PROJECT: TEMPORARY WORKS CAMP & INFRASTRUCTURE WORKS, RAPID JOB SAFETY ANALYSIS PROJECT: TEMPORARY WORKS CAMP & INFRASTRUCTURE WORKS, RAPID ACTIVITY : Construction of U-Drain PREPARED BY : Chung May Lynn REV. NO : 00 REVIEWED BY : LOCATION : Package 20Ai DATE : PAGES : 1 of 14 APPROVED BY: No . Job sequence / Steps Probable Hazards Identified Consequences Risk Assessment Risk Control Responsibility P S Rati ng 1. Mobilization of plant and machineries to the site Movement of machinery/ contact with machinery Poor access to the designated working area Insufficie nt of traffic management equipment Serious injuries Fatality Property damage 3 4 12 Ensure traffic management in order with traffic controller assistance Ensure adequate working clearance space Competent machinery operator/ driver Apply vehicle, plant, equipment, machinery inspections Good physical condition of vehicle, plant, equipment, machinery Machinery must be inspected and approved before start work Machinery with valid Project Manager Construction Manager SH Officer/ Supervisor Traffic Management Officer / Supervisor Project Engineer Site Supervisor Machinery operator/ supplier Workers / helpers
Transcript
Page 1: Rapid p20ai Jsa Box Culvert

PROJECT: TEMPORARY WORKS CAMP & INFRASTRUCTURE WORKS, RAPID

JOB SAFETY ANALYSIS

PROJECT: TEMPORARY WORKS CAMP & INFRASTRUCTURE WORKS, RAPID

ACTIVITY : Construction of U-Drain PREPARED BY : Chung May Lynn

REV. NO : 00 REVIEWED BY :

LOCATION : Package 20Ai DATE : PAGES : 1 of 8 APPROVED BY:

No. Job sequence / Steps Probable Hazards Identified Consequences

Risk AssessmentRisk Control Responsibility

P S Rating1. Mobilization of plant and

machineries to the site Movement of

machinery/ contact with machinery

Poor access to the designated working area

Insufficient of traffic management equipment

Lifting materials using crane

Serious injuriesFatalityProperty damage

Struck by falling objects Struck by struck objectsCrane overturn

3

3

4

4

12

12

Ensure traffic management in order with traffic controller assistance

Ensure adequate working clearance space

Competent machinery operator/ driver

Apply vehicle, plant, equipment, machinery inspections

Good physical condition of vehicle, plant, equipment, machinery

Machinery must be inspected and approved before start work

Machinery with valid insurance coverage

Plant & machinery shall be equipped and comply with all authorities and client’s requirement

Ensure Safe Working Load is followed

Loads slung correctly Personnel kept clear during crane

operation Apply PTW

Operators shall have valid license/

Project Manager Construction Manager SH Officer/ Supervisor Traffic Management

Officer / Supervisor Project Engineer Site Supervisor Machinery operator/

supplier Workers / helpers

Page 2: Rapid p20ai Jsa Box Culvert

PROJECT: TEMPORARY WORKS CAMP & INFRASTRUCTURE WORKS, RAPID

JOB SAFETY ANALYSIS

PROJECT: TEMPORARY WORKS CAMP & INFRASTRUCTURE WORKS, RAPID

ACTIVITY : Construction of U-Drain PREPARED BY : Chung May Lynn

REV. NO : 00 REVIEWED BY :

LOCATION : Package 20Ai DATE : PAGES : 2 of 8 APPROVED BY:

No. Job sequence / Steps Probable Hazards Identified Consequences

Risk AssessmentRisk Control Responsibility

P S Rating Incompetent

machinery operator

Serious injuriesFatalityProperty damage

4 4 16 competency Operator shall have proper training

records Operator shall be physically and

mentally fit to perform works

Incompetent machinery operator

2. Delivery of work materials to site

Movement of machinery/ contact with machinery

Insufficient of traffic management equipment

Unloading / lifting materials using crane

Incompetent machinery operator

Serious injuriesFatalityProperty damage

Struck by falling objects Struck by struck objectsCrane overturn

Serious injuriesFatalityProperty damage

3

3

4

4

4

4

12

12

16

Ensure traffic management in order with traffic controller assistance

Ensure adequate working clearance space

Ensure Safe Working is followed Loads slung correctly Personnel kept clear during crane

operation Apply PTW

Operators shall have valid license/ competency

Operator shall have proper training records

Operator shall be physically and mentally fit to perform works

Project Manager Construction Manager SH Officer/ Supervisor Traffic Management

Officer / Supervisor Site Supervisor

Machinery operator/ supplier

Incompetent machinery operator

3. Preliminary Survey Movement of vehicles /

Serious injuriesFatality

4 4 16 Wear high visibility vest with reflector

Project Manager Construction Manager

Page 3: Rapid p20ai Jsa Box Culvert

PROJECT: TEMPORARY WORKS CAMP & INFRASTRUCTURE WORKS, RAPID

JOB SAFETY ANALYSIS

PROJECT: TEMPORARY WORKS CAMP & INFRASTRUCTURE WORKS, RAPID

ACTIVITY : Construction of U-Drain PREPARED BY : Chung May Lynn

REV. NO : 00 REVIEWED BY :

LOCATION : Package 20Ai DATE : PAGES : 3 of 8 APPROVED BY:

No. Job sequence / Steps Probable Hazards Identified Consequences

Risk AssessmentRisk Control Responsibility

P S Ratingtraffic along highway / road

Biological hazard (bitten by fauna)

Strike by lightning

Serious injuriesFatality

4 3 12

Walking facing incoming traffic flow / inside guard rail

Placement of traffic / warning signage

Apply and obtain PTW prior to work Practice buddy system (min of 2

persons) Standby emergency facility/ vehicle Notify respective person in charge

(ie Project Manager) before start work

Stop work during bad weather Provide proper and safe rest area

SH Officer/ Supervisor Traffic Management

Officer / Supervisor Project Engineer Site Supervisor Surveyor Workers / helpers

4. Excavation Works Contact with existing utilities/ services

Serious injuriesFatalityProperty damage

4 2 8 To perform mapping and marking of utilities area

Obtain approval from utilities provider/ owner before start work

If necessary relocation of utilities are carried out

Project Manager Construction Manager SH Officer/ Supervisor Project Engineer Site Supervisor Machinery operator Workers / helpers

Movement of machinery/ contact with

Serious injuriesFatalityProperty damage

3 4 12 Ensure traffic management in order with traffic controller assistance

Ensure adequate working clearance

Project Manager Construction Manager SH Officer/ Supervisor

Page 4: Rapid p20ai Jsa Box Culvert

PROJECT: TEMPORARY WORKS CAMP & INFRASTRUCTURE WORKS, RAPID

JOB SAFETY ANALYSIS

PROJECT: TEMPORARY WORKS CAMP & INFRASTRUCTURE WORKS, RAPID

ACTIVITY : Construction of U-Drain PREPARED BY : Chung May Lynn

REV. NO : 00 REVIEWED BY :

LOCATION : Package 20Ai DATE : PAGES : 4 of 8 APPROVED BY:

No. Job sequence / Steps Probable Hazards Identified Consequences

Risk AssessmentRisk Control Responsibility

P S Ratingmachinery space

Competent machinery operator/ driver

Apply PTW Machinery must be inspected and

approved before start work Machinery with valid insurance

coverage machinery shall be equipped and

comply with all authorities and client’s requirement

Traffic Management Officer / Supervisor

Project Engineer Site Supervisor Machinery operator Workers / helpers

Inadequate machinery for excavation

Serious injuriesFatalityProperty damage

3 4 12 Ensure machinery do not carry out work more than its capacity

Competent machinery operator

Site Supervisor Machinery operator

Fall of person into excavation pit/ area

InjuryFatality

3 4 12 Installation of safety barrier surrounding excavation area for depth >1.0m

Put up safety / warning signage Excavation shall be consider as

restricted work area

Project Manager Construction Manager SH Officer/ Supervisor Project Engineer Site Supervisor

Failure of excavate slope

Engulfment hazardTopple of machinery

4 4 16 Ensure safe degree of slope cutting/ platform

Deep excavation shall provide temporary work ie shoring

Safe distance from machinery to

Project Manager Construction Manager SH Officer/ Supervisor Project Engineer Site Supervisor

Page 5: Rapid p20ai Jsa Box Culvert

PROJECT: TEMPORARY WORKS CAMP & INFRASTRUCTURE WORKS, RAPID

JOB SAFETY ANALYSIS

PROJECT: TEMPORARY WORKS CAMP & INFRASTRUCTURE WORKS, RAPID

ACTIVITY : Construction of U-Drain PREPARED BY : Chung May Lynn

REV. NO : 00 REVIEWED BY :

LOCATION : Package 20Ai DATE : PAGES : 5 of 8 APPROVED BY:

No. Job sequence / Steps Probable Hazards Identified Consequences

Risk AssessmentRisk Control Responsibility

P S Ratingexcavated area

Excavated earth to be pile minimum of 3m from the slope

Machinery shall be sit on top of steel plate when perform works at weak GROUND

To properly level the ground before machinery start excavation works

Machinery operator Workers / helpers

5. Laying of bedding materials

Movement of machinery/ contact with machinery

Serious injuriesFatality

3 4 12 Ensure traffic management in order with traffic controller assistance

Ensure adequate working clearance space

Competent machinery operator Apply PTW Machinery must be inspected and

approved before start work Machinery with valid insurance

coverage machinery shall be equipped and

comply with all authorities and client’s requirement

Project Manager Construction Manager SH Officer/ Supervisor Traffic Management

Officer / Supervisor Project Engineer Site Supervisor Machinery operator Workers / helpers

Page 6: Rapid p20ai Jsa Box Culvert

PROJECT: TEMPORARY WORKS CAMP & INFRASTRUCTURE WORKS, RAPID

JOB SAFETY ANALYSIS

PROJECT: TEMPORARY WORKS CAMP & INFRASTRUCTURE WORKS, RAPID

ACTIVITY : Construction of U-Drain PREPARED BY : Chung May Lynn

REV. NO : 00 REVIEWED BY :

LOCATION : Package 20Ai DATE : PAGES : 6 of 8 APPROVED BY:

No. Job sequence / Steps Probable Hazards Identified Consequences

Risk AssessmentRisk Control Responsibility

P S Rating Inadequate

machinery for excavation

Serious injuriesFatalityProperty damage

3 4 12 Ensure machinery do not carry out work more than its capacity

Competent machinery operator

Site Supervisor Machinery operator

Fall of person into excavation pit/ area

InjuryFatality

3 4 12 Installation of safety barrier surrounding excavation area for depth >1.0m

Put up safety / warning signage Excavation shall be consider as

restricted work area

Project Manager Construction Manager SH Officer/ Supervisor Project Engineer Site Supervisor

6. Installation of U-Drain Lifting materials using crane

Struck by falling objects Struck by struck objects

3 4 12 Ensure Safe Working Load is followed

Loads slung correctly Personnel kept clear during crane

operation

Project Manager Construction Manager SH Officer/ Supervisor Project Engineer Site Supervisor Machinery operator

Movement of machinery/ contact with machinery

Serious injuriesFatality

3 4 12 Ensure traffic management in order with traffic controller assistance

Ensure adequate working clearance space

Competent machinery operator Apply PTW Machinery must be inspected and

Project Manager Construction Manager SH Officer/ Supervisor Traffic Management

Officer / Supervisor Project Engineer Site Supervisor

Page 7: Rapid p20ai Jsa Box Culvert

PROJECT: TEMPORARY WORKS CAMP & INFRASTRUCTURE WORKS, RAPID

JOB SAFETY ANALYSIS

PROJECT: TEMPORARY WORKS CAMP & INFRASTRUCTURE WORKS, RAPID

ACTIVITY : Construction of U-Drain PREPARED BY : Chung May Lynn

REV. NO : 00 REVIEWED BY :

LOCATION : Package 20Ai DATE : PAGES : 7 of 8 APPROVED BY:

No. Job sequence / Steps Probable Hazards Identified Consequences

Risk AssessmentRisk Control Responsibility

P S Ratingapproved before start work

Machinery with valid insurance coverage

machinery shall be equipped and comply with all authorities and client’s requirement

Machinery operator Workers / helpers

Fall of person into excavation pit/ area

InjuryFatality

3 4 12 Installation of safety barrier surrounding excavation area for depth >1.0m

Put up safety / warning signage Excavation shall be consider as

restricted work area

Project Manager Construction Manager SH Officer/ Supervisor Project Engineer Site Supervisor

7. Backfilling Movement of machinery/ contact with machinery

Serious injuriesFatality

3 4 12 Ensure traffic management in order with traffic controller assistance

Ensure adequate working clearance space

Competent machinery operator Apply PTW Machinery must be inspected and

approved before start work Machinery with valid insurance

coverage machinery shall be equipped and

comply with all authorities and client’s requirement

Project Manager Construction Manager SH Officer/ Supervisor Traffic Management

Officer / Supervisor Project Engineer Site Supervisor Machinery operator Workers / helpers

Page 8: Rapid p20ai Jsa Box Culvert

PROJECT: TEMPORARY WORKS CAMP & INFRASTRUCTURE WORKS, RAPID

JOB SAFETY ANALYSIS

PROJECT: TEMPORARY WORKS CAMP & INFRASTRUCTURE WORKS, RAPID

ACTIVITY : Construction of U-Drain PREPARED BY : Chung May Lynn

REV. NO : 00 REVIEWED BY :

LOCATION : Package 20Ai DATE : PAGES : 8 of 8 APPROVED BY:

No. Job sequence / Steps Probable Hazards Identified Consequences

Risk AssessmentRisk Control Responsibility

P S Rating Fall of person

into excavation pit/ area

InjuryFatality

3 4 12 Installation of safety barrier surrounding excavation area for depth >1.0m

Put up safety / warning signage Excavation shall be consider as

restricted work area

Project Manager Construction Manager SH Officer/ Supervisor Project Engineer Site Supervisor