+ All Categories
Home > Documents > RADIATION CHECK-OFF LISTS Check-Off List... · 2020-01-31 · AtR Check-Off List AGS Injection &...

RADIATION CHECK-OFF LISTS Check-Off List... · 2020-01-31 · AtR Check-Off List AGS Injection &...

Date post: 10-Apr-2020
Category:
Upload: others
View: 4 times
Download: 0 times
Share this document with a friend
27
1/31/2020 1 of 27 RADIATION CHECK-OFF LISTS (filed by date) RSC Check off List for ATF Prepared by: K. Kusche Date: January 30, 2020 EBIS Operations with Beams of He and Heavier Prepared by: M. Okamura Date: January 27, 2020 RSC Check-Off List for UED Prepared by: K. Kusche Date: January 23, 2020 RHIC, LEReC and CeC RS Check Off List FY-20 Prepared by: A Drees Date: November 25, 2019 AtR Check-Off List for Extraction to the W-dump for FY20 Prepared by: V. Schoefer Date: November 18, 2019 RSC Pre Start IP4 RF conditioning without beam FY2020 Prepared by: A. Drees Date: November 13, 2019 AtR Check-Off List AGS Injection & Accelerated Beam with No Beam Extracted to U Line Prepared by: V. Schoefer Date: November 12, 2019 AGS Ring Radiation Security Check-Off List (For Heavy Ion and Polarized Proton Operation) C-A Run Plan FY2020-November 2019 Prepared by: H. Huang Date: November 04, 2019 LINAC Radiation Security Check-Off List, RF only – Pre-Start FY2020 Prepared by: D. Raparia Date: October 23, 2019 Fundamental Power Coupler Conditioning (ERL) Radiation Safety Check-Off List Prepared by: W. Xu Date: October 18, 2019 BLIP Radiation Safety Check-Off List Prepared by: D. Kim Date: October 17, 2019 RSC FY20 LEReC and CeC Gun and RF Conditioning Without Beam
Transcript
Page 1: RADIATION CHECK-OFF LISTS Check-Off List... · 2020-01-31 · AtR Check-Off List AGS Injection & Accelerated Beam with No Beam Extracted to U Line Prepared by: V. Schoefer . Date:

1/31/2020 1 of 27

RADIATION CHECK-OFF LISTS (filed by date)

RSC Check off List for ATF Prepared by: K. Kusche Date: January 30, 2020 EBIS Operations with Beams of He and Heavier Prepared by: M. Okamura Date: January 27, 2020 RSC Check-Off List for UED Prepared by: K. Kusche Date: January 23, 2020 RHIC, LEReC and CeC RS Check Off List FY-20 Prepared by: A Drees Date: November 25, 2019 AtR Check-Off List for Extraction to the W-dump for FY20 Prepared by: V. Schoefer Date: November 18, 2019 RSC Pre Start IP4 RF conditioning without beam FY2020 Prepared by: A. Drees Date: November 13, 2019 AtR Check-Off List AGS Injection & Accelerated Beam with No Beam Extracted to U Line Prepared by: V. Schoefer Date: November 12, 2019 AGS Ring Radiation Security Check-Off List (For Heavy Ion and Polarized Proton Operation) C-A Run Plan FY2020-November 2019 Prepared by: H. Huang Date: November 04, 2019 LINAC Radiation Security Check-Off List, RF only – Pre-Start FY2020 Prepared by: D. Raparia Date: October 23, 2019 Fundamental Power Coupler Conditioning (ERL) Radiation Safety Check-Off List Prepared by: W. Xu Date: October 18, 2019 BLIP Radiation Safety Check-Off List Prepared by: D. Kim Date: October 17, 2019 RSC FY20 LEReC and CeC Gun and RF Conditioning Without Beam

Page 2: RADIATION CHECK-OFF LISTS Check-Off List... · 2020-01-31 · AtR Check-Off List AGS Injection & Accelerated Beam with No Beam Extracted to U Line Prepared by: V. Schoefer . Date:

1/31/2020 2 of 27

Prepared by: A. Drees Date: September 26, 2019 RSC TTB Radiation Safety Checklist (C or Heavier) Prepared by: C. Carlson Date: September 6, 2019 Radiation Safety Check-Off List for TTB Operations with Protons Prepared by: C. Carlson Date: September 6, 2019 Radiation Safety Check-Off List for Operation of Booster with Ions from EBIS & Tandem Prepared by: C. J. Gardner Date: September 05, 2019 NSRL Check-Off List (NASA Run, from September 26th to end of June, 2020) Prepared by: A. Rusek Date: August 28, 2019 RSC Check off List for ATF Prepared by: K. Kusche Date: August 1, 2019 RSC Check-Off List for 56MHz SRF Cavity Vertical Test in LVTF Prepared by: Q. Wu Date: July 18, 2019 RSC Check-Off List for CeC Operation with Beam Prepared by: A. Drees Date: March 20, 2019 RSC Check-Off List for Klystron Test Prepared by: W. Xu Date: March 12, 2019 CeC Laser Only RS Check-Off List, FY2019 Prepared by: Angelika Drees Date: March 1, 2019 RHIC and LEReC RS Check Off List FY 19 (revised from 2/6/19) Prepared by: A Drees Date: February 25, 2019 AtR RSC Check Off List 2_11_19 Prepared by: V. Shoefer Date: February 7, 2019 RHIC and LEReC RS Check Off List FY 19 Prepared by: A Drees

Page 3: RADIATION CHECK-OFF LISTS Check-Off List... · 2020-01-31 · AtR Check-Off List AGS Injection & Accelerated Beam with No Beam Extracted to U Line Prepared by: V. Schoefer . Date:

1/31/2020 3 of 27

Date: February 6, 2019 NSRL Check Off List NSRL Run Prepared by: A. Rusek Date: February 1, 2019 NSRL Integrated Work Check Off List Prepared by: A. Rusek Date: February 1,2019 RSC for Operation of Booster with Protons from Linac Prepared by: C. Gardner Date: January 31, 2019 RSC EBIS Operations with Beams of He and Heavier Prepared by: M. Okamura Date: January 30, 2019 RSC AGS Injection and Accelerated Beam with no Beam Extracted to U line Prepared by: V. Schoefer Date: January 23, 2019 RSC Check Off List for Polarzied Proton and Heavy Ion Operation Prepared by: H. Huang Date: January 21, 2019 RSC Check Off List for FY19 LEReC operation with e beam without RHIC Prepared by: A. Drees Date: January 17, 2019 RSC Check-Off List for SR-82 Processing During BLIP Operation Prepared by: L. Hammons Date: January 10, 2019 RSC Check-Off List for 5-cell 650 MHz SRF Cavity Vertical Test in LVTF Prepared by: Q. Wu Date: January 10, 2019 BLIP Radiation Safety Check-Off List Prepared by: D. Kim Date: December 12, 2018 LINAC RF Radiation Security Check-Off List Prepared by: D. Raparia Date: December 11, 2018 FY19 LEReC gun and RF conditioning (w/o beam) - RSC Check-Off List Prepared by: A. Drees Date: December 10, 2018

Page 4: RADIATION CHECK-OFF LISTS Check-Off List... · 2020-01-31 · AtR Check-Off List AGS Injection & Accelerated Beam with No Beam Extracted to U Line Prepared by: V. Schoefer . Date:

1/31/2020 4 of 27

RSC Check-Off List for LINAC Prepared by: D. Raparia Date: December 10, 2018 VTF RSC Check-Off List for 5-cell 650 MHz SRF Cavity Verticle Test in LVTF Prepared by: Q. Wu Date: November 21, 2018 RSC Check-Off List for ATF Prepared by: K. Kusche Date: October 18, 2018 RS Check-Off List for IP4 RF Operation w/o Beam – FY2019 Prepared by: A. Drees Date: October 09, 2018 RSC Check-Off List for UED (B912) Prepared by: K. Kusche Date: September 21, 2018

RSC Check-Off List for ATF (B820) Prepared by: K. Kusche Date: September 06, 2018 Reference Photos for Booster Radiation Safety Check-Off List Prepared by: C. J. Gardner Date: September 06, 2018 Radiation Safety Check-Off List for Operation of Booster with Ions from EBIS & Tandem Prepared by: C. J. Gardner Date: August 27, 2018 NSRL Check-Off List (NASA Run, from September 11th to end of November, 2018) Prepared by: A. Rusek Date: August 21, 2018 VTF RSC Check-Off List for 5-cell 650 MHz SRF Cavity Verticle Test in LVTF Prepared by: Q. Wu Date: August 20, 2018 Radiation Security Check-Off List for TTB Operation WITH Protons Prepared by: C. Carlson Date: August 15, 2018 TTB Radiation Safety Checklist (C or heavier) Prepared by: C. Carlson Date: August 15, 2018

Page 5: RADIATION CHECK-OFF LISTS Check-Off List... · 2020-01-31 · AtR Check-Off List AGS Injection & Accelerated Beam with No Beam Extracted to U Line Prepared by: V. Schoefer . Date:

1/31/2020 5 of 27

AtR RSC Check-Off List for Transport of Low Energy Au Ions to W Dump Prepared by: V. Schoefer Date: April 4, 2018 NSRL Check-Off List (NASA Run, from March 27th to end of June, 2018) Prepared by: A. Rusek Date: March 15, 2018 RHIC, LEReC, CeCPOP RS Check-Off List-FY18 Prepared by: A. Drees Date: February 26, 2018 AtR Check-Off List for Protons and Heavy Ions to be Transported to the W-Dump Only Prepared by: V. Schoefer Date: February 14, 2018 AtR Check-Off List AGS Injection & Accelerated Beam with No Beam Extracted to U Line Prepared by: V. Schoefer Date: February 12, 2018 Radiation Safety Check-Off List for Operation of Booster with Protons from Linac, Ions from EBIS & Ions from Tandem Prepared by: C. J. Gardner Date: February 8, 2018 AGS Ring Radiation Security Check-Off List (For Polarized Proton and Ion Operation) C-A Run Plan FY2018-February 2018 Prepared by: H. Huang Date: February 5, 2018 RSC Check-Off List for ATF (B820) Prepared by: K. Kusche Date: February 01, 2018 FY18 CeC Operation - RSC Check-Off List Prepared by: A. Drees Date: January 31, 2018 RSC Check-Off List for Conditioning the ATF Linac Klystron without laser pulses to the gun in B820 Prepared by: K. Kusche Date: January 09, 2018 RSC Check-Off List for Conditioning the ATF Gun Klystron without Laser pulses to the Gun in B820 Prepared by: K. Kusche Date: December 21, 2017

Page 6: RADIATION CHECK-OFF LISTS Check-Off List... · 2020-01-31 · AtR Check-Off List AGS Injection & Accelerated Beam with No Beam Extracted to U Line Prepared by: V. Schoefer . Date:

1/31/2020 6 of 27

TPL Radiation Safety Check-Off List for Sr-82 Processing During BLIP Operation Prepared by: L. Hammons Date: December 19, 2017 BLIP Radiation Security Check-Off List Prepared by: D. Medvedev Date: December 21, 2017 Linac Radiation Security Check-Off List Prepared by: D. Raparia Date: November 22, 2017 Radiation Security Check-Off List for UED (B912) Prepared by: K. Kusche Date: September 19, 2017 NSRL Check-Off List (NASA Run, from September 27th 2017 to November 22nd 2017) Prepared by: A. Rusek Date: September 19, 2017 Radiation Security Check-Off List for TTB Operation WITH Protons Prepared by: C. Carlson Date: September 14, 2017 TTB Radiation Safety Checklist (C or heavier) Prepared by: C. Carlson Date: September 14, 2017 Radiation Safety Check-Off List for Operation of Booster with Ions from EBIS & Tandem Prepared by: C. J. Gardner Date: September 13, 2017 EBIS Operations with Beams of He and Heavier Prepared by: M. Okamura Date: September 12, 2017 RSC Check-Off List for ATF (B820) Prepared by: K. Kusche Date: August 11, 2017 Linac RF Radiation Security Check-Off List Prepared by: D. Raparia Date: August 14, 2017 ERL RSC Check-Off List for Cavity Testing Prepared by: W. Xu Date: May 31, 2017 TTB Radiation Safety Checklist (C or heavier)

Page 7: RADIATION CHECK-OFF LISTS Check-Off List... · 2020-01-31 · AtR Check-Off List AGS Injection & Accelerated Beam with No Beam Extracted to U Line Prepared by: V. Schoefer . Date:

1/31/2020 7 of 27

Prepared by: C. Carlson Date: May 26, 2017 Radiation Security Check-Off List for TTB Operation WITH Protons Prepared by: C. Carlson Date: May 26, 2017 NSRL Check-Off List (NASA Run, from April 3rd 2017 to July 2017) Prepared by: A. Rusek Date: March 21st, 2017 RSC Check-Off List for ATF (B820) Prepared by: K. Kusche Date: March 03, 2017 RHIC RS Check-Off List for pp Operation at 255 GeV- FY17 Prepared by: A. Drees Date: February 02, 2017 BLIP Radiation Security Check-Off List Prepared by: D. Medvedev Date: December 21, 2016 AtR Check-Off List for Protons and Heavy Ions to be Transported to the W-Dump Only Prepared by: V. Schoefer Date: December 13, 2016 AtR Check-Off List AGS Injection & Accelerated Beam with No Beam Extracted to U Line Prepared by: V. Schoefer Date: December 06, 2016 RHIC RS Check-Off List for RF cavity operation without beam in preparation for the FY2017 run Prepared by: A. Drees Date: December 06, 2016 AGS Ring Radiation Security Check-Off List (For Polarized Proton and Ion Operation) C-A Run Plan FY2017-December 2016 Prepared by: H. Huang Date: December 1, 2016 RSC Check-Off List for 1.3GHz gun field emission cathode beam test in SVTF Prepared by: E. Wang Date: November 29, 2016 Linac Radiation Security Check-Off List Prepared by: D. Raparia Date: November 28, 2016

Page 8: RADIATION CHECK-OFF LISTS Check-Off List... · 2020-01-31 · AtR Check-Off List AGS Injection & Accelerated Beam with No Beam Extracted to U Line Prepared by: V. Schoefer . Date:

1/31/2020 8 of 27

Linac RF Radiation Security Check-Off List Prepared by: D. Raparia Date: November 21, 2016 Booster Radiation Safety Check-Off List for Operation with Protons from Linac during (or immediately following) operation with Ions from EBIS Prepared by: C.J. Gardner Date: November 21, 2016 LEReC HV Gun Conditioning RSC Check-Off List Prepared by: D. Beavis Date: November 9, 2016 TTB Radiation Safety Checklist (C or heavier) Prepared by: C. Carlson Date: September 19, 2016 Radiation Security Check-Off List for TTB Operation WITH Protons Prepared by: C. Carlson Date: September 19, 2016 EBIS Operations with Beams of He and Heavier Prepared by: D. Raparia Date: September 19, 2016 Radiation Safety Check-Off List for Operation of Booster with Ions from EBIS & Tandem Prepared by: C. J. Gardner Date: September 14, 2016 NSRL Check-Off List (NASA Run, from September 26th 2016 to December 22nd 2016) Prepared by: A. Rusek Date: September 2st, 2016 RSC Check-Off List for 1.3GHz gun field emission cathode beam test in SVTF Prepared by: E. Wang Date: August 31, 2016 RSC Check-Off List for 1.3GHz gun field emission cathode beam test in SVTF Prepared by: E. Wang Date: May 16, 2016 UED RSC Check-Off List for Conditioning the Klystron & Gun without Laser Pulses to the Gun Prepared by: D. Beavis Date: April 17, 2016 CeC PoP Experiment RSC Check-Off List for Low Power Beam Testing of the CeC PoP Equipment Prepared by: I. Pinayev

Page 9: RADIATION CHECK-OFF LISTS Check-Off List... · 2020-01-31 · AtR Check-Off List AGS Injection & Accelerated Beam with No Beam Extracted to U Line Prepared by: V. Schoefer . Date:

1/31/2020 9 of 27

Date: March 7, 2016 Radiation Security Check-Off List for TTB Operation with Deuterium Prepared by: C. Carlson Date: March 1, 2016 NSRL Check-Off List (NASA Run, from March 14th 2016 to June 30th 2016) Prepared by: A. Rusek Date: February 26th, 2016 TTB Radiation Safety Checklist (C or heavier) Prepared by: C. Carlson Date: February 24, 2016 Booster Radiation Safety Check-Off List for Operation of with Protons from Linac during (or immediately following) operation with Ions from EBIS Prepared by: C.J. Gardner Date: February 23, 2016 RHIC RS Check-Off List for AuAu Operation at 100 GeV- FY16 Prepared by: A. Drees Date: January 15, 2016 AtR Check-Off List for Protons and Heavy Ions to be Transported to the W-Dump Only Prepared by: V. Schoefer Date: January 4, 2016 AtR Check-Off List AGS Injection & Accelerated Beam with No Beam Extracted to U Line Prepared by: V. Schoefer Date: January 4, 2016 AGS Ring Radiation Security Check-Off List (For Polarized Proton and Ion Operation) C-A Run Plan FY2016-December 2015 Prepared by: H. Huang Date: December 15, 2015 Linac Radiation Security Check-Off List; LLRF test at 35 Me V and Linac Routine Operations Prepared by: D. Raparia Date: November 23, 2015 BLIP Radiation Security Check-Off List Prepared by: D. Raparia Date: November 23, 2015 RSC Check-Off List for 1.3GHz gun field beam test in SVTF Prepared by: E. Wang Date: October 30, 2015 Linac RF Radiation Security Check-Off List

Page 10: RADIATION CHECK-OFF LISTS Check-Off List... · 2020-01-31 · AtR Check-Off List AGS Injection & Accelerated Beam with No Beam Extracted to U Line Prepared by: V. Schoefer . Date:

1/31/2020 10 of 27

Prepared by: D. Raparia Date: October 27, 2015 RSC Check-Off List for 56 MHz Cavity at RHIC (Includes operation of other existing RF Systems) Prepared by: A. Drees Date: October 23, 2015 Radiation Security Check-Off List for TTB Operation with Protons Prepared by: C. Carlson Date: October 13, 2015 TTB Radiation Safety Checklist (C or heavier) Prepared by: C. Carlson Date: October 12, 2015

EBIS Operations with Beams of He and Heavier Prepared by: J. Alessi Date: September 30, 2015 NSRL Check-Off List (NASA Run, from October 12th 2015 to November 20th 2015) Prepared by: A. Rusek Date: September 17th, 2015

Radiation Safety Check-Off List for Operation of Booster with Ions from EBIS & Tandem Prepared by: C. J. Gardner Date: September 9, 2015 CeC PoP Experiment RSC Check-Off List for Photocathode Testing in the 112 MHz SRF electron gun Prepared by: I. Pinayev Date: June 17, 2015 ERL RSC Check-Off List for Commissioning Gun to Dump (GtD) Prepared by: W. Xu Date: May 26, 2015 g-2 Electrostatic Quad HV test Prepared by: D. Beavis Date: April 29, 2015 RHIC RS Check-Off List for proton-Gold (pAu) Operation at 100 GeV- FY15 Prepared by: A. Drees Date: April 22, 2015 ERL RSC Check-Off List for Commissioning Gun to Dump (GtD) Prepared by: W. Xu Date: April 20, 2015

Page 11: RADIATION CHECK-OFF LISTS Check-Off List... · 2020-01-31 · AtR Check-Off List AGS Injection & Accelerated Beam with No Beam Extracted to U Line Prepared by: V. Schoefer . Date:

1/31/2020 11 of 27

NSRL Check-Off List (NASA/Others Run, from March 14th 2015 to July 2015) Prepared by: A. Rusek Date: February 25, 2015 ERL RSC Check-Off List for Cold Emission Testing of the SRF gun ERL and 5-cell Cavity Prepared by: W. Xu Date: December 31, 2014 AtR Check-Off List AGS Injection & Accelerated Beam with No Beam Extracted to U Line Prepared by: V. Schoefer Date: December 22, 2014 Booster Radiation Safety Check-Off List for operation with Protons from Linac During (or immediately following) operation with Ions from EBIS Prepared by: C.J. Gardner Date: December 16, 2014 AGS Ring Radiation Security Check-Off List (For Polarized Proton and Ion Operation) C-A Run Plan FY2015-December 2014 Prepared by: H. Huang Date: December 15, 2014 BLIP Radiation Security Check-Off List Prepared by: D. Raparia Date: December 1, 2014 Linac RF Radiation Security Check-Off List Prepared by: D. Raparia Date: December 1, 2014 Linac Radiation Security Check-Off List Prepared by: D. Raparia Date: December 1, 2014 ERL RSC Check-Off List for Low Power Beam Testing of the ERL SRF electron gun Prepared by: W. Xu Date: October 29, 2014 CeC PoP Experiment RSC Check-Off List for Lower Power Beam Testing of the 112 MHz SRF electron gun Prepared by: I. Pinayev Date: October 21, 2014 Radiation Safety Check-Off List for Operation of Booster with Ions from EBIS & Tandem Prepared by: C. J. Gardner Date: September 23, 2014 NSRL Check-Off List (NASA/Others Run, from September 30th 2014 to November 19th 2014)

Page 12: RADIATION CHECK-OFF LISTS Check-Off List... · 2020-01-31 · AtR Check-Off List AGS Injection & Accelerated Beam with No Beam Extracted to U Line Prepared by: V. Schoefer . Date:

1/31/2020 12 of 27

Prepared by: A. Rusek Date: September 17, 2014 EBIS Operations with Beams of He and Heavier Prepared by: J. Alessi Date: September 15, 2014 Radiation Security Check-Off List for TTB Operation with Protons Prepared by: C. Carlson Date: September 9, 2014 TTB Radiation Safety Checklist (C or heavier) Prepared by: C. Carlson Date: Sept. 9, 2014 g-2 HV test Prepared by: D. Beavis Date: August 11, 2014 ERL RSC Check-Off List for Cold Emission Testing of the SRF gun ERL & 5-cell Cavity Prepared by: W. Xu Date: August 11, 2014 CeC RS Check-Off List for Operation without Beam in RHIC, 2014 Prepared by: A. Drees Date: July 11, 2014 TTB Radiation Safety Checklist (C or heavier) Prepared by: C. Carlson Date: June 2, 2014 Target Room 2, 28 MeV Proton Radiation Safety Checklist Prepared by: C. Carlson Date: April 16, 2014 ERL RSC Check-Off List for Cold Emission Testing of the ERL 5-cell Cavity and SRF gun Prepared by: W. Xu Date: April 16, 2014 RSC Check-Off List for 56 MHz Cavity at RHIC Prepared by: S. Belomestnykh Date: April 15, 2014 ERL RSC Check-Off List for Low Power Beam Testing of the ERL SRF electron gun Prepared by: W. Xu Date: April 13, 2014 Booster Radiation Safety Check-Off List for operation with Protons from Linac During (or immediately following) operation with Ions from EBIS

Page 13: RADIATION CHECK-OFF LISTS Check-Off List... · 2020-01-31 · AtR Check-Off List AGS Injection & Accelerated Beam with No Beam Extracted to U Line Prepared by: V. Schoefer . Date:

1/31/2020 13 of 27

Prepared by: C.J. Gardner Date: April 1, 2014 NSRL Check-Off List (NASA/NRO Runs, from March 24th 2014 to June 27th 2014) Prepared by: A. Rusek Date: March 5, 2014 VTF RSC Check-Off List for Testing BNL3 SRF Cavities with RF Power up to 200 W CW Prepared by: W. Xu Date: February 24, 2014 The LHC Collimator Irradiation Check-Off List Prepared by: D. Beavis Date: February 14, 2014 RHIC RS Check-Off List for FY12 Heavy Ion (Au) operation at 7.3 GeV- FY14 Prepared by: A. Drees Date: January 30, 2014 RHIC RS Check-Off List for RF cavity operation without beam in preparation and shielding in front of the north magnet port Prepared by: A. Drees Date: January 29, 2014 Operation of e-lens without RHIC – FY14 Prepared by: A. Drees & X. Gu Date: January 23, 2014 AtR RSC Check-Off List for Protons and Heavy Ions to be Transported to the W-Dump only Prepared by: V. Schoefer Date: January 7, 2014 AtR Check-Off List AGS Injection & Accelerated Beam with No Beam Extracted to U Line Prepared by: V. Schoefer Date: January 7, 2014 AGS Ring Radiation Security Check-Off List (For Polarized Proton and Ion Operation) C-A Run Plan FY2014-January 2014 Prepared by: H. Huang Date: January 6, 2014 BLIP Radiation Security Check-Off List Prepared by: D. Raparia Date: December 2, 2013 Linac RF Radiation Security Check-Off List Prepared by: D. Raparia Date: December 2, 2013

Page 14: RADIATION CHECK-OFF LISTS Check-Off List... · 2020-01-31 · AtR Check-Off List AGS Injection & Accelerated Beam with No Beam Extracted to U Line Prepared by: V. Schoefer . Date:

1/31/2020 14 of 27

VTF RSC Check-Off List for Testing NSLSII Cavities with RF Power up to 200 W CW Prepared by: S. Belomestnykh Date: November 12, 2013 TTB Radiation Safety Checklist (C or heavier) Prepared by: C. Carlson Date: October 13, 2013 Radiation Security Check-Off List for TTB Operation with Protons Prepared by: C. Carlson Date: October 10, 2013 RHIC RS Check-Off List for RF cavity operation without beam in preparation for the FY2014 run Prepared by: A. Drees Date: October, 25, 2013 Radiation Safety Check-Off List for Operation of Booster with Ions from EBIS Prepared by: C. J. Gardner Date: September 20, 2013 NSRL Check-Off List (NASA/NRO Run, from October 7th to November 22nd, 2013) Prepared by: A. Rusek Date: September 20, 2013 EBIS Operations with Beams of He and Heavier Prepared by: J. Alessi Date: September 20, 2013 RSC Check-Off List for Cold Testing of the 400 MHz Double-Quarter Wave Crab Cavity (DQWCC) Prepared by: S. Verdu-Andres Date: September 10, 2013 VTF RSC Check-Off List for Testing SRF Cavities with RF Power up to 200 W CW Prepared by: S. Belomestnykh Date: June 17, 2013 ERL RSC Check-Off List for Cold Emission Testing of the ERL 5-cell Cavity and SRF gun Prepared by: W. Xu Date: May 20, 2013 RSC Check-Off List for Cold Emission Testing of the 400 MHz Double-Quarter Wave Crab Cavity (DQWCC) Prepared by: S. Verdu-Andres Date: May 17, 2013 RHIC RS Check-Off List for Proton operation (255 GeV pp) – FY13 Prepared by: A. Drees

Page 15: RADIATION CHECK-OFF LISTS Check-Off List... · 2020-01-31 · AtR Check-Off List AGS Injection & Accelerated Beam with No Beam Extracted to U Line Prepared by: V. Schoefer . Date:

1/31/2020 15 of 27

Date: February, 13, 2013 AtR RSC Check-Off List for Protons and Heavy Ions to be Transported to the W-Dump only Prepared by: V. Schoefer Date: January 30, 2013 EBIS Operations with Beams of He and Heavier Prepared by: J. Alessi Date: January 25, 2013 ERL RSC Check-Off List for Cold Emission Testing of the ERL 5-Cell Cavity Prepared by: W. Xu Date: January 24, 2013 ERL RSC Check-Off List for Cold Emission Testing of the ERL SRF electron gun Prepared by: S. Belomestnykh Date: January 22, 2013 AtR Check-Off List AGS Injection & Accelerated Beam with No Beam Extracted to U Line Prepared by: V. Schoefer Date: January 18, 2013 AGS Ring Radiation Security Check-Off List (For Polarized Proton and Ion Operation) Prepared by: H. Huang Date: January 17, 2013 Radiation Safety Check-Off List for Operation of Booster with Protons from Linac and with Ions from EBIS and Tandem Prepared by: C. J. Gardner Date: January 7, 2013 NSRL Check-Off List (NRO Run, from January 28th to February 8th, 2013) Prepared by: A. Rusek Date: December 27, 2012 Linac RF Radiation Security Check-Off List Prepared by: D. Raparia Date: November 27, 2012 Linac Radiation Security Check-Off List Prepared by: D. Raparia Date: November 27, 2012 BLIP Radiation Security Check-Off List Prepared by: D. Raparia Date: November 27, 2012 ERL RSC Check-Off List for Cold Emission Testing of the ERL SRF electron gun

Page 16: RADIATION CHECK-OFF LISTS Check-Off List... · 2020-01-31 · AtR Check-Off List AGS Injection & Accelerated Beam with No Beam Extracted to U Line Prepared by: V. Schoefer . Date:

1/31/2020 16 of 27

Prepared by: S. Belomestnykh Date: October 8, 2012 (Modified) RSC Check-Off List for Cold Testing of the 704MHz Large Grain Cavity with Local Power Supply Prepared by: W. Xu Date: October 4, 2012 RHIC RS Check-off List for RF cavity operation without beam in preparation for the FY2012 run Prepared by: A. Drees Date: September, 20, 2012 Radiation Safety Check-Off List for Operation of Booster with Ions from Tandem and EBIS Prepared by: C. J. Gardner Date: September 20, 2012 TTB Radiation Safety Checklist (C or heavier) Prepared by: C. Carlson Date: September 13, 2012 Radiation Security Check-Off List for TTB Operation with Protons Prepared by: C. Carlson Date: September 12, 2012 NSRL Check-Off List (NSRL-12C, October 5th to November 19th, 2012) Prepared by: A. Rusek Date: September 10, 2012 TR4 NASA Window Radiation Safety Checklist Prepared by: C. Carlson Date: May 18, 2012 RHIC RS Check-Off List for FY12 Heavy Ion (UU) operation at 96 GeV/beam Prepared by: A. Drees Date: April 19, 2012 AtR RSC Check-Off List for Transport of Heavy Ions Prepared by: V. Schoefer Date: April 17, 2012 NSRL Check-Off List (NSRL-12A and 12B; March 5th to June 30th, 2012) Prepared by: A. Rusek Date: February 2, 2012 TTB Radiation Safety Checklist (C or heavier) Prepared by: C. Carlson Date: February 21, 2012

Page 17: RADIATION CHECK-OFF LISTS Check-Off List... · 2020-01-31 · AtR Check-Off List AGS Injection & Accelerated Beam with No Beam Extracted to U Line Prepared by: V. Schoefer . Date:

1/31/2020 17 of 27

RHIC RS Check-Off List for Proton operation (100 GeV pp) – FY12 Prepared by: A. Drees Date: January 5, 2012 AtR RSC Check-Off List for Protons Produced by the Polarized Proton Source, to be Transported to the W-Dump only Prepared by: V. Schoefer Date: December 14, 2011 AtR Check-Off List AGS Injection & Accelerated Beam with No Beam Extracted to U Line Prepared by: V. Schoefer Date: December 14, 2011 Booster Radiation Safety Check-Off List for Operation of with Protons from Linac during (or immediately following) operation with Ions from Tandem and EBIS Prepared by: C.J. Gardner Date: December 12, 2011 RSC Check-Off List for Cold Testing of the 704MHz Large Grain Cavity with Local Power Supply Prepared by: W. Xu Date: December 9, 2011 AGS Ring Radiation Security Check-Off List Prepared by: H. Huang Date: December 7, 2011 LINAC RF Radiation Security Check-Off List Prepared by: D. Raparia Date: December 5, 2011 LINAC Radiation Security Check-Off List Prepared by: D. Raparia Date: December 1, 2011 BLIP Radiation Security Check-Off List Prepared by: D. Raparia Date: December 1, 2011 ERL RSC Check-Off List for Cold Emission Testing of the ERL 5-cell Cavity Prepared by: S. Belomestnykh Date: October 24, 2011 Radiation Safety Check-Off List for Operation of Booster with Ions from Tandem and EBIS Prepared by: C.J. Gardner Date: September 7, 2011 Radiation Security Check-Off List for TTB Operation with Protons Prepared by: C. Carlson Date: September 6, 2011

Page 18: RADIATION CHECK-OFF LISTS Check-Off List... · 2020-01-31 · AtR Check-Off List AGS Injection & Accelerated Beam with No Beam Extracted to U Line Prepared by: V. Schoefer . Date:

1/31/2020 18 of 27

TTB Radiation Safety Checklist (C or heavier) Prepared by: C. Carlson Date: September 6, 2011 ERL RSC Check-Off List for Cold Emission Testing of the ERL 5-cell Cavity Prepared by: S. Belomestnykh Date: June 16, 2011 Radiation Security Check-Off List for TTB Operation with Protons Prepared by: C. Carlson Date: May 13, 2011 RHIC RSC Check-off List for FY11 AuAu injection Energy Operation Prepared by: A. Drees Date: April 13, 2011 AtR RSC Check Off List for Transport of Au ions Prepared by: V. Schoefer Date: April 11, 2011 ERL RSC Check-Off List for FPC Test Prepared by: D. Beavis Date: March 16, 2011 NSRL Check-Off List (NSRL-11A and 11B; March 14th to June 30th, 2011) Prepared by: A. Rusek Date: March 4, 2011 TTB Radiation Safety Checklist (C or heavier) Prepared by: C. Carlson Date: March 1, 2011 Tandem/Target Room, Radiation Safety Checklist Prepared by: C. Carlson Date: March 1, 2011 RHIC RS Check-off List for Proton operation (250 GeV pp) – FY11 Prepared by: A. Drees Date: January 3, 2011 AtR RSC Check-Off List for Low Intensity Protons to be Transported to the W-Dump Only Prepared by: V. Schoefer Date: December 29, 2010 Booster Radiation Safety Check-Off List for operation with Protons from Linac During (or immediately following) operation with Ions from Tandem Prepared by: C.J. Gardner

Page 19: RADIATION CHECK-OFF LISTS Check-Off List... · 2020-01-31 · AtR Check-Off List AGS Injection & Accelerated Beam with No Beam Extracted to U Line Prepared by: V. Schoefer . Date:

1/31/2020 19 of 27

Date: November 10, 2010 AtR Check-Off List AGS Injection and Accelerated Beam with no Beam Extracted to U Line Prepared by: V. Schoefer Date: November 9, 2010 AGS Ring Radiation Security Check-Off List for Polarized Proton Operation Prepared by: H. Huang Date: November 2, 2010 BLIP Radiation Security Check-Off List Prepared by: D. Raparia Date: November 1, 2010 Linac Radiation Security Check-Off List Prepared by: D. Raparia Date: November 1, 2010 Linac RF Radiation Security Check-Off List Prepared by: D. Raparia Date: October 27, 2010 ERL RSC Check-Off List for Cold Emission Testing of ECX Cavity Prepared by: D. Kayran Date: October 18, 2010 Radiation Safety Check-off list for Operation of Booster with Ions from Tandem & EBIS Prepared by: C. Gardner Date: September 20, 2010 Radiation Security Check-Off List for TTB Operation with Protons Prepared by: C. Carlson Date: September 16, 2010 TTB Radiation Safety Checklist (C or heavier) Prepared by: C. Carlson Dare: September 16, 2010 Radiation Safety Check-Off for RHIC RF Operations Prepared by: A. Drees and D. Beavis Date: September 10, 2010 NSRL Check-Off List Prepared by: A. Rusek Date: September 9, 2010 ERL RSC Check-Off List for Cold Emission Testing of the ECX Cavity Prepared by: D. Kayran Date: July 16, 2010

Page 20: RADIATION CHECK-OFF LISTS Check-Off List... · 2020-01-31 · AtR Check-Off List AGS Injection & Accelerated Beam with No Beam Extracted to U Line Prepared by: V. Schoefer . Date:

1/31/2020 20 of 27

EDM 125 kV test Prepared by: D. Beavis Date: July 1, 2010 EBIS Commissioning with Beams of He and Heavier Prepared by: D. Beavis Date: June 10, 2010 RHIC RSC Check-off List for FY10 Heavy Ion Low Energy Operation Prepared by: A. Drees Date: April 21, 2010 Radiation Security Check-Off List for TTB Operation with Protons Prepared by: C. Carlson Date: April 13, 2010 AtR RSC Check-Off List for Transport of Low Energy Au Ions to W Dumps Prepared by: V. Schoefer Date: April 12, 2010 ERL RSC Check-Off List for Cold Emission Testing of the ECX Cavity Prepared by: D. Beavis & A. Burrill Date: March 8, 2010 NSRL Check-Off List (NSRL-10A, March 2010) Prepared by: A. Rusek Date: February 25, 2010 Booster Radiation Safety Check-Off List for Operation with Protons from Linac Prepared by: C.J. Gardner Date: January 12, 2010 ERL RSC Check-Off List for Cold Emission Testing of the ECX Cavity Prepared by: D. Beavis Date: January 12, 2010 Linac Radiation Security Check-Off List Prepared by: D. Raparia Date: December 24, 2009 BLIP Radiation Security Check-Off List Prepared by: D. Raparia Date: December 24, 2009 RHIC RS Check-off List for Heavy Ion operation (100 GeV Au) – FY10 Prepared by: A. Drees Date: December 2, 2009

Page 21: RADIATION CHECK-OFF LISTS Check-Off List... · 2020-01-31 · AtR Check-Off List AGS Injection & Accelerated Beam with No Beam Extracted to U Line Prepared by: V. Schoefer . Date:

1/31/2020 21 of 27

AtR RSC Check Off List for Transport of Au ions to W dump only Prepared by: V. Schoefer Date: November 9, 2009 AtR Check-Off List AGS Injection and Circulating Beam with No Beam Extracted to U Line Prepared by: V. Schoefer Date: November 9, 2009 AGS Ring Radiation Security Check-Off List For Heavy Ion Operation C-A Run Plan FY2010-November 2009 Prepared by: H. Huang Date: November 9, 2009 ERL RSC Check-Off List for Cold Emission Testing of the ECX Cavity Prepared by: D. Kayran Date: September 24, 2009 NSRL Check-Off List Prepared by: A. Rusek Date: September 16, 2009 Radiation Safety Check-Off List for Operation of Booster with Ions from Tandem Prepared by: C. Gardner Date: September 14, 2009 Radiation Security Check-Off List for TTB Operation with Protons Prepared by: C. Carlson Date: September 9, 2009 TTB Radiation Safety Checklist (C or heavier) Prepared by: C. Carlson Date: September 9, 2009 Radiation Safety Check-Off List for U-line experiments (E972&E973) Prepared by: K. Yip Date: June 30, 2009 ERL RSC Check-Off List for Cold Emission Testing of the ECX Cavity Prepared by: D. Beavis Date: April 8, 2009 Booster Radiation Safety Check-Off List for Operation with Ions from Tandem during (or immediately following) Operation with Protons from Linac (For operation with Tandem ions beginning in March 2009) Prepared by: C. Gardner Date: March 3, 2009 NSRL Check-Off List (NSRL-09A, March 2009)

Page 22: RADIATION CHECK-OFF LISTS Check-Off List... · 2020-01-31 · AtR Check-Off List AGS Injection & Accelerated Beam with No Beam Extracted to U Line Prepared by: V. Schoefer . Date:

1/31/2020 22 of 27

Prepared by: A. Rusek Date: February 26, 2009 Radiation Security Check-Off List for TTB Operation with Protons Prepared by: C. Carlson Date: February 24, 2009 TTB Radiation Safety Checklist (C or heavier) Prepared by: C. Carlson Date: February 24, 2009 RHIC RSC Check-Off List for Polarized Proton Operation at 250 GeV (pp) – FY09 Prepared by: A. Drees Date: February 5, 2009 AtR RSC Check-Off List for Protons Produced by the Polarized Proton Source, to be Transported to the W-Dump Only Prepared by: K. Brown Date: January 21, 2009 AtR Check-Off List AGS Injection and Circulating Beam with No Beam Extracted to U Line Prepared by: K. Brown Date: January 9, 2009 AGS Switchyard Check-Off List AGS Injection and FEB Extraction with No Beam Extracted to Switchyard Prepared by: K. Brown Date: January 9, 2009 AGS Ring Radiation Security Check-Off List for Polarized Proton Operation C-A Run Plan FY2009 – January 2009 Prepared by: H. Huang Date: January 8, 2009 Booster Radiation Safety Check-Off List for Operation with Protons from Linac Prepared by: C.J. Gardner Date: January 2, 2009 BLIP Radiation Security Check-Off List Prepared by: D. Raparia Date: November 5, 2008 Linac Radiation Security Check-Off List Prepared by: D. Raparia Date: November 5, 2008 AGS Ring Radiation Security Check-Off List For Proton Operation CA Run Plan FY 2009 – October 2009

Page 23: RADIATION CHECK-OFF LISTS Check-Off List... · 2020-01-31 · AtR Check-Off List AGS Injection & Accelerated Beam with No Beam Extracted to U Line Prepared by: V. Schoefer . Date:

1/31/2020 23 of 27

Prepared by: H. Huang Date: October 2, 2008 Radiation Safety Check-Off List for Operation of Booster with Ions from Tandem (For operation beginning 24 September 2008) Prepared by: C.J. Gardner Date: September 17, 2008 AtR Check-Off List AGS Injection and Circulating Beam with no Beam Extracted to U Line Prepared by: K. Brown Date: September 12, 2008 TTB Radiation Safety Checklist (C or heavier) Prepared by: C. Carlson Date: September 12, 2008 Radiation Security Check-Off List for TTB Operation with Protons Prepared by: C. Carlson Date: September 12, 2008 AGS Switchyard Check-Off List AGS Injection and FEB Extraction with no Beam Extracted to Switchyard Prepared by: K. Brown Date: September 10, 2008 NSRL Check-Off List Prepared by: A. Rusek Date: August 28, 2008 RSC Check-Off List for Phase II Test of ERL Klystron Prepared by: D. Beavis Date: June 20, 2008 RSC Check-Off List for Phase I Test of ERL Klystron Prepared by: D. Beavis Date: June 12, 2008 Radiation Security Check-Off List for TTB Operation with Protons Prepared by: C. Carlson Date: March 14, 2008 NSRL Check-Off List (NSRL-08A, March 2008) Prepared by: A. Rusek Date: February 11, 2008 RHIC RSC Check-off List for Polarized Proton Operation – FY08 Prepared by: A. Drees Date: January 28, 2008

Page 24: RADIATION CHECK-OFF LISTS Check-Off List... · 2020-01-31 · AtR Check-Off List AGS Injection & Accelerated Beam with No Beam Extracted to U Line Prepared by: V. Schoefer . Date:

1/31/2020 24 of 27

AtR RSC Check-Off List for Protons Produced by the Polarized Proton Source, to be Transported to the W-Dump only Prepared by: N. Tsoupas Date: January 16, 2008 BLIP Radiation Security Check-Off List Prepared by: D. Raparia Date: November 20, 2007 Linac Radiation Security Check-Off List Prepared by: D. Raparia Date: November 20, 2007 RHIC RSC Check-off List for Deuteron-Gold Operation (dAu) – FY08 Prepared by: A. Drees Date: November 1, 2007 AtR RSC Check-Off List for Au and d-ions Transport to W-Dump only Prepared by: N. Tsoupas Date: October 19, 2007 AGS Ring Radiation Security Check-Off List For Heavy Ions Operation (C-A Run Plan FY2008-October 2008) Prepared by: H. Huang Date: October 16, 2007 AGS Switchyard Check-Off List AGS Injection and FEB Extraction with No Beam Extracted to Switchyard Prepared by: K.A. Brown Date: October 15, 2007 RSC Check-Off List to Inhibit and Prevent Beam Entering into the U Line with Au or d ions circulating in the AGS Prepared by: N. Tsoupas Date: October 3, 2007 Radiation Security Check-Off List for TTB Operation with Protons Prepared by: C. Carlson Date: September 17, 2007 NSRL Check-Off List (NSRL-07C, September 2007) Prepared by: A. Rusek Date: August 23, 2007 Radiation Safety Check-Off List for Operation of Booster with Ions from Tandem Prepared by: C.J. Gardner Date: August 22, 2007 TTB Radiation Safety Checklist (C or heavier)

Page 25: RADIATION CHECK-OFF LISTS Check-Off List... · 2020-01-31 · AtR Check-Off List AGS Injection & Accelerated Beam with No Beam Extracted to U Line Prepared by: V. Schoefer . Date:

1/31/2020 25 of 27

Prepared by: C. Carlson Date: August 22, 2007 Radiation Security Check-Off List for TTB Operation with Protons Prepared by: C. Carlson Date: May 29, 2007 NSRL Check-off List Prepared by: A. Rusek Date: March 2, 2007 Booster Radiation Safety Check-Off List for Operation with Protons from Linac during (or immediately following) operation with Ions from Tandem Prepared by: C.J. Gardner Date: March 1, 2007 Linac Radiation Security Check-Off List Prepared by: D. Raparia Date: February 12, 2007 RHIC RSC Check-off List for Heavy Ion Operation (AuAu) – FY07 Prepared by: A. Drees Date: February 14, 2007 BLIP Radiation Security Check-off List Prepared by: D. Raparia Date: February 12, 2007 AtR RSC Check-Off List for Au ions Transport to W-dump only Prepared by: N. Tsoupas Date: February 6, 2007 RSC Check-Off List to Inhibit and Prevent Beam Entering into the U Line with Au ions circulating in the AGS Prepared by: N. Tsoupas Date: February 5, 2007 Radiation Safety Check-Off List for Operation of Booster with Ions from Tandem (For operation beginning February 2007) Prepared by: C.J. Gardner Date: February 2, 2007 TTB Radiation Safety Checklist (C or heavier) Prepared by: C. Carlson Date: February 2, 2007 AGS Ring Radiation Security Check-Off List for Heavy Ions Operation CA Run Plan FY 2007 – February 2007 Prepared by: H. Huang

Page 26: RADIATION CHECK-OFF LISTS Check-Off List... · 2020-01-31 · AtR Check-Off List AGS Injection & Accelerated Beam with No Beam Extracted to U Line Prepared by: V. Schoefer . Date:

1/31/2020 26 of 27

Date: February 1, 2007 RSC Check-Off List to Inhibit and Prevent Beam Entering into the U Line with Au ions circulating in the AGS Prepared by: N. Tsoupas Date: November 30, 2006 AGS Ring Radiation Security Check-Off List for Heavy Ions Operation CA-Run Plan FY2007 Prepared by: H. Huang Date: November 21, 2006 AGS Switchyard Check-Off List AGS Injection and FEB Extraction with No Beam Extracted to Switchyard Prepared by: K.A. Brown Date: November 20, 2006 – Updated February 5, 2007 Radiation Safety Check-Off List for Operation of Booster with Ions from Tandem Prepared by: C.J. Gardner Date: November 20, 2006 TTB Radiation Safety Checklist (C or heavier) Prepared by: C. Carlson Date: November 17, 2006 NSRL Check-Off List Prepared by: A. Rusek Date: August 29, 2006 Radiation Security Check-Off List for TTB Operation with Protons Prepared by: C. Carlson Date: August 21, 2006 Radiation Safety Check-Off List for Operation of Booster with Ions from Tandem Prepared by: C.J. Gardner Date: August 21, 2006 TTB Radiation Safety Checklist (C or heavier) Prepared by: C. Carlson Date: August 21, 2006 TTB Radiation Safety Checklist (C or heavier) Prepared by: J. Alessi Date: February 16, 2006 Radiation Safety Check-Off List for Booster Operation with Ions from Tandem Prepared by: C.J. Gardner Date: February 15, 2006

Page 27: RADIATION CHECK-OFF LISTS Check-Off List... · 2020-01-31 · AtR Check-Off List AGS Injection & Accelerated Beam with No Beam Extracted to U Line Prepared by: V. Schoefer . Date:

1/31/2020 27 of 27

NSRL Check-Off List Prepared by: A. Rusek Date: January 31, 2006 RSC Check-Off List to Inhibit and Prevent Beam Entering into the U Line with protons circulating in the AGS Prepared by: N. Tsoupas Date: January 11, 2006 AtR RSC Check-Off List for Protons Produced by the Polarized Proton Source, to be Transported to the W-Dump only Prepared by: N. Tsoupas Date: January 10, 2006 AGS Ring Radiation Security Check-Off List for Polarized Proton Operation C-A Run Plan FY2006-January 2006 Prepared by: H. Huang Date: January 7, 2006 AGS Switchyard Check-Off List AGS Injection and FEB Extraction with No Beam Extracted to Switchyard Prepared by: Kevin Brown Date: January 6, 2006 BLIP Radiation Security Check-Off List Prepared by: D. Raparia Date: January 6, 2006 LINAC Radiation Security Check-Off List Prepared by: D. Raparia Date: January 6, 2006


Recommended