September 20, 2000 41I15SW2025 2.20558 PARKIN 010
RECEIVED
SEP 2
GEOSCIENCE ASSESSMENT OfFlCE
Victor Boulard Box 39Blezard Valley Ontario, POM 1EO
Client Number 110822 Claim Number S984902
Geoscience, Sudbury Office
To whom it may concern.
Dear Sir, Madame,We have recently performed work on Claim Number S984902.
Rock Formation: Greywacke.The work was performed on an outcrop with the strike being 280 True North
dipping at 200 in the northerly direction. The outcrop is 65 meters long and is 7 meters wide at the area of drilling. The East side slopes down at 600 and disappears under the overburden. The west side is a sharp drop off of l .5 meters and disappears under the overburden. The overburden in both cases appears light as it supports only small trees and blueberry patches. The neighbouring outcrops run in the same direction and are of different heights and lengths. The outcrop to the West runs parallel at 70 meters and appears to have the same kind of veins as the outcrop that we worked on.
We worked on four veins three being quartz and one being carbonated calcite, they dip at 570 towards the south and run in an arc manor from east to west. We drilled one hole 45mm x 600 mm deep and perpendicularly down per vein for a total of four holes. The veins are l to 1.5 meters apart and the holes were drilled south side of the veins in order to get samples of the veins at the greatest depth possible. The blasting exposed fine grain pyrite at 200 mm below the surface and I would judge it to be crack filling much like on claims 1197293 and 1197291. The crack filling is apparent on all four holes. Also noted were chalcopyrite and sulphur.
The best samples of the four holes were combined into one and submitted to the laboratory for analyses.
The bearing of the fist hole is N 460 52-199, W 800 52- 480.Sketch included.I hope that you find everything in order.
Yours truly
Victor Boulard
September 20, 2000
MCEIVBDSEP 21 ::::i
GEOSCIENCE ASSESSMENT OFFICE ____
I Liliane Boulard assisted Victor Boulard to perform work on cl;aim number S984902 for a period of two days August 30 and September 7, 2000. License number C37460.
2.2055
CERTIFICATE OF ANALYSIS
Ontario
GEOSCIENCE LABORATORIES
933 Ramsay Lake Road, Bldg A4
Sudbury. ON P3E 6B5 Phone: 705-670-5637
Fax: 705-670-3047
Issued To
Phone
Fax
Client No.
Method Code
Method Cod*
AAT-100
IAC-100
IAT-200
IM-100
: Mr. VBoulard Certificate Date
Consultant Certificate No.
Box 39 Project Number
Blezard Valley, ON POM 1EO Canada .. . . . .GL Job No.
- 705^97^455 Submission Date
: 705-897-9726 Delivery Via
QC Requested : 453
reported with this certificate : IAT-200
Description! Qty Status ^^|
AA : Flame 1 COMPLETE
Custom ICP-AES Analysis 1 COMPLETE
PGE Analysis 1 COMPLETE
ICPJrfS Total Digestion 1 COMPLETE
10/08/2000
8682
n/a
00-0332l
09/08/2000
i FAX
NO
ts^o s ^^sss to B^^^HHH ui sssSSS
55^^^^^
K3
lo ^^^^^so ^^^ssss
Legend:
- Analysis not requestedN.D. Not detectedN.M. Not measuredPlease refer to GL Job No. 00-0332 if you have any questions.
HZ
o to o
impbell, Laboratory Manager
Except by special permission, reproduction of these results must include any qualifing remarks made by this Ministry with reference to any sample.
Results are for samples as received.
GEOSCIENCE LABORATORIESCERTIFICATE OF ANALYSIS
CLIENT: Boulard GL JOB #: 00-0332 DATE : 10/06/2000 METHOD CODE: MS-IAT
CLIENT ID Au Pd PtUnits ppb ppb ppbDetection Limit 588
C9 18.65 20.01 21.35
Section A Page 1 of 1
CERTIFICATE OF ANALYSIS
Ontario
GEOSCIENCE LABORATORIES
933 Ramsay Lake Road. Bldg A4
Sudbury, ON P3E 685 Phone: 705-670-5637
Fax: 705-670-3047
Issued To
l
Phone
Fax
Client No.
Method Code
Method Cock
AAT-100
IAC-100
IAT-200
IM-100
: Mr. VBoulard
Consultant
Box 39
Blezard Valley, ON POM 1EO Canada
. 705-897-5455
: 705-897-9726
453
reported with this certificate : IM-10Q
; Description
AA : Flame
Custom ICP-AES Analysis
PGE Analysis
ICP MS Total Digestion
Certificate Date
Certificate No.
Project Number
GL Job No.
Submission Date
Delivery Via
QC Requested
Qty Status ^^H
1 COMPLETE
1 COMPLETE
1 COMPLETE
1 COMPLETE
10/06/2000
8681
n/a
00-0332
09/08/2000
FAX
NO
Legend:
- Analysis not requestedN.O. Not detectedN.M. Not measuredPlease refer to GL Job No. 00-0332 if you have any questions.
Date
Roft-Caifipbell, Laboratory Manager
Except by special permission, reproduction of these results must include any gualifing remarks made by this Ministry with reference lo any sample.
Results are for samples as received.
GEOSCIENCE LABORATORIES CERTIFICATE OF ANALYSIS
CLIENT: Boulard GL JOB # : 00-0332 DATE : 10/06/2000 METHOD CODE: IM100A
CLIENT IDUniteDetection Limit
Bappm
5
Crppm
1
Moppm
1
Sbppm
0.5
Snppm
0.1
Wppm0.05
Znppm
5
C9 728.15 138.62 N.D. 0.90 2.42 3.22 74.08
Section A Page 1 of 1
CERTIFICATE OF ANALYSIS
Ontario
GEOSCIENCE LABORATORIES
933 Ramsay Lake Road. Bldg M
Sudbury, ON P3E 6B5 Phone: 705-670-5637
Fax: 705-670-3047
Issued Toi i
j Phone
! Fax
Client No.i
Method Code
Method Code
AAT-100
IAC-100
IAT-200
IM-100
: Mr. VBoulard Certificate Date
Consultant Certificate No.
Box 39 Project Number
Blezard Valley, ON POM 1EO Canada -. . . ..GL Job No.
705-897-5455 Submission Date
705-897-9726 Delivery Via
QC Requested 453
reported with this certificate : AAT-100
Description Qty Status ^^|
AA : Flame 1 COMPLETE
Custom ICP-AES Analysis 1 COMPLETE
PGE Analysis 1 IN PROG
ICP^MS Total Digestion 1 IN PROG
09/25/2000
8415
n/a
00-0332
09/08/2000
FAX
NO
Legend:
- Analysis not requestedN.D. Not detectedN.M. Not measuredPlease refer to GL Job No. 00-0332 if you have any questions.
Date:
Laboratory Manager7
Except by special permission, reproduction of these results must include any qualifing remarks made by this Ministry with reference lo any sample.
Results are for samples as received.
GEOSCIENCE LABORATORIES CERTIFICATE OF ANALYSIS
CLIENT: Boulard \
GL JOB #: 00-0332 -
DATE: 09/25/2000METHOD CODE: AAT-100
CLIENT ID Ag Cu Ni PbUnits ppm ppm ppm ppmDetection Limit 1853
C9 1 35 60 N.D.
Section A Page 1 of 1
Ontario MnlstrycXNortwn D*v*topmantand Mines
Declaration of Assessment Work Performed on Mining Land
Mining Act, Subsection 65(2) and 66(3), R.3.0.1990
Transaction Number (office use)
LOOO rlO.Assessment Files Research Imaging
section 65(2) and 66(3) of the Mining Act. Under section 8 of the Mining Act, this mt work and correspond wtth the mining land holder. Questions about this collection ant and Mines, 3rd Floor. 933 Ramsey Late Road, Sudbury, Ontario, P3E 685.
mill iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiniiii41I15SW2025 2.20558 PARKIN 9QQ
instructions: - For WOTK performed on crown Lands oerore recording a claim, use form 0240.- Please type or print in ink. ^
9 o A c: K, g1. Recorded holders) (Attach a list if necessary) ^ o fc* v oj us *J
Na Client Number
i/AMEV PdSh teaTetaphoneNumberT?af)
FaxNurnber
Name CHem Number
Address Telephone Number
Fax Number
2. Type of work performed: Check (S) and report on only ONE of the following groups for this declaration.
Geotechnical: prospecting, surveys, assays and work under section 18
Physical: drilling stripping, trenching and associated assays
Rehabilitation
Total S Value ofWork Claimed K (r i
OMMWork FromPerformed Day
\/Month
ToDay Morth^^
NTS Reference
Global Positioning System Data (if available)
ito'To.n^Area
M or G-Plan Numbef
Mining Division
Resident Geologist /-,District
4f-Please remember to: - obtain a work permit from the Ministry of Natural Resources as required;
- provide proper notice to surface rights holders before starting work;- complete and attach a Statement of Costs, form 0212;- provide a map showing contiguous mining lands that are linked for assigning work;- include two copies of your technical report.
3. Pereon or companies who prepared the technical report (Attach a list if necessary)Name
Address FaxN
Name
ECEIVFDTelephone Number
Address
SEP 11 20*!FaxNurnber
Name Telephone Number
Address GEOSCIENCE ASSESSMENT OFFICE
Fax Number
4. Certification bx Recorded Holder or Agentl, l/fCTD h G ou Lfl-ftQ________, do hereby certify that l have personal knowledge of the facts set forth in
(Print N*nn)
this Declaration of Assessment Work having caused the work to be performed or witnessed the same during or after its completion and, to the best of my knowledge, theannexed report is true.
Signature of Recorded Holder or Agent
0241 (03/97)
•jff\
(esn 80-yo) JBOMTN uogaesuRii ^O/vV )U9UI8SOS8V JO
land whe-'e work was performed, at the time work was performed. A map showing the contiguous link must accompany this
JMJC. ffi/73Mining Claim Number. Or If work was don* on other eligible mining land, snow in (Ms
column Iht location number Indicated on the claim map.
9
0
g
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
TB 7827
1234567
1234568
S9X WO 2
Column Totals
Number of Clabn Unit*. For other mining land. M hectares.
18 hi
12
2
/6
Value of work performed on this claim or other mWn0 Imd.
120,825
0
\ 8,892
ti6/. fo
So&l.to
Value of work applied to this claim.
N/A
S24,000
S 4,000
w/. m
/0&/.W
Value of work assigned to other mining claims.
124.000
0
0
Bank. Value of work to be distributed at a future date
92.825
0
54.892
. do hereby certify that the above work credits are eligible under(Pnnt Full Mam*)
subsection 7 (J) of the Assessment Work Regulation 6/96 for assignment to contiguous daims or for application to the daimwhere the work was done.
/lSignature of in Writing Date
6. Instructions for cutting back credits that are not approved.
Some of the credits daimed in this declaration may be cut back. Please check K) in the boxes below to show how you wish to prioritize the deletion of credits:
D 1. Credits are to be cut back from the Bank first, followed by option 2 or 3 or 4 as indicated.D 2. Credits are to be cut back starting with the daims listed last, working backwards; orD 3. Credits are to be cut back equally over all daims listed in this dedaration; orD 4. Credits are to be cut back as prioritized on the attached appendix or as follows (describe):
2.20558'Note: If you have not indicated how your credits are to be deleted, credits will be cut back from the Bank first,
followed by option number 2 if necessary.
For Office Use Only___________________Received Stamp
3241(03*7)
Deemed Approved Date
Date Approved
Date Notification Sent
Total Value of Credit Approved
Approved for Recording by Mining Recorder (Signature)
OntarioMinistry ofNorthern Developmentand Mines
Statement of Costs for Assessment Credit
Transaction Number (office use)
Personal information collected on this form is obtained under the authority of subsection 6(1) of the Assessment Work Regulation 6/96. Under section 8 of the Mining Act, the information is a public record. This information will be used to review the assessment work and correspond with the mining land holder. Questions about this collection should be directed to the Chief Mining Recorder, Ministry of Northern Development and Mines, 6th Floor, 933 Ramsey Lake Road, Sudbury, Ontario, P3E 6B5. ^ - . ,^ p ' ^ v
"
Work TypeUnits of Work
Depending on the type of work, list the number of hours/days worked, metres of drilling, kilo metres of grid line, number of samples, etc.
Cost Per Unit of work
Total Cost
l/
Associated Costs (e.g. supplies, mobilization and demobilization).
Transportation Costs
3o c 1 3 9LVO
Food and Lodging Costs
t il Value of Assessment Work
SEP 2 1 2G03
GEOSCIENCE ASSESSMENT OFFICE iSTJtarrrtc
Calculations of Filing Discounts:
1. Work filed within two years of pe2. If work is filed after two years and up to five years after performance, it can only be claimed at 5QQfo of the Total
Value of Assessment Work. If this situation applies to your claims, use the calculation below:
lUmldMl/o la Ulan HOU m )007o of the above Total Value of Assessment Work.
TOTAL VALUE OF ASSESSMENT WORK x 0.50 Total 3 value of worked claimed.
Note:- Work older than 5 years is not eligible for credit.- A recorded holder may be required to verify expenditures claimed in this statement of costs within 45 days of a request for verification and/or correction/clarification. If verification and/or correction/clarification is not made, the Minister may reject all or part of the assessment work submitted.
Certification verifying costs:
,__________ __ , do hereby certify, that the amounts shown are as accurate as may(please print full name)
reasonably be determined and the costs were incurred while conducting assessment work on the lands indicated on
JL*6c6t4Sthe accompanying Declaration of Work form
to make this certification.
(recorded holder, agent, or state/Company position with signing authority)l am authorized
0212(02(96)
Signati Date
Ministry ofNorthern Developmentand Mines
January 9, 2001
VICTOR JEROME BOULARD 2862 VALLEY VIEW ROAD BOX 39BLEZARD VALLEY, Ontario POM-1 EO
Mlnistere du Developpemenf du Nord et des Mines Ontario
Geoscience Assessment Office 933 Ramsey Lake Road 6th Floor Sudbury, Ontario P3E 6B5
Telephone: (888) 415-9845 Fax: (877)670-1555
Dear Sir or Madam:
Subject: Transaction Number(s):
Submission Number: 2 .20558
StatusW0070.00173 Approval After Notice
We have reviewed your Assessment Work submission with the above noted Transaction Number(s). The attached summary page(s) indicate the results of the review. WE RECOMMEND YOU READ THIS SUMMARY FOR THE DETAILS PERTAINING TO YOUR ASSESSMENT WORK.
If the status for a transaction is a 45 Day Notice, the summary will outline the reasons for the notice, and any steps you can take to remedy deficiencies. The 90-day deemed approval provision, subsection 6(7) of the Assessment Work Regulation, will no longer be in effect for assessment work which has received a 45 Day Notice. Allowable changes to your credit distribution can be made by contacting the Geoscience Assessment Office within this 45 Day period, otherwise assessment credit will be cut back and distributed as outlined in Section #6 of the Declaration of Assessment work form.
Please note any revisions must be submitted in DUPLICATE to the Geoscience Assessment Office, by the response date on the summary.
If you have any questions regarding this correspondence, please contact JIM MCAULEY by e-mail at [email protected] or by telephone at (705) 670-5858.
Yours sincerely,
ORIGINAL SIGNED BYLucille JeromeActing Supervisor, Geoscience Assessment OfficeMining Lands Section
Correspondence ID: 15579
Copy for: Assessment Library
Work Report Assessment Results
Submission Number: 2 .20558
Date Correspondence Sent: J anuary 09, 2001 AssessorJIM MCAULEY
Transaction First ClaimNumber Number Township(s) l Area(s) Status Approval Date
W0070.00173 984902 PARKIN Approval After Notice January 01,2001
Section:10 Physical PTRNCH
The 45 days outlined in the Notice dated November 17, 2000 have passed and the new information that was provided has been reviewed.
Assessment work credit has been approved as outlined on the attached Distribution of Assessment Work Credit sheet.
The assessment credit is being reduced by 879. The TOTAL VALUE of assessment credit that will be allowed, based on the information provided in this submission, is S982.
At the discretion of the Ministry, the assessment work performed on the mining lands noted in this work report may be subject to inspection and/or investigation at any time.
Correspondence to: Recorded Holder(s) and/or Agent(s):
Resident Geologist VICTOR JEROME BOULARDSudbury, ON BLEZARD VALLEY, Ontario
Assessment Files Library Sudbury, ON
Page: 1
Correspondence ID: 15579
Distribution of Assessment Work Credit
The following credit distribution reflects the value of assessment work performed on the mining land(s).
Date: January 09, 2001
Submission Number: 2 .20558
Transaction Number: W0070.00173
Claim Number Value Of Work Performed
984902 982.00
Total: S 982.00
Page: l
Correspondence ID: 15579
fi' ___( V. . -^^^-t .Hifc V^"~" '' *"" -r^ . C vnac:
C ^*
^,.
' fe...
.^1246499
V^f 246441
r-- 'V V7^ ^-
Ministry ofNaturalResources
Ministry ofNorthern Developmentand Mines
Ontario-.. .-, I*M
INDEX TO LAND DISPOSITIONHI
, -/--.
10 p^-,'ji- -Vfci^-*.- ,
.v~/^^,^^r T." -'J " *,-~,~ ."?~""T-^^\* - "^, .- '
PLAN
G-2915
TOWNSHIP
l BE394G l
•- \-X prtin j "jf?———"* ^ 1J If f*. i ' . 1
^.;,i- v 't-- -?n t"-"'-j 1D42965 J 104M66
y983S4S T^tiV'. '~
r., l
~^~^9*4905
;V\ n. i'":'
PARKIN
M.N.R. ADMINISTRATIVE DISTRICT
SUDBURYMINING DIVISION
SUDBURYLAND TITLES/REGISTRY DIVISION
SUDBURY
lCi
lVV*1*. s3*f .KB-/
--' r l l "^l f i i' '—— f—— ^— ———J 1042364 | 1042963 "-.VifiHUH fSH-^-" 1"" ^M1"1* V' 'l l \ V i^ il " ~ ^ V l V1 -l -1*1*Y \J ^ f——1--t-^-r-".
-. ,"."
^^
t f^r- *
r **1 '" "'.'^tuiaijrlf font -
' j - . &K J ^
8fi43rl
\ - "' ^i **/* i" !^^,,n'' ,' I
J i W l l ' * ~/M4S20
KS a-' r——i r; , , '-f ' ' l \ ^ . ,^-^- . r , c.---—**---..^-----f---—A "vi " ^-} . ^* ' ( 0 .^Vff 1 '' '- ' ' #" kC^
l TO
-T^t?1 1; - Jt-fti Llj
''"^-r'W-"""T'1I74B4i (j 12T4S3 lf f 64846* J-64S326 '.'riSa
il - i- J j - ^\' ^-^ -^ ,:-.
'-Jl____ '
? J\7S? S
. p~;-x;^l ^' 'Y•...r^ , -^
^www'l- M*1M|X :*M36* ^ ( iiaSa iii^3j^iHf MTsMM* ' i'^"-SMSMlit l i ' T .j r ' t fc. ,i•••7^ - 'r^"Tt l ?M ! f -,; ,,jzrs
a-' U t
'" ^ ^L L i * •^•^rrr-f-?- -i- ' '\- f l:
a \ f-'/^ \-w l '682110 l\
FMM 01 , - H -TIM
"T 'ill
1'" tOU M
SYMBOLS
Township, Heridlfln, Basalir
Road allowance; surveyed... shoreline
Lot/Concession; surveyed . ...•• unsurveyed
Parcel; surveyed . ...,...-.--- •• unsiirveyec).,,.... -. -..
Rlghtof-way; roadrailway
utility Reservation ........... - -
Cliff, Pit, Pila
ContourInterpolated ..... .. - - - - ~ApproKiinate .. - -. - - - - - -LJepf Bseion
Control point (horizonlal)
Flooded land
Mtra head f rama -
P pfttine (above flround)
Railway; single trackdouble tract*........ -.
Road: highway, courtty. twnrwhip ACceaB trail, Bush -- -. - .. ..
Srtoieline (o-iginal)
Transmission line
Wooded area .,......., - - - - -
20-
A
DISPOSITION OF CROWN LANDSPatent
Surface i Mining Rig Surface Ricihts Only.
Mining fcignts Only
LeeaeSulfate fi, Mining Ria Surface Rights Orlj- [Wnhia Rig fits Only.
Licenc* of Occupation-
Order-in-CouiKil -
Cancelled- .--- -, -
Reservation - - ... -
Sand a G ravel-- .-- -
LAND USE PERMIT
oc
TOM E 17
. O ,Vv!-:*/ --j""Tl - S *"; /'•- --^m ^J ii : '/
'ui*S- ' __ci^. .'^L^ft^J:^ w Ji W.w- i j *" nW"E
AREAS WITHDRAWN FROM DISPOSTION
M.R.O. - MINING RIGHTS ONLY S R.O. - SURFACE RIGHTS ONLY M.*S, - MINING AND SURFACE RIGHTS
D*itfifitrOn Order Me.
^i) -te K/M BJ/*!
© SEC. 35 w.*-*
D*** Diipoiitton F ile
l I/O :i 4 1 1 19*11
M*S t*wac
THE INFOKMATIDN THAT APPEARS ON THIS MAP HAS BEEN COMPLED FROM VARIdUS 30URCE3, AND ACCURACY IS NOT GUARANTEED THOSE WISHING TO STAKE MINING CLAIMS SHOULD CONSULT WTH THE MINING RECORDER WH1STRY OF NORTHERH DEVELOPMENT AND MINES. FOR ADDITIONAL INFORMATION ON THE STATUS OF THE LANDS SHOWN HtHfcON.
tOT"' TCWMSlilP 4U JflV'ISit,';
IM Ml* MAHWEP THUl/////!!*!!!!
M IN UMAUMOIVIftlA TOWMAHIP
J* tend, tendon * kx Mr*-ir
41I15SW2025 2.20553 PARKIN 200
GEOSCtENCE ASSESSMENT OFFICE U
41I15SH2025 2.20558 PARKIN 210
/'
TREES At/DRRttS/t
41I15SW2025 2.20558 PARKIN 220
' #ppe#xs /rMO SAfMt TftEES,
TtfF OUT c fid P A5
&HT c /Step
AASc
4#C