Parking garage market needs:• Onstairswithhightraffic,anodizedaluminumtoprails providealongerlasting,lowermaintenancesurfacethanpaint.• Sinceparkinggaragesareexposedtooutsideclimate conditions,corrosionresistanceiskey. • Hollander’scombinationofanodizedaluminumframe, andinfillpanelsthatarecanbeglass,acrylic,or DuoShieldTMcoatedmetal(e-coatprimer,AAMA2604 powdertopcoat)providealowmaintenance,corrosion resistantsystemthatislonglasting.• Architectsandownerswantavarietyofchoicesininfillpanels, sincethatiswhathasthemostaestheticeffectontheoverall railingappearance. • Hollaender’sInterna-Rail®andSpeed-Rail®frames canacceptwhateverinfillpanelmeetstheownerships’ aestheticrequirements.
www.hollaender.com
Parkinggaragestypicallyrequirerailinginthestairwellsandontheexteriorwalls.
WhilestairsrequirerailingthatmeetsIBCcodewithinfillpanels,therailingrequiredforexteriorwallsisdependentontheheightoftheexistingparapetwall.
The2003IBCbuildingcoderequiresrailingmeetthefollowingrequirements:• 42inchesinheightfromthewalkingsurface• Railingupto34inchesinheight,infillpanelsmust preventa4"spherefrompassing• Railing34to42inchesinheight,infillmustpreventa sphereof8"frompassing.Thenewer2009IBCchangesthiscodesuchthat:Railingupto36inchesa4"spherecannotpassandfrom36to42inches,a4-3/8"spherecannotpass.
Railing Systems for Parking Garages
Village Center Parking Garage Denver, ColoradoRailing: Interna-Rail®,clearanodizedaluminumArchitect:DavisPartnershipArchitects–Denver, ColoradoDuetotheheightofanexistingparapetwallandanopeninglimitationof8"from34"to42"horizontalpicketrailingwasutilized.
The Hollaender Manufacturing CompanyP.O. Box 156399 • 10285 Wayne Avenue • Cincinnati, Ohio 45215-6399
800 -772-8800 • 513-772-8800 • Fax: 800-772-8806
www.hollaender.com
09/11
Dayton International Airport Parking Garage Dayton, Ohio Railing: Interna-Rail®frame,clearanodizedaluminumInfill: 3/8"AcrylicPanelswithacustomdesignedHistoryofFlightthemeusingdesignsfromlocalstudentsArchitect: Levin-PorterArchitects–Dayton, Ohio