    Rapid EIA & EMP Report byGLOBAL EXPERTS, Bhubaneswar

    ForM/S Vedanta Aluminium Limited (VAL),

    Lanjigarh,

    Kalahandi,

    Orissa

    Expansion of Alumina Refinery from 1MMTPA to 6 MMTPA capacity

    Sitara D.

    2011 215 008

    M.E. Environmental Engg.

  • 7/28/2019 Rapid EIA report of an alumina refinery

    2/85

    General Introduction

    VAL Alumina Refinery: 1 MMTPA

    Expansion to 6 MMTPA

    Expand the capacity of aluminium smelter by 13.5 LTPA with

    Captive Power Plant of 5 x 135 MW (675 MW) capacity at

    Jharsuguda, Orissa.

    After expansion, the total capacity of smelter will be 16 LTPA and

    1350 MW CPP.

    Estimated cost, including environmental management of Rs. 593

    crores = Rs.6,500 crores

  • 7/28/2019 Rapid EIA report of an alumina refinery

    3/85

    Justification of the project

    More than 50 % of Indiasbauxite deposits Orissa (2

    BT)

    VAL to use Lanjigarh deposit

    of 75 MT (3.7 Km from

    plant)

    Agreement with Orissa

    Mining Corp. (OMC) for +

    150 MT

    Environmental Clearance isin advanced stage with

    MoEF

    VAL to be made world class

    refinery with best practices

    Category A project Sub-rule(3) of rule 5 of the

    Environmental(Protection)

    Rules 1986: Environmental

    Clearance (EC) from MoEF

    Purpose of the study

  • 7/28/2019 Rapid EIA report of an alumina refinery

    4/85

    LOCATION

    Within & adjacent to

    existing plant at

    Lanjigarh - Kalahandidistrict of Orissa.

    Nearest towns:

    Lanjigarhis 3.7km

    Bhawanipatna 65

    Km

    Road access: 6.5 Km

    Rail access from site

    21 Km Ambadola

    Airstrip: Utkala (80-

    km NW)

    Tel river: 67 km away.

  • 7/28/2019 Rapid EIA report of an alumina refinery

    5/85

    420 430 m above

    MSL

    Reserve Forests: 10 in

    no., 2 to 5 km distance

    each all directions

    Eco ~/ History/

    Defence/ industries:

    None in 10 km

    Coal: IB valley coalfield

    (MCL)

    Bauxite: 3.7 Km

    conveyor

    Lime: Katni / Jabalpur

    Topo sheet no. 65M/6/NE

  • 7/28/2019 Rapid EIA report of an alumina refinery

    6/85

    PURPOSE EXISTING (Ha) ADDITIONAL (Ha)

    Main Plant 279.87 140.84

    Red Mud 182.94 890.34

    Ash Pond 95.42 218.94

    Township 52.45 28.33

    Railway line 53.81 64.75

    TOTAL 664.49 1343.20

    The total area of the

    expanded Alumina

    Refinery will be

    2007.72 Ha

    No forest land will be

    utilized for the project.

    The additional land will

    be acquired through

    IDCO. The project site is

    mostly barren land.

    One third the area

    would be covered

    under Green Belt.

    LAND

    REQUIREMENT

  • 7/28/2019 Rapid EIA report of an alumina refinery

    7/85

    Energy requirement: Facility upgrade

    Calcination,boilers

    16000 tonsstorage

    Fuel oil

    Bauxitedigestion140oC

    Coal based co-

    generation 400 TPH

    2200 TPH

    Steam Final: 250 MW

    Steamturbine:

    3 X 25 MW+ (3 X 50MW & 2 X30 MW)

    3 X 287 TPHboilers + (5 x320 TPH)

    Electricity

  • 7/28/2019 Rapid EIA report of an alumina refinery

    8/85

    Water requirement

    Tel river 67 Kmaway

    Intake tower,Collection field, 2-stage pumpingfacility, 67-km

    pipeline of 700 mmdia., Intermediatepumping station @Lanjigarh Road - 32km from the plant.

    Expansion would bemet from the

    allocation alreadyavailable

    The approval fordrawing 56,500MTPD of water isalready available.

    Particulars Existing

    (m3/d)

    After expansion

    (m3/d)

    CGPP

    Boiler and Cooling tower 6665 29398

    Refinery And MinesCooling tower make-up

    and Process make-up

    5450 22541

    Dust Suppression system

    CGPP 480 831

    Refinery 180 300

    Domestic

    Onsite 120 180

    Township 2000 3000

    Total 14895 56250

  • 7/28/2019 Rapid EIA report of an alumina refinery

    9/85

    Process description: Bayer process

    NaOH

    Slaked lime

    Tri-Ca Aluminate

    Grinding:

    80 mm to D50 350 m (


Recommended