12
- .., Notes To Claim r · I OF I t I am 76 years old and so my work day is quite short. Water had to be trucked 1/2 mile to site, slowing progress. REC !VED JAN 2 0 2011 GEOSCIENCE ASSESSMENT OFFICE Enclosed ,a quotation for a job similar to this ,by NOR drilling. They cautioned that they Would not likely take on a job this small. District Geo. Visited the site near completion, and was impressed. Access to site by, Drive 4 miles south of Cochrane on HWY 11 to 49th parallel rd then turn West for 2 miles To offset in road, continue West for 2 more miles crossing bridge ,this will bring you to Claim #421994 7 corner post# 2 on North side of road.
Transcript

- ~ ..,

Notes To Claim ##421994C7 ~C/:CIH r · I OF I t

I am 76 years old and so my work day is quite short.

Water had to be trucked 1/2 mile to site, slowing progress.

REC !VED JAN 2 0 2011

GEOSCIENCE ASSESSMENT OFFICE

Enclosed ,a quotation for a job similar to this ,by NOR drilling. They cautioned that they

Would not likely take on a job this small.

District Geo. Visited the site near completion, and was impressed.

Access to site by,

Drive 4 miles south of Cochrane on HWY 11 to 49th parallel rd then turn West for 2 miles

To offset in road, continue West for 2 more miles crossing bridge ,this will bring you to

Claim #421994 7 corner post# 2 on North side of road.

fournier twp cochrane district ON. - Google Maps Page 1 of 1

" l~j [;j ~(~ j.. Search •. * Favorites

Administrative Boundaries is now the Active Layer

C:J (<' ....r.?. '- ( t(t( (i( l> ld .;;· ' C c( 6 ~·Ct"· ( /~ --c (o 2 J/t: ? Pan

J; 1 Rerni ... @J CLAIM .. I @J CLAiM... ~ Micros .. I

:2 (J) (.{) w (j) LlJ (.{)(.)

<:l:LL: N UJ LL

Parks

00 2 UJ (.) en 0 w (.!)

Pending Claims­Including Filed Only Claims

Dispositions

Pending Dispositions

Townships

600K Drainage

Refre$hMap · ·-~·sri · * - · ''

« 10:40 AM

Claim 4219947 Lot 5, Concession 3

DOH 2010 FOUR-1 262 feet

I .2 53 feet Post

-- -- ------------------------------------------------------------------------------ -------------------------------------

Fournier Concession 2-3 Road

Dic3_ni_c)_ri_(j __ (j_rnl-Fle5fE;_ts_t5~-~-~C51-C5~~C3iJr~-1-- - --------- - --------------------------------- - -----------------­

vertical hole, 90° dip, 130 feet deep Location: UTM NAD 83, Zone 17 491264 E, 5427613 N Claim No 4219947, Fournier Township Dri'lled Aprii-Augu~t 2010 _Qy___John 81ozocka Plan View

300 feet ' ' • J • ~ ' I • • ' I > ~ • -. t • ~ ~ _. • 4 • ~' _,. I J

• I ~ ' > I , I • < > • l .' l , c I l t ~· t• t l •

• ·(

Footage

0 umus-mu-cK- Surface

10 v.f. silt/sand

20

30

40 f.g. silt

50 II

60 f. g. silt with magnetite

70 magnetitic sand I 80 I grey clay

90 I 100 ~

110

120 silty sand boulder till

130 tonalite

Diamond drill hole DOH- 201 0-Four-1 . Vertical hole, 90° dip, 130 feet deep

Location: UTM NAD 83, Zone 17 491264E, 5427613N Claim No 4219947, Fournier Township

. Dri]l€}9 Ar?rii~_A~usL~Ol OJ;>'iJo_hn Blaz_ecl«l_ .____ .

t

John Blazecka Diamond Drill Hole Log

2010 FOUR-1 UTM NAD 83, Zone 17 Location Fournier Township 491264 Easting 5427613 Northing Claim No: 4219947 262 feet west of No 2 Post, 53 feet north of Fournier Concession Road Azimuth Vertical hole 90 degrees Total deptr 130 feet Date of drilling July-August 2010

Depth (Feet) 0-2 2-33 33-48 48-70 70-72 72-110 110-128 128-130 130

Description black muck, organics, humus very fine grained buff coloured silt and clay fine grained slit, buff coloured fine grained silt with clay and fine grained black magnetic sand black fine grained magnetic sand grey clay, hardens into small lumps when dry fine grained sand with slit, light buff colour boulder till with cobbles upt to 6" of various composition, rounded pebbles and fine light brown, sandy matrix bedrock or large boulder, medium grained biotltlc tonalite with amphibole. End of Hole

t1UJ e.- Au> L ~ L~v~...cJ ~l0/,~ (h

Notes: Collar left In hole for possible deepening Drill hole completed vsing a Winkle Drill, A size core recovery unconsolidated material collected from return water to minimize material loss

~ ~~\1. ~1 . .-e_;

) .

.~ ~$:>~~ T~.r4 ~-t

r'~

t?ontario www .placestogrow .ca

John Blazeck.a Project BLZ-FOURNIER #I

Attention : John Blazecka

Sample Ag AI As Ba Be Bi Ca Cd Co Cr Number ppm % ppm ppm ppm ppm %ppm ppm ppm

BLZ-FOUR-1 0.2 2.03 9 251 <0.5 <S 1.46 <1 18 33

Oupllcatost

BLZ-FOUR-1 <0.2 2.02 5 246 <0.5 <5 1.46 <1 17 32

Standards• Blank <0.2 <0.01 <5 <10 <0.5 <5 <0.01 <1 <1 <I

CH-4 2.2 1.65 14 283 <0.5 <5 O.SB 1 22 103

AC0509N 10.0 2.40 554 102 <0.5 6 5.09 9 23 56

Assayers Canada 8282 Sherbrooke St., Vancouver, B.C., VSX 4R6

Cu ppm

53

47

<1

1931

1733

Tel: (604) 327-3436 Fax: (604) 327-3423

Multi-Element ICP-AES Analysis Aqua Regia Digestion

Fe Hg K La Mg Mn Mo Na Ni

%ppm %ppm %ppm ppm %ppm

2.48 0.75 18 1.83 407 <2 0.23 52

2.47 0. 74 18 1.82 396 <2 0.23 50

<0.01 <I <0.01 <10 <0.01 <S <7 <0.01 <I

4.33 1 1.30 13 1.20 318 3 0.05 52

5.48 II 0.18 <10 2.29 !992 183 0.02 522

-

A .5 gm sample is digested with 5 ml3:1 HCI/HN03 at 9!i°C for 2 hours and diluted to 25m!.

Pago 1 of 1

p Pb s Sb Sc Sr Th

% t:Pm % ppm ppm ppm ppm

0.084 34 0.08 9 89 <5

0.081 33 0.06 <5 89 <5

<0.001 4 <0.01 <5 <1 <1 <5

0.074 20 0.62 <5 8 <S

0.162 387 1.80 11 10 !56 <S

Signed

Repmi No

Date

OW3160PJ

Oct-07-10

Sample type PULP

Ti Tl u v w Zn Zr % ppm ppm ppm ppm ppm ppm

0.14 <10 <10 55 <10 39 6

0.14 <10 <10 54 <10 37 5

<0.01 <10 <10 <I <10 <I

0.19 <10 <10 73 <10 205 12

0.03 <10 <10 144 <10 972 1

' Swastika Laboratories Ltd

Established 1928

Assay Certificate

Assaying - Consulting - Representation Page I of I

Certificate Number: 10-3160

Company:

Project:

John Blazecka BLZ-FOURNIER # 1 Report Date:

Attn: John Blazecka

We hereby certify the following Assay of I core samples submitted 17 -Sep-1 0 by John Blazecka

Au .A.u Chk Au Sample FP..-P1'l.S Ffl .. -A?.S FA-AAS Nurnber ·- -·"- -· ·-- ppb ppb g/i.v~t

BLZ-FOUR-1 1 33 0.03

Au Chk Au FA-A.A.S FA-AAS

9 /:v~r:: ';"oz/-=

0.001

r···--·\ " '

Certtfied by . /~o·L.,~/'-.-..__,-.._., . -

1. No Reject Denis Chartre

1 cameron Ave., P.O. Box 10, Swastika, Ontario POK lTO Telephone (705) 642-3244 Fax (705) 642-3300

Au Chk FA-AAS

7oz, /-;::_

21-Sep-1 0

, Swastika Laboratories (2008) Ltd

Box 10, 1 Cameron Ave Swastika, ON POK ITO

Invoice To

JOHN BLAZECKA RR#2 COCHRANE,ONTAFUO POL ICO

Qty Description

PROJECT: BLZ-FOURNIER # 1

1 GOLD ASSAY 1 SAMPLE PREPARATION

HST (ON) on sales

~ (QCJ /{/ -tf 0? 'b

Thank you for your business.

GST/HST No. 883022329

o/ro

Invoice Date Invoice#

9/22/2010 7727

P.O. No. Tenns

Due on receipt

Cert# Rate Amount

10-3160 12.00 12.00 6.00 6.00

13.00% 2.34

GST Tax Total $2.34

Total $20.34

• Swastika Laboratories (2008) Ltd

Box 10, 1 Cameron Ave Swastika, ON POK ITO

Invoice To

JOHN BLAZECKA RR#2 COCHRANE, ONTARIO POL ICO

Qty Description

PROJECT: BLZ - FOURNIER #I

I MUL T1 30 ELEMENT AQUA REGIA HST (ON) on sales

r @C/-t (tO ( '{ (

~ o<e<f

Thank you for your business.

GST/HST No. 883022329

Invoice Date Invoice#

10/8/2010 7816

P.O. No. Terms

Due on receipt

Cert# Rate Amount

OW-3160-PJ 12.00 12.00 13.00"/o 1.56

GST Tax Total $1.56

Total $13.56

Ministry of Northern Development and Mines

Ministere du Developpement du Nord et des Mines ®Ontario

() ; 1.\ ) If you have any question regarding this correspondence, please contact DANIEL SCHOLTZ by email at \j>~~ ·· -" [email protected] or by phone at (705) 670-5856 .

...

enomme

Senior Manager, Mining Lands Section

RECEIVED APR 1?2011

GEOSCIENCE ASSESSMENT OFFICE

Cc:

John Steven Blazecka (Claim Holder)

06 04 11 Submission #2.47552 re 45 day notice tel call 1:15

John Steven Blazecka (Assessment Office)

sample sent for assay was taken at 2 7/28 ft. level. Core size =HDX bit 13/8"00 7/8" ID core.

{cf/~>~ ~ t{-s---P ,_Jp~ .

I hope this satisfactory.

Thank you.

John Blazecka 1 02 menard lake Rd Cochrane ON.POL 1 CO Canada

O.f< . )-//Love .

Att : Mr John Blazecka 102 Menard Lake Rd. Cochrane, ON POL lCO

Dear Mr.Blazecka,

Please find below our pricing for the drill hole as requested:

-Rece:~~r.:o­

JAN 2 8 2011 J GEOSCIENCE ASSESSMENT L OFFICE -

J

To drill one AQ 1OOm hole, with truck access to within 1 00-200' from the hole, water within 500' and overburden approximately from 0-35m deep:

• Mobilization from Timmins to site: Float service at $130.00 per/hr -estimate 2 hrs

• Offloading drill and setting up at $160.00 perlhr -estimate 3 hours • Drilling lOOm hole with+/- 35m overburden at $160.00 per.hr -estimate 24hrs • Travel and accommodations/ meals for crew -estimate $600 • Demobilization from site back to Timmins:

Float service at $130.00 per/hr -estimate 2hrs • Core boxes at $6.50 per tray -estimate $44.00 • 1 AQ drill bit, 1 AQ reaming shell, 1 AQ casing shoe -estimate $800.00

Total Estimate: $6,284.00

Please note that-these are-estimates. Due-to the size of the project, work would be completed on an hourly basis plus consurnables. Should casing be left in hole, 3m lengths are sold at $142.00 each. Pulling casing is performed at $160.00 per/hr.

Sincerely, Serge Gagnon, General Manager Norex Drilling 721 0 HWY 1 0 1 E, Porcupine ON PON lCO