FIRSTLY, LAYOUT IS
TO BE GIVEN AT
SITE ACCORDING
TO PLAN W.R.T.
WHICH
EXCAVATION IS
CARRIED OUT WITH
THE HELP OF LANDEXCAVATOR AND
PREFERABLY
SHOULD BE
DISMENTLED AS
PER SITE
CONDITION.
8/13/2019 RAFT.ppt2
2/24
8/13/2019 RAFT.ppt2
3/24
A LAYER OF SAND
BED IS LAYED OVER
THE EXCAVATED
SURFACE AREA
(APPROX.- 75mm) OVER
WHICH PCC BED OF
RECOMMENDED
THICKNESS IS LAYED
SAY- 1:4:8. THESURFACE SHOULD BE
PROPERLY FINISHED
AND LEVELED AFTER
THE PCC COURSE.
8/13/2019 RAFT.ppt2
4/24
8/13/2019 RAFT.ppt2
5/24
8/13/2019 RAFT.ppt2
6/24
8/13/2019 RAFT.ppt2
7/24
8/13/2019 RAFT.ppt2
8/24
8/13/2019 RAFT.ppt2
9/24
AFTER COMPLETING THE
PCC COURSE BOTTOM
REINFOCEMENT IS PLACED
AS PER STRUCTURAL
DESIGN OF THE RAFT SLAB.
THE M/S RODS SHOULD BE
PLACED PREFERABLY
EQUALLY PARALEL TO EACH
OTHER.
8/13/2019 RAFT.ppt2
10/24
8/13/2019 RAFT.ppt2
11/24
8/13/2019 RAFT.ppt2
12/24
8/13/2019 RAFT.ppt2
13/24
AFTER COMPLETING
THE BOTTOM
REINFORCEMENT,
COLUMNS ARE
PLACED ACCORDING
TO THE LAYOUT
PLAN AND
SIMULTANEOUSLY
CHAIRS ARE ALSO
TIED TO THE
BOTTOM
REINFORCEMENT.
8/13/2019 RAFT.ppt2
14/24
8/13/2019 RAFT.ppt2
15/24
8/13/2019 RAFT.ppt2
16/24
FIXING OF CHAIRS OVER BOTTOM RODS
8/13/2019 RAFT.ppt2
17/24COLUMN & BOTTOM REINFORCEMENT JUNCTION
8/13/2019 RAFT.ppt2
18/24
8/13/2019 RAFT.ppt2
19/24
TOP
REINFORCEMENT OF
RAFT SLAB
8/13/2019 RAFT.ppt2
20/24
PROVIDING TOP REINFORCEMENT
8/13/2019 RAFT.ppt2
21/24
AFTER COMPLETING
ALL THE
REINFORCEMENT
WORKS,
CEMENT
CONCRETING IS TOBE DONE OF
RECOMMENDED
MIX.PROPER
GROUTING SHOULD
BE DONE.
8/13/2019 RAFT.ppt2
22/24
RAFT SLAB CASTING
8/13/2019 RAFT.ppt2
23/24
8/13/2019 RAFT.ppt2
24/24
THANK -YOU