WEBSITE सं. देिवस /अअ.1/52015/ No. SRPC/SE-1/5(REA)/2015/ िदनांक/ Dated: February 26, 2015 सेवा मɅ / To, वतरण सूची के अनुसार As per Distribution List िवषय : ेीय िवुत लेखा Sub: Regional Energy Account for the month of January 2015- Reg. महोदय /Sir, दिण े के ेीय िवुत लेखे को दिण ेीय िवुत सिमित के वेबसाईट www.srpc.kar.nic.in मᱶ अपलोड कर िदया गया है, िजसे संघटको ᳇ारा डाउनलोड िकया जा सकता है। डाक ᳇ारा भी एक ᮧित भेजी जा रही है। Regional Energy Account for the month in respect of Southern Region has been uploaded to the SRPC web site, www.srpc.kar.nic.in to enable down loading by constituents. A copy of the same is sent separately by post. भवदीय, Yours faithfully, रंगराजन R. M Rangarajan अधीण अिभयता (वा)/ Superintending Engineer(C) संलᲨक:यथोपिर Encl: as above भारत सरकार के ीय िवुत िधकरण दिण ेीय िवुत सिमित 29, रेस कोस ᮓास रोड बᱶगलूर :-560 009 Government of India Central Electricity Authority Southern Regional Power Committee 29, Race Course Cross Road BANGALORE - 560 009 Phone : 080 -2228 2516 ; FAX : 080-2225 9343; e-mail: [email protected]; web site: www.srpc.kar.nic.in
Transcript
  • WEBSITE

    . /.1/52015/ No. SRPC/SE-1/5(REA)/2015/ / Dated: February 26, 2015

    / To, As per Distribution List

    : Sub: Regional Energy Account for the month of January 2015- Reg.

    /Sir,

    www.srpc.kar.nic.in ,

    Regional Energy Account for the month in respect of Southern Region has been uploaded to

    the SRPC web site, www.srpc.kar.nic.in to enable down loading by constituents. A copy of the

    same is sent separately by post.

    , Yours faithfully,

    R. M Rangarajan

    ()/ Superintending Engineer(C) : Encl: as above

    29,

    :-560 009

    Government of India Central Electricity Authority

    Southern Regional Power Committee 29, Race Course Cross Road

    BANGALORE - 560 009

    Phone : 080 -2228 2516 ; FAX : 080-2225 9343; e-mail: [email protected]; web site: www.srpc.kar.nic.in

  • B(1) 31

    ISGS / BENIFICIARY TIME SLOT APKARNAT

    AKA KSEB TN TGPUDU

    CHERRY

    PG-HVDC

    GOAORISSA

    0000 Hrs to 0200 Hrs, 0600

    Hrs to 1800 Hrs & 2200 Hrs to

    2400 15.26 20.16 11.70 25.90 17.78 4.33 0.11 4.76 0.00

    0200 Hrs to 0600 Hrs 15.52 19.52 11.73 25.92 18.09 4.35 0.11 4.76 0.00

    1800 Hrs to 2200 Hrs 15.02 19.61 11.75 26.91 17.52 4.32 0.11 4.76 0.000000 Hrs to 0200 Hrs, 0600

    Hrs to 1800 Hrs & 2200 Hrs to

    2400 16.04 21.21 12.24 27.21 18.70 4.60 0.00 0.00 0.00

    0200 Hrs to 0600 Hrs 16.31 20.56 12.26 27.23 19.02 4.62 0.00 0.00 0.00

    1800 Hrs to 2200 Hrs 15.80 20.65 12.29 28.24 18.43 4.59 0.00 0.00 0.000000 Hrs to 0200 Hrs, 0600

    Hrs to 1800 Hrs & 2200 Hrs to

    2400 9.80 19.26 21.36 24.62 11.45 3.31 0.20 0.00 10.00

    0200 Hrs to 0600 Hrs 9.86 19.13 21.36 24.63 11.51 3.31 0.20 0.00 10.00

    1800 Hrs to 2200 Hrs 9.75 19.15 21.37 24.83 11.39 3.31 0.20 0.00 10.000000 Hrs to 0200 Hrs, 0600

    Hrs to 1800 Hrs & 2200 Hrs to

    240021.17 21.06 9.08 22.29 24.75 1.65 0.00 0.00 0.00

    0200 Hrs to 0600 Hrs 21.17 21.06 9.08 22.29 24.75 1.65 0.00 0.00 0.001800 Hrs to 2200 Hrs 21.17 21.06 9.08 22.29 24.75 1.65 0.00 0.00 0.00

    ISGS / BENIFICIARY TIME SLOT APKARNATAK

    A KSEB TN TGPUDU

    CHERRY NLC MINES

    0000 Hrs to 0200 Hrs, 0600

    Hrs to 1800 Hrs & 2200 Hrs to

    24008.48 20.82 10.03 30.69 9.94 12.10 7.94

    0200 Hrs to 0600 Hrs 8.69 20.31 10.05 30.71 10.19 12.11 7.94

    1800 Hrs to 2200 Hrs 8.29 20.38 10.07 31.50 9.73 12.09 7.940000 Hrs to 0200 Hrs, 0600

    Hrs to 1800 Hrs & 2200 Hrs to

    240011.25 21.08 10.74 34.26 13.17 3.55 5.95

    0200 Hrs to 0600 Hrs 11.46 20.57 10.76 34.28 13.42 3.56 5.95

    1800 Hrs to 2200 Hrs 11.06 20.64 10.78 35.07 12.96 3.54 5.950000 Hrs to 0200 Hrs, 0600

    Hrs to 1800 Hrs & 2200 Hrs to

    2400 0.00 25.73 16.38 53.81 0.00 4.080200 Hrs to 0600 Hrs 0.00 25.73 16.38 53.81 0.00 4.081800 Hrs to 2200 Hrs 0.00 25.73 16.38 53.81 0.00 4.080000 Hrs to 0200 Hrs, 0600

    Hrs to 1800 Hrs & 2200 Hrs to 6.61 9.04 3.35 71.58 7.72 1.70

    0200 Hrs to 0600 Hrs 6.77 8.63 3.37 71.60 7.92 1.71

    1800 Hrs to 2200 Hrs 6.46 8.69 3.38 72.23 7.55 1.690000 Hrs to 0200 Hrs, 0600

    Hrs to 1800 Hrs & 2200 Hrs to

    2400 4.59 7.47 5.24 75.52 5.36 1.82

    0200 Hrs to 0600 Hrs 4.68 7.24 5.25 75.53 5.47 1.83

    1800 Hrs to 2200 Hrs 4.50 7.27 5.26 75.88 5.27 1.820000 Hrs to 0200 Hrs, 0600

    Hrs to 1800 Hrs & 2200 Hrs to

    2400 14.27 27.76 8.68 28.28 16.68 4.33

    0200 Hrs to 0600 Hrs 14.61 26.94 8.71 28.31 17.08 4.35

    1800 Hrs to 2200 Hrs 13.97 27.05 8.75 29.58 16.34 4.310000 Hrs to 0200 Hrs, 0600

    Hrs to 1800 Hrs & 2200 Hrs to

    2400 15.11 30.26 8.00 25.10 17.66 3.87

    0200 Hrs to 0600 Hrs 15.45 29.43 8.03 25.13 18.06 3.90

    1800 Hrs to 2200 Hrs 14.81 29.55 8.06 26.40 17.32 3.86

    NPCIL - KKNPP Unit-1 * 0000 Hrs to 2400 Hrs 5.00 22.10 13.30 56.25 0.00 3.35 * CoD on 31.12.2014

    ISGS / BENEFICIARY TIME SLOT APKARNATAK

    A KSEB TN TGPUDU

    CHERRY

    0000 Hrs to 0200 Hrs, 0600

    Hrs to 1800 Hrs & 2200 Hrs to

    2400

    9.21 22.62 10.89 33.34 10.80 13.14

    0200 Hrs to 0600 Hrs 9.44 22.06 10.92 33.36 11.07 13.15

    1800 Hrs to 2200 Hrs 9.00 22.14 10.94 34.22 10.57 13.130000 Hrs to 0200 Hrs, 0600

    Hrs to 1800 Hrs & 2200 Hrs to

    240011.96 22.41 11.42 36.43 14.00 3.78

    0200 Hrs to 0600 Hrs 12.18 21.87 11.44 36.45 14.27 3.79

    1800 Hrs to 2200 Hrs 11.76 21.95 11.46 37.29 13.78 3.76

    :2:

    BASED ON GOI ORDERS ) OF BENEFICIARIES IN ISGS OF SR FOR THE MONTH OF

    B. PERCENTAGE OF ALLOCATED CAPACITY SHARE ( INCLUDING UNALLOCATED PORTION

    JANUARY 2015REA FOR

    NLC TPS II - STAGE - I

    JANUARY 2015

    NTPC - RSTPS STAGE-I & II

    NTPC - RSTPS STAGE-III

    NTPC - TALCHER STPS STAGE-II

    FOR THE PERIOD FROM 01.01.2015 TO 31.01.2015.

    NTPC - SIMHADRI STPS STAGE-II

    Days

    NLC TPS II - STAGE - II

    NLC TPS I - EXPN.

    NPCIL - MAPS

    NPCIL - KGS Unit-3&4

    PERCENTAGE OF ALLOCATION FOR SCHEDULING FOR THE PERIOD FROM 01.01.2015 TO 31.01.2015.

    NTECL- VALLUR STPS

    Units-1&2

    NPCIL - KGS Units-1&2

    NLC TPS II - STAGE - I

    NLC TPS II - STAGE - II

  • REA FOR JANUARY 2015

    RSTPS- I&II RSTPS- IIITALCHER

    STPS-II

    SIMHADRI

    STPS-II

    2100 500 2000 1000

    MW 14.55 3.52 14.08 7.04 39.19

    W A % 0.69 0.70 0.70 0.70

    MW 25.99 6.29 25.15 12.57 70

    % 1.24 1.26 1.26 1.26

    MW 1.85 0.45 1.80 0.90 5

    % 0.09 0.09 0.09 0.09

    MW 17.01 4.11 16.46 8.23 45.81

    WA % 0.81 0.82 0.82 0.82

    of the State from respective ISGS

    Note: These allocations have already been incorporated in the allocation

    TELANGANA

    TAMIL NADU

    KARNATAKA

    :2A:

    ANDHRA

    PRADESH

    ENTITLEMENT OF EQUIVALENT CAPACITY FROM NTPC COAL STATIONS OF

    SR FOR BUNDLING WITH SOLAR POWER UNDER JAWAHAR LAL NEHRU

    NATIONAL SOLAR MISSION

    FOR THE PERIOD FROM 01.01.2015 TO 31.01.2015.

    NTPC COAL STATIONS (ISGS) OF SR

    TOTAL

    IC in MW

    STATE

  • AP

    NVVN -

    Coal

    Power KAR

    NVVN -

    Coal

    Power TN

    NVVN -

    Coal

    Power TG

    NVVN -

    Coal

    Power

    14.29 0.69 20.76 1.24 13.92 24.24 0.09 17.44 0.81 1.65 0.11 0.00 4.76 0.00

    14.95 0.70 22.34 1.26 15.65 24.84 0.09 18.02 0.82 1.33 0.00 0.00 0.00 0.00

    9.08 0.70 18.08 1.26 21.42 24.43 0.09 10.67 0.82 3.25 0.20 0.00 0.00 10.00

    20.07 0.70 21.31 1.26 10.58 20.91 0.09 23.68 0.82 0.58 0.00 0.00 0.00 0.00

    8.38 0.00 22.00 0.00 11.78 30.00 0.00 10.08 0.00 9.82 0.00 7.94 0.00 0.00

    11.14 0.00 21.65 0.00 11.26 33.58 0.00 13.23 0.00 3.19 0.00 5.95 0.00 0.00

    0.00 0.00 25.73 0.00 16.39 53.81 0.00 0.00 0.00 4.07 0.00 0.00 0.00 0.00

    6.61 0.00 8.91 0.00 3.36 71.69 0.00 7.73 0.00 1.70 0.00 0.00 0.00 0.00

    NTPC - TALCHER STPS STAGE-II

    NTPC - SIMHADRI STPS STAGE-II

    NLC TPS I - EXPN.

    NIL

    : 3 :

    NLC TPS II - STAGE - I

    .... / ISGS

    NIL

    ORISSA

    [Computaion in line with CERC order dated 11/01/10 on petition No.134/2009 of NTPC]

    JANUARY 2015FOR THE MONTH OF

    ISGS

    Andhra Pradesh TAMIL NADU

    NTECL - VALLUR STPS UNIT - 1 &2

    No. of days for which FC deductableMis- Declaration Incident No. & Date

    NIL

    NLC TPS II - STAGE - II

    C. (2) DETAILS OF MISDECLARATION OF DECLARED CAPABLITY BY ISGS.

    JANUARY 2015REA FOR

    KARNATAKA

    NTPC - RSTPS STAGE-I & II

    NTPC - RSTPS STAGE-III

    C.(1) WEIGHTED AVERAGE OF PERCENTAGE ALLOCATED CAPACITY SHARE OF BENEFICIARIES IN ISGS (THERMAL)

    GOANLC

    MINESKSEB

    TELANGANA

    PUDU

    CHERRYPG-HVDC

  • AP (U)

    NVVN -

    Coal

    Power AP

    NVVN -

    Coal

    Power KAR

    NVVN -

    Coal

    Power TN

    NVVN -

    Coal

    Power TG

    NVVN -

    Coal

    Power

    6.52 0.13 12.07 0.34 18.64 1.24 12.95 25.28 0.09 14.16 0.39 3.32 0.11 0.00 4.76 0.00

    6.96 0.13 12.79 0.34 19.68 1.26 14.86 25.93 0.09 14.90 0.40 2.66 0.00 0.00 0.00 0.00

    4.04 0.13 7.42 0.34 17.95 1.26 21.51 24.66 0.09 8.60 0.40 3.40 0.20 0.00 0.00 10.00

    9.41 0.13 16.84 0.34 18.73 1.26 10.47 21.49 0.09 20.06 0.40 0.78 0.00 0.00 0.00 0.00

    3.73 0.00 7.04 0.00 20.31 0.00 10.80 30.39 0.00 8.14 0.00 11.65 0.00 7.94 0.00 0.00

    4.95 0.00 9.24 0.00 20.64 0.00 11.25 33.83 0.00 10.77 0.00 3.37 0.00 5.95 0.00 0.00

    0.00 0.00 0.00 0.00 25.66 0.00 16.52 53.74 0.00 0.00 0.00 4.08 0.00 0.00 0.00 0.00

    2.98 0.00 5.65 0.00 8.19 0.00 3.61 71.34 0.00 6.64 0.00 1.59 0.00 0.00 0.00 0.00

    KSEB

    (2014-15)

    NLC TPS I - EXPN.

    NTECL - VALLUR STPS UNIT - 1

    &2

    NTPC - TALCHER STPS STAGE-II

    NTPC - SIMHADRI STPS STAGE-II

    NLC TPS II - STAGE - II

    NLC TPS II - STAGE - I

    NTPC - RSTPS STAGE-III

    C.(2) CUMULATIVE WEIGHTED AVERAGE OF PERCENTAGE ALLOCATED CAPACITY SHARE OF BENEFICIARIES IN ISGS (THERMAL)

    [Computaion in line with CERC order dated 11/01/10 on petition No.134/2009 of NTPC]

    ISGS

    Andhra Pradesh

    (Residuary )KARNATAKA TAMIL NADU TELANGANA

    PUDU

    CHERRYPG-HVDC

    NLC

    MINESGOA ORISSA

    NTPC - RSTPS STAGE-I & II

    Andhra Pradesh

    (Undivided)

    JANUARY 2015UP TO THE MONTH OF

    JANUARY 2015REA FOR

    : 3 A:

  • REA

    5. DETAILS OF ENERGY SCHEDULED TO BENEFICIARIES IN EXCESS OF EX-BUS ENERGY CORRESPONDING TO NAPLF.

    NAPLFNTPC Stns = 85% Ex-Bus Energy to be Energy Ex-Bus Energy to be Energy Incetive NLC Stns = 80% Scheduled scheduled scheduled Scheduled scheduled scheduled Energy

    NTCEL Stn = 85% Energy upto NAPLF in excess of

    NAPLF Energy upto NAPLFin excess of

    NAPLF(Payable)

    NTPC RSTPS STAGE - I & II ANDHRA PRADESH -NTPC (U) 85,03,84,440 79,77,86,726 5,25,97,714 85,03,84,440 79,77,86,726 5,25,97,714 4,86,66,835ANDHRA PRADESH-NVVN (U) 1,63,88,638 1,53,59,658 10,28,980 1,63,88,638 1,53,59,658 10,28,980 9,52,079

    ANDHRA PRADESH-NTPC ( R ) 1,33,63,74,743 1,29,96,78,152 3,66,96,591 1,53,68,20,519 1,47,67,77,970 6,00,42,549 5,55,55,282

    ANDHRA PRADESH-NVVN (R) 3,68,10,811 3,30,10,072 38,00,739 4,64,39,712 4,15,61,428 48,78,284 45,13,706

    KARNATAKA-NTPC 2,05,28,05,361 2,02,31,53,236 2,96,52,125 2,35,39,74,590 2,28,04,37,506 7,35,37,084 6,80,41,305

    KARNATAKA-NVVN 14,07,23,989 13,63,25,962 43,98,027 15,80,28,101 15,16,93,616 63,34,485 58,61,079

    KERALA 1,48,49,96,618 1,41,14,13,469 7,35,83,149 1,68,85,67,071 1,58,39,27,777 10,46,39,294 9,68,19,098

    TAMIL TADU-NTPC 2,86,99,90,072 2,79,26,43,330 7,73,46,742 3,18,34,54,345 3,09,30,56,177 9,03,98,168 8,36,42,279

    TAMIL NADU-NVVN 1,02,13,839 98,94,626 3,19,213 1,14,69,783 1,10,10,021 4,59,762 4,25,402

    TELANGANA-NTPC 1,56,42,02,382 1,51,60,24,655 4,81,77,727 1,81,60,45,206 1,73,21,63,271 8,38,81,935 7,76,13,036

    TELANGANA-NVVN 4,23,56,536 3,81,39,287 42,17,249 5,36,60,028 4,81,77,835 54,82,193 50,72,483

    PUDUCHERRY 38,18,77,894 38,53,14,738 -34,36,844 39,61,86,224 40,57,63,632 -95,77,408 0

    GOA 54,88,90,711 52,31,91,857 2,56,98,854 55,04,99,605 58,21,83,819 -3,16,84,214 0

    PG-HVDC 1,26,92,855 1,20,93,432 5,99,423 8,22,83,499 1,34,56,692 6,88,26,807 6,36,83,050

    TOTAL 11,34,87,08,889 10,99,40,29,200 35,46,79,689 12,74,42,01,761 12,23,33,56,128 51,08,45,633 51,08,45,633NTPC RSTPS Stage - III ANDHRA PRADESH -NTPC (U) 24,14,15,906 20,47,27,173 3,66,88,733 24,14,15,906 20,47,27,173 3,66,88,733 3,40,96,406

    ANDHRA PRADESH-NVVN (U) 44,40,456 37,52,149 6,88,307 44,40,456 37,52,149 6,88,307 6,39,673

    ANDHRA PRADESH-NTPC ( R ) 33,75,33,968 33,18,10,914 57,23,054 38,80,62,501 37,63,64,680 1,16,97,821 1,08,71,285

    ANDHRA PRADESH-NVVN (R) 88,07,019 79,95,548 8,11,471 1,11,25,953 1,00,81,677 10,44,276 9,70,490

    KARNATAKA-NTPC 52,63,10,903 51,24,67,806 1,38,43,097 60,53,41,766 57,90,45,139 2,62,96,627 2,44,38,579

    KARNATAKA-NVVN 3,48,10,867 3,33,10,778 15,00,090 3,89,84,949 3,70,65,811 19,19,138 17,83,537

    KERALA 42,66,71,024 39,05,20,558 3,61,50,466 48,28,84,652 43,71,60,454 4,57,24,198 4,24,93,450

    TAMIL TADU-NTPC 71,46,37,210 68,86,66,918 2,59,70,292 78,75,40,441 76,26,94,713 2,48,45,728 2,30,90,196

    TAMIL NADU-NVVN 24,86,491 23,79,341 1,07,150 27,84,640 26,47,558 1,37,082 1,27,396

    TELANGANA-NTPC 39,02,19,333 38,44,41,942 57,77,391 45,18,41,639 43,81,44,876 1,36,96,763 1,27,28,987

    TELANGANA-NVVN 1,02,58,413 93,77,008 8,81,405 1,29,74,879 1,18,20,760 11,54,119 10,72,572

    PUDUCHERRY 6,51,75,646 7,42,62,365 -90,86,719 6,66,45,789 7,82,26,011 -1,15,80,222 0

    TOTAL 2,76,27,67,236 2,64,37,12,500 11,90,54,736 3,09,40,43,571 2,94,17,31,000 15,23,12,571 15,23,12,571NTPC Talcher Stage - II ANDHRA PRADESH -NTPC (U) 54,64,78,185 47,57,99,033 7,06,79,152 54,64,78,185 47,57,99,033 7,06,79,152 7,06,79,152

    ANDHRA PRADESH-NVVN (U) 1,72,50,077 1,50,08,596 22,41,481 1,72,50,077 1,50,08,596 22,41,481 22,41,481

    ANDHRA PRADESH-NTPC ( R ) 79,38,08,961 76,42,65,559 2,95,43,402 91,70,45,723 87,25,05,878 4,45,39,845 4,45,39,845

    ANDHRA PRADESH-NVVN (R) 3,60,00,253 3,19,82,192 40,18,061 4,54,59,145 4,03,26,710 51,32,435 51,32,435

    KARNATAKA-NTPC 1,99,84,69,146 1,89,70,08,883 10,14,60,263 2,24,30,02,113 2,11,25,35,862 13,04,66,251 13,04,66,251

    KARNATAKA-NVVN 14,17,39,653 13,32,43,110 84,96,543 15,87,65,658 14,82,63,242 1,05,02,416 1,05,02,416

    KSEB 2,43,00,20,215 2,27,58,42,309 15,41,77,906 2,72,09,15,060 2,53,11,84,560 18,97,30,500 18,97,30,500

    TAMIL TADU-NTPC 2,77,80,53,795 2,60,97,65,309 16,82,88,486 3,10,40,21,419 2,90,09,88,987 20,30,32,432 20,30,32,432

    TAMIL NADU-NVVN 1,01,24,262 95,17,365 6,06,897 1,13,40,405 1,05,90,232 7,50,173 7,50,173

    TELANGANA-NTPC 91,76,51,839 88,50,88,027 3,25,63,812 1,06,23,85,223 1,01,22,82,323 5,01,02,900 5,01,02,900

    TELANGANA-NVVN 4,20,85,041 3,75,08,032 45,77,009 5,31,65,457 4,72,83,038 58,82,419 58,82,419

    PUDUCHERRY 38,50,76,022 36,13,02,248 2,37,73,774 42,81,36,543 40,00,44,653 2,80,91,890 2,80,91,890

    PG-HVDC 2,25,93,744 2,11,49,700 14,44,044 2,53,08,800 2,35,33,848 17,74,952 17,74,952

    ORISSA 1,12,98,27,572 1,05,73,69,638 7,24,57,934 1,26,71,75,188 1,17,65,77,038 9,05,98,150 9,05,98,150 TOTAL 11,24,91,78,765 10,57,48,50,000 67,43,28,765 12,60,04,48,996 11,76,69,24,000 83,35,24,996 83,35,24,996

    up to Preivious Month up to Current Month

    JANUARY 2015

    ( Energy Figures in KWHrs )

  • 0 REA5. DETAILS OF ENERGY SCHEDULED TO BENEFICIARIES IN EXCESS OF EX-BUS ENERGY CORRESPONDING TO NAPLF.

    NAPLFNTPC Stns = 85% Ex-Bus Energy to be Energy Ex-Bus Energy to be Energy Incetive NLC Stns = 80% Scheduled scheduled scheduled Scheduled scheduled scheduled Energy

    NTCEL Stn = 85% Energy upto NAPLF in excess of

    NAPLF Energy upto NAPLF in excess of

    NAPLF(Payable)

    NTPC Simhadri Stage - IIANDHRA PRADESH -NTPC (U) 65,20,06,223 55,63,65,936 9,56,40,287 65,20,06,223 55,63,65,936 9,56,40,287 0

    ANDHRA PRADESH-NVVN (U) 88,62,856 75,44,109 13,18,747 88,62,856 75,44,109 13,18,747 0

    ANDHRA PRADESH-NTPC ( R ) 78,66,39,837 87,60,11,542 -8,93,71,705 92,05,77,464 99,62,70,781 -7,56,93,317 0

    ANDHRA PRADESH-NVVN (R) 1,57,63,886 1,60,75,929 -3,12,043 2,03,26,520 2,02,70,322 56,198 0

    KARNATAKA-NTPC 89,02,72,809 98,03,45,618 -9,00,72,809 1,04,07,44,932 1,10,80,34,925 -6,72,89,993 0

    KARNATAKA-NVVN 6,32,03,128 6,69,74,985 -37,71,857 7,14,15,868 7,45,24,892 -31,09,024 0

    KERALA 54,66,18,000 55,56,75,891 -90,57,891 62,32,35,785 61,90,71,145 41,64,640 0

    TAMIL TADU-NTPC 1,06,65,45,374 1,14,57,55,469 -7,92,10,095 1,18,28,48,235 1,27,10,47,979 -8,81,99,744 0

    TAMIL NADU-NVVN 45,14,510 47,83,928 -2,69,418 51,01,134 53,23,207 -2,22,073 0

    TELANGANA-NTPC 93,29,89,343 1,04,43,07,212 -11,13,17,869 1,08,74,70,167 1,18,61,97,535 -9,87,27,368 0

    TELANGANA-NVVN 1,82,84,119 1,88,53,507 -5,69,388 2,36,28,918 2,37,66,938 -1,38,020 0

    PUDUCHERRY 3,04,21,187 4,27,80,876 -1,23,59,689 3,17,07,960 4,62,56,230 -1,45,48,270 0 TOTAL 5,01,61,21,272 5,31,54,75,000 0 5,66,79,26,062 5,91,46,74,000 0 0

    NLC TPS II- STAGE-IANDHRA PRADESH -Undivided 15,36,12,177 12,43,84,290 2,92,27,887 15,36,12,177 12,43,84,290 2,92,27,887 2,92,27,887

    ANDHRA PRADESH - Residual 20,42,08,369 20,59,81,572 0 23,70,65,020 23,42,84,758 27,80,262 27,80,262

    KARNATAKA 62,41,25,124 60,24,99,780 2,16,25,344 71,12,02,385 67,67,21,857 3,44,80,528 3,44,80,528

    KERALA 33,96,33,594 32,02,73,688 1,93,59,906 38,61,62,118 36,00,09,994 2,61,52,124 2,61,52,124

    TAMIL NADU 97,02,01,387 91,10,19,643 5,91,81,744 1,08,66,23,958 1,01,22,71,107 7,43,52,851 7,43,52,851

    TELANGANA 23,73,30,116 23,69,72,664 3,57,452 27,72,28,190 27,09,92,410 62,35,780 62,35,780

    PUDUCHERRY 37,42,37,269 35,49,23,819 1,93,13,450 41,16,95,013 38,80,73,654 2,36,21,359 2,36,21,359 TOTAL 2,90,33,48,036 2,75,60,55,456 14,72,92,580 3,26,35,88,861 3,06,67,38,071 19,68,50,790 19,68,50,790

    NLC TPS II-STAGE-IIANDHRA PRADESH -Undivided 26,36,32,303 21,99,29,130 4,37,03,173 26,36,32,303 21,99,29,130 4,37,03,173 4,37,03,173

    ANDHRA PRADESH - Residual 35,70,99,436 36,03,47,563 -32,48,127 41,87,91,807 41,04,96,516 82,95,291 82,95,291

    KARNATAKA 83,22,20,202 81,91,73,280 1,30,46,922 95,27,83,327 91,65,93,440 3,61,89,887 3,61,89,887

    KERALA 46,70,44,890 44,86,78,523 1,83,66,367 52,99,45,635 49,93,35,314 3,06,10,321 3,06,10,321

    TAMIL NADU 1,40,83,06,725 1,35,17,36,456 5,65,70,269 1,58,92,60,967 1,50,28,18,111 8,64,42,856 8,64,42,856

    TELANGANA 41,24,00,659 41,87,61,161 0 48,62,27,718 47,83,05,108 79,22,610 79,22,610

    PUDUCHERRY 13,93,00,150 13,55,48,927 37,51,223 15,63,19,746 14,98,95,336 64,24,410 64,24,410 TOTAL 3,88,00,04,365 3,75,41,75,040 12,58,29,325 4,39,69,61,503 4,17,73,72,954 21,95,88,549 21,95,88,549

    NLC TPS I- Expn.ANDHRA PRADESH 0 0 0 0 0 0 0

    KARNATAKA 56,13,01,580 51,72,08,280 4,40,93,300 63,41,70,399 57,60,61,888 5,81,08,511 5,81,08,511

    KERALA 38,25,64,662 33,70,00,971 4,55,63,691 42,91,22,122 37,44,90,696 5,46,31,426 5,46,31,426

    TAMIL NADU 1,22,49,16,867 1,09,22,20,936 13,26,95,931 1,37,59,00,840 1,21,53,03,433 16,05,97,407 16,05,97,407

    TELANGANA 0 0 0 0 0 0 0

    PUDUCHERRY 9,27,02,651 8,26,73,813 1,00,28,838 10,40,13,233 9,19,83,343 1,20,29,890 1,20,29,890 TOTAL 2,26,14,85,760 2,02,91,04,000 23,23,81,760 2,54,32,06,594 2,25,78,39,360 28,53,67,234 28,53,67,234

    NTECL Vallur STPS ANDHRA PRADESH -Undivided 16,64,16,810 17,53,44,472 -89,27,662 16,64,16,810 17,53,44,472 -89,27,662 0

    ANDHRA PRADESH - Residual 19,26,29,426 29,29,36,804 -10,03,07,378 22,53,88,524 33,23,34,850 -10,69,46,326 0

    KARNATAKA 29,41,53,074 42,89,42,834 -13,47,89,760 33,81,04,523 48,20,49,731 -14,39,45,208 0

    KERALA 14,01,58,567 19,22,39,237 -5,20,80,670 15,69,74,381 21,22,66,080 -5,52,91,699 0

    TAMIL NADU 2,70,96,24,535 3,77,03,37,792 -1,06,07,13,257 3,06,37,24,136 4,19,76,36,717 -1,13,39,12,581 0

    TELANGANA 22,47,93,048 34,43,92,101 -11,95,99,053 26,33,14,670 39,04,65,761 -12,71,51,091 0

    PUDUCHERRY 5,82,71,582 8,32,31,760 -2,49,60,178 6,67,12,738 9,33,64,389 -2,66,51,651 0 TOTAL 3,78,60,47,042 5,28,74,25,000 0 4,28,06,35,782 5,88,34,62,000 0 0

    JANUARY 2015

    ( Energy Figures in KWHrs )up to Preivious Month up to Current Month

  • /RATE = 7.51-Sep-14 /TO 30-Sep-14

    KWHrs KWHrs KWHrs Rs.

    /KPTCL 137,340/TNEB 65,250,028/PONDY 4,790,698/APTRANSCO 31,566,336 73,294,280 /TELANGANA 19,399,248 85,720,440/KSEB 68,106,440 42,429,520/TNEB 133,684,840/KPTCL/TNEB 716,128/APTRANSCO 8,840,945 9,384,160/KPTCL 33,502,211 15,195,160/KSEB 47,361,267 10,850,160

    /TELANGANA /KPTCL/PUDUCHERRY /APTRANSCO

    /TOTAL 151,389,272 11,354,195

    /Beneficiary !/Energy /Ratio$ & '.)./

    Wheeling charges in Rs.

    /FOR THE PERIOD FROM

    /KPTCL

    54,818,158

    TO

    PAY

    5,263,355

    716,128 53,710

    25,676,920 1,925,769

    4,111,362/TNEB

    /KSEB

    $ &/WHEELING CHARGES

    TO

    R

    ECEI

    VE

    , -, - , () /

    TO BE SHARED IN THE RATIO OF SCHEDULE FROM RSTPS, NLC II STAGE I & II, NLC I ( Expn. ) & Talcher

    : 6 :

    TO

    K. ! $ /DETAILS OF WHEELING CHAREGES FOR THE MONTH OF

    70,178,066

    * /WHEELED BY

    /APTRANSCO

    !/ENERGY WHEELED

    / , /

    MAPS / KGS Share to be Wheeled

    / !/NET ENERGY WHEELED

    /APTRANSCO 608,330,250 0.135252354 1,535,682/KPTCL 847,157,793 0.18835178 2,138,583/KSEB 739,631,905 0.164445145 1,867,142/TNEB 1,493,812,138 0.332124874 3,771,011 /TELANGANA 631,093,008 0.140313283 1,593,144/PUDUCHERRY 177,717,335 0.039512564 448,633

    TO

    PAY

    /PUDUCHERRY 177,717,335 0.039512564 448,633

    KWHrs Rs. @ of 2.5 Ps/KWHr

    203,075,124 5,076,878

    /Beneficiary !/Energy /Ratio$ & '.)./

    Wheeling charges in Rs.

    ) + $- /MAPS ENERGY WHEELED BY TNEB TO BE SHARED IN THE RATIO OF DRAWAL FROM MAPS

    * &0/RECEIVABLE BY TNEB

    TO

    PAY

    /APTRANSCO 9,384,160 0.045710353 232,066/KPTCL 15,195,160 0.074015802 375,769/KSEB 10,850,160 0.052851256 268,319/TNEB 155,141,280 0.755694992 3,836,571 /TELANGANA 10,990,960 0.053537095 271,801/PUDUCHERRY 3,734,440 0.018190501 92,351

    KWHrs Rs. @ of 2.5 Ps/KWHr

    499,231,081 12,480,777

    /Beneficiary !/Energy /Ratio$ & '.)./

    Wheeling charges in Rs.

    * &0/RECEIVABLE BY KPTCL

    * ) + $- /KGS ENERGY WHEELED BY KPTCL TO BE SHARED IN THE RATIO OF DRAWAL FROM KGS

    TO

    PAY

    TO

    PAY

    /APTRANSCO 73,294,280 0.146694332 1,830,859/KPTCL 144,138,920 0.28848585 3,600,528/KSEB 42,429,520 0.084920271 1,059,871/TNEB 133,684,840 0.267562603 3,339,389 /TELANGANA 85,720,440 0.171564585 2,141,259/PUDUCHERRY 20,371,480 0.040772359 508,871

    /Beneficiary &0/Receivable /Payable //NET

    ) /PAYABLE BY

    ) $-/RECEIVABLE BY

    /APTRANSCO 5263355 3598607 1,664,748 /KPTCL /APTRANSCO 1,664,748

    /KPTCL 14406546 6114880 8,291,666 8,291,666

    /KSEB 53710 3195333 -3,141,623 /KSEB /KPTCL (3,141,623)/TNEB 9188240 10946971 -1,758,731 /TNEB /KPTCL (1,758,731) /TELANGANA 4006205 -4,006,205 /TELANGANA /KPTCL (4,006,205)/PUDUCHERRY 1049855 -1,049,855 /PUDUCHERRY /KPTCL (1,049,855)

    ! $ /STATEMENT OF WHEELING CHARGES

    ** -1 400 2 3 ! $/ Actual Energy wheeled on 400kV Kaiga - Guttur lines

    ! 1 /Amount in Rs.

    TO

    PAY

    / $ & '.)/NET WHEELING CHARGES IN Rs.

  • /RATE = 7.51-Jun-14 /TO 30-Jun-14

    KWHrs KWHrs KWHrs Rs.

    /KPTCL 3,492/TNEB 105,955,580/PONDY 5,657,746/APTRANSCO 37,262,160 57,864,110 /TELANGANA 52,451,584 63,115,418/KSEB 71,007,440 32,854,405/TNEB 104,008,533/KPTCL 16/TNEB 1,210,296/APTRANSCO 4,676,582 9,762,120/KPTCL 28,017,376 15,266,200/KSEB 40,110,668 10,901,080

    /TELANGANA /KPTCL/PUDUCHERRY /APTRANSCO

    /TOTAL 192,940,928 14,470,570

    /Beneficiary !/Energy /Ratio$ & '.)./

    Wheeling charges in Rs.

    /FOR THE PERIOD FROM

    /KPTCL

    41,960,763

    TO

    PAY

    8,371,261

    1,210,312 90,773

    38,153,035 2,861,478

    3,147,057/TNEB

    /KSEB

    $ &/WHEELING CHARGES

    TO

    R

    ECEI

    VE

    , -, - , () /

    TO BE SHARED IN THE RATIO OF SCHEDULE FROM RSTPS, NLC II STAGE I & II, NLC I ( Expn. ) & Talcher

    : 6 :

    TO

    K. ! $ /DETAILS OF WHEELING CHAREGES FOR THE MONTH OF

    111,616,818

    * /WHEELED BY

    /APTRANSCO

    !/ENERGY WHEELED

    / , /

    MAPS / KGS Share to be Wheeled

    / !/NET ENERGY WHEELED

    /APTRANSCO 723,577,848 0.138892118 2,009,848/KPTCL 955,656,368 0.183440023 2,654,482/KSEB 781,286,628 0.149969426 2,170,143/TNEB 1,810,577,635 0.347543755 5,029,156 /TELANGANA 745,970,378 0.143190406 2,072,047/PUDUCHERRY 192,570,533 0.036964273 534,894

    TO

    PAY

    /PUDUCHERRY 192,570,533 0.036964273 534,894

    KWHrs Rs. @ of 2.5 Ps/KWHr

    205,918,704 5,147,968

    /Beneficiary !/Energy /Ratio$ & '.)./

    Wheeling charges in Rs.

    ) + $- /MAPS ENERGY WHEELED BY TNEB TO BE SHARED IN THE RATIO OF DRAWAL FROM MAPS

    * &0/RECEIVABLE BY TNEB

    TO

    PAY

    /APTRANSCO 9,762,120 0.047330086 243,654/KPTCL 15,266,200 0.074015743 381,031/KSEB 10,901,080 0.052852153 272,081/TNEB 155,867,080 0.755696752 3,890,302 /TELANGANA 10,708,320 0.051917587 267,270/PUDUCHERRY 3,751,320 0.018187679 93,630

    KWHrs Rs. @ of 2.5 Ps/KWHr

    386,403,350 9,660,084

    /Beneficiary !/Energy /Ratio$ & '.)./

    Wheeling charges in Rs.

    * &0/RECEIVABLE BY KPTCL

    * ) + $- /KGS ENERGY WHEELED BY KPTCL TO BE SHARED IN THE RATIO OF DRAWAL FROM KGS

    TO

    PAY

    TO

    PAY

    /APTRANSCO 57,864,110 0.151109186 1,459,727/KPTCL 109,250,560 0.285302292 2,756,044/KSEB 32,854,405 0.085797611 828,812/TNEB 104,008,533 0.271613004 2,623,804 /TELANGANA 63,115,418 0.164822709 1,592,201/PUDUCHERRY 15,836,110 0.041355197 399,495

    /Beneficiary &0/Receivable /Payable //NET

    ) /PAYABLE BY

    ) $-/RECEIVABLE BY

    /APTRANSCO 8371261 3713229 4,658,032 /KPTCL /APTRANSCO 4,658,032

    /KPTCL 12521561 5791556 6,730,005 6,730,005

    /KSEB 90773 3271036 -3,180,263 /KSEB /KPTCL (3,180,263)/TNEB 8295025 11543263 -3,248,238 /TNEB /KPTCL (3,248,238) /TELANGANA 3931518 -3,931,518 /TELANGANA /KPTCL (3,931,518)/PUDUCHERRY 1028018 -1,028,018 /PUDUCHERRY /KPTCL (1,028,018)

    ! $ /STATEMENT OF WHEELING CHARGES

    ** -1 400 2 3 ! $/ Actual Energy wheeled on 400kV Kaiga - Guttur lines

    ! 1 /Amount in Rs.

    TO

    PAY

    / $ & '.)/NET WHEELING CHARGES IN Rs.

  • /RATE = 7.51-Jul-14 /TO 31-Jul-14

    KWHrs KWHrs KWHrs Rs.

    /KPTCL/TNEB 95,182,272/PONDY 4,081,945/APTRANSCO 44,420,028 71,698,510 /TELANGANA 67,210,976 83,855,930/KSEB 66,396,942 41,528,430/TNEB 130,856,260/KPTCL/TNEB 1,791,684/APTRANSCO 4,323,891 9,816,920/KPTCL 33,893,968 15,896,160/KSEB 28,919,131 11,351,000

    /TELANGANA /KPTCL/PUDUCHERRY /APTRANSCO

    /TOTAL 161,490,352 12,111,776

    /Beneficiary !/Energy /Ratio$ & '.)./

    Wheeling charges in Rs.

    TO

    K. /DETAILS OF WHEELING CHAREGES FOR THE MONTH OF

    99,264,217

    * /WHEELED BY

    /APTRANSCO

    !/ENERGY WHEELED

    / , /

    MAPS / KGS Share to be Wheeled

    / !/NET ENERGY WHEELED

    $ &/WHEELING CHARGES

    TO

    R

    ECEI

    VE

    , -, - , () ! " /

    TO BE SHARED IN THE RATIO OF SCHEDULE FROM RSTPS, NLC II STAGE I & II, NLC I ( Expn. ) & Talcher

    : 6 :

    24,868,512 1,865,138

    2,667,445/TNEB

    /KSEB

    % /FOR THE PERIOD FROM

    /KPTCL

    35,565,939

    TO

    PAY

    7,444,816

    1,791,684 134,376

    /APTRANSCO 727,915,468 0.139737579 1,692,470/KPTCL 853,833,853 0.16391007 1,985,242/KSEB 799,767,348 0.153530949 1,859,533/TNEB 1,773,049,903 0.340371529 4,122,504 /TELANGANA 867,023,518 0.166442084 2,015,909/PUDUCHERRY 187,570,355 0.03600779 436,118

    TO

    PAY

    /PUDUCHERRY 187,570,355 0.03600779 436,118

    KWHrs Rs. @ of 2.5 Ps/KWHr

    216,876,408 5,421,910

    /Beneficiary !/Energy /Ratio$ & '.)./

    Wheeling charges in Rs.

    * &0/RECEIVABLE BY TNEB

    TO

    PAY

    ) + - ! /MAPS ENERGY WHEELED BY TNEB TO BE SHARED IN THE RATIO OF DRAWAL FROM MAPS

    /APTRANSCO 9,816,920 0.045707842 247,824/KPTCL 15,896,160 0.074012946 401,292/KSEB 11,351,000 0.052850559 286,551/TNEB 162,306,080 0.755701444 4,097,345 /TELANGANA 11,498,840 0.053538906 290,283/PUDUCHERRY 3,906,400 0.018188303 98,615

    KWHrs Rs. @ of 2.5 Ps/KWHr

    498,289,495 12,457,237

    /Beneficiary !/Energy /Ratio$ & '.)./

    Wheeling charges in Rs.

    TO

    PAY

    TO

    PAY

    * &0/RECEIVABLE BY KPTCL

    * ) + - ! /KGS ENERGY WHEELED BY KPTCL TO BE SHARED IN THE RATIO OF DRAWAL FROM KGS

    /APTRANSCO 71,698,510 0.146658506 1,826,960/KPTCL 141,001,580 0.288417166 3,592,881/KSEB 41,528,430 0.084945942 1,058,192/TNEB 130,856,260 0.267665026 3,334,367 /TELANGANA 83,855,930 0.171526373 2,136,745/PUDUCHERRY 19,939,970 0.040786987 508,093

    /Beneficiary &0/Receivable /Payable //NET

    ) /PAYABLE BY

    ) -/RECEIVABLE BY

    /APTRANSCO 7444816 3767254 3,677,562 /KPTCL /APTRANSCO 3,677,562

    /KPTCL 14322376 5979415 8,342,961 8,342,961

    /KSEB 134376 3204275 -3,069,899 /KSEB /KPTCL (3,069,899)/TNEB 8089356 11554216 -3,464,860 /TNEB /KPTCL (3,464,860) /TELANGANA 4442937 -4,442,937 /TELANGANA /KPTCL (4,442,937)/PUDUCHERRY 1042827 -1,042,827 /PUDUCHERRY /KPTCL (1,042,827)

    1 !/Amount in Rs.

    TO

    PAY

    / $ & '.)/NET WHEELING CHARGES IN Rs.

    ** -1 400 2 3 ! $/ Actual Energy wheeled on 400kV Kaiga - Guttur lines

    /STATEMENT OF WHEELING CHARGES

  • /RATE = 7.51-Jan-15 /TO 31-Jan-15

    KWHrs KWHrs KWHrs Rs.

    /KPTCL 22,980/TNEB 72,841,032/PONDY 4,120,700/APTRANSCO 46,483,248 85,223,840 /TELANGANA 66,471,120 99,624,228/KSEB 77,887,062 48,301,840/TNEB 155,439,193/KPTCL/TNEB 148,840/APTRANSCO 30,341,258 8,870,935/KPTCL 23,566,988 14,296,323/KSEB 41,051,920 10,135,485

    /TELANGANA /KPTCL 128,464 128,464 9,635/PUDUCHERRY /APTRANSCO

    /TOTAL 168,504,662 12,637,850

    /Beneficiary !/Energy /Ratio$ & '.)./

    Wheeling charges in Rs.

    TO

    K. /DETAILS OF WHEELING CHAREGES FOR THE MONTH OF

    76,984,712

    * /WHEELED BY

    /APTRANSCO

    !/ENERGY WHEELED

    / , /

    MAPS / KGS Share to be Wheeled

    / !/NET ENERGY WHEELED

    $ &/WHEELING CHARGES

    TO

    R

    ECEI

    VE

    , -, - , () ! " /

    TO BE SHARED IN THE RATIO OF SCHEDULE FROM RSTPS, NLC II STAGE I & II, NLC I ( Expn. ) & Talcher

    : 6 :

    29,585,222 2,218,892

    4,624,307/TNEB

    /KSEB

    % /FOR THE PERIOD FROM

    /KPTCL

    61,657,424

    TO

    PAY

    5,773,853

    148,840 11,163

    /APTRANSCO 871,300,160 0.139702735 1,765,542/KPTCL 1,280,324,315 0.205284949 2,594,360/KSEB 1,006,695,445 0.161411777 2,039,898/TNEB 1,996,407,788 0.320100514 4,045,382 /TELANGANA 927,429,335 0.148702389 1,879,278/PUDUCHERRY 154,658,275 0.024797636 313,389

    TO

    PAY

    /PUDUCHERRY 154,658,275 0.024797636 313,389

    KWHrs Rs. @ of 2.5 Ps/KWHr

    187,952,124 4,698,803

    /Beneficiary !/Energy /Ratio$ & '.)./

    Wheeling charges in Rs.

    * &0/RECEIVABLE BY TNEB

    TO

    PAY

    ) + - ! /MAPS ENERGY WHEELED BY TNEB TO BE SHARED IN THE RATIO OF DRAWAL FROM MAPS

    /APTRANSCO 8,870,935 0.045906675 215,706/KPTCL 14,296,323 0.073982802 347,631/KSEB 10,135,485 0.052450662 246,455/TNEB 146,050,738 0.755805751 3,551,382 /TELANGANA 10,364,113 0.053633799 252,015/PUDUCHERRY 3,520,865 0.018220312 85,614

    KWHrs Rs. @ of 2.5 Ps/KWHr

    583,953,469 14,598,837

    /Beneficiary !/Energy /Ratio$ & '.)./

    Wheeling charges in Rs.

    TO

    PAY

    TO

    PAY

    * &0/RECEIVABLE BY KPTCL

    * ) + - ! /KGS ENERGY WHEELED BY KPTCL TO BE SHARED IN THE RATIO OF DRAWAL FROM KGS

    /APTRANSCO 85,223,840 0.147156425 2,148,313/KPTCL 166,853,738 0.288107173 4,206,030/KSEB 48,301,840 0.083403026 1,217,587/TNEB 155,439,193 0.268397621 3,918,293 /TELANGANA 99,624,228 0.172021646 2,511,316/PUDUCHERRY 23,694,905 0.040914109 597,298

    /Beneficiary &0/Receivable /Payable //NET

    ) /PAYABLE BY

    ) -/RECEIVABLE BY

    /APTRANSCO 5773853 4129561 1,644,292 /KPTCL /APTRANSCO 1,644,292

    /KPTCL 16817728 7148021 9,669,708 9,669,708

    /KSEB 11163 3503940 -3,492,777 /KSEB /KPTCL (3,492,777)/TNEB 9323110 11515058 -2,191,948 /TNEB /KPTCL (2,191,948) /TELANGANA 9635 4642609 -4,632,974 /TELANGANA /KPTCL (4,632,974)/PUDUCHERRY 996301 -996,301 /PUDUCHERRY /KPTCL (996,301)

    1 !/Amount in Rs.

    TO

    PAY

    / $ & '.)/NET WHEELING CHARGES IN Rs.

    ** -1 400 2 3 ! $/ Actual Energy wheeled on 400kV Kaiga - Guttur lines

    /STATEMENT OF WHEELING CHARGES

  • /RATE = 7.5 Ps./KWHr.1-Apr-14 /TO 30-Apr-14

    KWHrs KWHrs KWHrs Rs.

    /FOR THE PERIOD FROM

    /WHEELING CHARGES

    : 6 :

    Apr-14

    TO

    K. /DETAILS OF WHEELING CHAREGES FOR THE MONTH OF

    /WHEELED BY [/

    ENERGY WHEELED

    / /

    MAPS / KGS Share to be Wheeled

    [/NET ENERGY WHEELED

    /KPTCL/TNEB 8,49,49,556/PONDY 54,39,051/APTRANSCO 4,56,32,472 14,31,51,142/KSEB 7,36,41,596 3,85,53,059/TNEB 12,17,77,642/KPTCL/TNEB 3,33,23,770/APTRANSCO 56,89,326 1,83,09,776/KPTCL 3,06,03,207 1,36,53,016/KSEB 1,33,75,280 97,48,917

    /PUDUCHERRY /APTRANSCO/TOTAL 17 93 77 468 1 34 53 310

    /KPTCL

    2,05,76,554

    67,79,146

    3,33,23,770 24,99,283/KSEB

    3,50,88,537 26,31,640

    15,43,242/TNEB

    TO

    REC

    EIVE

    9,03,88,607/APTRANSCO

    /TOTAL 17,93,77,468 1,34,53,310

    /Beneficiary [/Energy /Ratio ../

    Wheeling charges in Rs.

    TO P

    AY

    , -, - , () /

    TO BE SHARED IN THE RATIO OF SCHEDULE FROM RSTPS, NLC II STAGE I & II, NLC I ( Expn. ) & Talcher

    /APTRANSCO 1,34,57,97,231 0.26639369 35,83,877/KPTCL 99,38,43,225 0.196726192 26,46,618/KSEB 74,98,71,103 0.148433156 19,96,917/TNEB 1,77,98,75,888 0.352317344 47,39,834/PUDUCHERRY 18,25,23,616 0.036129618 4,86,063

    KWHrs Rs @ of 2 5 Ps/KWHr

    TO P

    AY

    KWHrs Rs. @ of 2.5 Ps/KWHr

    18,44,61,912 46,11,548

    /Beneficiary [/Energy /Ratio ../

    Wheeling charges in Rs.

    [ /MAPS ENERGY WHEELED BY TNEB TO BE SHARED IN THE RATIO OF DRAWAL FROM MAPS

    /RECEIVABLE BY TNEB

    TO P

    AY

    /APTRANSCO 1,83,09,776 0.09926047 4,57,744/KPTCL 1,36,53,016 0.074015366 3,41,325/KSEB 97,48,917 0.052850569 2,43,723/TNEB 13,93,94,671 0.755682674 34,84,867/PUDUCHERRY 33,55,532 0.018190921 83,888

    TO P

    AY

    /PUDUCHERRY , , ,

    KWHrs Rs. @ of 2.5 Ps/KWHr

    17,71,15,666 44,27,892

    /Beneficiary [/Energy /Ratio ../

    Wheeling charges in Rs.

    /RECEIVABLE BY KPTCL

    * [ /KGS ENERGY WHEELED BY KPTCL TO BE SHARED IN THE RATIO OF DRAWAL FROM KGS

    O P

    AY

    /APTRANSCO 14,31,51,142 0.317033939 14,03,792/KPTCL 12,95,02,450 0.286806457 12,69,948/KSEB 3,85,53,059 0.08538268 3,78,065 O

    PAY

    /TNEB 12,17,77,642 0.269698481 11,94,196/PUDUCHERRY 1,85,48,254 0.041078443 1,81,891

    /Beneficiary /Receivable /Payable /NET

    /PAYABLE BY

    /RECEIVABLE BY

    /APTRANSCO 6779146 5445413 13,33,732 /KPTCL /APTRANSCO

    /KPTCL 7059532 4257892 28 01 640 /KPTCL /KPTCL

    13,33,732

    28 01 640

    /STATEMENT OF WHEELING CHARGES

    ** - 400 [ / Actual Energy wheeled on 400kV Kaiga - Guttur lines

    /Amount in

    Rs.

    TO

    ./NET WHEELING CHARGES IN Rs.

    /KPTCL 7059532 4257892 28,01,640 /KPTCL /KPTCL

    /KSEB 2499283 2618705 -1,19,423 /KSEB /KPTCL

    /TNEB 6154789 9418897 -32,64,108 /TNEB /KPTCL/PUDUCHERRY 751842 -7,51,842 /PUDUCHERRY /KPTCL

    POWER FLOW FROM KARNATAKA TO GOA 65586.304 In Kwhr

    7,51,842

    28,01,640

    1,19,423

    32,64,108

  • RSTPS

    Stg. I & II

    RSTPS

    Stg.III

    Talcher

    STPS-II

    Simhadri

    Stage-II

    NLC-II

    Stg-I

    NLC-II

    Stg-II

    NLC -I

    Expn.

    Vallur

    STPS MAPS

    KGS

    1&2

    KGS

    3&4

    KKNPP

    Unit-1

    2100 500 2000 1000 630 840 420 1000 440 440 440 1000

    AP 14.98 15.65 9.78 20.77 8.38 11.14 0.00 6.61 4.59 14.28 15.12 5.00

    KARNATAKA 22.00 23.60 19.34 22.57 22.00 21.65 25.73 8.91 7.40 27.50 30.00 22.10

    KSEB 13.92 15.65 21.42 10.58 11.78 11.26 16.39 3.36 5.25 8.70 8.02 13.30

    TN 24.33 24.93 24.52 21.00 30.00 33.58 53.81 71.69 75.58 28.50 25.32 56.25

    TG 18.25 18.84 11.49 24.50 10.08 13.23 0.00 7.73 5.36 16.69 17.67 0.00

    PUDUCHERRY 1.65 1.33 3.25 0.58 9.82 3.19 4.07 1.70 1.82 4.33 3.87 3.35

    GOA 4.76 0.00 0 0 0 0 0 0 0 0 0 0

    TOTAL 99.89 100.00 89.80 100.00 92.06 94.05 100.00 100.00 100.00 100.00 100.00 100.00

    RSTPS

    Stg. I & II

    RSTPS

    Stg.III

    Talcher

    STPS-II

    Simhadri

    Stage-II

    NLC-II

    Stg-I

    NLC-II

    Stg-II

    NLC -I

    Expn.

    Vallur

    STPS MAPS

    KGS

    1&2

    KGS

    3&4

    KKNPP

    Unit-1

    2100 500 2000 1000 630 840 420 1000 440 440 440 1000

    AP 314.58 78.25 195.60 207.70 52.80 93.58 0.00 66.10 20.20 62.83 66.53 50.00

    KARNATAKA 462.00 118.00 386.80 225.70 138.61 181.86 108.07 89.10 32.56 121.00 132.00 221.00

    KSEB 292.32 78.25 428.40 105.80 74.21 94.58 68.84 33.60 23.10 38.28 35.29 133.00

    TN 510.93 124.65 490.40 210.00 189.00 282.06 226.00 716.90 332.55 125.40 111.40 562.50

    TS 383.25 94.20 229.80 245.00 63.50 111.12 0.00 77.30 23.58 73.44 77.75 0.00

    PUDUCHERRY 34.65 6.65 65.00 5.80 61.87 26.80 17.09 17.00 8.01 19.05 17.03 33.50

    GOA 99.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    TOTAL 2097.69 500.00 1796.00 1000.00 579.99 790.00 420.00 1000.00 440.00 440.00 440.00 1000.00

    ANDHRA PRADESH 11.50

    KARNATAKA 21.10

    KSEB 13.38

    TAMIL NADU 36.96

    TELANGANA 13.13

    PUDUCHERRY 2.98

    GOA 0.95

    LKPL 0.00

    TOTAL 100.00

    * Subject to revision

    ANNEXURE

    FOREntity / Applicant REMRKS SHARING RATIO

    (% ) *

    Entity

    Entity

    ALLOCATION IN MW.

    JANUARY 2015COMPUTAION OF WEIGHTED AVERAGE ALLOCATION FROM CGS OF SR FOR THE MONTH OF

    WEIGHTED AVERAGE % OF ALLOCATION

    WEIGHTED AVERAGE MW ALLOCATION

    10503.68

    JA

    NU

    AR

    Y 2

    015

    1208.17

    1405.67

    3881.79

    2216.70

    99.96

    0.00

    312.45

    1378.94