Armageddon 11
Presented By: Josh Johnson, Lindsey Rapone, Hailey Nunn, John Chronopoulos
Recommendation for Installation of Air Conditioning on the Top Floor of the English Building● One of the oldest buildings
on campus
● Demand
● Heat affects learning
● Global warming(Cal Poly Quick Facts, 2015)1 of 13
(Flo
or P
lan
- Eng
lish
Bui
ldin
g)
Is Air Conditioning Important?
(Student Survey, 2015)
Survey Questions YES NO
Had a Class without A/C? 33 3
Hard to Concentrate? 33 3
Heat NOT a Temporary Issue? 27 9
Prefer Cool over Warm Room Temp? 35 1
TOTAL 128 16
2 of 13
Survey Results
(Student Survey, 2015)
IMPORTANCE OF A/C
Scale 1-10 Number of Students
1 0
2 0
3 1
4 0
5 3
6 6
7 5
8 11
9 4
10 6
3 of 13
The Effects of Heat on Learning
• Expends unnecessary energy
• Less resources for mental processes
• Less glucose for complex-decision making
4 of 13
(Wade, 2013 and Mooney, 2015)
Clinical Studies
● Finding Grammatical Errors
5 of 13
● Best Cell Phone Plan
(Source: Harder to Think Straight)(Source: Harder to Think Straight)
Will the Heat Continue?
• Since 2000, SLO has set 35 record heat days
• 2014 was the warmest year on record
• Expected temperature rise of 2.5 to 10 degrees
Fahrenheit
6 of 13
www.clkr.com
(Tarica, 2015 and NASA/GISS)
Type of Air Conditioning Unit
(ww
w.c
entra
lairs
toda
y.co
m, 2
015)
(Pictured above: Outdoor Unit)
• Large, forced-air central air conditioning unit
• Energy efficient • Low cost, easy
maintenance
7 of 13
(ww
w.w
ikip
edia
.com
)
(Pictured above: Indoor Unit)
Costs to Install and Maintain
(Dowdy, 2015 & Hunter, 2015)
Costs to Install and Maintain A/C
Installation Costs $75,000
Filter Costs $420
Yearly Energy Costs $6,500
How to Pay for Installation? Campus General Budget -Donation Requests
8 of 13
When to Install?• Plan to install A/C units during summer months when
enrollment is a fraction of other quarters
Cal Poly Enrollment - Fall 2014Undergrad Graduate Total
University Total 19,246 940 20,186
(www.calpolynews.edu/quickfacts, 2015)
9 of 13
Installation ScheduleInstalling A/C on the English Building - 2nd Floor
Activity Start Date End Date Duration
Phase 1 - "Gut" Old Rooms Mid June End of June 2 to 3 Weeks
Phase 2 - Begin Installation Beg. of July Mid July 2 Weeks
Phase 3 - Finish Installation
Mid July End July 2 Weeks
Phase 4 - Adjustments and Testing
Early August Mid August 2 to 3 Weeks
(Source: Dowdy, Charlie)
10 of 13
Where Will the Money Come From?
• There is money available in the general budget
• Possibility of finding donors
11 of 13
(Sourc
e: www.cl
ipartb
est.co
m)
Summary
• High demand from students
• Heat affects learning
• Temperatures are expected to rise
• Funding is there12 of 13
(Sou
rce:
ww
w.d
irkku
ytfo
unda
tion.
nl/)
Final RecommendationOur request is the Energy, Utilities, and Sustainability Department use the general campus budget and sponsored donations to fund the installation of air conditioning on the top floor of the English Building during the Summer Quarter 2016.
13 of 13