  • 8/10/2019 Railway Track Crack Detection

    1/24

    RAILWAY TRACK CRACK DETECTION

    Bhavana Harikoti

    Raghuveer.CH Manoj

  • 8/10/2019 Railway Track Crack Detection

    2/24

    Transport has throughout history been a spur to expansion as bettertransport leads to more trade.Economic prosperity has always been dependent on increasing thecapacity and rationality of transport.

  • 8/10/2019 Railway Track Crack Detection

    3/24

    ACCIDENTS DUE TO RAIL DERAILMENT

    The Indian Railways today has 113,617 kilometers (70,598 mi).of total trackover a route of 63,974 kilometers (39,752 mi) and 7,083 stations. It has the

    world's fourth largest railway network after those of the United States, Russiaand China. The railways traverse the length and breadth of the country and

    carry over 30 million passengers and 2.8 million tons of freight car.

  • 8/10/2019 Railway Track Crack Detection

    4/24

    Previous Methods

    Visual Inspections:-

    Not possible in INDIA.Ultrasonic Inspection:-Ultrasonic can only inspect the core of materials; that is,

    the method cannot check for surface and near-surface cracking where many of the faults are located

    Eddy Current Inspection:-

    Eddy currents are used to tide over this limitation associated with ultrasonics. They are effectively used to check for crackslocated at the surface of metals such as rails.

  • 8/10/2019 Railway Track Crack Detection

    5/24

    Magnetic Particle Inspection(MPI):-MPI is also used in the rail industry but there are anumber of problems inherent with this technique, someof which are mentioned below: Surface of the rail or component must first be cleaned

    of all coatings, rust and so on. To get a sensitive reading, contrast paint must first be

    applied to the rail, followed by the

    magnetic particle coating. The same inspection must then be carried out in twodifferent directions at a very slow overallspeed.

    Previous methods

  • 8/10/2019 Railway Track Crack Detection

    6/24

    COMPONENTS REQUIRED

    HARDWARE REQUIRED

    Transformer Bridge Rectifier Capacitor Regulator 8051 Microcontroller LDR Resisitors DC motor LED

    SOFTWARE REQUIRED

    KEIL SOFTWARE.

  • 8/10/2019 Railway Track Crack Detection

    7/24

    Light Dependent resistor(LDR)

  • 8/10/2019 Railway Track Crack Detection

    8/24

    LDR properties

    LDRs are light dependent

    devices whose R decreases whenlight falls on them andincreases in the dark.

    When a LDR is kept in

    dark, its resistance is veryhigh. This resistance iscalled as dark resistance.It can be as high as 1012. And if the device isallowed to absorb lightits R willdecreasedrastically.Ifconstant voltage is applied toit and intensity of light isincreasedthe current startsincreasing.

  • 8/10/2019 Railway Track Crack Detection

    9/24

    TRANSFORMER

    A transformer can be defined as a

    static device which helps in thetransformation of electric powerin one circuit to electric power ofthe same frequency in anothercircuit. The voltage can be raised

    or lowered in a circuit, but with aproportional increase or decreasein the current ratings.

  • 8/10/2019 Railway Track Crack Detection

    10/24

  • 8/10/2019 Railway Track Crack Detection

    11/24

    CAPACITOR A capacitor (originallyknown as a condenser )is a passive two-terminal electricalcomponent used tostore energy electrostatically in an electric field.The forms of practicalcapacitors vary widely,but all contain at leasttwo electricalconductors(plates)

    separated bya dielectric (i.e. insulator). The conductors can bethin films, foils orsintered beads of metalor conductive electrolyte,etc

  • 8/10/2019 Railway Track Crack Detection

    12/24

    REGULATOR A voltage regulator is

    designed to automaticallymaintain a constant voltage level. Electronic voltage regulators are foundin devices such as

    computer powersupplies where they stabilizethe DC voltages used by theprocessor and otherelements. Inautomobilealternators andcentral powerstation generator plants, voltage regulators controlthe output of the plant. Inan electric power

    distribution system.

    8051

  • 8/10/2019 Railway Track Crack Detection

    13/24

    8051MICROCONTROLL

    ER

  • 8/10/2019 Railway Track Crack Detection

    14/24

    Resistor is an

    electrical componentthat reduces theelectric current.The resistor's ability

    to reduce the currentis called resistanceand is measured inunits of ohms(symbol: ). If we make ananalogy to water flowthrough pipes, theresistor is a thin pipethat reduces the

  • 8/10/2019 Railway Track Crack Detection

    15/24

    Light Emitting Diode(LED)

    LEDs, or light emitting diodes, aresemiconductordevices that produce visible light when an

    electrical current ispassed throughthem. LEDs are atype of Solid State

    Lighting (SSL), as areorganic light emitting diodes(OLEDs) and light emitting polymers(LEPs).

  • 8/10/2019 Railway Track Crack Detection

    16/24

  • 8/10/2019 Railway Track Crack Detection

    17/24

  • 8/10/2019 Railway Track Crack Detection

    18/24

    CIRCUIT DIAGRAM

  • 8/10/2019 Railway Track Crack Detection

    19/24

    PRACTICAL KIT PHOTO

  • 8/10/2019 Railway Track Crack Detection

    20/24

    Embedded C programspecifically showing

    THRESHOLD values

  • 8/10/2019 Railway Track Crack Detection

    21/24

    ADVANTAGES

    It reduces manpower.

    Crack detecting efficiency is high.

    Accuracy is high.

    It consumes very low power for entire device.

    Lost cost and simple structure.

  • 8/10/2019 Railway Track Crack Detection

    22/24

    Future Aspects

  • 8/10/2019 Railway Track Crack Detection

    23/24

    CONCLUSION

    The project AUTOMATIC BROKEN TRACK DETECTIONUSING LED-LDR ASSEMBLY has been successfully designed and tested. It has been developed by integrating features of all the

    hardware components used.Presence of every module has been reasoned out and placedcarefully thus contributing to thebest working of the unit.Using highly advanced ICs (LPC2148) and with the help ofgrowing technology theproject has been successfully implemented.