Andrea Nardinocchi Technical Director Railway engineering in the experience of Italferr Milan, October 6th
Transcript
Page 1: Railway engineering in the experience of Italferr - … · Andrea Nardinocchi Technical Director Railway engineering in the experience of Italferr Milan, October 6th

Andrea Nardinocchi

Technical Director

Railway engineering in the

experience of Italferr

Milan, October 6th

Page 2: Railway engineering in the experience of Italferr - … · Andrea Nardinocchi Technical Director Railway engineering in the experience of Italferr Milan, October 6th

Who We Are and What We Do

Page 3: Railway engineering in the experience of Italferr - … · Andrea Nardinocchi Technical Director Railway engineering in the experience of Italferr Milan, October 6th

ITALFERR and the FS GROUP

Page 4: Railway engineering in the experience of Italferr - … · Andrea Nardinocchi Technical Director Railway engineering in the experience of Italferr Milan, October 6th

Italferr’s Comprehensive Process Management

This is why we are one of the few companies that can take care of the entire process of implementing an investment project!

On behalf of FS Italiane Group, Italferr has developed, supervised and managed the entire High Speed/High Capacity Railway Network Design and Construction Cycles, from Feasibility Studies to Commissioning and Operation, including Investments’ and Stakeholders’ Management, Construction Supervision of the Work Packages performed by the several Contractors involved

(HS/HC JUNCTIONS)

Planning Studies

Preliminary Design

Detailed Design

Procurement Phase

Final Design

Final Design

Procurement Phase

Final Design Verification

Construction

Work supervision

Construction

Work supervision

(HIGH SPEED LINES)

Page 5: Railway engineering in the experience of Italferr - … · Andrea Nardinocchi Technical Director Railway engineering in the experience of Italferr Milan, October 6th

Planning stage

Construction stage

Operational

Operational Railway lines less than 250 km/h

Extension and Development of the HS/HC Network

III° «Valico dei Giovi» -

Length 53 km

Length

78.8 km

Length

140 km

HS/HC

Line

Conven

tional

Line

HS/HC

Line

Conven

tional

Line

Alpine crossings

HS/HC Line

Conventiona

l

Line

Length 125 km

HS/HC Line

Conventional Line

Length 182 km

HS/HC Line

Conventional Line

Length 78.5

km

HS/HC Line

Conventional

Line

Length 205 km

The next development of the Network will focus on two

transversal axes Genoa-Milan and Milan-Trieste, the link Naples-

Bari towards Adriatic coast and the links towards south of Italy

and the rest of Europe.

• 660 km of new high speed lines with 145 km of new tunnels and 520 km of new viaducts, bridges, trenches and embankments (in operation since 2005 and completed in 2009), developed into 4 main civil lots

• 255 km of "Direttissima" Florence-Rome (in operation since 1977 and currently being updated)

To date the Italian network extends over 1000 km along

the most important national railway backbone Turin-Milan-

Rome-Naples-Salerno:

• 75 km of new interconnecting lines between the HS and the conventional network

• 7 new stations

Page 6: Railway engineering in the experience of Italferr - … · Andrea Nardinocchi Technical Director Railway engineering in the experience of Italferr Milan, October 6th

Milan-Bologna

HS/HC Line

183 km

3.5 kmtunnels

32 kmviaducts

Treviglio-Brescia

HS/HC Line

58 km

1 km tunnels

4 km viaducts

Terzo Valico dei Giovi

HS/HC Line

53 km

39 km tunnels

Rome-Naples

HS/HC Line

206 km

37 km tunnels

38 km viaducts

Bologna-Florence

HS/HC Line

78 km

72 km tunnels

1 km viaducts

Part of the

Trans-European

Transport

Network TEN-T

Turin-Novara

HS/HC Line

87 km

3km tunnels

15 kmviaducts

Novara-Milan

HS/HC line

78 km

2 km tunnels

8 km viaducts

Extension and Development of the HS/HC Network

Page 7: Railway engineering in the experience of Italferr - … · Andrea Nardinocchi Technical Director Railway engineering in the experience of Italferr Milan, October 6th

Main Projects managed in Italy by Italferr Conventional Network

DESIGN, WORKS SUPERVISION, TESTING AND COMMISSIONING, PROJECT MANAGEMENT OF: regional and urban lines upgrading and/or doubling new stations and upgrading of existing stations electrification of railway sections train movement protection systems traffic control and management systems upgrading traffic management of Italy’s main railway junctions technical control centers advanced technological systems, as European Rail Traffic Management System/European Train Control System (ERTMS/ETCS LEVEL 2) Advanced Train Control System (ATCS) implemented on approximately 6.250 miles of Railway Lines

Page 8: Railway engineering in the experience of Italferr - … · Andrea Nardinocchi Technical Director Railway engineering in the experience of Italferr Milan, October 6th

Inside the Company:

Our Key Strengths

Page 9: Railway engineering in the experience of Italferr - … · Andrea Nardinocchi Technical Director Railway engineering in the experience of Italferr Milan, October 6th

MARKET ANALYSIS

Traffic studies

Transportation development plans

FEASIBILITY STUDIES

Investment cost/benefit studies

Environmental impact studies

Preliminary studies

DESIGN

Preliminary, Final design and cost

estimate

Technical specifications

TECHNICAL SUPPORT

Construction Support,constructability

reviews

Construction Management and cost

control TESTING AND STARTUP OF

OPERATIONS

Testing and commissioning, training

SECTORS

High Speed Railway Systems

Conventional Railway Lines

Metro And Urban Transportation

Tunnels, Bridges And Other Civil

Passenger Stations

Depots/Maintenance Facilities

Freight Terminals

Rolling Stock

Traffic Management And

Technological Systems

HIG

H SPEED

RA

IL K

NO

WN

-H

OW

Italferr’s Engineering Services ITF’s Engineering Services

MANAGEMENT and QA/QC

Project Management

Program Management

Peer and QC reviews

Page 10: Railway engineering in the experience of Italferr - … · Andrea Nardinocchi Technical Director Railway engineering in the experience of Italferr Milan, October 6th

11 Maintenance, interoperability, system assurance

reliability, availability, maintainability and safety (RAMS) requirements

Feasibility Studies and Investment

Studies

Transport Models and Rail Operation Studies

Line, Junction and Rail Track Design

Permanent Way

SYSTEM INTEGRATION

traffic analysis alternative solutions multi criteria analysis

economical and financial study

functional requirements traffic requirements

transport capacity analysis planning of operational phases

Topographical survey alignment

study of route alignments

Definition of track and technological

characteristics, and relative

materials

System Engineering Department

INSIDE THE COMPANY

Page 11: Railway engineering in the experience of Italferr - … · Andrea Nardinocchi Technical Director Railway engineering in the experience of Italferr Milan, October 6th

Track Bed, Civil Works,

Geotechnical and Hydraulics

Bridges, viaducts and

structure

Tunnels and underground engineering

Architecture and

Environment

Design of civil works, including earth works

construction, embankments, cuttings,

and hydraulic works

Design of standard and non-standard bridges,

viaducts and structures, including foundations, piers, abutments, spans, seismic protection

systems and relevant buildings

Design of natural and artificial tunnels by

means of both traditional and TBM

technology, and/or cut & cover methods

Urban planning, architectural design,

environmental studies

ITALFERR

Civil Engineering Department

INSIDE THE COMPANY

Page 12: Railway engineering in the experience of Italferr - … · Andrea Nardinocchi Technical Director Railway engineering in the experience of Italferr Milan, October 6th

Tunneling Engineering

In over 30 years of activity, our Tunneling department has developed more than 250 projects involving railway tunneling, from feasibility studies (cost benefits analysis, comparison of different design alternatives) to the design and build phase, to the commissioning and start-up activities, always assessing the risks associated to construction, operation and maintenance activities.

almost 79 km more than 93% underground 9 tunnels separated by short surface stretches.

Civil Engineering Department

Best experience:

Bologna-Florence HS/HC Underground Line

Page 13: Railway engineering in the experience of Italferr - … · Andrea Nardinocchi Technical Director Railway engineering in the experience of Italferr Milan, October 6th

Bridges, viaducts and structures

One of the longest bridges in the world in its type, when put into operation it held the absolute record for cable-stayed High Speed/High Capacity Railway Bridges made of pre-stressed reinforced concrete. 450 yards in length (630 feet free span) 72 steel cables borne by 2 suspension towers 57 yards

tall resting upon 2 1,200 sq.yards artificial islands The design, building and put into operation of the two artificial islands entailed the identification and the resolution of specific hydraulic items, as the necessity of seasonal working in the river bed and the draining of the involved part by means of sheet piles.

Best experience:

Milan-Bologna HS/HC Line cable-stayed bridge over Po River

Civil Engineering Department

Page 14: Railway engineering in the experience of Italferr - … · Andrea Nardinocchi Technical Director Railway engineering in the experience of Italferr Milan, October 6th

Our best experiences in rail stations

In the large metropolitan nodes of Turin, Milan, Bologna, Florence, Rome and Naples, the stations designed to accommodate high-speed trains have been upgraded or built from scratch on projects of architects who won international competitions.

These stations are the most important factor of major urban rehabilitation projects and the expression of a new architectural style

Spaces no longer dedicated merely to train operations, but also as interaction and communication places. New Reggio Emilia Station

New Bologna Station

New Torino Porta Susa

New Roma Tiburtina Station

Civil Engineering Department

Page 15: Railway engineering in the experience of Italferr - … · Andrea Nardinocchi Technical Director Railway engineering in the experience of Italferr Milan, October 6th

Underground Through Stations

Civil Engineering Department

Our best experiences in rail stations

Torino Porta Susa Passenger Station

Arch. AREP – Silvio d’Ascia and Agostino Magnaghi

Page 16: Railway engineering in the experience of Italferr - … · Andrea Nardinocchi Technical Director Railway engineering in the experience of Italferr Milan, October 6th

AV

Hall

Temporary Hall via de’ Carracci m2 450

HS Platforms

Underground HS Building – Section

Bologna HS Station Chorography

Underground Through Stations Bologna Centrale Passenger Station

Underground Station geometry:

Length = 2100 ft

Width = 135 ft

Depth slab roof – slab foundation = 75 ft

Civil Engineering Department

Our best experiences in rail stations

Page 17: Railway engineering in the experience of Italferr - … · Andrea Nardinocchi Technical Director Railway engineering in the experience of Italferr Milan, October 6th

Civil Engineering Department

Our best experiences in rail stations

Underground Through Stations Bologna Centrale Passenger Station

Page 18: Railway engineering in the experience of Italferr - … · Andrea Nardinocchi Technical Director Railway engineering in the experience of Italferr Milan, October 6th

Civil Engineering Department

Our best experiences in rail stations

Underground Through Stations Bologna Centrale Passenger Station

Page 19: Railway engineering in the experience of Italferr - … · Andrea Nardinocchi Technical Director Railway engineering in the experience of Italferr Milan, October 6th

23 23 Arch. Santiago Calatrava

Brand New Through Stations New Reggio Emilia Passenger Station

Civil Engineering Department

Our best experiences in rail stations

Page 20: Railway engineering in the experience of Italferr - … · Andrea Nardinocchi Technical Director Railway engineering in the experience of Italferr Milan, October 6th

Civil Engineering Department

Our best experiences in rail stations

Brand New Through Stations New Reggio Emilia Passenger Station

Page 21: Railway engineering in the experience of Italferr - … · Andrea Nardinocchi Technical Director Railway engineering in the experience of Italferr Milan, October 6th

Civil Engineering Department

Our best experiences in rail stations

Brand New Through Stations New Reggio Emilia Passenger Station

Page 22: Railway engineering in the experience of Italferr - … · Andrea Nardinocchi Technical Director Railway engineering in the experience of Italferr Milan, October 6th

Environmental Sustainability

Concrete actions for an

environmentally sustainable design:

developed a methodology for the assessment of the greenhouse gas emissions produced by each stage of the project.

developed a method for assessing the environmental sustainability of projects: from a culture based on mitigating negative impacts to a culture based on positive opportunities that a new infrastructure can generate

Certification

of Compliance with

ISO 14064-1

Landscape study: simulation of a new coastal line

Civil Engineering Department

Page 23: Railway engineering in the experience of Italferr - … · Andrea Nardinocchi Technical Director Railway engineering in the experience of Italferr Milan, October 6th

Environment

Example:

new 1000 km High Speed/High Capacity Italian Railway Network

6 regions, 16 provinces, 150 municipalities crossed, 490 miles of new roads

and road re-routing: in order to achieve the highest socio-environmental integration of the Project, Italferr established more than 300 agreements with the Authorities, the Stakeholders, the Communities

control and mitigation of noise and vibrations: about 150 miles of noise barriers designed and implemented

control of power supply and of generated electromagnetic field prevention and mitigation measures to reduce the hydro-geologic impact environmental and urban rehabilitation, environmental readjustment

works, more than 6,25 square miles of landscaped greenery reduction of impact on human environment during construction period maximum reuse of excavated materials and reduce of solid waste protection of the historical and archaeological remains

Noise Barriers in Aluminum, PMMA and Wood

Frame and Steel Reinforced, Reinforced

Concrete and Glass Noise Barriers

Approximately 25% of the investment covered socio-environmental

costs, as construction of noise barriers, landscaping, and historical

heritage preservation projects

Civil Engineering Department

Page 24: Railway engineering in the experience of Italferr - … · Andrea Nardinocchi Technical Director Railway engineering in the experience of Italferr Milan, October 6th

ERTMS-European Rail Traffic

Management System

SCMT - Automatic Train Control System

SCC - Command

and Control system

GSM-R Radio

communication system

A radio-based signaling system for rail traffic

command, control and coordination (High

Speed/High Capacity Network): NO trackside

signals

An automatic train protection system that

monitors the train operation, limiting speed-exceeding

(Conventional Network)

Remote command and control system to

manage rail traffic and complementary

activities across entire areas (junctions or

mainlines)

Mobile telephone network for the

transmission of voice and data (GSM-Railway).

ITALFERR

Technologies Department

INSIDE THE COMPANY

Page 25: Railway engineering in the experience of Italferr - … · Andrea Nardinocchi Technical Director Railway engineering in the experience of Italferr Milan, October 6th

Progetto Definitivo I Lotto Funzionale Apice - Hirpinia

LINEA AV/AC NAPOLI - BARI

33

L’attuale collegamento

ferroviario tra la dorsale

Tirrenica ed Adriatica

presenta alcune

discontinuità, elevata

tortuosità di tracciato e

diffuse disomogeneità

nell’infrastruttura.

H

Page 26: Railway engineering in the experience of Italferr - … · Andrea Nardinocchi Technical Director Railway engineering in the experience of Italferr Milan, October 6th

Digitalization

Introduce the BIM methodology in the design and construction phases;

Create and offer the AIM (Asset Information Model) to our final clients

(asset manager) to support digital Facility Management activities (more

efficient management and maintenance of the asset)

Redesign of our business processes to align our organization to the

digitalization «mantra» and achieve significant efficiency improvements.

Page 27: Railway engineering in the experience of Italferr - … · Andrea Nardinocchi Technical Director Railway engineering in the experience of Italferr Milan, October 6th

Direct benefits from the BIM adoption

Design Quality improvements;

Cost Reduction through the asset lifecycle thank to:

• Reduction of change orders requests

• Digitalization of works supervision at the

construcion sites;

• Improved monitoring of technical and economic

work in progress;

• Optimization of facility management activities.

Aligned to the expectations of large international

players and investors/owners. Nowadays being BIM

Ready is a pre-requisite for international tenders.

The advantages that Italferr expects from the introduction of the BIM methodology are:

Page 28: Railway engineering in the experience of Italferr - … · Andrea Nardinocchi Technical Director Railway engineering in the experience of Italferr Milan, October 6th

36

Page 29: Railway engineering in the experience of Italferr - … · Andrea Nardinocchi Technical Director Railway engineering in the experience of Italferr Milan, October 6th
Page 30: Railway engineering in the experience of Italferr - … · Andrea Nardinocchi Technical Director Railway engineering in the experience of Italferr Milan, October 6th

Our International Presence

and Major Current Projects

Page 31: Railway engineering in the experience of Italferr - … · Andrea Nardinocchi Technical Director Railway engineering in the experience of Italferr Milan, October 6th

Italferr’s Main Projects, Worldwide

Countries with permanent

establishments and on going

projects

Countries with projects

realized or ongoing

SYRIA

Railway Network Upgrading Project

IRAQ

Mussayeb-Samawa Railway Line

Project

ALGERIA

Technical Assistance and

Consulting Services to

National Railway Authority

ETHIOPIA

Technical Assistance and

Consulting Services for

Djibouti-Addis Abeba and

Tram Addis Abeba railway line

Projects

CONGO-BRAZZAVILLE

Uodate Master Plan Congo

ROMANIA

Feasibility Study and

Preliminary Design for the

4th corridor of the railway

network (480 km)

PERU

Lima Metro Line 2,

Interfaces / Integration

Management Consulting

Services

BRAZIL

Technical Assistance,

Preliminary Project and

Consulting Services for

Açailândia-Barcarena, Sinop-

Miritituba and Americana-São

Paulo railway line Projects

AUSTRALIA

Strategic Study on

Brisbane-Melbourne High-

Speed Railway Line Project

EGYPT

Feasibility Study for El Cairo-

Alexandria High-Speed Railway

Line Project

Feasibility Study for signaling

systems El Qantara - Zagazig -

Abu-Kebir Railway Line Project

MOROCCO

Consulting services (signaling

verification Technical

Assistance) on Tanger-

Casablanca Railway Line Project

INDIA

Mumbai Metro Rail

project

Anji Khad Bridge,

Khurja - Dadri Section of

Eastern Dedicated

Freight Corridor

Projects

KINGDOM OF SAUDI

ARABIA

Landbridge Railway Line Project,

Final Design

Validation Assistance on Mecca-

Medina High-Speed Railway Line

Project

OMAN

National Railway Network

Preliminary Design

QATAR

Metro Doha Project, Civil Works

Design

UZBEKISTAN

IRAN

Tehran-Qom-Esfahan High Speed

Railway Line

CROATIA

Hrvastki - Karlovac

Railway line Project,

Preliminary and

Detailed Design

ALBANIA

Feasibility Study for

Tirana Multimodal

Station Project

BULGARIA

Technical Design and

Detailed Zoning Plan

for Modernization of

Railway Section Sofia-

Pernik-Radomir

USA

California HSR Project

CHSRA ETO

VTA Risk Assessment

Boston GLX

AUSTRIA-ITALY

Supervision of Construction

of BBT allotment for Brenner

Base Tunnel

NORWAY

Framework Agreement for

Technical Consultants to

the Norwegian ERTMS

National Implementation

Project

Verification of the

detailed technical design

for the Norwegian railway

line - Follo Line, Oslo

FRANCE

Turin-Lyon High-Speed Rail

Line Project, Rolling Stock

Consulting Services

BOSNIA HERZEGOVINA

Consulting Services,Technical

Assistance

TURKEY

Preliminary Design for

High-Speed Rolling Stock

Maintenance Facilities

Bosphorus Tunnel Project

Works Supervision

Ankara and Istanbul HST

Maintenance Facilities

SWITZERLAND

Chiasso Station Project

Consultant services for project

implementation support in the

framework of the Project “The

Construction of Electrified

Railway line Angren-Pap”.

ARGENTINA

Technical Assistance, Preliminary

Project and Consulting Services for

Railway Systems

Sarmiento Passenger Line

Buenos Aires

UNITED KINGDOM

HIGH SPEED 2 - PHASE

Procurement Delivery

Partner

SERBIA

National Transport

Program

Page 32: Railway engineering in the experience of Italferr - … · Andrea Nardinocchi Technical Director Railway engineering in the experience of Italferr Milan, October 6th

Peru Metro Lima Line 2 Project

Al Wahda Station 9-jul-14 IN 2015 NEW BRANCH

IN LIMA!

“ITALFERR SUCURSAL

PERU S.L.”

PERU

Lima Metro Line 2,

Interfaces / Integration

Management Consulting

Services

Metro Lima Project, Line 2 and extension Line 4

Interface coordination during Design and Works on Railway and non-Railway

Works, on Rolling Stock, and on Testing, Commissioning and Put into Service

driverless

22 miles (35 km) underground tunnels: 17 miles (27 km) East-West Line

and 5 miles (8 km) Avenida Elmer Faucett-Avenida Nèstor Gambetta span

35 passenger stations, 13 in El Callao and 22 in Lima, to be realized by

both cut & conver and by traditional methods

2 maintenance yards

Contractor: Dragados, FCC, Salini

Impregilo, Cosapi, Ansaldo STS, Ansaldo

Breda Joint Venture

Countries with permanent

establishments and on going

projects

Countries with projects realized or

on going

Page 33: Railway engineering in the experience of Italferr - … · Andrea Nardinocchi Technical Director Railway engineering in the experience of Italferr Milan, October 6th

Argentina Urban Line Sarmiento

ARGENTINA Technical Assistance, Preliminary Project and Consulting Services for Railway Systems Sarmiento Passenger Line Buenos Aires

New Sarmiento Line – Urban Line Technical Assistance, Preliminary Design and Consulting Services for Railway Systems (signaling, telecom, MEP, energy, maintenance yards, track, alignment, ) 22,5 miles (36 km), 11,2 underground tunnels 16 passenger stations, to be realized by both cut & conver and by

traditional methods 1 maintenance yard

Contractor: UTE CNS (Ghella, Odebrecht, Iecsa)

Countries with permanent

establishments and on going projects

Countries with projects realized or on

going

NUEVAS ESTACIONES

Page 34: Railway engineering in the experience of Italferr - … · Andrea Nardinocchi Technical Director Railway engineering in the experience of Italferr Milan, October 6th

Qatar Metro Doha Red Line North UG & PMC Lusail Tram Projects

Al Wahda Station 9-jul-14

Metro Doha Red Line North Underground Project

North Branch of Metro Doha System Coastal Line: linking the city center with New Doha International Airport and the new Lusail Urban Development

detailed design of civil works, architectural finishes and MEP equipment responsible for interface management, system assurance, requirements management

and configuration management activities.

8 miles (13 km) twin single-track tbm tunnel in highly urbanized areas 7 cut & cover underground stations (2 interconnecting different lines) emergency exits + shafts + tunnel approach structures

Contractor: Salini-Impregilo, SK E&C, Galfar al Misnad Joint Venture QATAR Metro Doha Project, MEP and Civil Works Design SINCE 2014

ITALFERR HAS A NEW BRANCH IN

DOHA!

“ITALFERR S.P.A. QATAR BRANCH.”

Countries with permanent establishments and on going projects Countries with projects realized or on going

PMC Lusail Tram Project

Project Management Consulatancy services for the realization of a 38 km tram line in Ludsail.

Page 35: Railway engineering in the experience of Italferr - … · Andrea Nardinocchi Technical Director Railway engineering in the experience of Italferr Milan, October 6th

KSA The Saudi Landbridge Railway Project

KINGDOM OF SAUDI ARABIA Landbridge Railway Line

Project, Final Design Validation Assistance on

Mecca-Medina High-Speed Railway Line Project

The Saudi Landbridge Railway Project – Preliminary and Detailed Design

The Saudi Landbridge Railway Project is part of the Country’s overall railway network expansion strategy. The Project consists of the study of two different lines:

RED Corridor: 595 miles (958 km) line linking Jeddah with the existing Riyadh and Dammam networks

BLU Corridor: 797 mils (1283 km) Jeddah-Jubail coast to coast line

(first 168 miles, 271 km, departing from Jeddah common between the two Corridors).

Preliminary Design: review of the reference materials and validation of existing data environmental impact assessment (eia) definition of system parameters and operation plan passenger traffic study financial and economic model surveys, geotechnical and hydrological analysis

Detailed Design: alignment and earthwork railway superstructure bridges, viaducts, culverts, tunnels,

structures bills of quantities and cost estimate

Participation on: implementation plan design dossier implementation plan

Client: Saudi Railways Company

SINCE 2013 ITALFERR HAS A NEW BRANCH IN

RIYADH!

“ITALFERR S.P.A. SAUDI ARABIA”

Countries with permanent establishments and on going projects Countries with projects realized or on going

Page 36: Railway engineering in the experience of Italferr - … · Andrea Nardinocchi Technical Director Railway engineering in the experience of Italferr Milan, October 6th

Oman Oman National Railway Project

SINCE 2013 ITALFERR HAS A NEW BRANCH IN

MUSCAT

“ITALFERR S.P.A. OMAN BRANCH.”

OMAN National Railway Network Preliminary Design

Oman National Railway Project – Preliminary Design

The about 1,395 miles (2,244 km) National Railway Project in the Sultanate of Oman will consist in a new railway network divided in 9 segments, linking the Omani-United Arab Emirates border (at Al Ain and at Khatmat Milahah) to Muscat as part of GCC Railway Network and to the southern parts of the Country (at Port of Ad Duqm and at Salalah) and to Yemen border.

passenger trains operational speed: 125 mph (200 km/h) passenger trains design speed: 137 mph (220 km/h) freight trains speed: 50-75 mph (80-120 km/h) the corridor will allow 217 mph (350 km/h) future speed The Preliminary Design includes: review of previous study reports & validation infrastructure preliminary design systems preliminary design rolling stock performance specifications prepare tender documents for design & build (d&b)

contractors for infrastructures and systems.

Client: Oman Rail Company

Countries with permanent establishments and on going projects Countries with projects realized or on going

Consultancy Services for the Mineral Line Design The Concept Design for the mineral line segment “sector 4d” (from Amal to Duqm connection estimated at 212 Km from Amal in Duqm plus 110 km for the railway connection of the quarries/mine of Manji Loadout and Ash Shwaymiyyah); the review of the Concept Alignment on the Segment 1 from the Sohar marshalling yard until Sohar port (this activity has to be considered optional for the purpose of tender document).

Page 37: Railway engineering in the experience of Italferr - … · Andrea Nardinocchi Technical Director Railway engineering in the experience of Italferr Milan, October 6th

Iran

IRAN

Tehran-Qom-Esfahan High Speed Railway Line

Tehran-Qom-Esfahan High Speed Railway Line

Tehran-Qom-Esfahan High Speed Railway Line

The high speed construction project for the Tehran-Qom-Esfahan is an EPC (Engineering, Procurement and Construction) and will be assigned to a Chinese group. The high speed construction project: 385 km of high speed line Tehran-Qom 135 Km forecast speed 200 km/h Qom-Esfahan 250 Km forecast speed 300Km/h procurement of rolling stock

Countries with permanent establishments and on going projects Countries with projects realized or on going

Project Management Consultancy to TDIC for Tehran-Qom-Esfahan Italferr, alongside a local engineering company, IRAN OSTON, has taken an assignment to supervise the contract

Page 38: Railway engineering in the experience of Italferr - … · Andrea Nardinocchi Technical Director Railway engineering in the experience of Italferr Milan, October 6th

High Speed Line and Technological Upgrades

EGYPT Hiigh speed line Cairo Alex Line Benha Zagazig Cairo Alex Asyut main corridor

Line Benha-El Qantara and Zagazig-Abu-Kebir Consulting services for the Modernization of Signalling Systems

preliminary traffic study

definition of the system architecture

procurement

definition of functional specifications and drawings;

works supervision

High Speed Line Cairo Alexandria Feasibility Study

demand analysis

alternative routes for the proposed corridor

technology options

preliminary implementation program

preliminary costs for implementing and maintaining

preliminary financial analysis

Mixed line: 170km Diesel traction

High Speed line: 180 km Electrification 25Kv

50Hz 1 Rolling Stock

maintenance workshop Client: ENR, Egyptian National Railways, Ministry of Transport

Client: ENR, Egyptian National Railways

Cairo Alex Asyut main corridor Migration to ETCS level 1 – on board and track side Preliminary design

migration strategy to etcs lev.1

cost appraisal

functional specifications,

technical specifications and bidding documents

assistance during the bidding procedure

Client: ENR, Egyptian National Railways, Ministry of Transport

Mixed line: 550km

Egypt

Countries with permanent establishments and on going projects Countries with projects realized or on going

Page 39: Railway engineering in the experience of Italferr - … · Andrea Nardinocchi Technical Director Railway engineering in the experience of Italferr Milan, October 6th

Algeria Consultancy Services Anesrif Agency

Al Wahda Station 9-jul-14

ACTIIVITY STARTED IN

2007

JOINT COMPANY ITALFERR ANESRIF

PLANNED FOR 2016

Technical Assistance Services technical support for the implementation of the algerian investment

plan in the railway sector technical support for tender documents, tender procedures and

management of the design contract technical support to design and project management technical support to supervision of work and management of

construction contracts. training of ANESRIF staff

Specific projects developed: feasibility study for the choice of the electrification system of the railway

« Rocade Nord » (1220 km of length at 160/220 km/h) feasibility study about high speed railway from Est to West of Algeria

(length of 1200 km at 350 km/h)

Client: ANESRIF (Agence Nationale d’Etudes et de Suivi de la réalisation des Investissements Ferroviaires)

Countries with permanent establishments and on going projects Countries with projects realized or on going

ALGERIA Technical Assistance Services

Page 40: Railway engineering in the experience of Italferr - … · Andrea Nardinocchi Technical Director Railway engineering in the experience of Italferr Milan, October 6th

Turkey Esenboga Airport Rail Link Project

Esenboga International Airport -Ankara Railway System Project – Preliminary and Detailed Design

14 miles (23 km) rail connection, including 8 intermediate Stations.

Feasibility Study: alternative rail transport systems analysis (metro, light rail train, monorail) alternative alignment study transport study economical and financial analysis

Environmental Study cartography geotechnical investigations preliminary and final design preparation of works tender documents

Client: General Directorate of Infrastructure Investments (DLH)

Countries with permanent establishments and on going projects Countries with projects realized or on going

Page 41: Railway engineering in the experience of Italferr - … · Andrea Nardinocchi Technical Director Railway engineering in the experience of Italferr Milan, October 6th

Andrea Nardinocchi

[email protected]

http://www.italferr.it/ifer-en