Real Time Tools Outreach Carlos Martinez January 27-29, 2004 Washington, D.C. nsmission Reliability Research Rev
Transcript
Page 1: Real Time Tools Outreach Carlos Martinez January 27-29, 2004 Washington, D.C. Transmission Reliability Research Review.

Real Time Tools Outreach

Carlos Martinez

January 27-29, 2004

Washington, D.C.

Transmission Reliability Research Review

Page 2: Real Time Tools Outreach Carlos Martinez January 27-29, 2004 Washington, D.C. Transmission Reliability Research Review.

Goals

Vision/Goal: This project will conduct additional demonstrations and enhancements to the current CERTS prototypes, focusing on dissemination for new locations outside of the Western Interconnection.

Key Issues being addressed: Identify and target host sites for current and expanded CERTS Real

Time Monitoring Tools

Work jointly with Hosts to identify their specific operational requirements, and to expand the current set of tools functionality to meet industry requirements

Page 3: Real Time Tools Outreach Carlos Martinez January 27-29, 2004 Washington, D.C. Transmission Reliability Research Review.

Real Time Tools Timeframes

Research, Develop, & Demonstrate Platform Prototypes for:

• Supply Resources and Control Adequacy - ACE, AIE, CPS, FRR• Transmission – VAR Management, Congestion• Markets- Ancillary Services• System

Dispatcher and Operating Engineering Applications Based on Synchronized Phasor Measurements:

• Post Disturbance Applications (Completed, Released)• Real Time Dynamics Monitor (Completed, Released)• Enhance Stability Nomograms• Standard, Low Cost, Reliable Phasor Technologies • Validation of Stability Models

Prototype New Real Time Controls Based on Distributed Closed Loop Feedback Controls and Synchronized Phasor Measurements

1999-2005 2000-2006 2001-2010

SHORT TERM GOAL: BOTLENECK IDENTIFICATION AND RELIEVE

LONG TERM GOAL: AUTOMATIC SWITCHABLE NETWORK

Performance Monitoring,

Prediction and Tracking Platform

Advance Measurements and Controls

2001-2005

Security and Congestion Assessment Tools:

• Integrated Security Analysis• Congestion Management• Cascading and Self Organized Criticality Utilization

System Security Management Tools

Page 4: Real Time Tools Outreach Carlos Martinez January 27-29, 2004 Washington, D.C. Transmission Reliability Research Review.

CERTS Research and Development Process

PROBLEMSIdentify Reliability - Market

RESEARCH

Developand Test

PROTOTYPES

DEMONSTRATEPrototypes

DISSEMINATEand

TrainingSolutions and

Design ConceptsRESEARCH AND

DEVELOPMENTPROCESS

Page 5: Real Time Tools Outreach Carlos Martinez January 27-29, 2004 Washington, D.C. Transmission Reliability Research Review.

CERTS Real Time Grid Monitoring Tools Roadmap

RTO/ISO FUNCTIONS

REAL-TIME PERFORMANCE

MONITORINGTECHNOLOGIES

Probabilistic Analysis & Risk

Assessment

ContingencySelection

PerformanceMetrics

Data & InformationManagement

VisualizationTechnologies

Grid-3PPlatform

MONITORING

OPERATIONS

MARKETS

SECURITY

REAL-TIME SOFWARE

ANALYSIS

STATE

EST

IMATOR

SCADA andADVANCE

MEASUREMENTS

GENEART I ON

&

TRANSM I SS I ON

REAL-TIMELOCAL CONTROL

WIDE-AREAAUTOMATICCONTROL

AUTOMATIC

SWICHABLE

NETWORK

A

B

C

D

RTO/ISO FUNCTIONS

REAL-TIME PERFORMANCE

MONITORINGTECHNOLOGIES

Probabilistic Analysis & Risk

Assessment

Probabilistic Analysis & Risk

Assessment

ContingencySelection

ContingencySelection

PerformanceMetrics

PerformanceMetrics

Data & InformationManagement

Data & InformationManagement

VisualizationTechnologiesVisualizationTechnologies

Grid-3PPlatformGrid-3PPlatform

MONITORING

OPERATIONSOPERATIONS

MARKETSMARKETS

SECURITY

REAL-TIME SOFWARE

ANALYSIS

STATE

EST

IMATOR

SCADA andADVANCE

MEASUREMENTS

GENEART I ON

&

TRANSM I SS I ON

REAL-TIMELOCAL CONTROL

WIDE-AREAAUTOMATICCONTROL

AUTOMATIC

SWICHABLE

NETWORK

A

B

C

D

Page 6: Real Time Tools Outreach Carlos Martinez January 27-29, 2004 Washington, D.C. Transmission Reliability Research Review.

Outreach Activities – Briefings/Demonstrations

Wide Area Grid Reliability Monitoring

Real Time Dynamics Monitoring With Phasors

ACE-Frequency Monitoring

VAR Monitoring

Security Constrained Dispatch

Grid Monitoring for Infrastructure Security

TVA, ERCOT, Southern, TXU, CEA-Montreal

Southern, EIPP*, CAISO*

NERC Resources Subcommittee*, Reliability Coordinators and Blackout Team

CAISO*, AEP

PJM*, CAISO*

Office of Energy Assurance, NETL*Applications deployed or under development

Page 7: Real Time Tools Outreach Carlos Martinez January 27-29, 2004 Washington, D.C. Transmission Reliability Research Review.

Outreach – PJMSecurity Constraint Dispatch Visualization Solution

1-Panel for Each Jurisdiction

4-Panels for a Selected Jurisdiction

C o n tr o l Ar ea C o n tr o l Z o n e Z o n e Un itsO w n er s Un its

Home Display

C o n tr o l Ar ea C o n tr o l Z o n e Z o n e Un itsO w n er s Un its

Maximize Panel

for a Set of Metrics

C o n tr o l Ar ea C o n tr o l Z o n e Z o n e Un itsO w n er s Un its

Historical and Near Time Prediction Metric

Page 8: Real Time Tools Outreach Carlos Martinez January 27-29, 2004 Washington, D.C. Transmission Reliability Research Review.

Outreach CAISO – Real Time Dynamics Monitoring (RTDM) - Frequency Response

1-Panel Visual

3-Panel Visual

Page 9: Real Time Tools Outreach Carlos Martinez January 27-29, 2004 Washington, D.C. Transmission Reliability Research Review.

Local View

Wide-Area View

Outreach CAISO – Real Time Dynamics Monitoring (RTDM) – Key Paths Monitoring

Page 10: Real Time Tools Outreach Carlos Martinez January 27-29, 2004 Washington, D.C. Transmission Reliability Research Review.

Outreach AEP – VAR Management

VAR/Voltage Monitoring and Alarming

Sensitivities and Collapse Distances

Control Compliance and Corrective Actions

Historical Tracking and ReplayClick To Start