Railway Engineering Submitted by: Akshay Kaushal (110134) Jaspreet Singh (110138)
Transcript
Page 1: Railway engineering

Railway Engineering

Submitted by:

Akshay Kaushal (110134)

Jaspreet Singh (110138)

Page 2: Railway engineering

https://www.youtube.com/watch?v=pvg3e2P2TAo

History of Indian Railway

Page 3: Railway engineering

Railway Engineering

• It is a branch of civil engineering concerned with the design, construction, maintenance, and operation of railways.

• Railway engineering includes elements of civil, mechanical, industrial, and electrical engineering.

• Railway engineers handle the design, construction, and operation of railroads and mass transit systems that use a fixed guideway(such as light rail or even monorails).

• Typical tasks would include determining horizontal and vertical alignment design, station location and design, construction cost estimating, and establishment of signaling & controlling system.

• Railroad engineers can also move into the specialized field of train dispatching which focuses on train movement control.

Page 4: Railway engineering

Section of Permanent Way

Page 5: Railway engineering

RAIL GAUGE

The gauge of a railway track is defined as the clear minimum perpendicular distance between the inner faces of the two rails.

Page 6: Railway engineering

Dimension of gauges

1. Broad Gauge(BG) 1676mm(5’6”)

2. Standard Gauge(SG) 1435mm

3. Metre Gauge(MG) 1000mm

4. Narrow Gauge(NG) 762mm(2’6”)

5. Light Gauge 610mm

Page 7: Railway engineering

Coning of Wheels

• Coning of wheels – The distance between the inside edges ofwheel flanges is generally kept less than the gauge. Gap isabout 38 mm on Either side. Normally the tyre is absolutelyahead centre on the head of the rail, as the wheel is coned tokeep it in this central position automatically. These wheel areconed at a slope

• Theory of coning:- On a level track, as soon as the axle movestowards one rail, the diameter of the wheel tread over the railincreases, while It decreases over the other rail. This preventsto further movement And axle retreats back to its originalposition (with equal dia or both rails and equal pressure onboth rails).

Page 8: Railway engineering

Coning of Wheel on Level-track

Page 9: Railway engineering

RAILS

The high carbon rolled steel sections, which are laidend-to-end, in two parallel lines over sleepers toprovide continuous and leveled surface for the trainsto move and for carrying axle loads of the rollingstock are called rails.

`

Page 10: Railway engineering

Functions of the rails:

To provide continuous and level surface for the movement of trains with minimum friction with steel wheels of the rolling stock;

Provide strength, durability and lateral guidance to the track;

Transmit the axle loads to sleepers which transfer the same load to the underlying ballast and formation;

Bear the stresses developed due to heavy vertical loads, breaking forces and temperature variance.

Page 11: Railway engineering

RAILSTypes of rails:

1. Double Headed Rails (DH Rails)

2. Bull Headed Rails (BH Rails)

3. Flat-footed Rails (FF Rails)

Page 12: Railway engineering

Length of Rails

On Indian Railways the standard lengths are the following:

Length = 12.80 m. (42 ft.) for BG (say 13 m) andLength = 11.89 m. (39 ft.) for MG (say 12 m)

Page 13: Railway engineering

Corrugated or Roaring Rails

In certain places, head of rails are found to becorrugated rather than smooth and straight,when the vehicles pass over such rails, a roaringsound is created which is intense enough to beunpleasant.

Page 14: Railway engineering

Hogged RailsDue to battering action of wheels over the end of the rails, therails get bent down and get deflected at the ends. These rails arecalled hogged rails.

Measures taken to rectify the hogged rails are:

1. Cropping

2. Replacing

3. Welding

4. Dehogging

Page 15: Railway engineering

Reason of Hogging!

https://www.youtube.com/watch?v=9njqDgjIcWQ

Page 16: Railway engineering

Kinks In RailsWhen the ends of adjoining rails move slightly out of position, “shoulders” or “kinks” are formed.

Measures taken to rectify kinks in rails:

1. By correcting alignment at joints and at curved locations.

2. Proper packing of joints.

3. Proper maintenance of the track periodically in repect of cross levels, gauge, alignment, welding of worn out portions etc.

Page 17: Railway engineering

Buckling of RailsBuckling means the track has gone out of its original position or alignment due to prevention of expansion of rails in hot weather on account of temperature variations.

Page 18: Railway engineering

Damaged Rails

These are the rails which should be removed on account of their becoming unsafe for a railway track.

Page 19: Railway engineering

Rail Features

• Crushed Heads

• Square or Angular Break

• Split Heads

• Split Web

• Horizontal Fissures

• Transverse Fissures

• Flowing Metal in Heads

• Horizontal Cracks

Page 20: Railway engineering

Crushed Head

Page 21: Railway engineering

Split Heads

Page 22: Railway engineering

Horizontal and Transverse Fissures

Page 23: Railway engineering

Flowing Metal in Heads

Page 24: Railway engineering
Page 25: Railway engineering

Rail Joints

• Supported Rail Joint• Suspended Rail Joint• Bridge Joint• Base Joint• Welded Rail Joint• Staggered or Broken Joint• Square or Even Joint• Compromise Joint• Insulated Joint• Expansion Joint`

Page 26: Railway engineering

Rail Joint

Page 27: Railway engineering
Page 28: Railway engineering

Insulated Joint

Page 29: Railway engineering

Expansion Joint

Page 30: Railway engineering

Creep of RailsCreep is defined as the longitudinal movement of the rail with respect to the sleepers.

Page 31: Railway engineering

Defects of Creep

(i) Sleepers move out of position thereby the rail gauge.

(ii) Position of points and crossings are disturbed.

(iii) Interlocking mechanism getsdisturbed.

Page 32: Railway engineering

Remedies or Prevention of Creep

• Pulling back of rails

• Provision of Anchors or Anticreepers.

• Use of steel sleepers.

Anticreeper

Page 33: Railway engineering

Sleepers

Sleepers are the transverse ties that are laid to support the rails. They transmit wheel load from the rails to the ballast.

Page 34: Railway engineering

Classification of sleepers

(i) Wooden sleeper

(ii) Metal sleeperCast iron sleeper

Steel sleeper

(iii) Concrete sleeperReinforced concreteSleeper (R.C.C)

Prestressed ConcreteSleeper .

Page 35: Railway engineering

Wooden Sleepers

• Hard wood such as, sal and teak

• Soft wood such as, chir and deodar

Page 36: Railway engineering

Metal Sleepers

Page 37: Railway engineering

Concrete Sleepers

Page 38: Railway engineering

Sleeper Density

Sleeper density is the number of sleepers Perrail length. It is specified as (M+x) or (N+x),where M or N is the length of the rail in metersand x is a number that varies according tofactors such as axle load, speed, type & sectionof the rail etc.

It varies in India from M+4 to M+7 for maintracks.

Page 39: Railway engineering

Track Fittings & Fastenings• Fish plates

• Spikes

– Dog spikes

– Screw spikes

– Round spikes

– Standard spikes

– Elastic spikes

• Bolts– Dog or Hook bolt– Fish bolt– Rag bolt– Fang nut and bolt

• Keys– Wooden key for C.I. Chair– M.S. key and steel trough

sleepers– Stuart’s key– Morgan key– Cotter and tie bars

• Chairs

– Cast steel chairs

– Mild steel and Cast Iron Slide Chairs

Page 40: Railway engineering

• Blocks

– Heel blocks

– Distance blocks

– Crossing blocks

– Check blocks

• Plates

– Bearing Plates

– Saddle Plates

Track Fittings & Fastenings contd..

Page 41: Railway engineering

Fish Plate

Page 42: Railway engineering

Dog Spike

Page 43: Railway engineering

Screw spikes

Page 44: Railway engineering

Chair

Page 45: Railway engineering

Bearing Plate

Page 46: Railway engineering

Ballast

To provide structural support for the track, holding it in good line and surface

To distribute the load evenly to the subballast and subgrade and thus help to provide stability

Provide for drainage

Ballast in railroad terminology is durable granular material placed between

the crosstie and the sub ballast to hold the track in line and grade.

The primary purposes of ballast are:

Page 47: Railway engineering

BALLAST

SUBBALLAST SUBGRADE

BALLAST SECTION

Page 48: Railway engineering

Types of Ballast

• Broken Stone• Gravel or River Pebbles or Shingle• Ashes or Cinders• Sand• Mooram• Kankar• Brick Ballast• Blast Furnace Slag• Selected Earth

Page 49: Railway engineering

Ballast Size

• For wooden sleepers = 5.1 cm

• For steel sleepers = 3.8 cm

• For under switches & crossings = 2.54 cm

Page 50: Railway engineering

Points & Crossings

• Points and crossings provide flexibility ofmovement by connecting one line to anotheraccording to requirements.

• They also help for imposing restrictions overturnouts which necessarily retard themovements.

• From safety aspect, it is also important as pointsand crossings are weak kinks or points in thetrack and vehicles are susceptible to derailmentsat these places.

Page 51: Railway engineering

Turnouts• It’s the simplest combination of points and crossings which

enables one track either a branch line or a siding, to take off from another track.

• Parts of a turnout:– A pair of points or switches– A pair of stockrails– A Vee crossing– Two check rails– Four lead rails– Switch tie plate– Studs or stops– Bearing plates, slide chairs, stretcher bars etc.– For operating the points – rods, cranks, levers etc.– For locking system – locking box, lock bar, plunger bar etc.

Page 52: Railway engineering
Page 53: Railway engineering
Page 54: Railway engineering

Types of Switches

Page 55: Railway engineering

CrossingsA crossing or a frog is a device which provides two flangewaysthrough which the wheels of the flanges may move, when tworails intersect each other at an angle.

Page 56: Railway engineering

Acute Angle Crossing

Page 57: Railway engineering

Diamond Crossing

Page 58: Railway engineering

Square Crossing

Page 59: Railway engineering

Track Junctions• Turnouts• Symmetrical split• Three throw switch• Double turnout or Tandem• Diamond crossing• Cross overs• Single slip and double slip• Gauntlet track and ladder tracks• Temporary diversion• Triangle• Double junctions

Page 60: Railway engineering

Turnout

Page 61: Railway engineering

Symmetrical split

Page 62: Railway engineering

https://www.youtube.com/watch?v=L_wOPY5Pu-A

How Railway Track Changes

Page 63: Railway engineering

Signalling It consists of the systems, devices and means by which trains are operated efficiently and tracks are used to maximum extent, maintaining the safety of the passengers, the staff and the rolling stock.

Page 64: Railway engineering

On the basis of Operating Characteristics:

• Detonating Signals (Fog or audible signals)

• Hand signals (Visual Indication signals)

• Fixed signals (Visual Indication signals)

Page 65: Railway engineering

Detonating Signal

Page 66: Railway engineering

Hand Signals

Page 67: Railway engineering

Fixed Signals

Page 68: Railway engineering

• Stop or Semaphore type Signals

• Warner Signals

• Shunting Signals (Disc or Ground Signals)

• Coloured-light Signals

On the basis of Functional Characteristics:

Page 69: Railway engineering

Semaphore type signals

Page 70: Railway engineering

Warner Signals

Page 71: Railway engineering

Shunting Signals

Page 72: Railway engineering

Coloured-light Signals

Page 73: Railway engineering

• Reception Signals

– Outer signals

– Home signals

• Departure Signals

– Starter

– Advance Starter

On the basis of Locational Characteristics:

Page 74: Railway engineering

Departure Signals

Page 75: Railway engineering

• Repeater or Co-acting signals

• Routing Signals

• Calling on signals

• Point indicator

• Modified lower quadrant semaphore signal

• Miscellaneous signals

On the basis of Special Characteristics:

Page 76: Railway engineering

High Speed Bullet Train

https://www.youtube.com/watch?v=2-_yS60NhyM

Page 77: Railway engineering

THANK YOU