Page 1 Clouds and the Earth’s Radiant Energy System RBI Instrument Overview Kory Priestley, RBI Project Scientist Mohan Shankar, Deputy PS – Calibration Anum Barki, Deputy PS - Modeling
Transcript
Page 1: RBI Instrument Overview - CERES · • JPPS-2 On-dock Delivery Date: April 2019 ... Alignment Cube Assembly Motor Mounts Motor Support Bracket Interface to Optical Module. Page 20

Page 1

Clouds and the Earth’s Radiant Energy System

RBI Instrument OverviewKory Priestley, RBI Project Scientist

Mohan Shankar, Deputy PS – CalibrationAnum Barki, Deputy PS - Modeling

Page 2: RBI Instrument Overview - CERES · • JPPS-2 On-dock Delivery Date: April 2019 ... Alignment Cube Assembly Motor Mounts Motor Support Bracket Interface to Optical Module. Page 20

Page 2

Radiation Budget Instrument

ScienceGoal• Tocontinue themeasurementsfromthelasttwodecadesin

supportofglobalclimatemonitoring.• RBIextends theEarthradiationbudgetmeasurementsofthe

EarthObservingSystem(EOS)andJointPolarSatelliteSystem(JPSS)

• NASA/NOAAPartnership– NOAAprovidesJPSS-2satelliteforaccommodationofRBI– NASAprovidesRBIinstrumentandsupportthroughspacecraftI&Tandlaunch/activation– NASAfundsradiationbudgetsciencedataanalysisandgenerationofscienceproducts(RBMProject)

• NASALangley– ManagesprimecontractordevelopmentofRBIinstrument,providesmanagement,technical,andmissionassuranceinsightandoversight;providessupporttospacecraftI&Tthrulaunchandearlyon-orbitcheckout(thruPhaseD)– Hand-overandreleaseofRBIinstrumentownershipbyRBIProjectoccursattheJPSS-2OperationalHand-overReview(OHR).ForPhaseE,theLangleyScienceDirectorate(SD)RadiationBudgetMeasurement(RBM)ProjectassumesresponsibilityforRBIformissionplanningandoperations• HarrisCorp.– RBIInstrumentprovider/primecontractorwithsub-contractorsprovidingkeyelementsandsupport(SDLforCalibration,JPLforThermopileDetectors,SierraNevadaforAzimuthRotationModule)

• JPSS-2SpacecraftandMissionInterface-- InterfaceControl(ICD&MICD)andDataFormat

PartnershipsandTeams

RadiationBudgetInstrument(RBI)RBIscanningradiometermeasuringthreespectralbandsattopofAtmosphere(TOA)• Total0.3to>50+m• Shortwave0.3to5.0m• Longwave5.0to50+m

µµ µ

RBI is a New Instrument Developed as a Follow-on to CERES Flown on TRMM, EOS, NPP, and JPSS-1

• Phase:Formulation(C)• Risk:7120.5E,Category2;8705.4PayloadRiskClassB• FlightInstrumentDelivery: March2019• JPPS-2On-dockDeliveryDate: April2019• Life:7years

RBI is a CERES Data Continuity Mission

Page 3: RBI Instrument Overview - CERES · • JPPS-2 On-dock Delivery Date: April 2019 ... Alignment Cube Assembly Motor Mounts Motor Support Bracket Interface to Optical Module. Page 20

Page 3

Radiation Budget Instrument

Partnerships and Teams

Page 4: RBI Instrument Overview - CERES · • JPPS-2 On-dock Delivery Date: April 2019 ... Alignment Cube Assembly Motor Mounts Motor Support Bracket Interface to Optical Module. Page 20

Page 4

Radiation Budget Instrument

RBI Baseline and Threshold Requirements

KeyPerformanceRequirements BaselineScienceRequirements ThresholdScienceRequirements

TotalSpectralRange 0.3to100+microns 0.3to50+ microns

ShortwaveSpectralRange 0.3to5microns 0.3to5microns

LongwaveSpectralRange 5to50+microns 5to35+ microns

TotalChannelAbsoluteRadiometricAccuracy ≤Largerof0.575W/m2-sror0.5%(k=1)

≤Largerof0.575W/m2-sror0.75% (k=1)

ShortwaveChannelAbsoluteRadiometricAccuracy

≤Largerof0.75W/m2-sror1.0%(k=1)

≤Largerof0.75W/m2-sror1.25% (k=1)

LongwaveChannelAbsoluteRadiometricAccuracy

≤Largerof0.575W/m2-sror0.5%(k=1)

≤Largerof0.575W/m2-sror0.75% (k=1)

TotalChannelRadiometricPrecision ≤0.2W/m2-sr+0.1%(k=3)

≤0.2W/m2-sr+0.1%(k=2)

ShortwaveChannelRadiometricPrecision ≤0.2W/m2-sr+0.1%(k=3)

≤0.2W/m2-sr+0.1%(k=2)

LongwaveChannelRadiometricPrecision ≤0.2W/m2-sr+0.1%(k=3)

≤0.2W/m2-sr+0.1%(k=2)

TotalChannelLinearity ≤1.5W/m2-sr ≤2.5W/m2-sr

ShortwaveChannelLinearity ≤1.28W/m2-sr ≤2.13W/m2-sr

LongwaveChannelLinearity ≤0.54W/m2-sr ≤0.9W/m2-sr

PointSpreadFunction Within95%ofCERES Within90%ofCERES

RBI Baseline Science Requirements Match CERES

Page 5: RBI Instrument Overview - CERES · • JPPS-2 On-dock Delivery Date: April 2019 ... Alignment Cube Assembly Motor Mounts Motor Support Bracket Interface to Optical Module. Page 20

Page 5

Radiation Budget Instrument

RBI Accommodated on JPSS-2 Spacecraft Nadir Deck

RBI+ X (Velocity)

+ Z (Nadir)

+Y

JPSS-2InstrumentComplement• RadiationBudgetInstrument(RBI)• AdvancedTechnologyMicrowaveSounder(ATMS)• Cross-trackInfraredSounder(CrIS)• VisibleInfraredImaginingRadiometerSuite(VIIRS)• OzoneMappingandProfilerSuite(OMPS)

SpacecraftdesignandInstrumentlocationsarenotionalandrepresentativeofJPSS-1JPSS-2configurationhasnotbeendetermined

JPSS-2Observatory•NominalAltitude:824km± 17km•GroundTrackRepeatabilityAccuracy:±20kmattheequator•GroundTrackRepeatCycle:<20days•NominalAscendingEquatorCrossingTime:1330(localtime)± 10min

Page 6: RBI Instrument Overview - CERES · • JPPS-2 On-dock Delivery Date: April 2019 ... Alignment Cube Assembly Motor Mounts Motor Support Bracket Interface to Optical Module. Page 20

Page 6

Radiation Budget Instrument

Instrument Overview

¨ Instrument Design Overview§ Instrument Features§ ConOps Overview§ Module Overviews

¨Performance Overview¨Engineering Development Unit Overview

Page 7: RBI Instrument Overview - CERES · • JPPS-2 On-dock Delivery Date: April 2019 ... Alignment Cube Assembly Motor Mounts Motor Support Bracket Interface to Optical Module. Page 20

Radiation Budget Instrument

Page 7

Science and Continuity Drive Key Features of RBI Design

RBIScienceNeeds RBIDesign FeaturetoFulfillScienceNeedLowShortwaveRadiometricUncertainty

VCT containingElectricalSubstitutionRadiometer(ESR)providesstableSWreferenceradianceoverlife

LowTotalandLongwaveRadiometricUncertainty

Heatedhigh-emissivityICTwithwell-calibratedtemperaturesensorsprovideon-orbitreferenceforTotalandLWchannels

AccurateKnowledgeofRelativeSpectralResponse OverLife

6-diodeVCT providesmultispectralRSRcharacterizationwithabsolutestabilityprovidedbytheESR

RadiometricCalibrationConsistencyBetweenChannels All channelsviewthesameVCT,ICT andSCT.

StableRadiometricResponse Effectivetemperaturestabilityoftelescope anddetectorsPointSpreadFunction(PSF)CloselyMatchesHeritageCERES

RBIusesanIFOV size/shapeandscanratethatarenearlyidenticaltoheritageCERES.PSFclosely matchesCERES.

RadiometricVerificationViaSolarCalibration

SCT containingmultipleSpectralon surfaces.Pristinesurfacesareusedtodetectdegradationofprimarysurface.

MultipleObservationModes(crosstrack,bi-axial, userdefined)

3telescopes (oneforeachband)providebestoperationalflexibilityandcontinuity.Uploadable scanpattern.

Reliable ScienceData Completelyredundant instrument,includingdetectorsandelectronics

VCT =VisibleCalibrationTargetICT =InfraredCalibrationTarget

SCT =SolarCalibrationTarget

Page 8: RBI Instrument Overview - CERES · • JPPS-2 On-dock Delivery Date: April 2019 ... Alignment Cube Assembly Motor Mounts Motor Support Bracket Interface to Optical Module. Page 20

Page 8

Radiation Budget Instrument

RBI ConOps Provides Operational Flexibility

¨Earth observations: Crosstrack and Biaxial scanning¨Calibration

§ Every scan line: space look§ Daily: single point gain response using VCT and ICT§ Monthly

• Spectral calibration using VCT• Linearity measurement using VCT and ICT

¨User-defined modes for operational flexibility § Earth target for validation campaigns

• Includes cross-correlations with CERES by viewing the same earth location

§ Solar observations via diffuse target§ Lunar observations

Page 9: RBI Instrument Overview - CERES · • JPPS-2 On-dock Delivery Date: April 2019 ... Alignment Cube Assembly Motor Mounts Motor Support Bracket Interface to Optical Module. Page 20

Page 9

Radiation Budget Instrument

Field of Regard Obtained by Mounting Orientation & Two-Axis Pointing

Cross-trackScanModule(CSM)enablesswathmodeviewsoftheEarth,internalcalibrationtargets,andspaceviews

AzimuthRotationModule(ARM)enablesbiaxial-modeforviewsoftheEarthtosupportAngularDistributionModels(ADM),directLunarcalibration,andindirectSolarcalibrationusingtheSolarCalibrationTarget(SCT)

+X

+Y

+Z (Nadir)

Page 10: RBI Instrument Overview - CERES · • JPPS-2 On-dock Delivery Date: April 2019 ... Alignment Cube Assembly Motor Mounts Motor Support Bracket Interface to Optical Module. Page 20

Radiation Budget Instrument

Page 10

Cross-Track Scan is Primary Operational Mode

Constant63.1deg/secrateoverfullEarth;6.6-seccycle

time

Earth

Space (Cal)

Space (No-Cal)Spacelook 1 Spacelook 2

Page 11: RBI Instrument Overview - CERES · • JPPS-2 On-dock Delivery Date: April 2019 ... Alignment Cube Assembly Motor Mounts Motor Support Bracket Interface to Optical Module. Page 20

Page 11

Radiation Budget Instrument

Bi-Axial Scan Mode SupportsRefinement of Angular Distribution Models

¨During a Bi-axial scan the instrument is commanded to rotate both the azimuth and Elevation gimbals§ Data is used to validate and refine

Angular Distribution Models used to convert RBI radiances into fluxes at top of atmosphere

¨Elevation scan rate is 63.1 deg/sec with a +/- 70 deg rotation

¨Azimuth scan rate is 0.5 to 6.0 deg/sec with a +/-90 deg rotation

¨Azimuth scan rate and rotation are commanded from ground

Example: Azimuth scan rate is 0.5 deg/sec

Page 12: RBI Instrument Overview - CERES · • JPPS-2 On-dock Delivery Date: April 2019 ... Alignment Cube Assembly Motor Mounts Motor Support Bracket Interface to Optical Module. Page 20

Radiation Budget Instrument

Page 12

Modular Design Simplifies Integration

ElectronicsUnit(EU)

Cross-TrackScanModule(CSM)

AzimuthRotationModule(ARM)

ThermalMountingFeet

BenchShroud

SolarCalibrationTarget(SCT)

InfraredCalibrationTarget(ICT)

OpticalModule(OM)

VisibleCalibrationTarget(VCT)

ExternalFilterModule

TwistCapsule

LaserDiodeAssembly

ESRElectronics

TwistCapsuleMountingBracket

CSMAssembly

Page 13: RBI Instrument Overview - CERES · • JPPS-2 On-dock Delivery Date: April 2019 ... Alignment Cube Assembly Motor Mounts Motor Support Bracket Interface to Optical Module. Page 20

Radiation Budget Instrument

Page 13

Optical Modules and Targets Designed for Maximum Stability and Accuracy

ICTHeated,High-Emissivity SCTWith3Protected

Spectralon®Surfaces

VCTWith6-WavelengthRadianceOutputandESRforAbsoluteReference

NADIR0o (+Z)

SWLW

Total

ThermalShroudsMinimize

TemperatureDrifts

TelescopeBafflingMinimizesStrayLight

ThermopileDetectors;ShapeProvidesHeritagePSF

Page 14: RBI Instrument Overview - CERES · • JPPS-2 On-dock Delivery Date: April 2019 ... Alignment Cube Assembly Motor Mounts Motor Support Bracket Interface to Optical Module. Page 20

Radiation Budget Instrument

Page 14

Optical Module Controls Stray Light While Providing a Stable Thermal Environment

Fore-Baffles

TelescopeMirrors Filter

JPLThermopileDetector

OpticalModule

ExtensiveTelescopeBafflingMinimizesStray

Light

MaterialsMinimizeThermal

GradientsRearEnclosureProvides

ThermallyStableEnvironment

OneTelescopePerBandSimplifiesDetectorDesign

Page 15: RBI Instrument Overview - CERES · • JPPS-2 On-dock Delivery Date: April 2019 ... Alignment Cube Assembly Motor Mounts Motor Support Bracket Interface to Optical Module. Page 20

Radiation Budget Instrument

Page 15

JPL Thermopile Detectors Enable Data Continuity with CERES

¨ Uncooled thermopile detectors with Gold-Black coating are responsive over the full RBI spectral range from UV to far-infrared§ Scene radiance is measured by detecting

small changes in temperature of the detector material

¨ Detectors are highly linear, stable, low noise, and fully redundant

¨ Heritage: MCS/Diviner (15 years of flight ops)

Requirement Value Compliance

SpectralResponse Specified over0.2-100microns Yes

DynamicRange 0-600W/m2/sr Yes

Gain 22,000V/W+/-10% Yes

Gain TempCoefficient <220V/W/K Yes

Reliability(glintsurvival) 3.81 mW, 30times Yes

Non-linearity <0.04% Yes

ResponseUniformity +/-5%3x75umspot Yes

Outoffieldresponse <0.01% Yes

NoiseEquivalentPower <3nW Yes

Timeconstantmax <9.0msec Yes

Timeconstantmin >7.5msec Yes

OutputStability <0.5nWfor6.6sec Yes

Page 16: RBI Instrument Overview - CERES · • JPPS-2 On-dock Delivery Date: April 2019 ... Alignment Cube Assembly Motor Mounts Motor Support Bracket Interface to Optical Module. Page 20

Page 16

Radiation Budget Instrument

ICT is a Thermal Infrared Radiance Source for Precise Calibration

¨Provides IR calibration source for LW and Total channels

¨Harris-patented Specular Trap design provides >0.995 emissivity in a compact, easy to manufacture package

¨PRTs are carefully calibrated to NIST standard on the ground prior to installation

¨Heaters enable linearity measurements while on-orbit

¨Beryllium minimizes thermal gradients¨Flight heritage design from CrIS and AHI-8

PrimaryPlatePRTHousing

PrimaryPlateSidePlate/

Heater

Page 17: RBI Instrument Overview - CERES · • JPPS-2 On-dock Delivery Date: April 2019 ... Alignment Cube Assembly Motor Mounts Motor Support Bracket Interface to Optical Module. Page 20

Page 17

Radiation Budget Instrument

Visible Calibration Target Provides Reflected Solar Band Calibration Standard

¨VCT provides 6 laser diode sources§ 375, 405, 445, 690, 915, 1470 nm § Radiometric calibration uses 915nm

laser only§ RSR characterization uses all 6

wavelengths sequentially¨Si and InGaAs photodiodes provide

short-term radiance reference¨ESR provides stable absolute

radiance traceable to NIST§ Used monthly to calibrate

photodiodes and SW / Total channels

¨Laser diodes are remotely located, fiber coupled, providing thermal stability of diodes and sphere

Photodiodes

ElectricalSubstitutionRadiometer(ESR)

IntegratingSphereAperture

FiberOpticPortsforLaserIlluminationInput

Page 18: RBI Instrument Overview - CERES · • JPPS-2 On-dock Delivery Date: April 2019 ... Alignment Cube Assembly Motor Mounts Motor Support Bracket Interface to Optical Module. Page 20

Page 18

Radiation Budget Instrument

Solar Cal Target Provides Additional Independent Check of SW/Total Calibration

¨SCT contains three protected Spectralon® solar diffusers for on-orbit calibration checks§ Targets are in a cube orientation within a

sealed enclosure, which protects them from solar degradation

§ At least one surface can be maintained in a pristine condition to track and correct for changes in the “daily” surface

§ The 4th face blocks incoming solar radiation and contamination when the SCT not in use

¨SCT mechanism is space-qualified¨Proven Spectralon® solar diffuser material,

also used by ABI, AHI, COMS, and GOSAT programs

CutawayView

SpectralonSurfaces

ProtectiveEnclosure

Page 19: RBI Instrument Overview - CERES · • JPPS-2 On-dock Delivery Date: April 2019 ... Alignment Cube Assembly Motor Mounts Motor Support Bracket Interface to Optical Module. Page 20

Page 19

Radiation Budget Instrument

CSM Provides Low-Jitter Cross-Track Scanning of Optical Module

¨Designs leverage heritage motor/ encoder designs

¨Design optimizes OM thermal performance

¨Twist flex design provides redundant OM connections

¨H infinity control optimizes response and provides robustness to external disturbances

¨Heritage bearing system has proven long life on CrIS

ElectronicsandHousing

Motor/BearingAssembly

BEIEncoder(OpticalUnit)

TwistCapsule

TwistCapsuleMount

AlignmentCubeAssembly

MotorMounts

MotorSupportBracket

InterfacetoOpticalModule

Page 20: RBI Instrument Overview - CERES · • JPPS-2 On-dock Delivery Date: April 2019 ... Alignment Cube Assembly Motor Mounts Motor Support Bracket Interface to Optical Module. Page 20

Page 20

Radiation Budget Instrument

Azimuth Rotation Module Provides Reliable Bi-Axial Scan Capability

¨Provides azimuth rotation of upper half of instrument § Rate of 0.5-6.0 deg/sec

¨Open-loop stepping system with simple and reliable control process

¨Resolver feedback in telemetry provides confirmation of positioning

¨Leverages many assemblies with flight heritage § Gearbox, resolvers, hybrid

stepper motor, Electronic Control Unit, launch lock

Gray=Stationary(TiedtoSpacecraft)Blue=RotatingWithRBIBenchOrange=Combination

Launch Lock

ECU

Twist Capsules

Actuator

Resolvers

Page 21: RBI Instrument Overview - CERES · • JPPS-2 On-dock Delivery Date: April 2019 ... Alignment Cube Assembly Motor Mounts Motor Support Bracket Interface to Optical Module. Page 20

Page 21

Radiation Budget Instrument

¨ Instrument Design Overview§ Instrument Features§ ConOps Overview§ Module Overviews

¨Performance Overview¨Engineering Development Unit Overview

Instrument Overview

Page 22: RBI Instrument Overview - CERES · • JPPS-2 On-dock Delivery Date: April 2019 ... Alignment Cube Assembly Motor Mounts Motor Support Bracket Interface to Optical Module. Page 20

Page 22

Radiation Budget Instrument

CERES-Like Point Spread Function (PSF) Provides Important Data Continuity

¨RBI detector shape mimics the CERES precision aperture, and heritage scan rate and time constant provides best PSF match

¨RBI PSF is required to be smaller than CERES, referenced to 95% energy contour§ i.e., over 95% of RBI

energy must be within the CERES 95% energy contour

¨Close match to CERES PSF enhances data continuity

CERES PSF (95% Energy Contour)

Detector IFOV

63.1 Degree / Sec Scan Rate

95.2%ofRBIEnergyFallsWithintheHeritageCERESContour

(Worst-Case)

Page 23: RBI Instrument Overview - CERES · • JPPS-2 On-dock Delivery Date: April 2019 ... Alignment Cube Assembly Motor Mounts Motor Support Bracket Interface to Optical Module. Page 20

Page 23

Radiation Budget Instrument

Knowledge of Relative Spectral Response Ensures Accurate Observations

¨VCT detects changes in Relative Spectral Response (RSR) over life allowing corrections to be implemented

¨SCT can also support corrections

VCTMeasuresResponsivityChangesat6Wavelengths,AllowingRSRChangestoBeCorrected

Total

LW

SW

PreliminaryRSRCurvesUse

MeasuredDataFromPrototypeParts

Page 24: RBI Instrument Overview - CERES · • JPPS-2 On-dock Delivery Date: April 2019 ... Alignment Cube Assembly Motor Mounts Motor Support Bracket Interface to Optical Module. Page 20

Radiation Budget Instrument

Page 24

0.000

0.100

0.200

0.300

0.400

0.500

0.600

0.700

0.800

0.900

1.000

0 100 200 300 400 500

Repe

atab

ility(W

/m2sr)

TotalChannelDynamicRangeW/(m2sr)

CalculatedW/(m2sr)K=3

TotalChannelRepeat.PRD437

0.000

0.500

1.000

1.500

2.000

2.500

0 100 200 300 400 500

UncertaintyW

/(m2sr)

TotalChannelDynamicRangeW/(m2sr)

CalculatedW/(m2sr)K=1

TotalChannelUncert.PRD426

0.0000.1000.2000.3000.4000.5000.6000.7000.8000.9001.000

0 100 200 300 400

Repe

atab

ilityW

/(m2sr)

SWChannelDynamicRangeW/(m2sr)

CalculatedW/(m2sr)K=3

SWChannelRepeat.PRD443

0.0000.5001.0001.5002.0002.5003.0003.5004.0004.5005.000

0 100 200 300 400

UncertaintyW

/(m2sr)

SWChannelDynamicRangeW/(m2sr)

CalculatedW/(m2sr)K=1

SWChannelUncert.PRD432

0.000

0.050

0.100

0.150

0.200

0.250

0.300

0.350

0.400

0.450

0.500

0 50 100 150

Repe

atab

ilityW

/(m2sr)

LWChannelDynamicRangeW/(m2sr)

CalculatedW/(m2sr)K=3

LWChannelRepeat.PRD440

0.000

0.100

0.200

0.300

0.400

0.500

0.600

0.700

0.800

0.900

1.000

0 50 100 150

UncertaintyW

/(m2sr)

LWChannelDynamicRangeW/(m2sr)

CalculatedW/(m2sr)K=1LWChannelUncert.PRD429

Radiometric Performance Expected to Meet Requirements

• Radiometricrepeatabilityanduncertaintyareexpectedtomeetrequirements

• AccurateradiancemeasurementsarecriticaltotheERBCDR

Total Total

LW

SW

LW

SW

Repeatability Uncertainty

RequirementCapability

Page 25: RBI Instrument Overview - CERES · • JPPS-2 On-dock Delivery Date: April 2019 ... Alignment Cube Assembly Motor Mounts Motor Support Bracket Interface to Optical Module. Page 20

Page 25

Radiation Budget Instrument

RBI Expected to Satisfy Science Requirements

KeyPerformanceRequirements BaselineScienceRequirements PredictedRBICapability

TotalSpectralRange 0.3to100+microns 0.3to100microns

ShortwaveSpectralRange 0.3to5microns 0.3to5microns

LongwaveSpectralRange 5to50+microns 5to50microns

TotalChannelAbsoluteRadiometricUncertainty ≤Larger of0.575W/m2-sror0.5%(k=1) Compliant– SeePrevious Page

ShortwaveChannelAbsoluteRadiometricUncertainty

≤Larger of0.75W/m2-sror1.0%(k=1) Compliant– SeePrevious Page

LongwaveChannelAbsoluteRadiometricUncertainty

≤Larger of0.575W/m2-sror0.5%(k=1) Compliant– SeePrevious Page

TotalChannelRadiometricRepeatability ≤0.2W/m2-sr+0.1%(k=3) Compliant– SeePrevious Page

ShortwaveChannelRadiometricRepeatability ≤0.2W/m2-sr+0.1%(k=3) Compliant– SeePrevious Page

LongwaveChannelRadiometricRepeatability ≤0.2W/m2-sr+0.1%(k=3) Compliant– SeePrevious Page

TotalChannelLinearity ≤1.5W/m2-sr 0.5W/m2-sr

ShortwaveChannelLinearity ≤1.28W/m2-sr 0.43W/m2-sr

LongwaveChannelLinearity ≤0.54W/m2-sr 0.18W/m2-sr

PointSpread Function >95%ofCERES 95.2%ofCERES,WorstCase

Page 26: RBI Instrument Overview - CERES · • JPPS-2 On-dock Delivery Date: April 2019 ... Alignment Cube Assembly Motor Mounts Motor Support Bracket Interface to Optical Module. Page 20

Page 26

Radiation Budget Instrument

¨ Instrument Design Overview§ Instrument Features§ ConOps Overview§ Changes Since SRR§ Module Overviews

¨Performance Overview¨Engineering Development Unit Overview

Instrument Overview

Page 27: RBI Instrument Overview - CERES · • JPPS-2 On-dock Delivery Date: April 2019 ... Alignment Cube Assembly Motor Mounts Motor Support Bracket Interface to Optical Module. Page 20

Page 27

Radiation Budget Instrument

¨EDU is a pathfinder for calibration§ Design is quite similar to RBI flight design§ Manufacturing processes are validated § Radiometric performance requirements are demonstrated § Calibration approach is demonstrated

¨EDU is a pathfinder for test execution § “Dry Run” of the Flight pre-launch calibration campaign§ Limited environmental tests bring confidence to design robustness

¨EDU TVAC Testing Scheduled for Summer 2017§ Provides first opportunity to correlate end-to-end radiometric model

Engineering Development Unit

Page 28: RBI Instrument Overview - CERES · • JPPS-2 On-dock Delivery Date: April 2019 ... Alignment Cube Assembly Motor Mounts Motor Support Bracket Interface to Optical Module. Page 20

Radiation Budget Instrument

Page 28

EDU is a Representation of Flight Design

EDU

StaticARMEnablesFasterBuild

EDUIsNotelectricallyredundant

MultipleAluminumSubstitutionsto

EnableFasterBuildandTest

QualityStandardsAreSpecifictoEDU-TypeBuild

OpticalModulesfailstraylightrequirements

Page 29: RBI Instrument Overview - CERES · • JPPS-2 On-dock Delivery Date: April 2019 ... Alignment Cube Assembly Motor Mounts Motor Support Bracket Interface to Optical Module. Page 20

Page 29

Radiation Budget Instrument

Summary

¨RBI design is optimized for its mission¨RBI provides valuable data continuity with CERES¨Operations are highly flexible to support science needs¨Design utilizes heritage sub-assemblies to minimize development

risk and schedule¨Performance expected to meet requirements¨RTM and EDU provide early risk mitigation

Page 30: RBI Instrument Overview - CERES · • JPPS-2 On-dock Delivery Date: April 2019 ... Alignment Cube Assembly Motor Mounts Motor Support Bracket Interface to Optical Module. Page 20

Page 30

Radiation Budget Instrument

Back-Up

Page 31: RBI Instrument Overview - CERES · • JPPS-2 On-dock Delivery Date: April 2019 ... Alignment Cube Assembly Motor Mounts Motor Support Bracket Interface to Optical Module. Page 20

Radiation Budget Instrument

Page 31

Modular Design Simplifies Integration

ElectronicsUnit(EU)

Cross-TrackScanModule(CSM)

AzimuthRotationModule(ARM)

ThermalMountingFeet

BenchShroud

SolarCalibrationTarget(SCT)

InfraredCalibrationTarget(ICT)

OpticalModule(OM)

VisibleCalibrationTarget(VCT)

ExternalFilterModule

TwistCapsule

LaserDiodeAssembly

ESRElectronics

TwistCapsuleMountingBracket

CSMAssembly

Page 32: RBI Instrument Overview - CERES · • JPPS-2 On-dock Delivery Date: April 2019 ... Alignment Cube Assembly Motor Mounts Motor Support Bracket Interface to Optical Module. Page 20

Page 32

Radiation Budget Instrument

Instrument Design Addresses Mission Needs

¨Design features maximize mission performance§ Stable thermal environment§ Comprehensive suite of calibration targets§ High-performance detectors§ Flexible operational strategy§ PSF closely matched to CERES for best data continuity

¨Design uses flight heritage, as able, to reduce development risk

Page 33: RBI Instrument Overview - CERES · • JPPS-2 On-dock Delivery Date: April 2019 ... Alignment Cube Assembly Motor Mounts Motor Support Bracket Interface to Optical Module. Page 20

Page 33

Radiation Budget Instrument

Radiation Budget Instrument is Designed to Meet Mission Needs

¨Measures upwelling earth radiance over a wide spectral range § Ultraviolet to far-infrared (100um)§ Continuous cross-track scans

¨Three spectral bands§ Shortwave (SW): reflected solar

energy§ Longwave (LW): emitted earth

energy§ Total: reflected solar plus emitted

thermal energy¨Very precise calibration

§ Extensive ground calibration program establishes radiometric traceability

§ Multiple onboard targets hold calibration over mission life

Electronics Unit

Azimuth Rotation Module

Optical Modules and Calibration

Targets

Cross-track Scan Module

External Filter


Recommended