20
RAS/9/077: Supporting Regional Nuclear Emergency Preparedness and Response in the Member States of ASEAN Region BRUNEI DARUSSALAM Zubaidah Hj Mahmud Mohd Firdaus Md Shah Final Project Review Meeting on the Status of EPR in the ASEAN Region 2-6 December 2019 Pattaya, Thailand
Transcript
Page 1: RAS/9/077: Supporting Regional Nuclear Emergency ... · Final Project Review Meeting on the Status of EPR in the ASEAN Region 2-6 December 2019 ... HAZMAT TEAM CBRN TEAM Q: Overview

RAS/9/077: Supporting Regional Nuclear Emergency Preparedness and Response in the Member States of ASEAN Region

BRUNEI DARUSSALAMZubaidah Hj Mahmud

Mohd Firdaus Md Shah

Final Project Review Meeting on the Status of EPR in the ASEAN Region2-6 December 2019

Pattaya, Thailand

Page 2: RAS/9/077: Supporting Regional Nuclear Emergency ... · Final Project Review Meeting on the Status of EPR in the ASEAN Region 2-6 December 2019 ... HAZMAT TEAM CBRN TEAM Q: Overview

TABLE OF CONTENTS

01RADIATION PROTECTION ORDER, 2018

02REGULATORY ACTIVITES

03EMERGENCY PREPAREDNESS

04WAY FORWARD

Page 3: RAS/9/077: Supporting Regional Nuclear Emergency ... · Final Project Review Meeting on the Status of EPR in the ASEAN Region 2-6 December 2019 ... HAZMAT TEAM CBRN TEAM Q: Overview

w w w . s h e n a . g o v . b n

LAWS

ENFORCEMENT OF THE WORKPLACE

SAFETY AND HEALTHORDER (WSHO), 2009

This order is goal setting and describes the general safety and health expectations on all workplaces.

Duties are placed primarily on the Employer, with further duties on employer roles, such as contractor, sub-contractor, designer, manufacturer. There are also duties placed on individual employees.

The Orders ensure that those creating the risks reduce those risks to persons (employees and public), assets and the environment, to As Low As is Reasonably Practicable.

ENFORCEMENT OFTHE ENVIRONMENTAL

PROTECTION ANDMANAGEMENT

ORDER (EPMO), 2016

This order is goal setting and describes the general environmental expectations on all industry sectors and persons.

ENFORCEMENT OF THE RADIATION

PROTECTIONORDER, 2018

This order is goal setting and describes the general expectations on all industry sectors covering radiation requirements of the International Atomic Energy Agency (IAEA).

Page 4: RAS/9/077: Supporting Regional Nuclear Emergency ... · Final Project Review Meeting on the Status of EPR in the ASEAN Region 2-6 December 2019 ... HAZMAT TEAM CBRN TEAM Q: Overview

w w w . s h e n a . g o v . b n

FUNCTIONAL CHART SHENA

CEO

DCEO

INDUSTRY SECTOR

MAH INDUSTRY NON-INDUSTRY

SPECIALIST SUPPORT FUNCTION

RADIATION DEPARTMENT

CORPORATE SUPPORT FUNCTION

HUMAN RESOURCES

DEPARTMENT

LEGAL DEPARTMENT

FINANCE DEPARTMENT

Page 5: RAS/9/077: Supporting Regional Nuclear Emergency ... · Final Project Review Meeting on the Status of EPR in the ASEAN Region 2-6 December 2019 ... HAZMAT TEAM CBRN TEAM Q: Overview

w w w . s h e n a . g o v . b n

RADIATION DEPARTMENT CHART

CHIEF INSPECTOR

SENIOR INSPECTOR

AUTHORIZATION SECTION ENFORCEMENT SECTION TECHNICAL SUPPORT SECTION

Page 6: RAS/9/077: Supporting Regional Nuclear Emergency ... · Final Project Review Meeting on the Status of EPR in the ASEAN Region 2-6 December 2019 ... HAZMAT TEAM CBRN TEAM Q: Overview

w w w . s h e n a . g o v . b n

LICENSE CLASSIFICATION

RADIATION PROTECTION ORDER, 2018

(INDUSTRY & MEDICAL)

NUCLEAR MATERIAL

IRRADIATING APPARATUS

RADIOACTIVE MATERIAL

EDUCATION

DISPOSAL/STORAGE

SALE & SERVICES

TRANSPORTATION

IMPORT/EXPORT

Page 7: RAS/9/077: Supporting Regional Nuclear Emergency ... · Final Project Review Meeting on the Status of EPR in the ASEAN Region 2-6 December 2019 ... HAZMAT TEAM CBRN TEAM Q: Overview

w w w . s h e n a . g o v . b n

0

50

100

150

200

250

LICENCE APPROVED RADIATION WORKERREGISTERED

PERMIT IMPORT/EXPORTAPPROVED

67

223243

NO

. OF

AP

PL

ICA

TIO

N

13

13

616

18

1

DISTRIBUTION OF ACTIVITIES

NDT GAUGE MEDICAL TRANSPORTER SALES EDUCATION

Note: Updating till October 2019

TYPE OF REGULATORY ACTIVITIES

RADIATION REGULATORY ACTIVITIES

Page 8: RAS/9/077: Supporting Regional Nuclear Emergency ... · Final Project Review Meeting on the Status of EPR in the ASEAN Region 2-6 December 2019 ... HAZMAT TEAM CBRN TEAM Q: Overview

w w w . s h e n a . g o v . b n

SELF ASSESSMENT ON: HAZARD ASSESSMENT

CATEGORY CRITERIA NOTE

I • Reactors with power levels equal to or greater than 100 MW none

II • Reactors with power levels equal to or greater than 2 MW and less than 100 MW none

III • Reactor with power levels of less or equal to 2 MW• Irradiation facility

none

IV • Mobile source with potential if shielding is lost• Satellites with dangerous sources• Transportation of radioactive material• Scrap metal processing facilities.• National border crossings.• Facilities with fixed gauges with dangerous sources

Complied

V • Areas within emergency planning zones and emergency planning distance in a state for a facility in category I or II located in another state.

none

TABLE 1. EMERGENCY PREPAREDNESS CATEGORIES (REF: IAEA GSR Part 7)

Self-assessment of national capabilities based on the requirements established in the IAEA safety standards on EPR (consider GSR Part 7, paragraphs 4.18 to 4.26)

Page 9: RAS/9/077: Supporting Regional Nuclear Emergency ... · Final Project Review Meeting on the Status of EPR in the ASEAN Region 2-6 December 2019 ... HAZMAT TEAM CBRN TEAM Q: Overview

w w w . s h e n a . g o v . b n

KEY NATIONAL PLAYERS IN THE EPR DOMAIN

1. National Competent Authority (NCA)

NCA

SAFETY, HEALTH, AND ENVIRONMENT NATIONAL AUTHORITY (SHENA)

2. Point of Contact (POC) of Brunei Darussalam to the ASEAN Coordinating Centre for Humanitarian Assistance on Disaster Management (Aha Centre) for Emergency Response

Organisational POC for Emergency Response

NATIONAL DISASTER MANAGEMENT CENTRE (NDMC)

3. Contact for Public Communication (CPC)

Organisational CPC

MINISTRY OF HOME AFFAIRS

4. Emergency Response Team

Organisational CPC

HAZMAT TEAM CBRN TEAM

Q: Overview of the changes in EPR National Arrangements at high level with a focus on changes since the start of theproject in 2016.

❑ In the past, limited communication has been established with the stakeholders. Since the introduction ofthis project, we have engaged the relevant agencies to work together in establishing a National EPR.

Page 10: RAS/9/077: Supporting Regional Nuclear Emergency ... · Final Project Review Meeting on the Status of EPR in the ASEAN Region 2-6 December 2019 ... HAZMAT TEAM CBRN TEAM Q: Overview

w w w . s h e n a . g o v . b n

OVERVIEW OF EPR NATIONAL ARRANGEMENTS

SMALL SCALE

LARGE SCALE(NATIONAL LEVEL)

Reference: NaSOP under NDMC shared to Regional Workshop on Combined Decision-making and Public Communication in a Nuclear or Radiological Emergency, 18th-22nd November 2019 , Kuala Lumpur

Q: General information about national arrangements to face nuclear and/or radiologicalemergencies

Page 11: RAS/9/077: Supporting Regional Nuclear Emergency ... · Final Project Review Meeting on the Status of EPR in the ASEAN Region 2-6 December 2019 ... HAZMAT TEAM CBRN TEAM Q: Overview

w w w . s h e n a . g o v . b n

NATIONAL PUBLIC COMMUNICATION STRATEGY LEVEL

National Authority

Ministry in Charge

Radiological Accident or Incident

Media Partner

Radiological Team Responder/Hazmat Team / CBRN Team

NDMC & MOHA

ActivateCall Authority Duty

Phone

Drafting Media Advisory

Getting information& report

Page 12: RAS/9/077: Supporting Regional Nuclear Emergency ... · Final Project Review Meeting on the Status of EPR in the ASEAN Region 2-6 December 2019 ... HAZMAT TEAM CBRN TEAM Q: Overview

w w w . s h e n a . g o v . b n

APPROVAL PROCESS FOR THE ASEAN PROTOCOL ON EPR DECISION-MAKING AND

COMMUNICATION

✓ Input on Draft has been given to Ministry ForeignAffairs related to Draft ASEAN Protocol

✓ Protocol consideration and approval by ASEANMember States

✓ Once finalized and agreed, will be reflected in NationalEPR

✓ Identified gaps in national capacity and capability

Draft ASEAN Protocol for Preparedness and Response to a

Nuclear or Radiological Emergency

Page 13: RAS/9/077: Supporting Regional Nuclear Emergency ... · Final Project Review Meeting on the Status of EPR in the ASEAN Region 2-6 December 2019 ... HAZMAT TEAM CBRN TEAM Q: Overview

w w w . s h e n a . g o v . b n

ACHIEVEMENTS OF RAS/9/077

Q: Elaborate on achievements of the project as you see them at regional and/or national level

REGIONAL

❑ Establishment of a professional networking mechanism (e.g. regional support in theevent of radiological/nuclear emergency in the ASEAN region and ensure we areworking towards the same goals

NATIONAL

❑ Better understanding on the plan to further strengthen our National RegulatoryFramework

❑ Brings the key stakeholders to a more united front

Page 14: RAS/9/077: Supporting Regional Nuclear Emergency ... · Final Project Review Meeting on the Status of EPR in the ASEAN Region 2-6 December 2019 ... HAZMAT TEAM CBRN TEAM Q: Overview

w w w . s h e n a . g o v . b n

FEEDBACK ON PROJECT ACTIVITIES

Q: Elaborate on the quality, content, relevance etc. of training activities, specialist workshops andother project activities

❑ Based on our participation in all the trainings and workshops, we are very satisfiedwith the quality of the contents, logistics arrangement, competency of the experts andthe guidance provided which gives the participant with a better and clearerunderstanding in the topics. This further enhance our capability and competenciesworking under the Regulatory framework through discussion and sharing session withall the ASEAN MS.

Q: What are the strengths & weaknesses you or participants on behalf of your country observed inthe conduct of the project activities?

❑ Strength: We are more familiar with the requirements that contribute to a strongerradiation safety and security measures in EPR provisions, which we plan to incorporateinto Brunei’s radiation infrastructure.

❑ Weakness: Disparity in support to countries perceived with high GDP such as BruneiDarussalam

Page 15: RAS/9/077: Supporting Regional Nuclear Emergency ... · Final Project Review Meeting on the Status of EPR in the ASEAN Region 2-6 December 2019 ... HAZMAT TEAM CBRN TEAM Q: Overview

w w w . s h e n a . g o v . b n

Q: Do you/participants feel more competent/confident in dealing with EPR issues?

❑ Yes, more confident and competent compared to before, but still require morecompetency development and enhancement.

Q: Are you or national participants now better familiar with the IAEA tools for sharingdata during the preparedness phase and during an emergency?

❑ Generally, our participants are now more familiar and after being introducedthe existence of the Incident and Emergency Centre (IEC), Brunei Darussalamcan seek clearer and more relevant support from the IAEA in case of anynuclear or radiological emergency.

❑ USIE and EPRIMS has also been introduced as a tools in accessingRadiological accident notification.

FEEDBACK ON PROJECT ACTIVITIES

Page 16: RAS/9/077: Supporting Regional Nuclear Emergency ... · Final Project Review Meeting on the Status of EPR in the ASEAN Region 2-6 December 2019 ... HAZMAT TEAM CBRN TEAM Q: Overview

w w w . s h e n a . g o v . b n

WAYFORWARD

Q: Think about follow up activities that may become part of a future project

❑ EWRMS – to setup monitoring detector in Brunei Darussalam as a collaboration project withidentify country

❑ Environment and Water sampling

❑ National and Regional Table top exercise and drill

❑ Establish radiation portal monitoring system in Brunei Darussalam to monitor environment,water and movement of Radiation source at point of entry.

Q: Briefly describe the training your experts have received in the operation and use of the monitoringsystem.

❑ Operator for JRodos

❑ Dose assessment

Q: Identify the national/regional activities or needs which would benefit from additional IAEA support

❑ Awareness programme to the ministerial level and stakeholder

❑ Table top exercise at National and Regional Level

Q: Complementarity to activities supported by third parties in your country/region

❑ Further engagement with relevant agencies and stakeholders and identification ofcompetent personnel whom will be involved in the EPR framework.

Page 17: RAS/9/077: Supporting Regional Nuclear Emergency ... · Final Project Review Meeting on the Status of EPR in the ASEAN Region 2-6 December 2019 ... HAZMAT TEAM CBRN TEAM Q: Overview

w w w . s h e n a . g o v . b n

STATUS OF BRUNEI DARUSSALAM VIS-A-VIS

THE RELEVANT INTERNATIONAL LEGAL

INSTRUMENTS

NUCLEAR SAFETY

1.Early Notification Convention

Convention on Early Notification of a Nuclear Accident (INFCIRC/335) NON-PARTY

2. Assistance Convention Convention on Assistance in the Case of a Nuclear Accident or Radiological Emergency (INFCIRC/336) NON-PARTY

3. CNS Convention on Nuclear Safety (INFCIRC/449) NON-PARTY

4. Joint ConventionJoint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management (INFCIRC/546)

NON-PARTY

5. Code of Conduct Code of Conduct on the Safety and Security of Radioactive SourcesNO POLITICAL COMMITMENT

NUCLEAR SECURITY

1. CPPNMConvention on the Physical Protection of Nuclear Material(INFCIRC/274/ Rev.1)

NON-PARTY

2. ACPPNM Amendment to the Convention on the Physical Protection of Nuclear Material (INFCIRC/274/Rev.1/Mod.1) NON-PARTY

NUCLEAR LIABILITY

1.1963 Vienna Convention

Vienna Convention on Civil Liability for Nuclear Damage (INFCIRC/500) NON-PARTY

2.1997 Vienna Convention

Protocol to Amend the Vienna Convention on Civil Liability for Nuclear Damage (INFCIRC/566) NON-PARTY

3. 1997 CSC Convention on Supplementary Compensation for Nuclear Damage (INFCIRC/567) NON-PARTY

4. 1988 Joint ProtocolJoint Protocol Relating to the Application of the Vienna Convention and the Paris Convention (INFCIRC/402)

NON-PARTY

WAY FORWARD

Page 18: RAS/9/077: Supporting Regional Nuclear Emergency ... · Final Project Review Meeting on the Status of EPR in the ASEAN Region 2-6 December 2019 ... HAZMAT TEAM CBRN TEAM Q: Overview

w w w . s h e n a . g o v . b n

STRENGTHS, WEAKNESSES, OPPORTUNITIES AND THREATS (SWOT ANALYSIS)

STRENGTHS WEAKNESSES OPPORTUNITIES THREATS

Good Team Work within the Radiation Department and proper distribution of

Tasks and Responsibilities

Inadequate number of Trained and Competent

staff

Establish national workshop and technical collaboration.

Networking among the ASEAN MS

No POE, Front liners or first responders have

not been trained in Radiological Emergency

Q: This may be useful for our discussion of follow up activities for IAEA support in the ASEAN region

Page 19: RAS/9/077: Supporting Regional Nuclear Emergency ... · Final Project Review Meeting on the Status of EPR in the ASEAN Region 2-6 December 2019 ... HAZMAT TEAM CBRN TEAM Q: Overview

w w w . s h e n a . g o v . b n

KEY POINTS

• National focal point and Authority for ionizingrelated matter and currently in the startupmode

• Strengthening of regulatory infrastructure

• Strengthening of EPR capacity and capabilitywith stakeholders

Page 20: RAS/9/077: Supporting Regional Nuclear Emergency ... · Final Project Review Meeting on the Status of EPR in the ASEAN Region 2-6 December 2019 ... HAZMAT TEAM CBRN TEAM Q: Overview

THANKOffice: +673 238 2000

Incident Reporting Duty Phone: +673 733 2000

Website: www.shena.gov.bn

Email: [email protected] | [email protected]

Address: Level 4, Design & Technology Building,

Spg 32-37, Kg. Anggerek Desa,

Bandar Seri Begawan, BB3713,

Negara Brunei Darussalam

YOU