Re-use , recycling and future of demolished buildings in Ru ss ia. Dasha Sinishin Irina Dombrovskaya Aleksandra Pravikovskaya Ksenia Latushko Evgenia Solodchenko Maria T olkombaeva. Most of the buildings will be demolished sooner or later . - PowerPoint PPT Presentation
Popular Tags:
20
Re-use, recycling and future of demolished buildings in Russia Dasha Sinishin Irina Dombrovskaya Aleksandra Pravikovskaya Ksenia Latushko Evgenia Solodchenko Maria Tolkombaeva
Transcript
Page 1: Re-use , recycling and future of demolished  buildings in Ru ss ia

Re-use, recycling and future of demolished buildings in Russia

Dasha SinishinIrina DombrovskayaAleksandra PravikovskayaKsenia LatushkoEvgenia SolodchenkoMaria Tolkombaeva

Page 2: Re-use , recycling and future of demolished  buildings in Ru ss ia

Most of the buildings will be demolished sooner or later.

In the process of work a lot of waste is formed.

Page 3: Re-use , recycling and future of demolished  buildings in Ru ss ia

What shall we do with these

wastes?

land filling recycling

Page 4: Re-use , recycling and future of demolished  buildings in Ru ss ia

Construction waste

Consist of :63% – crushed brick

26% – ferroconcrete items breakage

Page 5: Re-use , recycling and future of demolished  buildings in Ru ss ia

Construction wastes

11% – wood wastes and scrap metal

Page 6: Re-use , recycling and future of demolished  buildings in Ru ss ia

Procedure

We need some Demolition permit

Regulations for preparation and execution of earth-

moving work

Page 7: Re-use , recycling and future of demolished  buildings in Ru ss ia

Procedure

In order to demolish any building you need to implement the following procedure:

prepare the draft for demolition of the building,

get Demolition permit,

Page 8: Re-use , recycling and future of demolished  buildings in Ru ss ia

Procedure

move the people who are staying in the building and offices

make ready the territory for the demolition,

demolish the building

Page 9: Re-use , recycling and future of demolished  buildings in Ru ss ia

Procedure

clean up the territory,

remove and recycle construction wastes

Page 10: Re-use , recycling and future of demolished  buildings in Ru ss ia

Actual problems

Customer must be sure that contractor has all the needed documents such as a Permission for operation with wastes

Page 11: Re-use , recycling and future of demolished  buildings in Ru ss ia

Re-using and recycling

The rate of recycling of all dismantled construction material is only 1%

There is no sorting of construction rubble at all

Page 12: Re-use , recycling and future of demolished  buildings in Ru ss ia

There are some open reasons:

Lack of information about sources of materials, composition of materials, including information of specification, standards, legislation and performance

Page 13: Re-use , recycling and future of demolished  buildings in Ru ss ia

High costs of transportation and material storage;

Complications with legislation: it is necessary to convert construction rubble from the class of waste to the class of recyclable materials.

Page 14: Re-use , recycling and future of demolished  buildings in Ru ss ia

There are some variants such as facade preservation, but with the replacement of all inside, especially when we are talking about some historical buildings.

Page 15: Re-use , recycling and future of demolished  buildings in Ru ss ia

National laws and regulations

The Federal Law ‘On waste production and

consumption’

the ownership of the waste belongs to the owner of the

material

Page 16: Re-use , recycling and future of demolished  buildings in Ru ss ia

An art. 751 of the Civil Code

the ownership of the waste belongs to contractors and

subcontractors

Page 17: Re-use , recycling and future of demolished  buildings in Ru ss ia

The Federal Law ‘On technical regulation’

the owner of the waste is the legal entity who is responsible for the

areas where the wastes are located legally.

Page 18: Re-use , recycling and future of demolished  buildings in Ru ss ia

In each case, you need to control the contract

because these civil rules are applied only if

they satisfy contract terms or requirement

Page 19: Re-use , recycling and future of demolished  buildings in Ru ss ia

We should right one extra section in the contract:

ownership and responsibility for the waste

Conclusion

Page 20: Re-use , recycling and future of demolished  buildings in Ru ss ia

Thank you for your

attention!