+ All Categories
Home > Education > Railway reservation management by sandip murari

Railway reservation management by sandip murari

Date post: 05-Dec-2014
Category:
Upload: sandip-murari
View: 1,323 times
Download: 7 times
Share this document with a friend
Description:
 
24
Railway Reservation System
Transcript
Page 1: Railway reservation management by sandip murari

Railway Reservation System

Page 2: Railway reservation management by sandip murari

PROJECT MEMBERS OF THE RAILWAY RESERVATION

SYSTEM

Soumya Dutta

Joydip Deb Sandip Murari

Page 3: Railway reservation management by sandip murari

CERTIFICATE

This is to certify that the following students have completed the project Railway Reservation System under the guidance of Mr. Samiran

Mandal for the fulfillment of Minor Project as prescribed by West Bengal University of

Technology in the academic year 2013-2014 for the course Bachelor of Computer Application.

Name of Student College Roll No University Roll No

Joydip Deb 24 1150 1211 021

Sandip Murari 38 1150 1211 036

Soumya Dutta 49 1150 1211 046

Page 4: Railway reservation management by sandip murari

ACKNOWLEDGEMENT We have come to know about many things while

completing this project and we are really thankful to our respected teacher Mr. Samiran Mandal without whose guidance our project would have been incomplete and imperfect.

We are also thankful to Mr. Suman Chakraborty (FACULTY MEMBER, B.C.A, BPPIMT), Md. Sadiqur Rahaman (HOD, B.C.A, BPPIMT), Mr. Partha Sen (Technical Stuff , B.C.A, BPPIMT), who have always encouraged us to do the project and helped us in various aspects of the project.

Page 5: Railway reservation management by sandip murari

IndexCONTENT SLIDE NO

Introduction 6

Objective 7

Description 8

Hardware Specification 9

Software Specification 10

Modular Description 11

Data Flow Diagram 12

Flow Chart 15

Entity Relationship Diagram 18

Feasibility Study 19

Testing 20

Screenshots 21

References 23

Page 6: Railway reservation management by sandip murari

INTRODUCTION TO PROJECTThe project railway reservation system aims to

provide a mechanism for the railway management to deal with number of tasks efficiently using this system

There are three basic tasks performed under this system

1. RESERVATION MANAGEMENT2. FARE MANAGEMENT3. TIMETABLE MANAGEMENT

Page 7: Railway reservation management by sandip murari

OBJECTIVE OF PROJECT The objective of railway reservation system

is to give structural design to railway system The project provides functionality and

flexibility to railway system such that one can operate that system easily and efficiently.

This project also provides a complete set of solutions for some common and specific area as of work in the railways

Page 8: Railway reservation management by sandip murari

PROJECT DESCRIPTION1. Searching of the trains is so easy

2. Provides fare tables for passengers

3. Reduce the possibility to make mistake.

4. Reservation can be done very easily

Page 9: Railway reservation management by sandip murari

Hardware SpecificationPROCESSOR : Pentium IV processor or

Greater RAM : 128 Mega Byte (MB) or Greater

HARDDISK  : 160 Giga Byte (GB) or GreaterKeyboard & Mouse

MONITOR : Colour (For Best Result) Printer

Page 10: Railway reservation management by sandip murari

SOFTWARE SPECIFICATION

Operating System : Windows 2000/ xp /7

Front-End : vb 6.0 Back-end : Ms access 2007

Page 11: Railway reservation management by sandip murari

MODULAR DESCRIPTION RESERVATION FORM

� CANCELLATION FORM

FARE RECORDS �

TRAIN ENQUIRY

RESERVATION ENQUIRY �

SEAT DETAILS

Page 12: Railway reservation management by sandip murari

Level 0 DFD Or Context Free Diagram

Page 13: Railway reservation management by sandip murari

Level 1 DFD

Page 14: Railway reservation management by sandip murari

Level 2 DFD

Page 15: Railway reservation management by sandip murari

INPUT Flow Chart

Page 16: Railway reservation management by sandip murari

Output Flow Chart

Page 17: Railway reservation management by sandip murari

Report Flow Chart

Page 18: Railway reservation management by sandip murari

Entity Relationship Diagram

Page 19: Railway reservation management by sandip murari

Feasibility StudyAs a software needs to be verified as a feasible one, our

software has undergone the underlying feasibility studies and it fulfills the demand of all the feasibility studies.

1 . Legal Feasibility : To verify whether it has any legally issues.2. Operational Feasibility : To see how  system solves the problems, takes advantage of the opportunities and satisfies the requirements.

3. Economic Feasibility : To see the economic benefits to the organization provided by the

program.4. Technical Feasibility : To see whether the program has any technical fault.

Page 20: Railway reservation management by sandip murari

TestingWe have done several Software testing to verify the quality of our product.

1. White-Box testing : To test internal structures or workings of the program.

2. Black-box testing : To examine functionality of the program 3. Alpha Testing : This is done by our team to test the functionality.

4. Beta Testing : An external group of people were given the product to use, and later took their reviews.

• Applied Tests

Page 21: Railway reservation management by sandip murari

Database Screenshot

Page 22: Railway reservation management by sandip murari

Program Screenshots

Page 23: Railway reservation management by sandip murari

REFERENCES

WEBSITES

BOOKS

• www.google.com• www.wikipedia.org• www.indianrail.gov.in

• Mastering Visual Basic 6 by Evangelos Petroutsos

Page 24: Railway reservation management by sandip murari

Thank you


Recommended