Report run on: January 30, 2006 1:27 PM
RECAPP Facility Evaluation Report
Queen Elizabeth Junior / Senior High School
B2745ACalgary
Report run on: January 30, 2006 1:27 PM Page 2 of 33
B2745ABuilding Id:
Queen Elizabeth Junior / SenBuilding Name:
CalgaryLocation:512 - 18 Street N. W.Address:
0.00Gross Area (sq. m): $20,703,008Replacement Cost:0Construction Year:
Evaluation Date: December 1 2004
Marshall TittemoreEvaluation Company:
Mr. Tom TittemoreEvaluator Name:
The Queen Elizabeth Junior / Senior High School is a 14,096 m2 facility located in the West Hillhurst communty ofnorth-west Calgary. The school is largely a two-stories in height with basement sections located in all builldings. Theschool was constructed in a series of stages - 1930 (original), 1946 (classroom addition), 1952 (largest section), 1963junior high gym) and 1968 (library / science). A major modernization took place in 1997, largely in the 1952 section of the school. All building componentsincorporated in the modernization are assumed to be a '6' rating. Most of the facility is constructed of cast in place foundations, slab on grade, floor slabs, columns / piers and roofstructure. The 1963 section is constrcuted using precast concrete tee wall and roof systems. Brick masonry veneerconstitutes the primary building cladding. Major exterior upgrades need to address window, door and roof????? replacement. Interior upgrades need to address flooring, stair, washrooms and doors / frames. The 1930 and 1946 sections of the school pose the greatest building condition and functional / circulation challenges.Coupled with the remote location and fair condition of the 1963 section, serious thought should be given to completelyreplacing these two sections of the school. Roof replacement to be confirmed. Otherwise the school and site are in good condition.
General Summary:
Structural Summary:The school's structure is comprised largely of cast in place foundations, slab on grade, floor slabs, columns / piers and roof. Wood framing comprises the remaining roof structure, coupled with some steel structure in the main gym. Concretemasonry is the primary interior load bearing system. The building's structure is in good condition. The 1963 section is constructed using precast concrete tee wall and roof systems.
Envelope Summary:Major building envelope upgrades need to address deteriorating brick mortar joints, concrete window sills, window anddoor replacement and roof replacement????
Interior Summary:Major interior upgrades need to replace terrazzoo and resilient flooring, doors and frames, washroom upgrades. Mostbarrier free issues were addressed during the 1997 modernization.
Mechanical Summary:Heating in the 1930 and 1952 sections is being provided with two new steam boilers.The existing piping system,perimeter radiation, unit heaters and fan coils are original.Heating in the 1968 section is being provide by the new steamboiler in th 1952 section and a new heat exchanger which supplies the existing hot water radiation.The existing heatingsystem with the excception of the new boilers is in marginal condition.The ventilation system consists of a new constantvolume air handling unit for the 1952 main floor and original unit ventilators for the second floor.The 1930 and 1968section of the school are equiped with seperate constant volume are handling units which are in marginal condition.Theremaining ventilation,heating and control systems which have not been renovated are past their life cycle and should be
4.32%5 year Facility Condition Index (FCI):
Facility Details Evaluation Details
Total Maintenance Events Next 5 years: $893,700
Calgary - Queen Elizabeth Junior / Senior High School (B2745A)
Report run on: January 30, 2006 1:27 PM Page 3 of 33
considered for replacement.The 1930 and 1952 heating distribution systems require replacement as well the air handlingsystems in the 1930 and 1952 sections.The unit ventilators in the 1952 second floor also require replacement.A newcontrol system for the 1930,1952 and 1968 should also be considered.Washroom renovation are recommended for thesenoir boys and girls locker rooms as well as main floor and second floor washrooms in the 1952 and 1968 sections ofthe school.
Electrical Summary:The main switchboard is a 3000amp, 120/208volt, 3 phase, 4 wire system complete with a 3000amp CDP. Installation ofpower surge protection is recommended. Distribution panels are located throughout the school. Light Fixtures have T-8lamps with electronic ballasts. Emergency lighting was upgraded in 1999. Exterior lighing upgrade is recommended. In1999/2001 the Fire Alarm system was upgraded to include strobe. The school has a Silent Knight security panel and aCCTV Surveilllance system. The telephone system is by Nortel. Data Cabling is Category 5 & 5e with 4 outlets locatedin each classroom. The school is equiped with both Fiber Optic cable and Supernet. Overall the school is in acceptablecondition.
Calgary - Queen Elizabeth Junior / Senior High School (B2745A)
Condition Rating Performance1 - Critical Unsafe, high risk of injury or critical system failure.2 - Poor Does not meet requirements, has significant deficiencies. May have high operating/maintenance costs.
3 - Marginal Meets minimum requirements, has significant deficiencies. May have above average operating maintenance costs.4 - Acceptable Meets present requirements, minor deficiencies. Average operating/maintenance costs.
Rating Guide
5 - Good Meets all present requirements. No deficiencies.6 - Excellent As new/state of the art, meets present and foreseeable requirements.
Report run on: January 30, 2006 1:27 PM Page 4 of 33
A1010 Standard Foundations*
A1030 Slab on Grade*
A2020 Basement Walls*
B1010.01 Floor Structural Frame*(Building Frame)
B1010.02 Structural Interior Walls Supporting Floors*
B1010.03 Floor Decks, Slabs, and Toppings*
B1010.09 Floor Construction Fireproofing*
B1010.10 Floor Construction Firestopping*
5 - Good
5 - Good
5 - Good
5 - Good
5 - Good
5 - Good
5 - Good
5 - Good
Rating
Rating
Rating
Rating
Rating
Rating
Rating
Rating
0
0
0
0
0
0
0
0
Installed
Installed
Installed
Installed
Installed
Installed
Installed
Installed
100
100
100
100
100
100
0
0
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
DEC-04
DEC-04
DEC-04
DEC-04
DEC-04
DEC-04
DEC-04
DEC-04
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Calgary - Queen Elizabeth Junior / Senior High School (B2745A)
S1 STRUCTURAL
(1930 / 1946 / 1952 / 1963 / 1968) Cast in place concrete strip footings
(1930 / 1946 / 1952 / 1963 / 1968) Cast in place concrete floor slab; ramps to 1952 gymnasium
(1930 / 1946 / 1952 / 1963 / 1968) Cast in place concrete / concrete block masonry
(1930 / 1946 / 1952 / 1963) Cast in place concrete on concrete walls / columns (1968) Cast in place concrete piers supporting second level
(1930 / 1946 / 1952 / 1963 / 1968) Cast in place concrete / concrete masonry
(1930 / 1946 / 1952 / 1963 / 1968) Cast in place concrete
(1930 / 1946 / 1952 / 1963 / 1968) Fire rated gysum board / rated concrete assembly
(1930 / 1946 / 1952 / 1963 / 1968)
Report run on: January 30, 2006 1:27 PM Page 5 of 33
B1020.01 Roof Structural Frame*
B1020.04 Canopies*
B1020.06 Roof Construction Fireproofing*
5 - Good
4 - Acceptable
5 - Good
Rating
Rating
Rating
0
0
0
Installed
Installed
Installed
100
100
100
Design Life
Design Life
Design Life
DEC-04
DEC-04
DEC-04
Updated
Updated
Updated
Calgary - Queen Elizabeth Junior / Senior High School (B2745A)
(1930 1946) Cast in place concrete columns and roof structure (1952) Concrete over boiler room, steel structure over IA shop, steel columns in gymnasium, wood framing / deckingelsewhere (1963) Precast concrete tees. Steel columns, tees & joists (1968) Concrete; not certain due to unavailability of drawings and lack of access.
(1930 / 1946 / 1952) Wood framed canopies (1963) Concrete canopies
(1930 / 1946 / 1952 / 1963 / 1968) Fire rated gysum board, rated concrete roof assemblies.
Report run on: January 30, 2006 1:27 PM Page 6 of 33
B2010.01.01 Precast Concrete: Exterior Wall Skin*
B2010.01.02.01 Brick Masonry: Ext. Wall Skin*
B2010.01.08 Portland Cement Plaster: Ext. Wall*
5 - Good
3 - Marginal
3 - Marginal
Rating
Rating
Rating
0
0
0
Installed
Installed
Installed
75
75
75
Design Life
Design Life
Design Life
DEC-04
DEC-04
DEC-04
Updated
Updated
Updated
Brick veneer
Exterior parged components
Failure Replacement
Repair
2005
2005
$54,000
$27,000
Low
Low
Sections of brick veneer require repair / repointing
Foundations and stair entry components parging deteriorating.
Concern:
Concern:
Repair / repoint brick veneer to suit. Engaging a buildingenvelope specialist to review all components recommended.
Repair deteriorated parged components
Recommendation:
Recommendation:
Calgary - Queen Elizabeth Junior / Senior High School (B2745A)
S2 ENVELOPE
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
March 4 2005
March 4 2005
(1963) Precast concrete tees / wall panels
(1930 / 1946 / 1952 / 1963 / 1968)
(1930 / 1946 / 1952 / 1963 / 1968) Parging to lower level components - foundations, entries
Report run on: January 30, 2006 1:27 PM Page 7 of 33
B2010.01.11 Joint Sealers (caulking): Ext. Wall*
B2010.01.13 Paints (& Stains): Exterior Wall*
B2010.01.99 Other Exterior Wall Skin*
B2010.02.01 Cast-in-place Concrete:Ext.Wall Const*
3 - Marginal
4 - Acceptable
4 - Acceptable
3 - Marginal
Rating
Rating
Rating
Rating
0
0
0
0
Installed
Installed
Installed
Installed
0
15
0
100
Design Life
Design Life
Design Life
Design Life
DEC-04
DEC-04
DEC-04
DEC-04
Updated
Updated
Updated
Updated
Exterior caulking
Window sills and decorative features
Preventative Maintenance
Repair
2005
2005
$11,880
$162,000
Low
Medium
Joint sealers to be upgraded in selective areas of school,including between tees of the 1963 addition
Deteriorating condition to cast in place decorative components
Concern:
Concern:
Repair joint sealers to suit
Restoration program required
Recommendation:
Recommendation:
Calgary - Queen Elizabeth Junior / Senior High School (B2745A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
March 4 2005
March 4 2005
(1930 / 1946 / 1952 / 1963 / 1968)
(1930 / 1946 / 1952 / 1963 / 1968) Painting costs to components in B2010.02.01 included.
(1968) Cast in place concrete wall skin at stairwell connectors
(1930 / 1946 / 1952) Cast in place concrete window sills and decorative coping
Report run on: January 30, 2006 1:27 PM Page 8 of 33
B2010.02.02 Precast Concrete: Ext. Wall Const.*
B2010.02.03 Masonry Units: Ext. Wall Const.*
B2010.03 Exterior Wall Vapor Retarders, Air Barriers, and Insulation*
B2010.06 Exterior Louvers, Grilles, and Screens*
B2020.01.01.02 Aluminum Windows*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
3 - Marginal
Rating
Rating
Rating
Rating
Rating
0
0
0
0
0
Installed
Installed
Installed
Installed
Installed
100
100
20
20
35
Design Life
Design Life
Design Life
Design Life
Design Life
DEC-04
DEC-04
DEC-04
DEC-04
DEC-04
Updated
Updated
Updated
Updated
Updated
Aluminum windows at stairwell connectors
Preventative Maintenance 2006 $64,800 Low
Windows have exceed life cycleConcern:
Replace windows in stairwell connectorsRecommendation:
Calgary - Queen Elizabeth Junior / Senior High School (B2745A)
Event:
Type Year Cost Priority
Updated: March 4 2005
(1963)
(1930 / 1946 / 1952 / 1963 / 1968)
(1930 / 1946 / 1952 / 1963 / 1968) Engagement of a building envelope specialist recommended to study entire buildingenvelope.
(1930 / 1946 / 1952 / 1963 / 1968)
(1968) Stairwell connectors (1952 / 1997) New aluminum windows
Report run on: January 30, 2006 1:27 PM Page 9 of 33
B2020.01.01.05 Wood Windows*
B2020.04 Other Exterior Windows*
B2030.01.10 Wood Entrance Door*
3 - Marginal
4 - Acceptable
3 - Marginal
Rating
Rating
Rating
0
0
0
Installed
Installed
Installed
35
35
30
Design Life
Design Life
Design Life
DEC-04
DEC-04
DEC-04
Updated
Updated
Updated
Original wood windows.
North entry doors and frames
Preventative Maintenance
Failure Replacement
2006
2005
$324,000
$10,800
Low
Low
Wood windows in all sections of school require replacement
Frost heave occuring at exterior set of doors. Exit set ofexterior / interior doors and frames in need of replacement
Concern:
Concern:
Replace wood windows
Replace exit door units and repair damage from frost heave
Recommendation:
Recommendation:
Calgary - Queen Elizabeth Junior / Senior High School (B2745A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
March 4 2005
March 4 2005
(1930 / 1946 / 1952 / 1963) Remaining sections of 1952 building plus remaining sections excluding 1968 section.
( 1952) Glass block units
(1952) North entry doors
Report run on: January 30, 2006 1:27 PM Page 10 of 33
B2030.02 Exterior Utility Doors*
B3010.01 Deck Vapor Retarder and Insulation*
B3010.04.01 Built-up Bituminous Roofing (Asphalt & Gravel)*
3 - Marginal
4 - Acceptable
3 - Marginal
Rating
Rating
Rating
0
0
0
Installed
Installed
Installed
0
0
25
Design Life
Design Life
Design Life
DEC-04
DEC-04
DEC-04
Updated
Updated
Updated
Numerous entry / exit doors
BUR replacement
Lifecycle Replacement
Preventative Maintenance
2011
2005
$54,000
$108,000
Low
Low
Numerous exterior doors in need of replacement
Sections of school built up roof are due for replacement
Concern:
Concern:
Replace numerous exterior doors
Replace sections of BUR roof with SBS roofing
Recommendation:
Recommendation:
Calgary - Queen Elizabeth Junior / Senior High School (B2745A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
March 4 2005
March 4 2005
(1930 / 1946 / 1952 / 1963 / 1968) Solid wood doors in wood and steel frames. New doors and frames provided as part of1997 modernization.
(1930 / 1946 / 1952 / 1963 / 1968)
Report run on: January 30, 2006 1:27 PM Page 11 of 33
B3020.02 Other Roofing Openings*
4 - AcceptableRating
0Installed
0Design Life
DEC-04Updated
Calgary - Queen Elizabeth Junior / Senior High School (B2745A)
(1930 / 1946 / 1952 / 1963 / 1968) Roof access ladders & hatches
Report run on: January 30, 2006 1:27 PM Page 12 of 33
C1010.01 Interior Fixed Partitions*
C1010.03 Interior Operable Folding Panel Partitions*
C1010.04 Interior Balustrades and Screens, Interior Railings*
C1010.05 Interior Windows*
C1010.07 Interior Partition Firestopping*
C1020.01 Interior Swinging Doors*
5 - Good
6 - Excellent
4 - Acceptable
4 - Acceptable
5 - Good
3 - Marginal
Rating
Rating
Rating
Rating
Rating
Rating
0
0
0
0
0
0
Installed
Installed
Installed
Installed
Installed
Installed
50
30
40
40
0
50
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
DEC-04
DEC-04
DEC-04
DEC-04
DEC-04
DEC-04
Updated
Updated
Updated
Updated
Updated
Updated
Interior doors and frames
Maintenance 2011 $54,000 Low
Some interior doors and frames in need of lifecyclereplacement
Concern:
Replacement allowance for interior doors and framesRecommendation:
Calgary - Queen Elizabeth Junior / Senior High School (B2745A)
S3 INTERIOR
Event:
Type Year Cost Priority
Updated: March 4 2005
(1930 / 1946 / 1952 / 1963 / 1968 / 1997) Concrete masonry / cast in place concrete / wood and metal studs
(1997)
( 1968)
(1930 / 1946 / 1952 / 1963 / 1968 ) Tempered glazing in wood and steel frames
(1930 / 1946 / 1952 / 1963 / 1968 / 1997) Fire rated partitions
(1930 / 1946 / 1952 / 1963) Solid core wood doors in wood frames.
Report run on: January 30, 2006 1:27 PM Page 13 of 33
C1020.02 Interior Entrance Doors*
C1020.03 Interior Fire Doors*
C1030.01 Visual Display Boards*
C1030.02 Fabricated Compartments(Toilets/Showers)*
C1030.05 Wall and Corner Guards*
4 - Acceptable
4 - Acceptable
3 - Marginal
3 - Marginal
6 - Excellent
Rating
Rating
Rating
Rating
Rating
0
0
0
0
0
Installed
Installed
Installed
Installed
Installed
50
50
0
0
0
Design Life
Design Life
Design Life
Design Life
Design Life
DEC-04
DEC-04
DEC-04
DEC-04
DEC-04
Updated
Updated
Updated
Updated
Updated
Classroom white boards, chalk boards, tack boards
Toilet compartments
Lifecycle Replacement
Lifecycle Replacement
2011
2005
$16,200
$4,860
Unassigned
Low
Some visual display boards in need of lifecycle replacement
Toilet compartments in need of lifecycle replacement
Concern:
Concern:
Replace visual display boards to suit - allowance noted
Replace toilet compartments
Recommendation:
Recommendation:
Calgary - Queen Elizabeth Junior / Senior High School (B2745A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
March 4 2005
March 4 2005
(1930 / 1946 / 1952 / 1963 / 1968)
(1930 / 1946 / 1952 / 1963 / 1968)
(1930 / 1946 / 1952 / 1963 / 1968) White boards, chalk boards, tack boards
(1952) Gymnasium change rooms, second floor north washrooms (1968) Library washrooms
(1997)
Report run on: January 30, 2006 1:27 PM Page 14 of 33
C1030.06 Handrails*
C1030.08 Interior Identifying Devices*
C1030.10 Lockers*
C1030.12 Storage Shelving*
C1030.14 Toilet, Bath, and Laundry Accessories*
4 - Acceptable
4 - Acceptable
3 - Marginal
4 - Acceptable
3 - Marginal
Rating
Rating
Rating
Rating
Rating
0
0
0
0
0
Installed
Installed
Installed
Installed
Installed
50
0
30
0
20
Design Life
Design Life
Design Life
Design Life
Design Life
DEC-04
DEC-04
DEC-04
DEC-04
DEC-04
Updated
Updated
Updated
Updated
Updated
Lockers
Washroom / change room accessories
Lifecycle Replacement
Preventative Maintenance
2011
2006
$6,480
$3,780
Low
Low
Lockers in need of lifecycle replacement
Accessories in need of lifecycle replacement
Concern:
Concern:
Replace lockers
Replace washroom accessories
Recommendation:
Recommendation:
Calgary - Queen Elizabeth Junior / Senior High School (B2745A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
March 4 2005
March 4 2005
(1930 / 1946 / 1952 / 1963 / 1968)
(1930 / 1946 / 1952 / 1963 / 1968)
(1930)
(1930 / 1946 / 1952 / 1963 / 1968)
( 1952) Gymnasium change room, second floor north washrooms (1968) Library washrooms
Report run on: January 30, 2006 1:27 PM Page 15 of 33
C2010 Stair Construction*
C2020.01 Tile Stair Finishes*
C2020.02 Terrazzo Stair Finishes*
4 - Acceptable
4 - Acceptable
3 - Marginal
Rating
Rating
Rating
0
0
0
Installed
Installed
Installed
100
30
50
Design Life
Design Life
Design Life
DEC-04
DEC-04
DEC-04
Updated
Updated
Updated
Terrazzo stair finishes in 1963 section
Failure Replacement 2005 $9,180 Low
Terrazzo stair finishes in need of lifecycle replacementConcern:
Replace terrazzo stair finishes with resilient flooringRecommendation:
Calgary - Queen Elizabeth Junior / Senior High School (B2745A)
Event:
Type Year Cost Priority
Updated: March 4 2005
(1930 / 1946 / 1952 / 1963 / 1968) Concrete and wood framed stairs
(1952)
(1963)
Report run on: January 30, 2006 1:27 PM Page 16 of 33
C2020.05 Resilient Stair Finishes*
C2020.08 Stair Railings and Balustrades*
C3010.01 Concrete Wall Finishes*
C3010.02 Wall Paneling*
C3010.03 Plaster Wall Finishes*
3 - Marginal
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
0
0
0
0
0
Installed
Installed
Installed
Installed
Installed
20
50
100
30
40
Design Life
Design Life
Design Life
Design Life
Design Life
DEC-04
DEC-04
DEC-04
DEC-04
DEC-04
Updated
Updated
Updated
Updated
Updated
Exit stairs
Failure Replacement 2005 $16,200 Low
Two sets of stairs / finishes in need of lifecycle replacementConcern:
Upgrade stair finishesRecommendation:
Calgary - Queen Elizabeth Junior / Senior High School (B2745A)
Event:
Type Year Cost Priority
Updated: March 4 2005
( 1952) East stairs (2) between main and second floor
(1930 / 1946 / 1952 / 1963 / 1968)
(1930 / 1946 / 1952 / 1963 / 1968)
(1946 / 1963) Corridors & gymnasium
(1930 / 1946) Minor repairs required
Report run on: January 30, 2006 1:27 PM Page 17 of 33
C3010.04 Gypsum Board Wall Finishes*
C3010.06 Tile Wall Finishes*
3 - Marginal
3 - Marginal
Rating
Rating
0
0
Installed
Installed
40
50
Design Life
Design Life
DEC-04
DEC-04
Updated
Updated
Misc gypsum board painting
Washroom tile walls
Maintenance
Preventative Maintenance
2011
2006
$29,160
$24,840
Unassigned
Low
Miscellaneous rooms in need of repainting
Wall tiles in need of lifecyle replacement
Concern:
Concern:
Repaint rooms
Replace wall tiles
Recommendation:
Recommendation:
Calgary - Queen Elizabeth Junior / Senior High School (B2745A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
March 4 2005
March 4 2005
(1930) East vestibule, second floor staff room (1952) Sports med area, 2 east stairwells, second floor north washrooms, gym storage (1968) Library washrooms
( 1952) Second floor north washrooms, gymnasium change rooms (1968) Library washrooms
Report run on: January 30, 2006 1:27 PM Page 18 of 33
C3010.14 Other Wall Finishes*
C3020.01 Concrete Floor Finishes*
C3020.02 Tile Floor Finishes*
C3020.03 Terrazzo Floor Finishes*
C3020.04 Wood Flooring*
3 - Marginal
4 - Acceptable
4 - Acceptable
3 - Marginal
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
0
0
0
0
0
Installed
Installed
Installed
Installed
Installed
0
75
30
70
25
Design Life
Design Life
Design Life
Design Life
Design Life
DEC-04
DEC-04
DEC-04
DEC-04
DEC-04
Updated
Updated
Updated
Updated
Updated
Protective corridor wall treatment
Terrazzo floors
Preventative Maintenance
Preventative Maintenance
2011
2007
$21,600
$27,000
Low
Low
Protective wall treatment in corridors of 1997 modernized areanot completed
Terrazzo floors in need of lifecycle replacement
Concern:
Concern:
Complete installation of protective wall treatment
Replace terrazzo floors with resilient flooring
Recommendation:
Recommendation:
Calgary - Queen Elizabeth Junior / Senior High School (B2745A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
March 4 2005
March 4 2005
(1952 / 1997) Protective wall covering
(1930 / 1946 / 1952 / 1963 / 1968)
(1952)
(1930 / 1963)
(1952, 1963) Gymnasia
Report run on: January 30, 2006 1:27 PM Page 19 of 33
C3020.07 Resilient Flooring*
C3020.08 Carpet Flooring*
C3020.11 Floor Painting
C3030.01 Concrete Ceiling Finishes*
C3030.04 Gypsum Board Ceiling Finishes*
3 - Marginal
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
0
0
0
0
0
Installed
Installed
Installed
Installed
Installed
20
10
0
100
50
Design Life
Design Life
Design Life
Design Life
Design Life
DEC-04
DEC-04
DEC-04
DEC-04
DEC-04
Updated
Updated
Updated
Updated
Updated
VAT / sheet flooring
Preventative Maintenance 2005 $32,400 Low
Areas of school flooring require lifecycle replacementConcern:
Replace resilient flooring to suitRecommendation:
Calgary - Queen Elizabeth Junior / Senior High School (B2745A)
Event:
Type Year Cost Priority
Updated: March 4 2005
(1930) Entry vestibule, second floor staff room, basement cafeteria (1952) Sports med area, gym storage
(1930 / 1946 / 1952 / 1963 / 1968)
(1930 / 1946 / 1952 / 1963 / 1968)
Refer to C3010.04 above
Report run on: January 30, 2006 1:27 PM Page 20 of 33
C3030.06 Acoustic Ceiling Treatment (Susp.T-Bar)*
C3030.09 Other Ceiling Finishes*
D1010.01.02 Hydraulic Passenger Elevators*
3 - Marginal
4 - Acceptable
6 - Excellent
Rating
Rating
Rating
0
0
0
Installed
Installed
Installed
25
0
30
Design Life
Design Life
Design Life
DEC-04
DEC-04
DEC-04
Updated
Updated
Updated
Selective acoustic tile replacement
Repair 2005 $12,960 Low
Damaged acoustic ceiling tile in need of replacementConcern:
Replace damaged ceiling tile in areas notedRecommendation:
Calgary - Queen Elizabeth Junior / Senior High School (B2745A)
Event:
Type Year Cost Priority
Updated: March 4 2005
(1952) Gym storage (1930) Main floor level
(1963) Glue on ceiling tile
(1997) Lift installed as part of recent modernization
Report run on: January 30, 2006 1:27 PM Page 21 of 33
D2010.01 Water Closets*
D2010.02 Urinals*
D2010.03 Lavatories*
3 - Marginal
3 - Marginal
4 - Acceptable
Rating
Rating
Rating
0
0
0
Installed
Installed
Installed
30
30
30
Design Life
Design Life
Design Life
DEC-04
DEC-04
DEC-04
Updated
Updated
Updated
Replacement of water closets
Urinal replacement
Lavatories replacement
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2011
2011
2011
$40,500
$24,300
$30,780
Low
Low
Low
Fixtures are past their life cycle
Fixtures are past their life cycle
Fixtures are past their life cycle
Concern:
Concern:
Concern:
Replace all water closets
Replace all urinals
Replace all lavatories
Recommendation:
Recommendation:
Recommendation:
Calgary - Queen Elizabeth Junior / Senior High School (B2745A)
S4 MECHANICAL
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
February 21 2005
February 21 2005
February 21 2005
Water closets are original and past their life cycle.
Urinals are original and past their life cycle.
Lavatories are original
Report run on: January 30, 2006 1:27 PM Page 22 of 33
D2010.04 Sinks*
D2010.05 Showers*
D2010.08 Drinking Fountains / Coolers*
D2020.01.01 Pipes and Tubes: Domestic Water*
D2020.01.02 Valves: Domestic Water
D2020.01.03 Piping Specialties (Backflow Preventors)*
D2020.02.02 Plumbing Pumps: Domestic Water*
4 - Acceptable
3 - Marginal
4 - Acceptable
4 - Acceptable
4 - Acceptable
5 - Good
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
Rating
Rating
0
0
0
0
0
0
0
Installed
Installed
Installed
Installed
Installed
Installed
Installed
30
30
30
40
0
0
20
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
DEC-04
DEC-04
DEC-04
DEC-04
DEC-04
DEC-04
DEC-04
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Replacement of showers
Lifecycle Replacement 2011 $28,620 Low
Fixtuers are past their life cycleConcern:
Replace all showersRecommendation:
Calgary - Queen Elizabeth Junior / Senior High School (B2745A)
Event:
Type Year Cost Priority
Updated: February 21 2005
Sinks are original
Showers are original and past their life cycle.
Drinking fountains are original
Domestic water piping is copper.
Valves are original
Backflow preventors are installed on icoming water services.
Domestic water recirc.pumps are original
Report run on: January 30, 2006 1:27 PM Page 23 of 33
D2020.02.06 Domestic Water Heaters*
D2020.03 Water Supply Insulation*: Domestic
D2030.01 Waste and Vent Piping*
D2040.01 Rain Water Drainage Piping Systems*
D2040.02.04 Roof Drains*
D3010.02 Gas Supply Systems*
D3020.01.01 Heating Boilers & Accessories: Steam*
D3020.01.03 Chimneys (&Comb. Air) : Steam Boilers*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
Rating
Rating
Rating
0
0
0
0
0
0
0
0
Installed
Installed
Installed
Installed
Installed
Installed
Installed
Installed
20
0
50
50
40
50
35
0
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
DEC-04
DEC-04
DEC-04
DEC-04
DEC-04
DEC-04
DEC-04
DEC-04
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Calgary - Queen Elizabeth Junior / Senior High School (B2745A)
Two 75 GAL 179 MBH water heater serve the 1952 and 1930 sections of the school.The units are functional and approx. 12years old.
Domestic piping is insulated.
Waste and vent piping is original
Rain water piping system is original
Roof drains are original
Gas supply piping is original
There are boilers in the 1930 and 1952 sectins of the school .The 1930 boiler was replaced in 1998 with two new Ritesteam boilers Model#350S .The boiler in the 1952 section was replaced with a new steam boiler Rite Model A605S. The1968 boiler was removed and supplied from the new boiler and a steam to hot water exchanger in the 1930 section of theschool.
Chimney and comb. air are functional.
Report run on: January 30, 2006 1:27 PM Page 24 of 33
D3020.01.04 Water Treatment: Steam Boilers*
D3040.01.01 Air Handling Units: Air Distribution*
D3040.01.01 Air Handling Units:1952 Gymnasium Air Distribution*
D3040.01.01 Air Handling Units:1963 Gymnasium Air Distribution*
D3040.01.01 Air Handling Units:1968 addition Air Distribution*
D3040.01.03 Air Cleaning Devices:Air Distribution*
D3040.01.04 Ducts: Air Distribution*
D3040.01.05 Duct Accessories: Air Distribution*
4 - Acceptable
6 - Excellent
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
Rating
Rating
Rating
0
0
0
0
0
0
0
0
Installed
Installed
Installed
Installed
Installed
Installed
Installed
Installed
0
30
30
30
30
0
50
0
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
DEC-04
DEC-04
DEC-04
DEC-04
DEC-04
DEC-04
DEC-04
DEC-04
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Calgary - Queen Elizabeth Junior / Senior High School (B2745A)
Treatment systems are current
!952 portion of school main floor is equiped with a new ventilation unit installed in 1998.The unit is an Eng-Air model LM-15-C with hot water heating coil and a capacity of 17000 CFM.The 1952 CTS area has a new roof mounted Air Handling unitwith air conditioning,Eng-Air Model FWA-224-CO (8430 CFM).The Art room 1952 section second floor has a new roofmounted vetilation unit (heat only) Eng-Air modelDJ-400 (3360CFM).
!952 Gymnasium has a seperate ventilation systemwhich is original .
The 1963 gymnasium ventilation unit is original
The 1968 section is equiped with a central air handling unit. The evaporative humidifier is coroded and requires repairand orreplacement..
All air handling system are equiped with low efficiency fiber glass filters.
Duct distribution is new for the three new air handling units and original for the rest of the systems.
Duct accessories are original
Report run on: January 30, 2006 1:27 PM Page 25 of 33
D3040.01.07 Air Outlets & Inlets:Air Distribution*
D3040.02 Steam Distribution Systems: Piping/Pumps*
D3040.03.01 Hot Water Distribution Systems*
D3040.04.01 Fans*: Exhaust
D3040.04.03 Ducts*: Exhaust
D3040.04.04 Ducts Accessories*: Exhaust
D3040.04.05 Air Outlets and Inlets*: Exhaust
D3040.05 Heat Exchangers*
D3050.03 Humidifiers*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
Rating
Rating
Rating
Rating
0
0
0
0
0
0
0
0
0
Installed
Installed
Installed
Installed
Installed
Installed
Installed
Installed
Installed
50
30
40
30
0
0
0
30
25
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
DEC-04
DEC-04
DEC-04
DEC-04
DEC-04
DEC-04
DEC-04
DEC-04
DEC-04
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Calgary - Queen Elizabeth Junior / Senior High School (B2745A)
Air inlets and outlets are new for the new air handling systems and original for the remaining systems.
The steam distibution systems are past there life cycle and should be replaced.
The hot water distibution system in the 1968 section is originall.The distribution in the 1952 main floor upgrade(1998) isnew.
Exhaust fans are all original with the exception of some new fans in the CTS and Arts area.
Exhaust ductwork is original with the exception of the CTS and ARTs areas.
Duct accessories are original
Air inlets and outlets are new for the replaced air handling systems and original for the remainder.
Heat exchangers are original,units are located in the 1952 and 1968 sections of the school.Both units are original
SeeG3040.01.01
Report run on: January 30, 2006 1:27 PM Page 26 of 33
D3050.05.02 Fan Coil Units*
D3050.05.03 Finned Tube Radiation*
D3050.05.06 Unit Heaters*
D3050.05.07 Unit Ventilators*
D3060.02.01 Electric and Electronic Controls*
D3060.02.02 Pneumatic Controls*
D4020 Standpipes*
D4030.01 Fire Extinguisher, Cabinets and Accessories*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
6 - Excellent
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
Rating
Rating
Rating
0
0
0
0
0
0
0
0
Installed
Installed
Installed
Installed
Installed
Installed
Installed
Installed
0
0
0
0
30
40
50
30
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
DEC-04
DEC-04
DEC-04
DEC-04
DEC-04
DEC-04
DEC-04
DEC-04
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Calgary - Queen Elizabeth Junior / Senior High School (B2745A)
Fan coil units are original .
Radiation is original in all areas except the upgraded 1952 main floor area.
Unit heaters are orginal
Unit ventilators in the 1952 second floor area are past there life cycle and require replacement. The units are difficult tomaintain due to the lack of availabilty of parts.
Electronic controls have been provided for the three new air handling units.
The pnuematic controls throughout the school are original
The school is equiped with a 40mm fire hose standpipe system.The system is original
Hand fire extingiushers are located throughout the school.
Report run on: January 30, 2006 1:27 PM Page 27 of 33
D5010.02 Secondary Electrical Transformers (Interior)*
D5010.03 Main Electrical Switchboards (Main Distribution)*
D5010.03.03 Voltage Regulators
D5010.05 Electrical Branch Circuit Panelboards (Secondary Distribution)*
5 - Good
4 - Acceptable
3 - Marginal
5 - Good
Rating
Rating
Rating
Rating
0
0
0
0
Installed
Installed
Installed
Installed
40
40
0
25
Design Life
Design Life
Design Life
Design Life
DEC-04
DEC-04
DEC-04
DEC-04
Updated
Updated
Updated
Updated
Install Voltage Surge Protection unit
Program Functional Upgrade 2005 $2,700 Low
No voltage surge protectionConcern:
Install Voltage Protection unitRecommendation:
Calgary - Queen Elizabeth Junior / Senior High School (B2745A)
S5 ELECTRICAL
Event:
Type Year Cost Priority
Updated: February 21 2005
(1999) 225amp, 208/600volt tramsformer
(1986) FPE 3000amp, 120/208volt, 3 phase, 4 wire service complete with a 3000amp, 120/208volt, 3 phase, 4 wire CDP.CDP has spare capacity.
Voltage Surge Protection unit
(1999) Sq D panelboards. Panelboards have spare capacity
Report run on: January 30, 2006 1:27 PM Page 28 of 33
D5010.07.02 Motor Starters and Accessories*
D5020.02.01 Lighting Accessories (Lighting Controls)*
D5020.02.02.02 Interior Florescent Fixtures*
D5020.02.03 Emergency Lighting*
D5020.02.03.03 Exit Signs
3 - Marginal
4 - Acceptable
5 - Good
5 - Good
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
0
0
0
0
0
Installed
Installed
Installed
Installed
Installed
0
30
30
30
0
Design Life
Design Life
Design Life
Design Life
Design Life
DEC-04
DEC-04
DEC-04
DEC-04
DEC-04
Updated
Updated
Updated
Updated
Updated
Replace loose starters
Lifecycle Replacement 2011 $2,700 Low
Some of the starters are at the end of their life cycle. Concern:
Replace startersRecommendation:
Calgary - Queen Elizabeth Junior / Senior High School (B2745A)
Event:
Type Year Cost Priority
Updated: February 21 2005
Some of the loose starters are obsolete. Starters are replaced when they fail
Wall switches
(1999 & 2001) Fixtures have T-8 lamps with electronic ballasts
(1999) Lumacell self contained battery packs complete with remote heads in corridors
(1990 & 1999) Emergilite units with DC power feed
Report run on: January 30, 2006 1:27 PM Page 29 of 33
D5020.03.01.03 Exterior Metal Halide Fixtures*
D5020.03.02 Lighting Accessories (Lighting Controls)*
D5030.01 Detection and Alarm Fire Alarm*
D5030.02.02 Intrusion Detection*
D5030.02.04 Video Surveillance*
D5030.03 Clock and Program Systems*
D5030.04.01 Telephone Systems*
3 - Marginal
5 - Good
5 - Good
5 - Good
5 - Good
4 - Acceptable
6 - Excellent
Rating
Rating
Rating
Rating
Rating
Rating
Rating
0
0
0
0
0
0
0
Installed
Installed
Installed
Installed
Installed
Installed
Installed
0
25
25
25
25
25
25
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
DEC-04
DEC-04
DEC-04
DEC-04
DEC-04
DEC-04
DEC-04
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Install additional HID Lighting
Program Functional Upgrade 2005 $8,640 Medium
Dark areas around the exterior of the school. Concern:
Install additional fixturesRecommendation:
Calgary - Queen Elizabeth Junior / Senior High School (B2745A)
Event:
Type Year Cost Priority
Updated: February 21 2005
(1958 to 1993) Combination of incandescent, HID and Quartz lighting
Lights are controlled by photocell and motion sensors
(1990) Simplex 4100 panel, strobes were added throughout the school in 1999/2001
(1997) Silent Knight Model 4720
(1999) Gyyr multiplexer (1995 & newer) 13 cameras (4 exterior and 9 interior)
(1986) Simplex 2350
(2003) Nortel Norstar phone switch. There is a phone outlet installed in each classroom.
Report run on: January 30, 2006 1:27 PM Page 30 of 33
D5030.04.02 Paging Systems*
D5030.04.04 Data Systems*
D5030.05 Public Address and Music Systems*
D5030.07 Other Communications and Security Systems*
D5030.07 Other Communications and Security Systems*
5 - Good
5 - Good
4 - Acceptable
5 - Good
6 - Excellent
Rating
Rating
Rating
Rating
Rating
0
0
0
0
0
Installed
Installed
Installed
Installed
Installed
25
0
0
0
0
Design Life
Design Life
Design Life
Design Life
Design Life
DEC-04
DEC-04
DEC-04
DEC-04
DEC-04
Updated
Updated
Updated
Updated
Updated
Calgary - Queen Elizabeth Junior / Senior High School (B2745A)
(2000) Bogen
(1995 & 1999) Category 5 & 5e Structured cabling complete with fiber connection between the 5 data closets. Minimun of 4data outlets in each classroom
(1991) Raulands SAX 100 amps, PA Control Model CBE-82B with Model SBA 225 switch panels. There is a Sony Tapeplayer and a Sony CD player.
(1998) Fiber Optic Cable
(2004) Supernet
Report run on: January 30, 2006 1:27 PM Page 31 of 33
E1020.03 Theater and Stage Equipment*
E1020.07 Laboratory Equipment*
E1090.03 Food Service Equipment*
E1090.07 Athletic, Recreational, and Therapeutic Equipment*
E2010.02.05 Educational Facility Casework*
E2010.02.07 Kitchen Casework*
E2010.02.08 Laboratory Casework*
E2010.02.09 Library Casework*
4 - Acceptable
5 - Good
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
N/A
5 - Good
Rating
Rating
Rating
Rating
Rating
Rating
Rating
Rating
0
0
0
0
0
0
0
0
Installed
Installed
Installed
Installed
Installed
Installed
Installed
Installed
0
0
0
0
0
0
0
0
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
DEC-04
DEC-04
DEC-04
DEC-04
DEC-04
DEC-04
DEC-04
DEC-04
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Calgary - Queen Elizabeth Junior / Senior High School (B2745A)
S6 EQUIPMENT, FURNISHINGS AND SPECIAL CONSTRUCTION
(1930 / 1952)
( 1968)
(1930 / 1946)
(1952 / 1963) Basketball backstops, climbing walls
(1930 / 1946 / 1952 / 1963 / 1968)
(1930 / 1946)
( 1952 / 1968)
(1968)
Report run on: January 30, 2006 1:27 PM Page 32 of 33
E2010.03.01 Blinds*
E2010.03.06 Curtains and Drapes*
E2010.05 Fixed Multiple Seating*
F1020.02.13 Paint Booths*
F2020.01 Asbestos*
3 - Marginal
4 - Acceptable
6 - Excellent
5 - Good
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
0
0
0
0
0
Installed
Installed
Installed
Installed
Installed
0
0
0
0
0
Design Life
Design Life
Design Life
Design Life
Design Life
DEC-04
DEC-04
DEC-04
DEC-04
DEC-04
Updated
Updated
Updated
Updated
Updated
Window blinds
Lifecycle Replacement 2011 $75,600 Low
Window blinds that were not effected by the 1997modernization are in need of lifecycle replacement
Concern:
Replace remaining window blindsRecommendation:
Calgary - Queen Elizabeth Junior / Senior High School (B2745A)
Event:
Type Year Cost Priority
Updated: March 4 2005
(1930 / 1946 / 1952)
(1930 / 1952) Stage drapery
(1952) Gymnasium bleachers
( 1952 / 1997)
Asbestos may be present n floor and ceiling tiles
Report run on: February 13, 2006 4:04 PM Page 2 of 7
S2745Building Id:
Queen Elizabeth Junior / SenBuilding Name:
CalgaryLocation:Address:
0.00Gross Area (sq. m): $0Replacement Cost:0Construction Year:
Evaluation Date:
Evaluation Company:
Evaluator Name:
Various upgrades to parking areas and paved surfaces required General Summary:
Structural Summary:
Envelope Summary:
Interior Summary:
Mechanical Summary:
Electrical Summary:
0%5 year Facility Condition Index (FCI):
Facility Details Evaluation Details
Total Maintenance Events Next 5 years: $16,200
Calgary - Queen Elizabeth Junior / Senior High School (S2745)
Condition Rating Performance1 - Critical Unsafe, high risk of injury or critical system failure.2 - Poor Does not meet requirements, has significant deficiencies. May have high operating/maintenance costs.
3 - Marginal Meets minimum requirements, has significant deficiencies. May have above average operating maintenance costs.4 - Acceptable Meets present requirements, minor deficiencies. Average operating/maintenance costs.
Rating Guide
5 - Good Meets all present requirements. No deficiencies.6 - Excellent As new/state of the art, meets present and foreseeable requirements.
Report run on: February 13, 2006 4:04 PM Page 3 of 7
G2010.02.01 Aggregate Roadway (Gravel)*
G2010.02.02 Flexible Pavement Roadway (Asphalt)*
G2010.05 Roadway Curbs and Gutters*
G2020.02.01 Aggregate Parking Lots (Gravel)*
G2020.02.02 Flexible Paving Parking Lots(Asphalt)*
G2020.06.02 Parking Bumpers*
G2020.06.03 Parking Lot Signs*
G2020.06.04 Pavement Markings*
G2030.02.02 Asphalt Pedestrain Pavement*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
Rating
Rating
Rating
Rating
0
0
0
0
0
0
0
0
0
Installed
Installed
Installed
Installed
Installed
Installed
Installed
Installed
Installed
0
0
0
0
0
0
0
0
0
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Calgary - Queen Elizabeth Junior / Senior High School (S2745)
S7 SITE
Report run on: February 13, 2006 4:04 PM Page 4 of 7
G2030.04 Rigid Pedestrian Pavement (Concrete)*
G2030.06 Exterior Steps and Ramps*
G2040.02 Fences and Gates*
G2040.03 Athletic and Recreational Surfaces*
G2040.06 Exterior Signs*
G2040.08 Flagpoles*
G2050.04 Lawns and Grasses*
4 - Acceptable
3 - Marginal
4 - Acceptable
4 - Acceptable
5 - Good
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
Rating
Rating
0
0
0
0
0
0
0
Installed
Installed
Installed
Installed
Installed
Installed
Installed
0
0
0
0
0
0
0
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Updated
Updated
Updated
Updated
Updated
Updated
Updated
North entrance - 1952 section
Maintenance 2005 $16,200 Medium
North entry sidewalk and stairs subjected to high traffic anddamage
Concern:
Replace north entry sidewalk and stairsRecommendation:
Calgary - Queen Elizabeth Junior / Senior High School (S2745)
Event:
Type Year Cost Priority
Updated: March 4 2005
(1952)
Report run on: February 13, 2006 4:04 PM Page 5 of 7
G2050.05 Trees, Plants and Ground Covers*
G3010.02 Site Domestic Water Distribution*
G3010.03 Site Fire Protection Water Distribution*
G3020.01 Sanitary Sewage Collection*
G3020.02 Septic Systems*
G3020.03 Sanitary Sewage Equipment*
G3030.01 Storm Water Collection*
G3030.02 Storm Water Equipment*
G3030.03 Storm Water Ponds and Reservoirs*
4 - Acceptable
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Rating
Rating
Rating
Rating
Rating
Rating
Rating
Rating
Rating
0
0
0
0
0
0
0
0
0
Installed
Installed
Installed
Installed
Installed
Installed
Installed
Installed
Installed
0
0
0
0
0
0
0
0
0
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Calgary - Queen Elizabeth Junior / Senior High School (S2745)
Report run on: February 13, 2006 4:04 PM Page 6 of 7
G3060.01 Gas Distribution*
G3060.04 Fuel Storage Tanks*
G3060.05 Fuel Dispensing Equipment*
G3090 Other Site Mechanical Utilities*
G4010.01 Electrical Substations*
G4010.02 Electrical Power Distribution Lines*
G4010.03 Electrical Power Distribution Equipment*
G4010.04 Car Plugs-ins*
G4020.01 Area Lighting*
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Rating
Rating
Rating
Rating
Rating
Rating
Rating
Rating
Rating
0
0
0
0
0
0
0
0
0
Installed
Installed
Installed
Installed
Installed
Installed
Installed
Installed
Installed
0
0
0
0
0
0
0
0
0
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Calgary - Queen Elizabeth Junior / Senior High School (S2745)
Report run on: February 13, 2006 4:04 PM Page 7 of 7
G9090 Other Site Systems*
N/ARating
0Installed
0Design Life Updated
Calgary - Queen Elizabeth Junior / Senior High School (S2745)
Report run on: January 30, 2006 1:27 PM Page 33 of 33
K40 Current Code Issues
K4010.01 Barrier Free Route: Parking to Entrance
K4010.02 Barrier Free Entrances
K4010.03 Barrier Free Interior Circulation
K4010.04 Barrier Free Washrooms
5 - Good
5 - Good
5 - Good
6 - Excellent
6 - Excellent
Rating
Rating
Rating
Rating
Rating
0
0
0
0
0
Installed
Installed
Installed
Installed
Installed
0
0
0
0
0
Design Life
Design Life
Design Life
Design Life
Design Life
DEC-04
DEC-04
DEC-04
DEC-04
DEC-04
Updated
Updated
Updated
Updated
Updated
Calgary - Queen Elizabeth Junior / Senior High School (B2745A)
S8 FUNCTIONAL ASSESSMENT