PROJECT: TEMPORARY WORKS CAMP & INFRASTRUCTURE WORKS, RAPID
JOB SAFETY ANALYSIS
PROJECT: TEMPORARY WORKS CAMP & INFRASTRUCTURE WORKS, RAPID
ACTIVITY : Construction of U-Drain PREPARED BY : Chung May Lynn
REV. NO : 00 REVIEWED BY :
LOCATION : Package 20Ai DATE : PAGES : 1 of 8 APPROVED BY:
No. Job sequence / Steps Probable Hazards Identified Consequences
Risk AssessmentRisk Control Responsibility
P S Rating1. Mobilization of plant and
machineries to the site Movement of
machinery/ contact with machinery
Poor access to the designated working area
Insufficient of traffic management equipment
Lifting materials using crane
Serious injuriesFatalityProperty damage
Struck by falling objects Struck by struck objectsCrane overturn
3
3
4
4
12
12
Ensure traffic management in order with traffic controller assistance
Ensure adequate working clearance space
Competent machinery operator/ driver
Apply vehicle, plant, equipment, machinery inspections
Good physical condition of vehicle, plant, equipment, machinery
Machinery must be inspected and approved before start work
Machinery with valid insurance coverage
Plant & machinery shall be equipped and comply with all authorities and client’s requirement
Ensure Safe Working Load is followed
Loads slung correctly Personnel kept clear during crane
operation Apply PTW
Operators shall have valid license/
Project Manager Construction Manager SH Officer/ Supervisor Traffic Management
Officer / Supervisor Project Engineer Site Supervisor Machinery operator/
supplier Workers / helpers
PROJECT: TEMPORARY WORKS CAMP & INFRASTRUCTURE WORKS, RAPID
JOB SAFETY ANALYSIS
PROJECT: TEMPORARY WORKS CAMP & INFRASTRUCTURE WORKS, RAPID
ACTIVITY : Construction of U-Drain PREPARED BY : Chung May Lynn
REV. NO : 00 REVIEWED BY :
LOCATION : Package 20Ai DATE : PAGES : 2 of 8 APPROVED BY:
No. Job sequence / Steps Probable Hazards Identified Consequences
Risk AssessmentRisk Control Responsibility
P S Rating Incompetent
machinery operator
Serious injuriesFatalityProperty damage
4 4 16 competency Operator shall have proper training
records Operator shall be physically and
mentally fit to perform works
Incompetent machinery operator
2. Delivery of work materials to site
Movement of machinery/ contact with machinery
Insufficient of traffic management equipment
Unloading / lifting materials using crane
Incompetent machinery operator
Serious injuriesFatalityProperty damage
Struck by falling objects Struck by struck objectsCrane overturn
Serious injuriesFatalityProperty damage
3
3
4
4
4
4
12
12
16
Ensure traffic management in order with traffic controller assistance
Ensure adequate working clearance space
Ensure Safe Working is followed Loads slung correctly Personnel kept clear during crane
operation Apply PTW
Operators shall have valid license/ competency
Operator shall have proper training records
Operator shall be physically and mentally fit to perform works
Project Manager Construction Manager SH Officer/ Supervisor Traffic Management
Officer / Supervisor Site Supervisor
Machinery operator/ supplier
Incompetent machinery operator
3. Preliminary Survey Movement of vehicles /
Serious injuriesFatality
4 4 16 Wear high visibility vest with reflector
Project Manager Construction Manager
PROJECT: TEMPORARY WORKS CAMP & INFRASTRUCTURE WORKS, RAPID
JOB SAFETY ANALYSIS
PROJECT: TEMPORARY WORKS CAMP & INFRASTRUCTURE WORKS, RAPID
ACTIVITY : Construction of U-Drain PREPARED BY : Chung May Lynn
REV. NO : 00 REVIEWED BY :
LOCATION : Package 20Ai DATE : PAGES : 3 of 8 APPROVED BY:
No. Job sequence / Steps Probable Hazards Identified Consequences
Risk AssessmentRisk Control Responsibility
P S Ratingtraffic along highway / road
Biological hazard (bitten by fauna)
Strike by lightning
Serious injuriesFatality
4 3 12
Walking facing incoming traffic flow / inside guard rail
Placement of traffic / warning signage
Apply and obtain PTW prior to work Practice buddy system (min of 2
persons) Standby emergency facility/ vehicle Notify respective person in charge
(ie Project Manager) before start work
Stop work during bad weather Provide proper and safe rest area
SH Officer/ Supervisor Traffic Management
Officer / Supervisor Project Engineer Site Supervisor Surveyor Workers / helpers
4. Excavation Works Contact with existing utilities/ services
Serious injuriesFatalityProperty damage
4 2 8 To perform mapping and marking of utilities area
Obtain approval from utilities provider/ owner before start work
If necessary relocation of utilities are carried out
Project Manager Construction Manager SH Officer/ Supervisor Project Engineer Site Supervisor Machinery operator Workers / helpers
Movement of machinery/ contact with
Serious injuriesFatalityProperty damage
3 4 12 Ensure traffic management in order with traffic controller assistance
Ensure adequate working clearance
Project Manager Construction Manager SH Officer/ Supervisor
PROJECT: TEMPORARY WORKS CAMP & INFRASTRUCTURE WORKS, RAPID
JOB SAFETY ANALYSIS
PROJECT: TEMPORARY WORKS CAMP & INFRASTRUCTURE WORKS, RAPID
ACTIVITY : Construction of U-Drain PREPARED BY : Chung May Lynn
REV. NO : 00 REVIEWED BY :
LOCATION : Package 20Ai DATE : PAGES : 4 of 8 APPROVED BY:
No. Job sequence / Steps Probable Hazards Identified Consequences
Risk AssessmentRisk Control Responsibility
P S Ratingmachinery space
Competent machinery operator/ driver
Apply PTW Machinery must be inspected and
approved before start work Machinery with valid insurance
coverage machinery shall be equipped and
comply with all authorities and client’s requirement
Traffic Management Officer / Supervisor
Project Engineer Site Supervisor Machinery operator Workers / helpers
Inadequate machinery for excavation
Serious injuriesFatalityProperty damage
3 4 12 Ensure machinery do not carry out work more than its capacity
Competent machinery operator
Site Supervisor Machinery operator
Fall of person into excavation pit/ area
InjuryFatality
3 4 12 Installation of safety barrier surrounding excavation area for depth >1.0m
Put up safety / warning signage Excavation shall be consider as
restricted work area
Project Manager Construction Manager SH Officer/ Supervisor Project Engineer Site Supervisor
Failure of excavate slope
Engulfment hazardTopple of machinery
4 4 16 Ensure safe degree of slope cutting/ platform
Deep excavation shall provide temporary work ie shoring
Safe distance from machinery to
Project Manager Construction Manager SH Officer/ Supervisor Project Engineer Site Supervisor
PROJECT: TEMPORARY WORKS CAMP & INFRASTRUCTURE WORKS, RAPID
JOB SAFETY ANALYSIS
PROJECT: TEMPORARY WORKS CAMP & INFRASTRUCTURE WORKS, RAPID
ACTIVITY : Construction of U-Drain PREPARED BY : Chung May Lynn
REV. NO : 00 REVIEWED BY :
LOCATION : Package 20Ai DATE : PAGES : 5 of 8 APPROVED BY:
No. Job sequence / Steps Probable Hazards Identified Consequences
Risk AssessmentRisk Control Responsibility
P S Ratingexcavated area
Excavated earth to be pile minimum of 3m from the slope
Machinery shall be sit on top of steel plate when perform works at weak GROUND
To properly level the ground before machinery start excavation works
Machinery operator Workers / helpers
5. Laying of bedding materials
Movement of machinery/ contact with machinery
Serious injuriesFatality
3 4 12 Ensure traffic management in order with traffic controller assistance
Ensure adequate working clearance space
Competent machinery operator Apply PTW Machinery must be inspected and
approved before start work Machinery with valid insurance
coverage machinery shall be equipped and
comply with all authorities and client’s requirement
Project Manager Construction Manager SH Officer/ Supervisor Traffic Management
Officer / Supervisor Project Engineer Site Supervisor Machinery operator Workers / helpers
PROJECT: TEMPORARY WORKS CAMP & INFRASTRUCTURE WORKS, RAPID
JOB SAFETY ANALYSIS
PROJECT: TEMPORARY WORKS CAMP & INFRASTRUCTURE WORKS, RAPID
ACTIVITY : Construction of U-Drain PREPARED BY : Chung May Lynn
REV. NO : 00 REVIEWED BY :
LOCATION : Package 20Ai DATE : PAGES : 6 of 8 APPROVED BY:
No. Job sequence / Steps Probable Hazards Identified Consequences
Risk AssessmentRisk Control Responsibility
P S Rating Inadequate
machinery for excavation
Serious injuriesFatalityProperty damage
3 4 12 Ensure machinery do not carry out work more than its capacity
Competent machinery operator
Site Supervisor Machinery operator
Fall of person into excavation pit/ area
InjuryFatality
3 4 12 Installation of safety barrier surrounding excavation area for depth >1.0m
Put up safety / warning signage Excavation shall be consider as
restricted work area
Project Manager Construction Manager SH Officer/ Supervisor Project Engineer Site Supervisor
6. Installation of U-Drain Lifting materials using crane
Struck by falling objects Struck by struck objects
3 4 12 Ensure Safe Working Load is followed
Loads slung correctly Personnel kept clear during crane
operation
Project Manager Construction Manager SH Officer/ Supervisor Project Engineer Site Supervisor Machinery operator
Movement of machinery/ contact with machinery
Serious injuriesFatality
3 4 12 Ensure traffic management in order with traffic controller assistance
Ensure adequate working clearance space
Competent machinery operator Apply PTW Machinery must be inspected and
Project Manager Construction Manager SH Officer/ Supervisor Traffic Management
Officer / Supervisor Project Engineer Site Supervisor
PROJECT: TEMPORARY WORKS CAMP & INFRASTRUCTURE WORKS, RAPID
JOB SAFETY ANALYSIS
PROJECT: TEMPORARY WORKS CAMP & INFRASTRUCTURE WORKS, RAPID
ACTIVITY : Construction of U-Drain PREPARED BY : Chung May Lynn
REV. NO : 00 REVIEWED BY :
LOCATION : Package 20Ai DATE : PAGES : 7 of 8 APPROVED BY:
No. Job sequence / Steps Probable Hazards Identified Consequences
Risk AssessmentRisk Control Responsibility
P S Ratingapproved before start work
Machinery with valid insurance coverage
machinery shall be equipped and comply with all authorities and client’s requirement
Machinery operator Workers / helpers
Fall of person into excavation pit/ area
InjuryFatality
3 4 12 Installation of safety barrier surrounding excavation area for depth >1.0m
Put up safety / warning signage Excavation shall be consider as
restricted work area
Project Manager Construction Manager SH Officer/ Supervisor Project Engineer Site Supervisor
7. Backfilling Movement of machinery/ contact with machinery
Serious injuriesFatality
3 4 12 Ensure traffic management in order with traffic controller assistance
Ensure adequate working clearance space
Competent machinery operator Apply PTW Machinery must be inspected and
approved before start work Machinery with valid insurance
coverage machinery shall be equipped and
comply with all authorities and client’s requirement
Project Manager Construction Manager SH Officer/ Supervisor Traffic Management
Officer / Supervisor Project Engineer Site Supervisor Machinery operator Workers / helpers
PROJECT: TEMPORARY WORKS CAMP & INFRASTRUCTURE WORKS, RAPID
JOB SAFETY ANALYSIS
PROJECT: TEMPORARY WORKS CAMP & INFRASTRUCTURE WORKS, RAPID
ACTIVITY : Construction of U-Drain PREPARED BY : Chung May Lynn
REV. NO : 00 REVIEWED BY :
LOCATION : Package 20Ai DATE : PAGES : 8 of 8 APPROVED BY:
No. Job sequence / Steps Probable Hazards Identified Consequences
Risk AssessmentRisk Control Responsibility
P S Rating Fall of person
into excavation pit/ area
InjuryFatality
3 4 12 Installation of safety barrier surrounding excavation area for depth >1.0m
Put up safety / warning signage Excavation shall be consider as
restricted work area
Project Manager Construction Manager SH Officer/ Supervisor Project Engineer Site Supervisor