1 Receivin g the Award When the Award Arrives Module 7
Transcript
Page 1: Receiving the Award

1

Receiving the Award

Receiving the AwardWhen the Award Arrives

Module 7

Page 2: Receiving the Award

2

Office of Sponsored Programs Contact Information

Director

Jeanne Wicks 472-1825 [email protected]

Associate Director

Suzan Lund 472-1930 [email protected]

Assistant Directors

Deb Arent 472-6327 [email protected]

Mike Behne 472-6323 [email protected]

Page 3: Receiving the Award

3

Office of Sponsored Programs Contact Information

Grants Coordinators

Nancy Becker 472-3601 [email protected]

Shelly Cutsor 472-2247 [email protected]

Julie Poykko-Post 472-6174 [email protected]

Contracts Coordinator

Andy Budell 472-3759 [email protected]

Page 4: Receiving the Award

4

Office of Sponsored Programs Contact Information312 N 14th StreetAlexander Bldg West Lincoln, NE 68588-0430Ph 402-472-3171Fax 402-472-9323http://research.unl.edu/sp1

Official Applicant/Recipient Entity:The Board of Regents of the University of Nebraska for the University of Nebraska-Lincolnuse same address as above

Page 5: Receiving the Award

5

Negotiation & Signature Authority Sponsored Programs has authority for negotiation and acceptance of grants, cooperative agreements and contracts.

Signature authority is delegated by the Board of Regents (http://bf.unl.edu/bfpolicy/SignatureAuthority.pdf)

Note: PIs, deans, chairs and others are not authorized to negotiate or sign agreements or any other sponsored programs document on behalf of the Board of Regents of the University of Nebraska.

Page 6: Receiving the Award

6

Funding Mechanisms

• Grants

• Cooperative Agreements

• Contracts

• Incoming Subawards – can come in any of these forms – sometimes come in as Purchase Order

Page 7: Receiving the Award

7

Financial assistance for a project that will benefit the public. There is no substantial involvement between the sponsor and the recipient during performance. Federal grants are governed by Office of Management and Budget (OMB) circulars and Code of Federal Regulations (CFR).

Grant

7

Page 8: Receiving the Award

8

Grants• Financial Assistance Award (CFDA)• Funding Opportunity Announcement (FOA),

Broad Agency Announcements (BAA), Program Announcement/Solicitation (PA)

• Made for stated purpose (proposal/award)• Made for stated period of time (project period)• Made to an organization in the name of a

Principal Investigator (PI)• No substantial programmatic involvement by

awarding agency

8

Page 9: Receiving the Award

9

Grants• Funding may be annual, multi-year or for entire

budget period• Minimum of limiting conditions (governed by

OMB Circulars A-21 and A-110)

9

Page 10: Receiving the Award

10

Financial assistance for a project that will benefit the public. Substantial involvement is expected between the government agency and the recipient during performance. Federal cooperative agreements are governed by OMB and CFR regulations.

Cooperative Agreement

Page 11: Receiving the Award

11

Cooperative Agreements• Financial Assistance Award (CFDA)• Funding Opportunity Announcement (FOA),

Broad Agency Announcements (BAA), Program Announcement/Solicitation (PA)

• Made for stated purpose usually developed in conjunction with the sponsor (scope of work)

• Made for stated period of time (project period)• Made to an organization in the name of a

Principal Investigator (PI)• Substantial programmatic involvement by

awarding agency

Page 12: Receiving the Award

12

Cooperative Agreements• Agencies have substantial freedom to structure

the terms and conditions (T&Cs)• Often differ from standard assistance regulations

and may even resemble acquisition regulations

Page 13: Receiving the Award

13

An agreement, enforceable by law, between two or more competent parties, to do or not do something not prohibited by law, for a legal consideration.

FAR 2.101 defines a contract as a mutually binding legal relationship that obligates the seller to furnish supplies or services and the buyer to pay for them.

Contract

Page 14: Receiving the Award

14

Contracts

• Request for Proposal (RFP) and Invitation for Bid (IFB)

• Handled as a procurement or acquisition• Terms are usually detailed and specific• Activities frequently dictated by sponsor (buyer)• Scope of work dictated by sponsor with less

latitude to modify it• Depending on contract type, may not be able to

modify line-item expenditures

Page 15: Receiving the Award

15

Contracts

• Funding may be incremental, tied to set deliverables or schedules

• final payment (e.g. 10%) may be held until “acceptance” of deliverables

• Federal process governed by Federal Acquisition Regulations (FAR)

Page 16: Receiving the Award

16

Contracts - Research & Development

• Purpose is to advance scientific and technical knowledge and apply that knowledge to the extent necessary to achieve agency and national goals.

• Focus is on the Statement of Work (SOW)

• Regulations found at FAR Part 35

Page 17: Receiving the Award

17

Contract TypesCost-Reimbursement (CRC)

• Pays allowable costs that are expensed and invoiced

• Contractor must have adequate accounting system to track applicable costs

Fixed Price (FPC)• Price-based, not cost-based• Price defined in contract (by unit or deliverable)• May be firm or adjustable

Purchase Orders

• Contract becomes effective upon written acceptance or actual performance

Page 18: Receiving the Award

18

Contracts – Cost Reimbursable vs. Fixed Price • Cost reimbursable contracts paid on regular billing

intervals or payment schedule – only costs incurred will be paid – excess balance returned to sponsor

• Fixed-price contracts pay a flat amount whether or not costs are covered – any excess balance is retained

• UNL requires a substantial up-front payment on industry contracts regardless of the type (usually 75-100%)

Page 19: Receiving the Award

19

Contracts – Fixed Price Issues

• UNL must fully recover costs in performing services and cannot generate profit or be in deficit

• Even if costs are found to be underestimated, UNL must still perform full SOW promised and loses money

• If costs are significantly overestimated, residual balances at project end may be subject to UBIT and affect UNL’s tax status

• UBIT is Unrelated Business Income Tax – UNL’s tax status is based on its non-profit related mission (education, research and community outreach)

Page 20: Receiving the Award

20

Contracts – Fixed Price Issues• Residual balances can also violate state or federal

regulations on non-profit status, or on cost-accounting standards

• Salaries for staff working on the project but not charged to the account in proportion to the effort expended may not comply with OMB Circular A-21 effort reporting requirements

• Must track all effort through PARs • Account may not pass an audit – costs could be

disallowed and required to be returned to the sponsor, possibly with penalty fees

Page 21: Receiving the Award

21

What is FAR?

• Federal Acquisitions Regulations (FAR)

• System of uniform policies and procedures governing the acquisition (purchasing) for all federal agencies

• Procedures manual for federal agencies to acquire goods and services, including research

Page 22: Receiving the Award

22

Location of the FAR

• The FAR is codified at Title 48 of the Code of Federal Regulations (CFR) and consists of 63 chapters.

• The components consist of:– Federal Acquisition Regulations (Chapter 1)

– Agency Specific Supplemental Regulations (Chapters 2-63)

Page 23: Receiving the Award

23

Path to the FAR

Code of Federal Regulations

US CodePublic Law

Federal Acquisition Regulations

Federal Agency Supplements

Page 24: Receiving the Award

24

Contracting under the FAR

• Begin by determining the nature of contract:– Type

• Cost-Reimbursement• Fixed-Price• Time & Material/Labor Hour• Indefinite Delivery/Indefinite Quantity• Basic Ordering

– Purpose• Construction• Research & Development• Supply• Service

Page 25: Receiving the Award

25

Export ControlsWhat are Export Controls?

• Restrictions on shipments outside of the US and/orand/or• Restrictions on the transfer of information and/or

technology (either outside or inside the US)– 'deemed' exports

Page 26: Receiving the Award

26

Export ControlsHow are Export Controls Regulated?

• Department of State (International Traffic in Arms Regulations [ITAR]) - Primarily Military and Space related items

• Department of Commerce (Export Administration Regulations [EAR]) - dual-use items

• Department of Treasury - imposes sanctions on foreign countries prohibiting exports

• Other government agencies (i.e. USDA - fungi, etc)

Page 27: Receiving the Award

27

Export Controls

Fundamental Research

• Basic and applied research in science and engineering, the results of which ordinarily are published and shared broadly within the scientific community

• Excluded from Export Control Regulations (Fundamental Research Exclusion)

 

Page 28: Receiving the Award

28

Export Controls

Fundamental Research

• Differs from proprietary research and industrial development, design, production, and product utilization, the results of which ordinarily are restricted for proprietary or national security reasons.

• The Fundamental Research Exclusion applies only to the dissemination of research data and information, not to the transmission of material goods. 

Page 29: Receiving the Award

29

Export Controls

• The Fundamental Research Exclusion is DESTROYED IF:

The university accepts any contract clause that

– Forbids the participation of foreign persons

– Gives the sponsor a right to approve publications resulting from the research; or

– Otherwise operates to restrict participation in research and/or access to and disclosure of research results.

 

Page 30: Receiving the Award

30

Export Controls

• “Side deals” between a PI and Sponsor to comply with such requirements, even though not stated in the research contract, may destroy the fundamental research exclusion.

• Civil and/or Criminal penalties for export control violations can result for both the PI and the University and may also violate university policies on openness in research.

• A separate Export Control NURAMP course is in preparation for the upcoming fall or spring session.

• UNL’s Export Control website: http://research.unl.edu/orr/exportcontrol.shtml

Page 31: Receiving the Award

31

Contracts & OMB Circulars• OMB A-21 (2 CFR 220) – Cost Principles

– Incorporated by FAR 31.3, allowable costs

• OMB A-110 (2 CFR 215) – Uniform Admin Requirements– Sets standards for grants & cooperative agreements

– Specific actions not applicable to contracts (i.e. expanded authorities)

– FAR replaces this circular in contracts

• OMB A-133 – Audit Requirements– incorporated by FAR 52.215-02, Alt.II

Page 32: Receiving the Award

32

Major Differences between Contracts & GrantsContracts• Often RFP solicitations• Need for specific

service/product• Schedule technical &

expenditure reports and/or other deliverables

• Payment often tied to deliverables

• Numerous special terms and conditions

• Close control on budget • Usually audited• Can be cancelled for default

Grants• Often standard

guidelines/proposal kits• Support for proposed work in

general programmatic areas - need to advance knowledge

• Requires technical progress reports

• Payments may be in advance, by schedule, or upon completion

• General terms and conditions• Flexible budget control• Some audited• Almost never cancelled

Page 33: Receiving the Award

33

Pre-award awarding processAward arrives in OSP and Pre-award Coordinator:

• Reviews award terms & conditions alongside original proposal documents– Verifies routing form fully signed

• Reviews award budget against proposed budget– Verifies any cost share commitments documented

• Verifies subaward documents complete – Letter of commitment– contact information– budget and justification– detailed work statement

Page 34: Receiving the Award

34

Pre-award awarding process• Verifies compliance requirements are met, as

necessary– IRB approvals obtained– IACUC approvals obtained– Biosafety approvals obtained– DOI process complete

• Submits to Post-award for creation of WBS and ongoing financial management

• NOTE: PARs from previous awards must be current before WBS is established.

Page 35: Receiving the Award

35

Useful Web sites

OMB CircularsOMB Circulars: http://www.omb.gov/circulars

CFRCFR: http://www.access.gpo.gov/nara/cfr/cfr-table-search.html

FARFAR: http://www.arnet.gov/far/ or http://farsite.hill.af.mil/vffara.htm

FDPFDP: http://www.thefdp.org

CFDACFDA: http://12.46.245.173/cfda/cfda.html

MIT Export ControlsMIT Export Controls: http://web.mit.edu/osp/www/Export_Controls/index.htm

Page 36: Receiving the Award

36


Recommended