain Stainless 27,000.00

0.1000 OH Tukang Batu 90,000.00

0.0100 OH Kepala Tukang 120,000.00

Jumlah

7 Memasang 1 Buah Shower Kloset Bh

1.0000 Bh Shower Kloset 320,000.00

0.0100 OH Pekerja Biasa 80,000.00

0.1000 OH Tukang Batu 90,000.00

0.0100 OH Kepala Tukang 120,000.00

0.0050 OH Mandor 140,000.00

Jumlah

8 Memasang 1 Buah Wastafel + aksesoris Bh

6.0000 Kg Semen Portland 50 Kg 1,300.00

0.0100 M3 Pasir Pasang (Tenggarong) 165,000.00

1.0000 Bh Wastafel + aksesoris 300,000.00

0.1200 Bh Perlengkapan 12 % Harga wastafel 36,000.00

1.2000 OH Pekerja Biasa 80,000.00

1.4500 OH Tukang Batu 90,000.00

0.1500 OH Kepala Tukang 120,000.00

0.1000 OH Mandor 140,000.00

Jumlah

Page 69: Rab Anime Class

NO1 2 3

URAIAN PEKERJAAN DANANALISA

SATUAN(Rp)

Page 70: Rab Anime Class

DAFTAR ANALISA DAN UPAH

4 5 6

29,400.00

18,900.00

340.00

8,000.00

9,000.00

1,200.00

700.00

18,900.00 48,640.00 67,540.00

8,000.00

7,000.00

15,000.00 15,000.00

38,400.00

176,400.00

1,020.00

32,000.00

18,000.00

2,400.00

2,800.00

23,200.00 215,820.00 239,020.00

60,000.00

3,500.00

63,500.00 63,500.00

15,360.00

2,660.00

18,020.00 18,020.00

120,000.00

24,000.00

1,400.00

25,400.00 120,000.00 145,400.00

102,000.00

24,000.00

1,400.00

25,400.00 102,000.00 127,400.00

UPAH(Rp)

BAHAN(Rp)

JUMLAH(Rp)

Page 71: Rab Anime Class

4 5 6

UPAH(Rp)

BAHAN(Rp)

JUMLAH(Rp)

240,000.00

211,900.00

85,800.00

120,000.00

67,500.00

9,000.00

10,500.00

207,000.00 537,700.00 744,700.00

240,000.00

71,280.00

62,400.00

35,100.00

4,680.00

4,680.00

106,860.00 311,280.00 418,140.00

205,975.00

100,000.00

305,975.00 305,975.00

71,500.00

2,550.00

5,750.00

5,040.00

3,588.00

16,928.00 71,500.00 88,428.00

24,635.00

63,000.00

6,270.00

24,000.00

9,000.00

1,200.00

2,100.00

36,300.00 93,905.00 130,205.00

14,950.00

63,000.00

7,095.00

24,000.00

9,000.00

1,200.00

2,100.00

36,300.00 85,045.00 121,345.00

34,515.00

126,000.00

Page 72: Rab Anime Class

4 5 6

UPAH(Rp)

BAHAN(Rp)

JUMLAH(Rp)

15,345.00

48,000.00

18,000.00

2,400.00

4,200.00

72,600.00 175,860.00 248,460.00

13,291.20

3,300.00

24,000.00

13,500.00

1,800.00

2,100.00

41,400.00 16,591.20 57,991.20

8,112.00

3,960.00

24,000.00

13,500.00

1,800.00

1,400.00

40,700.00 12,072.00 52,772.00

4,225.00

16,000.00

9,000.00

1,200.00

1,400.00

27,600.00 4,225.00 31,825.00

951,060.00

30,261.00

200,000.00

200,000.00 981,321.00 1,181,321.00

150,000.00

9,375.00

50,000.00

5,200.00

14,625.00

1,950.00

4,550.00

26,325.00 209,375.00 235,700.00

4,400,000.00

2,500.00

8,000.00

35,000.00

Page 73: Rab Anime Class

4 5 6

UPAH(Rp)

BAHAN(Rp)

JUMLAH(Rp)

45,500.00 4,400,000.00 4,445,500.00

84,000.00

1,700.00

44,145.00

8,000.00

18,000.00

3,000.00

700.00

29,700.00 129,845.00 159,545.00

220,000.00

11,000.00

2,352.90

3,440.00

3,870.00

516.00

294.00

8,120.00 233,352.90 241,472.90

880,000.00

460,800.00

10,588.05

6,800.00

7,650.00

1,080.00

700.00

16,230.00 1,351,388.05 1,367,618.05

700,000.00

6,800.00

7,650.00

1,080.00

700.00

16,230.00 700,000.00 716,230.00

880,000.00

73,728.00

35,200.00

39,600.00

5,280.00

3,080.00

83,160.00 953,728.00 1,036,888.00

112,640.00

1,200.00

13,500.00

1,800.00

112.00

Page 74: Rab Anime Class

4 5 6

UPAH(Rp)

BAHAN(Rp)

JUMLAH(Rp)

16,612.00 112,640.00 129,252.00

700,000.00

35,200.00

39,600.00

5,280.00

3,080.00

83,160.00 700,000.00 783,160.00

40,000.00

11,250.00

1,560.00

12,810.00 40,000.00 52,810.00

30,000.00

8,000.00

900.00

8,900.00 30,000.00 38,900.00

150,000.00

40,000.00

4,500.00

44,500.00 150,000.00 194,500.00

130,500.00

20,000.00 2,250.00 22,250.00 130,500.00 152,750.00

20,000.00 8,000.00 8,000.00 20,000.00 28,000.00

17,500.00

8,000.00

8,000.00 17,500.00 25,500.00

150,000.00 8,000.00 8,000.00 150,000.00 158,000.00

120,000.00

8,000.00

8,000.00 120,000.00 128,000.00

400,000.00

50,000.00

1,200.00

81,000.00

10,800.00

700.00

93,700.00 450,000.00 543,700.00

Page 75: Rab Anime Class

4 5 6

UPAH(Rp)

BAHAN(Rp)

JUMLAH(Rp)

400,000.00

50,000.00

1,200.00

81,000.00

10,800.00

700.00

93,700.00 450,000.00 543,700.00

131,480.00

423,800.00

308,700.00

132,000.00

24,750.00

3,360.00

11,620.00

171,730.00 863,980.00 1,035,710.00

120,754.00

482,300.00

314,100.00

132,000.00

24,750.00

3,360.00

11,620.00

171,730.00 917,154.00 1,088,884.00

2,208,602.90

43,200.00

8,100.00

1,080.00

3,780.00

391,454.87

544.46

1,170.00

56,160.00 2,601,772.23 2,657,932.23

2,227,976.66

43,200.00

8,100.00

1,080.00

3,780.00

391,454.87

544.46

1,170.00

56,160.00 2,621,146.00 2,677,306.00

98,000.00

5,100.00

Page 76: Rab Anime Class

4 5 6

UPAH(Rp)

BAHAN(Rp)

JUMLAH(Rp)

2,500.00

41,600.00

23,400.00

3,120.00

3,640.00

6,760.00 105,600.00 112,360.00

110,250.00

5,100.00

2,500.00

41,600.00

23,400.00

3,120.00

3,640.00

6,760.00 117,850.00 124,610.00

Page 77: Rab Anime Class

4 5 6

UPAH(Rp)

BAHAN(Rp)

JUMLAH(Rp)

31,500.00

108,000.00

36,750.00

20,000.00

6,800.00

5,000.00

52,800.00

29,700.00

3,960.00

4,620.00

8,580.00 208,050.00 216,630.00

31,500.00

81,000.00

36,750.00

20,000.00

6,800.00

3,750.00

52,800.00

29,700.00

3,960.00

4,620.00

8,580.00 179,800.00 188,380.00

31,500.00

108,000.00

36,750.00

60,000.00

6,800.00

5,000.00

52,800.00

29,700.00

3,960.00

4,620.00

8,580.00 248,050.00 256,630.00

31,500.00

108,000.00

44,100.00

20,000.00

6,800.00

5,000.00

52,800.00

29,700.00

3,960.00

4,620.00

8,580.00 215,400.00 223,980.00

102,900.00

306.00

Page 78: Rab Anime Class

4 5 6

UPAH(Rp)

BAHAN(Rp)

JUMLAH(Rp)

560.00

630.00

84.00

56.00

1,330.00 103,206.00 104,536.00

108,150.00

306.00

560.00

630.00

84.00

56.00

1,330.00 108,456.00 109,786.00

Page 79: Rab Anime Class

4 5 6

UPAH(Rp)

BAHAN(Rp)

JUMLAH(Rp)

2,154,734.00

15,383,609.55

996,880.00

18,535,223.55

2,154,734.00

15,666,374.37

1,661,462.51

19,482,570.88

2,173,635.00

14,167,575.90

2,527,357.22

18,868,568.12

1,035,710.00

18,992,978.00

4,332,600.00

24,361,288.00

2,154,734.00

14,821,110.00

1,941,234.66

18,917,078.66

2,154,734.00

16,028,756.00

2,015,820.00

20,199,310.00

2,154,734.00

18,663,620.00

2,911,740.00

23,730,094.00

2,657,932.23

13,485,144.00

2,138,574.78

18,281,651.01

2,657,932.23

11,603,496.00

53,505.83

14,314,934.07

2,657,932.23

42,737,482.77

5,604,305.00

50,999,720.00

Page 80: Rab Anime Class

4 5 6

UPAH(Rp)

BAHAN(Rp)

JUMLAH(Rp)

2,640.00

122,000.00

16,000.00

9,000.00

1,200.00

138.00

26,338.00 124,640.00 150,978.00

143,750.00

4,800.00

5,400.00

7,200.00

420.00

13,020.00 148,550.00 161,570.00

20,000.00

13,600.00

4,400.00

15,000.00

24,000.00

27,900.00

27,600.00

2,760.00

82,260.00 53,000.00 135,260.00

23,296.00

2,783.00

2,200.00

972.00

8,500.00

5,750.00

630.00

690.00

1,320.00 29,251.00 30,571.00

50,960.00

132.00

2,200.00

972.00

8,500.00

5,750.00

630.00

690.00

7,070.00 54,264.00 61,334.00

33,600.00

1,575.00

5,100.00

6,900.00

Page 81: Rab Anime Class

4 5 6

UPAH(Rp)

BAHAN(Rp)

JUMLAH(Rp)

756.00

414.00

13,170.00 35,175.00 48,345.00

14,300.00

4,000.00

3,547.50

79,000.00

52,700.00

40,250.00

4,410.00

4,140.00

101,500.00 100,847.50 202,347.50

13,520.00

4,050.00

7,425.00

82,680.00

59,500.00

40,250.00

4,410.00

4,140.00

108,300.00 107,675.00 215,975.00

12,740.00

3,250.00

7,425.00

127,296.00

21,250.00

14,375.00

1,638.00

1,794.00

39,057.00 150,711.00 189,768.00

14,794.00

4,125.00

3,547.50

90,000.00

52,700.00

40,250.00

4,410.00

4,140.00

101,500.00 112,466.50 213,966.50

200,000.00

14,794.00

3,547.50

49,600.00

31,500.00

4,200.00

Page 82: Rab Anime Class

4 5 6

UPAH(Rp)

BAHAN(Rp)

JUMLAH(Rp)

4,200.00

89,500.00 218,341.50 307,841.50

4,250.00

6,000.00

11,700.00

7,425.00

5,600.00

8,100.00

720.00

350.00

14,770.00 29,375.00 44,145.00

3,500.00

17,860.00

200.00

1,650.00

3,200.00

2,700.00

360.00

280.00

6,540.00 23,210.00 29,750.00

3,500.00

9,120.00

200.00

1,650.00

4,800.00

3,600.00

480.00

420.00

9,300.00 14,470.00 23,770.00

47,950.00

1,678.25

80000.0014000.00

94,000.00 49,628.25 143,628.25

54,800.00

1,678.25

80000.0014000.00

94,000.00 56,478.25 150,478.25

82,000.00

8000.001400.00

9,400.00 82,000.00 91,400.00

Page 83: Rab Anime Class

4 5 6

UPAH(Rp)

BAHAN(Rp)

JUMLAH(Rp)

44,000.00

8000.001400.009400.00 44,000.00 53,400.00

37,500.00

8000.001400.00

9,400.00 37,500.00 46,900.00

26,000.00

8000.001400.00

9,400.00 26,000.00 35,400.00

29,900.00

8000.001400.00

9,400.00 29,900.00 39,300.00

35,000.00

8000.001400.00

9,400.00 35,000.00 44,400.00

258,000.00

8000.001400.00

9,400.00 258,000.00 267,400.00

7,500,000.00

80001400

9,400.00 7,500,000.00 7,509,400.00

10,236.00

1,707.00

2,125,000.00

80,000.00

135,000.00

36,000.00

22,400.00

273,400.00 2,136,943.00 2,410,343.00

11,400.00

1,163.75

2,880.00

5,400.00

720.00

Page 84: Rab Anime Class

4 5 6

UPAH(Rp)

BAHAN(Rp)

JUMLAH(Rp)

252.00

9,252.00 12,563.75 21,815.75

10,500.00

1,071.88

4,320.00

8,100.00

1,080.00

378.00

13,878.00 11,571.88 25,449.88

24,000.00

2,450.00

6,480.00

12,150.00

1,620.00

574.00

20,824.00 26,450.00 47,274.00

27,000.00

9,000.00

1,200.00

10,200.00 27,000.00 37,200.00

27,000.00

9,000.00

1,200.00

10,200.00 27,000.00 37,200.00

320,000.00

800.00

9,000.00

1,200.00

700.00

11,700.00 320,000.00 331,700.00

7,800.00

1,650.00

300,000.00

4,320.00

96,000.00

130,500.00

18,000.00

14,000.00

258,500.00 313,770.00 572,270.00

Samarinda, Agustus 2015

Dibuat Oleh :

Page 85: Rab Anime Class

4 5 6

UPAH(Rp)

BAHAN(Rp)

JUMLAH(Rp)

Nama Mahasiswa

ACHMAD FARUG

12 619 014

Page 86: Rab Anime Class

DAFTAR SATUAN UPAH DAN BAHAN

PROGRAM :PEKERJAAN :LOKASI :TAHUN ANGGARAN :

No. BAHAN - BAHAN

AGREGAT KASAR, BAHAN PEREKAT DAN BAHAN JADINYA

1 Batu bata merah2 Batu gunung3 Pancang mini pile 25 x 25 cm4 Batu kerikil lokal5 Koral Beton6 Pasir urug7 Pasir pasang8 Pasir beton9 Tanah urug pilihan10 Semen11 Semen warna12 Cor beton ready mix K-22513 Cor beton ready mix K-30014 Batu Alam Acak15 Concrete pump16 Vibrator17 Bensin18 Lem Gypsum19 Lem kayu20 Sealeant21 Kompon22 Joint Tape23 Buis beton diameter 100 cm24 Aluminium Composite Panel25 Pintu Geser26 Pintu PVC

BAHAN FINISHING1 Amplas2 Thinner A Spesial3 Cat dasar kayu

Page 87: Rab Anime Class

4 Cat kilap5 Plamir tembok / Kayu6 Cat tembok ex mowilex8 Cat meni9 Cat meni besi10 Roll10 Dempul kayu11 Minyak cat kilap12 Minyak begesting15 Finishing Melamic ducco natural gelap16 Finishing Melamic ducco natural terang19 Water Proofing

Page 88: Rab Anime Class

No. BAHAN - BAHAN

BAHAN KAYU DAN BAHAN JADI LAINNYA1 Papan Ulin2 Papan Meranti3 Papan Bengkirai4 Kayu Ulin5 Kayu Bengkirai6 Kayu Kapur7 Kayu Meranti8 Dolken kayu Galam 9 Plywood 4 mm10 Plywood 9 mm11 Multiplek 12 mm12 Teakwood 13 GRC 9 mm14 Calsium silicate board 9 mm (bebas Asbes)15 Calsium silicate board motif jati (bebas Asbes)16 List plafond gypsum + finishing17 List Plafond Plywood 5 cm + Finishing

BAHAN KERAMIK DAN PELAPIS DINDING 1 Keramik uk. 25x20 cm (polish)2 Keramik uk. 20x20 cm (unpolish)3 Keramik uk. 60x60 cm (polish)4 Keramik uk. 40x40 cm (unpolish)

BAHAN LOGAM DAN PAKU1 Besi beton polos2 Besi beton Ulir3 Kawat ikat beton4 Kawat Penggantung5 Paku kayu6 Paku ulin7 Paku plywood8 Paku gypsum9 Paku Sekrup10 Seng Gelombang BJLS 2011 Seng Plat BJLS 2012 Railing Pagar besi Hollow

Page 89: Rab Anime Class

13 Railing Tangga besi Hollow14 Teralis besi hollow pada main entrance + Finishing15 Rangka Metal (untuk dinding)16 Rangka Metal Furing CR17 Rangka Metal Furing MR18 Rangka Metal Furing JC19 Alluminium Profil20 Skrup fixer

BAHAN KACA1 Kaca Bening tbl 5 mm

Page 90: Rab Anime Class

No. BAHAN - BAHAN

BAHAN SANITASI 1 Kloset Duduk2 Floor drain stainless3 Roof drain stainless4 Biological Filter Septicktank5 Wastafel + aksesoris8 Shower Kloset9 Pipa Dia. 1/2"10 Pipa Dia. 2"11 Pipa Dia. 4"

BAHAN PENUTUP ATAP1 Atap Metal Deck2 Rangka Atap Baja ringan

BAHAN PENGGANTUNG DAN KUNCI1 Engsel 3 "2 Handle Jendela3 Engsel 4"4 Grandel pintu5 Grandel jendela6 Kunci pintu tanam7 Kunci slot Km/Wc8 Rel pintu geser bagian atas9 Rel pintu geser bagian bawah

BAHAN ELEKTRIKAL1 Lampu TL 18 watt2 Lampu Downlight 4" + SL 18 watt3 Lampu Downlight 3" + SL 13 watt4 Saklar tunggal5 Saklar double6 Stop kontak8 Kabel9 Perlengkapan Harga kabel10 Zekring kast 4 box MCB11 Penangkal petir

Bahan / material sepenuhnya menggunakan kandungan lokal

Page 91: Rab Anime Class

No. U R A I A NDAFTAR UPAH KERJA

1 Pekerja2 Tukang kayu3 Tukang batu4 Tukang besi6 Tukang cat7 Kepala Tukang kayu8 Kepala Tukang batu9 Kepala Tukang besi11 Kepala Tukang cat12 Mandor

Page 92: Rab Anime Class

DAFTAR SATUAN UPAH DAN BAHAN

TUGAS AKHIRPembangunan Martial Arts Center JL. A.W.Syahranie2015

BAHAN - BAHAN SATUAN

AGREGAT KASAR, BAHAN PEREKAT DAN

BhM3M1M3M3M3M3M3M3KgKgM3M3M2JamJamLtrKg

LiterLiterZakRol

BuahM2UnitUnit

LbrLtrKg

Page 93: Rab Anime Class

LiterKgkgKgKgBhKg

LiterLtr

Finishing Melamic ducco natural gelap M2Finishing Melamic ducco natural terang M2

Kg

Page 94: Rab Anime Class

BAHAN - BAHAN SATUAN

BAHAN KAYU DAN BAHAN JADI LAINNYAM3M3M3M3M3M3M3BtgLbrLbrLbrLbrLbr

Calsium silicate board 9 mm (bebas Asbes) LbrCalsium silicate board motif jati (bebas Asbes) M1

M1List Plafond Plywood 5 cm + Finishing M1

BAHAN KERAMIK DAN PELAPIS DINDING Bh

Keramik uk. 20x20 cm (unpolish) BhBh

Keramik uk. 40x40 cm (unpolish) Bh

BtgBtgKgKgKgKgKgKgKtkLbrLbrM1

Page 95: Rab Anime Class

M1Teralis besi hollow pada main entrance + Finishing M1

M1M1M1BhBhBh

M2

Page 96: Rab Anime Class

BAHAN - BAHAN SATUAN

bhbhbh

UnitSetBhM1M1M1

M2Kg

BAHAN PENGGANTUNG DAN KUNCIbhbhbhbhbhbhbhM1M1

bhLampu Downlight 4" + SL 18 watt bhLampu Downlight 3" + SL 13 watt bh

bhbhbhTtkTtkUnitUnit

Bahan / material sepenuhnya menggunakan kandungan lokal

Page 97: Rab Anime Class

U R A I A N SATUANDAFTAR UPAH KERJA

1 HARI1 HARI1 HARI1 HARI1 HARI1 HARI1 HARI1 HARI1 HARI1 HARI

Page 98: Rab Anime Class

DAFTAR SATUAN UPAH DAN BAHAN

HARGA KETERANGAN

900.00 Di lokasi 200,000.00 Di lokasi 205,975.00 Di lokasi 325,000.00 Di lokasi 300,000.00 Di lokasi 100,000.00 Di lokasi 165,000.00 Di lokasi 173,000.00 Di lokasi 65,000.00 Di lokasi 1,300.00 Di lokasi 2,500.00 Di lokasi 2,154,734.54 Di lokasi 2,173,635.77 Di lokasi 200,000.00 Di lokasi 381,907.19 Di lokasi 54,446.15 Di lokasi 7,800.00 Di lokasi 10,500.00 Di lokasi 30,800.00 Di lokasi 39,215.00 Di lokasi 88,000.00 Di lokasi 32,400.00 Di lokasi 412,000.00 Di lokasi 864,600.00 Terpasang 700,000.00 Terpasang 500,000.00 Terpasang

3,300.00 Di lokasi 20,000.00 Di lokasi 25,000.00 Di lokasi

Page 99: Rab Anime Class

45,000.00 Di lokasi 35,000.00 Di lokasi 38,000.00 Di lokasi 30,000.00 Di lokasi 35,000.00 Di lokasi 20,000.00 Di lokasi 66,000.00 Di lokasi 12,500.00 Di lokasi 25,000.00 Di lokasi 150,000.00 Di lokasi 150,000.00 Di lokasi 65,000.00 Di lokasi

Page 100: Rab Anime Class

HARGA KETERANGAN

4,000,000.00 Di lokasi 2,700,000.00 Di lokasi 4,200,000.00 Di lokasi 3,750,000.00 Di lokasi 3,900,000.00 Di lokasi 2,500,000.00 Di lokasi 2,450,000.00 Di lokasi 10,000.00 Di lokasi 65,000.00 Di lokasi 90,000.00 Di lokasi 130,000.00 Di lokasi 65,000.00 Di lokasi 64,000.00 Di lokasi 140,000.00 Di lokasi 18,000.00 Di lokasi 32,000.00 Di lokasi 7,500.00 Terpasang

3,950.00 Di lokasi 3,120.00 Di lokasi 19,200.00 Di lokasi 14,400.00 Di lokasi

9,800.00 Di lokasi 10,300.00 Di lokasi 25,000.00 Di lokasi 15,000.00 Di lokasi 17,000.00 Di lokasi 25,000.00 Di lokasi 30,000.00 Di lokasi 25,300.00 Di lokasi 13,200.00 Di lokasi 32,000.00 Di lokasi 30,700.00 Di lokasi 400,000.00 Terpasang

Page 101: Rab Anime Class

400,000.00 Terpasang 75,000.00 Terpasang 20,000.00 Di lokasi 10,000.00 Di lokasi 8,500.00 Di lokasi 1,100.00 Di lokasi 200,000.00 Di lokasi 5,500.00 Di lokasi

102,400.00 Di lokasi

Page 102: Rab Anime Class

HARGA KETERANGAN

550,000.00 Di lokasi27,000.00 Di lokasi27,000.00 Di lokasi

4,300,000.00 Terpasang 300,000.00 Di lokasi 320,000.00 Di lokasi 10,000.00 Di lokasi 8,750.00 Di lokasi

20,000.00 Di lokasi

200,000.00 Terpasang 125,000.00 Terpasang

30,000.00 Terpasang20,000.00 Terpasang40,000.00 Terpasang20,000.00 Terpasang17,500.00 Terpasang

150,000.00 Terpasang130,500.00 Terpasang150,000.00 Terpasang120,000.00 Terpasang

82,000.00 Terpasang44,000.00 Terpasang37,500.00 Terpasang29,900.00 Terpasang35,000.00 Terpasang26,000.00 Terpasang13,700.00 Terpasang

4,795.00 Terpasang258,000.00 Terpasang

7,500,000.00 Terpasang

Bahan / material sepenuhnya menggunakan kandungan lokal

Page 103: Rab Anime Class

HARGA KETERANGAN

80,000.00 Tenaga lokal 90,000.00 Tenaga lokal 90,000.00 Tenaga lokal 90,000.00 Tenaga lokal 90,000.00 Tenaga lokal 120,000.00 Tenaga lokal 120,000.00 Tenaga lokal 120,000.00 Tenaga lokal 120,000.00 Tenaga lokal 140,000.00 Tenaga lokal


Recommended