Date post: | 05-Dec-2014 |
Category: |
Education |
Upload: | sandip-murari |
View: | 1,323 times |
Download: | 7 times |
Railway Reservation System
PROJECT MEMBERS OF THE RAILWAY RESERVATION
SYSTEM
Soumya Dutta
Joydip Deb Sandip Murari
CERTIFICATE
This is to certify that the following students have completed the project Railway Reservation System under the guidance of Mr. Samiran
Mandal for the fulfillment of Minor Project as prescribed by West Bengal University of
Technology in the academic year 2013-2014 for the course Bachelor of Computer Application.
Name of Student College Roll No University Roll No
Joydip Deb 24 1150 1211 021
Sandip Murari 38 1150 1211 036
Soumya Dutta 49 1150 1211 046
ACKNOWLEDGEMENT We have come to know about many things while
completing this project and we are really thankful to our respected teacher Mr. Samiran Mandal without whose guidance our project would have been incomplete and imperfect.
We are also thankful to Mr. Suman Chakraborty (FACULTY MEMBER, B.C.A, BPPIMT), Md. Sadiqur Rahaman (HOD, B.C.A, BPPIMT), Mr. Partha Sen (Technical Stuff , B.C.A, BPPIMT), who have always encouraged us to do the project and helped us in various aspects of the project.
IndexCONTENT SLIDE NO
Introduction 6
Objective 7
Description 8
Hardware Specification 9
Software Specification 10
Modular Description 11
Data Flow Diagram 12
Flow Chart 15
Entity Relationship Diagram 18
Feasibility Study 19
Testing 20
Screenshots 21
References 23
INTRODUCTION TO PROJECTThe project railway reservation system aims to
provide a mechanism for the railway management to deal with number of tasks efficiently using this system
There are three basic tasks performed under this system
1. RESERVATION MANAGEMENT2. FARE MANAGEMENT3. TIMETABLE MANAGEMENT
OBJECTIVE OF PROJECT The objective of railway reservation system
is to give structural design to railway system The project provides functionality and
flexibility to railway system such that one can operate that system easily and efficiently.
This project also provides a complete set of solutions for some common and specific area as of work in the railways
PROJECT DESCRIPTION1. Searching of the trains is so easy
2. Provides fare tables for passengers
3. Reduce the possibility to make mistake.
4. Reservation can be done very easily
Hardware SpecificationPROCESSOR : Pentium IV processor or
Greater RAM : 128 Mega Byte (MB) or Greater
HARDDISK : 160 Giga Byte (GB) or GreaterKeyboard & Mouse
MONITOR : Colour (For Best Result) Printer
SOFTWARE SPECIFICATION
Operating System : Windows 2000/ xp /7
Front-End : vb 6.0 Back-end : Ms access 2007
MODULAR DESCRIPTION RESERVATION FORM
� CANCELLATION FORM
FARE RECORDS �
TRAIN ENQUIRY
RESERVATION ENQUIRY �
SEAT DETAILS
Level 0 DFD Or Context Free Diagram
Level 1 DFD
Level 2 DFD
INPUT Flow Chart
Output Flow Chart
Report Flow Chart
Entity Relationship Diagram
Feasibility StudyAs a software needs to be verified as a feasible one, our
software has undergone the underlying feasibility studies and it fulfills the demand of all the feasibility studies.
1 . Legal Feasibility : To verify whether it has any legally issues.2. Operational Feasibility : To see how system solves the problems, takes advantage of the opportunities and satisfies the requirements.
3. Economic Feasibility : To see the economic benefits to the organization provided by the
program.4. Technical Feasibility : To see whether the program has any technical fault.
TestingWe have done several Software testing to verify the quality of our product.
1. White-Box testing : To test internal structures or workings of the program.
2. Black-box testing : To examine functionality of the program 3. Alpha Testing : This is done by our team to test the functionality.
4. Beta Testing : An external group of people were given the product to use, and later took their reviews.
• Applied Tests
Database Screenshot
Program Screenshots
REFERENCES
WEBSITES
BOOKS
• www.google.com• www.wikipedia.org• www.indianrail.gov.in
• Mastering Visual Basic 6 by Evangelos Petroutsos
Thank you