RACKET CREEK @ ELK CITY LAKE NEAR INDEPENDENCE, KANSAS PROJECT CONSTRUCTED DECEMBER 7-9, 2008. RACKET CREEK NEAR INDEPENDENCE, KANSAS. Bank erosion is actively eroding and threatening infrastructure within a U. S. Army Corps of Engineers public campground Rural, sparsely populated - PowerPoint PPT Presentation
Popular Tags:
90
RACKET CREEK @ ELK CITY LAKE NEAR INDEPENDENCE, KANSAS PROJECT CONSTRUCTED DECEMBER 7-9, 2008
Transcript
Page 1: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

RACKET CREEK @ ELK CITY LAKE

NEAR INDEPENDENCE, KANSAS

PROJECT CONSTRUCTED DECEMBER 7-9, 2008

Page 2: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

RACKET CREEK NEAR INDEPENDENCE, KANSAS

Bank erosion is actively eroding and threatening infrastructure within a U. S. Army Corps of Engineers public campground

Rural, sparsely populated Bed material: silts, clay, aluvium, deeply incised Pool-riffle-pool regime, slope less than 1% Average width 30-40 ft 32 ft tall eroding banks are a public safety issue One gully had a series of headcuts up to 4 ft tall.

Page 3: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

PRE-PROJECT PHOTOSby

Eugene Goff September 2008

Page 4: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

Looking US @ entrance conditions into project bend.

PRE-PROJECT-RACKET CREEK PIX BY EUGENE GOFF SEPT 2008

Page 5: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

Looking US @ middle of project bend.

PRE-PROJECT-RACKET CREEK PIX BY EUGENE GOFF SEPT 2008

Page 6: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

Looking DS @ middle of project bend.

PRE-PROJECT-RACKET CREEK PIX BY EUGENE GOFF SEPT 2008

Page 7: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

Looking DS @ lower end of project bend.

PRE-PROJECT-RACKET CREEK PIX BY EUGENE GOFF SEPT 2008

Page 8: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

Looking US @ entrance into straight section of the project.

PRE-PROJECT-RACKET CREEK PIX BY EUGENE GOFF SEPT 2008

Page 9: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

Looking US at straight section of project.

PRE-PROJECT-RACKET CREEK PIX BY EUGENE GOFF SEPT 2008

Page 10: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

STEP-BY-STEPS FOR RACKET

CREEK

All drawings by Dave Derrick

Page 11: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

stream channel

Top bankEroding bank

approximately 32 ft tall

1 of 9

Racket Creek, Independence, KS

Page 12: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

2 of 9

Racket Creek, Independence, KS

Dig a notch (2 ft deep and 4 ft wide) to tuck LPSTP closer to bank toe

Page 13: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

Looking DS. Tracked back hoe has dug out a notch (2 ft deep & 4 ft wide) to tuck LPSTP closer to bank toe

CONSTRUCTION-RACKET CR. PIX BY DAVE DERRICK 12-8&9-2008

Page 14: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

3 of 9

Racket Creek, Independence, KS

From top bank, dump stone down over hill

Page 15: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

4 of 9

Racket Creek, Independence, KS

Tracked backhoe shapes stone into a Longitudinal Peaked Stone Toe Protection (LPSTP) with a crest

height 4 ft above the base flow water surface elevation

Page 16: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

5 of 9

Racket Creek, Independence, KS

Willow poles (termed Live Siltation) were then laid on the LPSTP at a rate of 3.5 poles per ft. Basal

ends should be in vadose zone (capillary zone)

Live Siltation

Page 17: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

6 of 9

Racket Creek, Independence, KS

Soil dug from the opposite bank of the stream was used to “plant” the Live Siltation & also to

provide a flatter slope for the eroded bank.

Page 18: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

7 of 9

Racket Creek, Independence, KS

In some sections of the project the upper bank will be sloped to

a stable angle of repose.

Page 19: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

8 of 9

Racket Creek, Independence, KS

Rooted-stock plants will be added in spring 2009 to

stabilize the bank, reduce high flow velocities, &

provide a vegetated riparian corridor.

Page 20: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

9 of 9

Racket Creek, Independence, KS

Seed & mulch all disturbed areas

Page 21: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

CONSTRUCTION PHOTOS

by Dave Derrick, December 8-9, 2008

Page 22: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

Keys #1-3, LPSTP, Live Siltation, & soil

placement at the upper end of the

project bend.

Page 23: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

Looking DS @ hoe digging Key #1

CONSTRUCTION-RACKET CR. PIX BY DAVE DERRICK 12-8&9-2008

Page 24: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

Looking US @ Key #1 with hoe digging Key #2. Key # 1 will be extended up the hill to top bank. The key will be vegetated

with willow poles, filled with stone, backfilled with soil, with a berm at top bank to stop runoff flow down the key.

CONSTRUCTION-RACKET CR. PIX BY DAVE DERRICK 12-8&9-2008

Page 25: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

Looking US. Building Key #1.

CONSTRUCTION-RACKET CR. PIX BY DAVE DERRICK 12-8&9-2008

Page 26: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

It takes a BIG generator to brew coffee on a cold day in Kansas

CONSTRUCTION-RACKET CR. PIX BY DAVE DERRICK 12-8&9-2008

Page 27: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

Looking DS @ workers planting 2,000 willow poles

CONSTRUCTION-RACKET CR. PIX BY DAVE DERRICK 12-8&9-2008

Page 28: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

Looking US @ willows in key & on LPSTP.

CONSTRUCTION-RACKET CR. PIX BY DAVE DERRICK 12-8&9-2008

Page 29: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

Looking US @ hoe planting willows with soil from opposite bank

CONSTRUCTION-RACKET CR. PIX BY DAVE DERRICK 12-8&9-2008

Page 30: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

Looking US @ the upper section of the project bend with snow

CONSTRUCTION-RACKET CR. PIX BY DAVE DERRICK 12-8&9-2008

Page 31: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

Looking US @ first half of project bend with snow.

CONSTRUCTION-RACKET CR. PIX BY DAVE DERRICK 12-8&9-2008

Page 32: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

Looking DS @ hoe building Key #7 (last key in bend). Soil dug on inside of bend placed on outer bank. This soil would have been

washed away since the stream was shifted over with Bendway Weirs

CONSTRUCTION-RACKET CR. PIX BY DAVE DERRICK 12-8&9-2008

Page 33: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

Traffic Control Stones delineate steep bank

CONSTRUCTION-RACKET CR. PIX BY DAVE DERRICK 12-8&9-2008

Page 34: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

Rooted-stock plants were

installed March 18, 2009.

Page 35: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

460 RPM TREES, SHRUBS, & GRASSES FOR RACKET CR.

Quercus palustris Pin Oak 20

Quercus bicolor Swamp White 20

Quercus macrocarpa Bur Oak 20

Platanus occidentalis Sycamore 15

Acer rubrum Red Maple 15

Amorpha fruiticosa Indigo Bush 15

Cephalanthus occidentalis Button Bush 15

Cornus drummondii Rough Leaf Dogwood 15

Aronia arbutifolia brilliantissima Choke Berry 15

Rosa palustris Swamp Rose 15

Cornus stolinifera Red Osier Dogwood 15

Spartina pectinata Prairie Cordgrass

180

Lobelia cardinalis Cardinal Flower 20

Juncus effusus Soft Common Rush 20

Hibiscus lasiocarpus Rose Mallow 20

Liatris pychnostachya Spike Blazing Star 20

Asclepias incarnata Swamp Milk weed 20

Page 36: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

Crew ready, RPM plants ready, let’s plant!!

CONSTRUCTION-RACKET CR. PIX SHOT 3-18-2009

Page 37: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

Root Production Method (RPM) cRaZy gRoWtH WITHOUT CHANGING GENETICS

(for oaks 0.8 inches @ DBH/year and 4 ft of growth per year are typical

A patented process RPM Method developed by Wayne Lovelace in 1991 Wayne Lovelace has 50 years experience in horticulture RPM Method applied to over 250 different species-trees,

shrubs, & grasses Cost effective – 50 trees per acre vs 300-400 with seedlings 60 acres of planted Mississippi River hardwood floodplain

we observed (50 trees/acre, total 3,000 trees), only 7 trees dead

Page 38: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

Here is the teaser, an RPM Nuttal Oak, 7 years old, 7-inch dbh, & 35 ft tall. 92 degrees, we need shade

PHOTO-DEB FREEMAN

Page 39: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

The RPM method is a 21 step patented process, with plants

grown in bottomless trays. The tap root hits air and stops

growing (air pruned). Plant is repotted twice, mychorrhiza inoculated twice, the rest is

secret !!

Page 40: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

A bottomless tray in the greenhouse

Photos by derrick

A stage 1 RPM seedling

Page 41: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

Photos by derrick

Meet Wayne Lovelace, the RPM inventor

Stage 2 Stage 1 Stage 3

Page 42: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

Acorns planted in Feb-March, these RPM trees are less than 6 months old

Photo by derrick

Page 43: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

Three gallon container (removed), oak tree 6 months old, nothing but dense

roots, allows for increased absorption of water, nutrients, and oxygen !!! Note mychorriza colonization (white area)

Photo by derrick

Page 44: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

These RPM oaks were acorns in Feb, already 4-6 ft tall, several of these plants WERE PRODUCING ACORNS!!!

Photo by derrick

Page 45: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

Acorns growing on a 6 month old Burr Oak. Typically these trees do not produce acorns during the first 30 years. Wayne says acorn

production coincides with the wasting away of the tap root.

Photo by derrick

Page 46: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

“Kimberley”, a natural cross between a Swamp White Oak & a Burr Oak discovered by Wayne’s wife. Over the last 20 years it has delivered 100 lbs of

acorns per year (not diurnal). 50 Kimberlys per acre=5,000 lbs seed/food.

Photo by derrick

Page 47: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

Planting the rooted-stock plants in the

upstream half of the project bend.

March 3, 2009.

Page 48: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

It’s a long way up! Topsoil added to slope eroded bank.

CONSTRUCTION-RACKET CR. PIX SHOT 3-18-2009

Page 49: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

Looking DS @ crew planting the upper section of the project bend. Note flows have reshaped the active stream channel. Fine material

deposited between the short Bendway Weirs.

CONSTRUCTION-RACKET CR. PIX SHOT 3-18-2009

Page 50: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

Looking US @ the US section of the project bend. Channel within project is stable with sediment between Bendway Weirs. Bank has been graded & a few rooted-stock plants installed.

CONSTRUCTION-RACKET CR. PIX SHOT 3-18-2009

Page 51: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

Looking US @ upper bank plantings with browse guards installed.

CONSTRUCTION-RACKET CR. PIX SHOT 3-18-2009

Page 52: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

Looking US @ plantings on the US section of the project bend.

CONSTRUCTION-RACKET CR. PIX SHOT 3-18-2009

Page 53: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

Planting the rooted-stock plants in the downstream half of

the project bend March 3, 2009.

Page 54: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

Looking US @ “exclusionary vegetation” plantings between the Traffic Control Stones on top bank above the steep bank .

CONSTRUCTION-RACKET CR. PIX SHOT 3-18-2009

Page 55: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

Looking down hill at planting crew installing rooted-stock plants on the narrow floodplain bench above the LPSTP.

CONSTRUCTION-RACKET CR. PIX SHOT 3-18-2009

Page 56: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

CONSTRUCTION-RACKET CR. PIX SHOT 3-18-2009

Looking down hill at planting crew installing rooted-stock plants on the narrow floodplain bench above the LPSTP.

Page 57: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

Stream Project Functions:

Fully functioning both hydraulically & environmentally. Multiple protection redundancy. Longitudinal Peaked Stone Toe Protection provides a robust adjustable bank toe protection. Bendway Weirs move scour & thalweg away from attacked bank, with velocities reduced within weir field & on bank. Live Siltation, pole plantings, & rooted-stock plants provide roughness & reduce near-bank flow velocities. Roots strengthen bank & bind soil. Bank & top bank rooted stock plantings will provide stability and a continuous riparian corridor.

Page 58: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

8 MONTHS AFTER PROJECT

COMPLETION(1/2 A GROWING SEASON)

Photos by Derrick AUGUST 19, 2009

Page 59: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

8 MONTHS LATER –

THE UPSTREAM HALF OF THE PROJECT BEND

Page 60: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

8 MONTHS LATER-Looking uphill at the multi-function structure that serves as Key #4 & visitors path to the stream.

8 MONTHS LATER-RACKET CREEK-PIX BY DERRICK 8-19-09

Page 61: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

8 MONTHS LATER-Looking downhill @ the headcut gully repair, Key #4, & visitors path to the stream.

8 MONTHS LATER-RACKET CREEK-PIX BY DERRICK 8-19-09

Page 62: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

8 MONTHS LATER-From stream looking uphill at the visitors path.

8 MONTHS LATER-RACKET CREEK-PIX BY DERRICK 8-19-09

Page 63: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

8 MONTHS LATER-From top bank looking US @ the upper section of the project. Vegetation functioning well!!

8 MONTHS LATER-RACKET CREEK-PIX BY DERRICK 8-19-09

Page 64: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

8 MONTHS LATER-Looking US. 32 ft tall bank is steep but stable & well vegged with an assortment of native trees, shrubs, & grasses.

8 MONTHS LATER-RACKET CREEK-PIX BY DERRICK 8-19-09

Page 65: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

8 MONTHS LATER-Looking US. LPSTP has stabilized the toe & Bendway Weirs have transferred energy to the inside of the bend.

8 MONTHS LATER-RACKET CREEK-PIX BY DERRICK 8-19-09

Page 66: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

8 MONTHS LATER-Looking US. Entire bend is stable.

8 MONTHS LATER-RACKET CREEK-PIX BY DERRICK 8-19-09

Page 67: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

8 MONTHS LATER-Looking US @ stable LPSTP, deposition between Bendway Weirs, & good willow growth

8 MONTHS LATER-RACKET CREEK-PIX BY DERRICK 8-19-09

Page 68: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

8 MONTHS LATER-Looking US @ willows dead & alive

8 MONTHS LATER-RACKET CREEK-PIX BY DERRICK 8-19-09

Page 69: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

8 MONTHS LATER-Cottonwood trees growing from seed @ toe

8 MONTHS LATER-RACKET CREEK-PIX BY DERRICK 8-19-09

Page 70: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

8 MONTHS LATER-Looking US. Stable channel thanks to LPSTP, Bendway Weirs, & vegetation

8 MONTHS LATER-RACKET CREEK-PIX BY DERRICK 8-19-09

Page 71: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

8 MONTHS LATER-Looking uphill @ grasses, trees & shrubs

8 MONTHS LATER-RACKET CREEK-PIX BY DERRICK 8-19-09

Page 72: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

8 MONTHS LATER-Looking uphill @ grasses, trees & shrubs

8 MONTHS LATER-RACKET CREEK-PIX BY DERRICK 8-19-09

Page 73: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

8 MONTHS LATER-Looking US @ upper end of project

8 MONTHS LATER-RACKET CREEK-PIX BY DERRICK 8-19-09

Page 74: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

8 MONTHS LATER-Looking uphill @ the upstream vegged key

8 MONTHS LATER-RACKET CREEK-PIX BY DERRICK 8-19-09

Page 75: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

8 MONTHS LATER-Slump near US end of project. Slumped material is rapidly colonizing with cottonwood trees & other natives.

8 MONTHS LATER-RACKET CREEK-PIX BY DERRICK 8-19-09

Page 76: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

8 MONTHS LATER-From US end, looking DS @ stable channel

8 MONTHS LATER-RACKET CREEK-PIX BY DERRICK 8-19-09

Page 77: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

8 MONTHS LATER-From top bank looking DS @ US end of project

8 MONTHS LATER-RACKET CREEK-PIX BY DERRICK 8-19-09

Page 78: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

8 MONTHS LATER - THE

DOWNSTREAM HALF OF THE PROJECT BEND

Page 79: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

8 MONTHS LATER-From top bank looking DS @ US end of project

8 MONTHS LATER-RACKET CREEK-PIX BY DERRICK 8-19-09

Page 80: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

8 MONTHS LATER-Looking DS @ lower section of project bend. Over steepened bank will not support vegetation. However colluvium at toe is partially vegged & collecting other fallen

material.

8 MONTHS LATER-RACKET CREEK-PIX BY DERRICK 8-19-09

Page 81: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

8 MONTHS LATER-Looking DS. Bendway Weirs & LPSTP is stabilizing toe. Veg is holding colluvium.

8 MONTHS LATER-RACKET CREEK-PIX BY DERRICK 8-19-09

Page 82: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

8 MONTHS LATER-Looking DS. Some rilling of bank. Toe above LPSTP could use some additional shrubs & bunch grass.

8 MONTHS LATER-RACKET CREEK-PIX BY DERRICK 8-19-09

Page 83: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

8 MONTHS LATER-From top bank looking @ toe & BW

8 MONTHS LATER-RACKET CREEK-PIX BY DERRICK 8-19-09

Page 84: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

8 MONTHS LATER-Top bank stone & grasses at bank edge

8 MONTHS LATER-RACKET CREEK-PIX BY DERRICK 8-19-09

Page 85: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

8 MONTHS LATER - KEYS/HARD

POINTS/SHORT LPSTP STRUCTURES FOR

THE DOWNSTREAM (STRAIGHTER

PORTION) OF THE PROJECT

Page 86: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

8 MONTHS LATER-Looking @ the L-Head structure. Note deposition DS of bank section of L-Head

8 MONTHS LATER-RACKET CREEK-PIX BY DERRICK 8-19-09

Page 87: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

8 MONTHS LATER-Looking @ a hard point. Stable & deposition DS of the structure. Shady so no veg.

8 MONTHS LATER-RACKET CREEK-PIX BY DERRICK 8-19-09

Page 88: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

8 MONTHS LATER-Looking DS @

8 MONTHS LATER-RACKET CREEK-PIX BY DERRICK 8-19-09

Page 89: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

8 MONTHS LATER-Looking US @ stable bank & deposition DS of structures. Shady so little veg.

8 MONTHS LATER-RACKET CREEK-PIX BY DERRICK 8-19-09

Page 90: RACKET  CREEK   NEAR  INDEPENDENCE, KANSAS

This project is done. NOT BAD FOR 4 DAYS WORK!!

CONSTRUCTION-RACKET CR. PIX BY DAVE DERRICK 12-8&9-2008